This is an HTML version of an attachment to the Freedom of Information request 'Staff levels and Budget'.


 
 
 
 

Aldridge 
School  
 
Financial Management 
Reports as at  
 
31st August 2016 
 
Period 12 
August 2016 
 
Twelve Months to  
31st August 2016 
 
 

Contents 
 
 
Page   
 

Financial Summary Income and Expenditure Actual, Budgeted and 
 
Forecast 
 

Statement of Variance Criteria 
 

Detailed Budget Monitoring 
 
10 
Variance Notes and Explanations 
 
12 
2015-16 Year End Forecast Detail 
 
 
15 
2015-16 Year End Forecast Summary 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


Financial Summary Income and Expenditure 
Actual, Budgeted and Forecast 
 
 
Income    P12 - August     
  
  
 Year to date     
 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 Actual  
 Budget  
 Variance     
 Actual  
 Budget   
 Variance       Forecast Budget    % Received    
 Income  
 Variance   
 Total Restricted Income  
 645,019  
 603,251  
 41,768  
 7,931,308  
 7,629,800  
 301,508  
 7,629,800  
 104  
 7,629,800  
 -    
 
 
 
  Total Unrestricted Income   
 1,401  
 631  
 770  
 40,780  
 54,559  
-13,779  
 54,559  
 75  
 54,559  
 -    
 
 
 
 Total Income  
 646,420  
 603,882  
 42,538       7,972,089  
 7,684,359    287,730     
 7,684,359  
 104     
 7,684,359  
 -    
   
 
 
 
 
 
 
 
 
 
 
 
 
 Expenditure    P12 - August     
  
  
 Year to date     
 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 Actual  
 Budget  
 Variance   
 Actual  
 Budget   
 Variance   
 Forecast Budget  
 % Spent  
 Expenditure    Variance   
 
 
 
 Staffing Total  
 499,027  
 509,894  
 10,867  
 6,061,023  
 6,378,087  
 317,064  
 6,378,087  
 95    -    
 6,061,023  
 317,064  
 
 
 Premises and Occupation Costs Total  
 300,145  
 16,792  
-283,353    
 745,829  
 577,861  
-167,968    
 577,861  
 129    -    
 775,715  
-197,854  
 Administration Total  
 464  
 12,241  
 11,777  
 508,374  
 561,261  
 52,887  
 561,261  
 91    -    
 508,374  
 52,887  
 
 
 Curriculum Capitation Total  
 45  
 -    
-45  
 135,821  
 154,000  
 18,179  
 154,000  
 88    -    
 135,821  
 18,179  
 
 
 SLT Capitation Total  
 4,858  
 5,236  
 378  
 185,755  
 202,900  
 17,145  
 202,900  
 92    -    
 185,755  
 17,145  
 
 
 Grand Total Expenditure  
 804,539  
 544,163  
-260,376       7,636,802  
 7,874,109    237,307     
 7,874,109  
 97    -    
 7,666,688  
 207,421  
   
 
 
 
 
 
 
 
 
 
 
 
 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
Carry Forward (£) 
  
 
 
 
 
 
 
 
 
 
 
 
 
Balance brought forward from 2014/15 
 645,705  
 
 
 
 
 
 
 
 
 
 
 
 
Surplus from 2015/16 
 17,671  
 
 
 
 
 
 
 
 
 
 
 
 
Total 
 663,376  
 
 
 
 
 
 
 
 
 
 
 
 
 
  

 
Statement of Variance Criteria 
 
Budgets with an overspend of 10% and over £250 or £1000 (which ever 
lower), are deemed to require specific explanation to Governors and SLT.   
 
This explanation will include a reason for the variance and action required 
to either avoided it happening again or to rectify the situation and 
reduce/remove the overspend where possible. 
 
 
 

Detailed Budget Monitoring Period 12 
 
 

Income  
 
 P12 - August     
 
  
 Year to date     
 
 Full Year  
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 % Received  
 
 
901 
GAG Income 
600,613 
603,251 
-2,638 
 
7,649,596 
7,599,914 
49,682 
 
7,599,914 
101 
945 
Developed Formula Capital 



47,213 
29,886 
17,327 
29,886 
158 
 
 
946 
Condition Improvement Fund (CIF) 
41,906 

41,906 
155,051 

155,051 

 
 
 
950 
Other Government Grants 
2,500 

2,500 
64,749 

64,749 

 
 
 
952 
LEARNING FORUM 



10,000 

10,000 

 
 
 
969 
Bursary 16-19 Fund 



 
1,200 

1,200 
 

 
972 
Additional Grant Mental 



 
3,500 

3,500 
 

 
  
Total Restricted Income 
645,019 
603,251 
41,768    
7,931,308 
7,629,800 
301,508 
  
7,629,800 
104 
960 
Lettings & Rental Income 
1,337 
631 
706 
28,195 
25,231 
2,964 
25,231 
112 
 
 
964 
Bank interest 
64 

64 
 
10,046 
7,000 
3,046 
 
7,000 
144 
965 
Other Employee Income 



2,552 
22,328 
-19,777 
22,328 
11 
 
 
966 
Other Miscellaneous Income 



-13 

-13 

 
 
 
  
 Total Unrestricted Income  
1,401 
631 
770    
40,780 
54,559 
-13,779 
  
54,559 
75 
   
 
 
 
 
 
 
 
 
 
 
 
Total Income 
646,420 
603,882 
42,538    
7,972,089 
7,684,359 
287,730 
  
7,684,359 
104 
 
 
 
 
 


 
  
Expenditure - Staffing  
 P12 - August     
  
  
 Year to date     
 Full Year  
 
 
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 %Spent  
 
 
001 
Teaching Staff 
402,681 
419,950 
17,269 
4,767,058 
4,997,262 
230,204 
4,997,262 
95 
 
 
002 
Associate Staff 
95,687 
89,944 
-5,743 
 
1,166,725 
1,200,625 
33,900 
 
1,200,625 
97 
003 
Supply Staff - Illness 
-17,010 

17,010 
 
38,602 
100,000 
61,398 
 
100,000 
39 
004 
Supply Staff - Maternity/Pat'nty 



33,100 
69,200 
36,100 
69,200 
48 
 
 
006 
Supply Staff - Other Authorised 
15,140 

-15,140 
31,775 

-31,775 

 
 
 
007 
Lunchcover 
2,034 

-2,034 
8,107 

-8,107 

 
 
 
010 
Employee Related Costs 
495 

-495 
4,381 
7,000 
2,619 
7,000 
63 
 
 
011 
Recruitment 



 
11,275 
4,000 
-7,275 
 
4,000 
282 
  
Staffing Total 
499,027 
509,894 
10,867    
6,061,023 
6,378,087 
317,064    
6,378,087 
95 
   
 
 
 
 
 
 
 
 
 
 
 Premises and Occupation Costs  
 P12 - August     
  
  
 Year to date     
 Full Year  
 
 
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 %Spent  
 
 
012 
Welfare and Hospitality 
1,366 

-1,366 
 
4,996 
10,000 
5,004 
 
10,000 
50 
013 
Simply Health 
865 
895 
30 
10,460 
10,740 
280 
10,740 
97 
 
 
015 
Capital Improvment Fund 
-4,507 

4,507 
22,152 
22,994 
842 
22,994 
96 
 
 
016 
Capital Mainenance Round 2 




2,000 
2,000 
2,000 

 
 
018 
Capital Maintenance Fund 2016 
206,380 

-206,380 
220,820 

-220,820 

 
 
 
019 
Devolved Formula Capital (Exp) 

2,390 
2,390 

29,886 
29,886 
29,886 

 
 
020 
Operational Maintenance 
20,924 
5,188 
-15,736 
 
58,295 
60,000 
1,705 
 
60,000 
97 
021 
Grounds Maintenance 
4,696 

-4,696 
14,877 
15,000 
123 
15,000 
99 
 
 
022 
Property Projects 
41,571 

-41,571 
48,215 

-48,215 

 
 
 
023 
Water and Sewerage 
1,369 
1,288 
-81 
10,550 
14,168 
3,618 
14,168 
74 
 
 
024 
Energy 
7,745 
2,934 
-4,811 
104,935 
144,120 
39,185 
144,120 
73 
 
 
025 
Other Occupation Costs 
3,617 
2,075 
-1,542 
39,425 
40,000 
575 
40,000 
99 
 
 
026 
Cleaning and Caretaking 
11,285 

-11,285 
 
136,134 
138,000 
1,866 
 
138,000 
99 
028 
Insurance 
2,420 

-2,420 
53,437 
54,452 
1,015 
54,452 
98 
 
 
029 
Rates 
2,415 
2,022 
-393 
21,533 
36,501 
14,968 
36,501 
59 
 
 
  
Premises and Occupation Costs Total 
300,145 
16,792 
-283,353    
745,829 
577,861 
-167,968    
577,861 
129 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 


 Administration  
 P12 - August     
  
 
  
 Year to date     
 
 Full Year  
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 %Spent  
 
 
030 
Admin Supplies 
2,933 

-2,933 
11,811 
19,854 
8,043 
19,854 
59 
 
 
031 
Communications 
1,542 
250 
-1,292 
18,676 
20,800 
2,124 
20,800 
90 
 
 
033 
ICT Consumables 



4,993 
5,000 

5,000 
100 
 
 
034 
ICT Curriculum Development 
-2 
419 
421 
37,838 
38,000 
162 
38,000 
100 
 
 
035 
ICT Network Support 
642 
7,407 
6,765 
106,435 
114,837 
8,402 
114,837 
93 
 
 
037 
BYOD 
-10,052 

10,052 
 
-3,035 
7,459 
10,494 
 
7,459 
-41 
040 
Professional services 
2,239 
1,404 
-835 
62,027 
48,458 
-13,569 
48,458 
128 
 
 
042 
Governance Expenses 



790 
8,300 
7,510 
8,300 
10 
 
 
048 
Admissions and Marketing 
2,799 
261 
-2,538 
15,247 
15,460 
213 
15,460 
99 
 
 
049 
Admission appeals 




3,825 
3,825 
3,825 

 
 
050 
Library 
89 

-89 
9,919 
10,000 
81 
10,000 
99 
 
 
055 
Resources 
75 

-75 
 
13,213 
15,438 
2,225 
 
15,438 
86 
060 
Furniture & Equipment 



2,929 
3,000 
71 
3,000 
98 
 
 
061 
Minibus Operating costs 
268 

-268 
3,513 
6,000 
2,487 
6,000 
59 
 
 
065 
Transport PE activities-external 



6,175 
5,000 
-1,175 
5,000 
124 
 
 
070 
Examinations Fees 
339 
2,500 
2,161 
144,496 
139,000 
-5,496 
139,000 
104 
 
 
085 
Free School Meals 
-1,269 

1,269 
66,804 
84,028 
17,224 
84,028 
80 
 
 
091 
Bursary 16-19 Distribution 
862 

-862 
 
6,544 
16,802 
10,258 
 
16,802 
39 
  
Administration Total 
464 
12,241 
11,777    
508,374 
561,261 
52,887    
561,261 
91 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 


 Curriculum Capitation  
 P12 - August     
  
 
  
 Year to date     
 
 Full Year  
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 %Spent  
 
 
100 
Faculty of English 



299 
1,500 
1,201 
1,500 
20 
 
 
101 
English Department 
-532 

532 
8,324 
10,500 
2,176 
10,500 
79 
 
 
102 
Media Studies 



-282 

282 

 
 
 
130 
Faculty of Mathematics 



1,404 
3,000 
1,596 
3,000 
47 
 
 
131 
Mathematics Department 
380 

-380 
9,649 
9,000 
-649 
9,000 
107 
 
 
140 
Maths Futures 



 

1,400 
1,400 
 
1,400 

160 
Faculty of Science 
250 

-250 
1,441 
1,500 
59 
1,500 
96 
 
 
161 
Science Department 
-121 

121 
15,806 
17,000 
1,194 
17,000 
93 
 
 
200 
Faculty of BusComm 



2,336 
3,000 
664 
3,000 
78 
 
 
201 
Business Studies 



622 
1,500 
878 
1,500 
41 
 
 
202 
ICT Department 
-2 


692 
1,500 
808 
1,500 
46 
 
 
203 
MFL Department 



 
3,032 
3,500 
468 
 
3,500 
87 
205 
Psychology/Sociology 


-5 
884 
1,000 
116 
1,000 
88 
 
 
206 
Health & Social 



672 
1,000 
328 
1,000 
67 
 
 
250 
Faculty of Humanities 



1,502 
1,500 
-2 
1,500 
100 
 
 
251 
Geography Department 



2,432 
3,250 
818 
3,250 
75 
 
 
252 
History Department 



2,960 
3,250 
290 
3,250 
91 
 
 
253 
RST Department 



 
2,215 
2,500 
285 
 
2,500 
89 
255 
Citizenship 



258 
250 
-8 
250 
103 
 
 
256 
LAW 



143 
250 
108 
250 
57 
 
 
300 
Faculty of Performance 



1,341 
1,500 
159 
1,500 
89 
 
 
301 
PE Department 



4,845 
5,000 
155 
5,000 
97 
 
 
302 
Music Department 



4,925 
5,000 
75 
5,000 
98 
 
 
303 
Walsall/Other Music Support 



 
43,231 
45,000 
1,769 
 
45,000 
96 
304 
Drama Department 
50 

-50 
832 
1,000 
168 
1,000 
83 
 
 
335 
PP Food Technology 



-310 

310 

 
 
 
350 
Faculty of Design 




1,500 
1,500 
1,500 

 
 
351 
D&T Department 



17,769 
18,000 
231 
18,000 
99 
 
 
352 
Art Department 
16 

-16 
5,519 
6,100 
581 
6,100 
90 
 
 
380 
EPQ 



 

1,000 
1,000 
 
1,000 

391 
Student Development Department 



2,830 
3,000 
170 
3,000 
94 
 
 
392 
Student Development Social Club 



-11 

11 

 
 
 
393 
Student Dev. Foundation Learning 



463 
500 
37 
500 
93 
 
 
  
Curriculum Capitation Total 
45 

-45    
135,821 
154,000 
18,179    
154,000 
88 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 


 SLT Capitation  
 P12 - August     
  
 
  
 Year to date     
 
 Full Year  
 
 Code  
 Description  
 Actual  
 Budget  
 Variance  
 Actual  
 Budget   
 Variance  
 Budget  
 %Spent  
 
 
400 
Revision and Boosters 



1,495 
4,000 
2,505 
4,000 
37 
 
 
401 
Improving T&L 
-235 

235 
3,480 
5,000 
1,520 
5,000 
70 
 
 
402 
Planners 



2,317 
3,000 
683 
3,000 
77 
 
 
410 
Primary Enterprise 



253 

-253 

 
 
 
411 
Curriculum Development GM 



439 
1,000 
561 
1,000 
44 
 
 
420 
Surveys 



 

2,000 
2,000 
 
2,000 

421 
CPD 
1,955 

-1,955 
9,808 
10,000 
193 
10,000 
98 
 
 
422 
NQT 
19 

-19 
3,618 
4,000 
382 
4,000 
90 
 
 
431 
Science and Engineering 



4,356 
4,500 
144 
4,500 
97 
 
 
433 
Summer School 



173 

-173 

 
 
 
440 
Alternative Provision 



24,163 
40,000 
15,837 
40,000 
60 
 
 
450 
Sixth Form Funding 
250 

-250 
 
3,861 
5,000 
1,139 
 
5,000 
77 
451 
Careers 



19,811 
18,000 
-1,811 
18,000 
110 
 
 
452 
UCAS 



-218 

218 

 
 
 
461 
Rewards and Consequences 
1,511 

-1,511 
7,999 
8,000 

8,000 
100 
 
 
470 
Aldridge Partnership 



213 
1,300 
1,087 
1,300 
16 
 
 
480 
Barr House 



157 
200 
43 
200 
78 
 
 
481 
Daniels House 



 
129 
200 
71 
 
200 
64 
482 
Linley House 



 
198 
200 

 
200 
99 
483 
Scott House 



186 
200 
14 
200 
93 
 
 
484 
Alder Centre 



67 

-67 

 
 
 
486 
PSHCE 



176 
300 
124 
300 
59 
 
 
488 
Pastoral/Attendance 



372 
1,000 
628 
1,000 
37 
 
 
492 
LAC 


-6 
 
26,153 

-26,153 
 

 
495 
SLT Residual 
829 

-829 
 
5,261 

-5,261 
 

 
496 
Pupil Premium Exp 
523 
5,236 
4,713 
71,290 
95,000 
23,710 
95,000 
75 
 
 
  
SLT Capitation Total 
4,858 
5,236 
378    
185,755 
202,900 
17,145    
202,900 
92 
   
 
 
 
 
 
 
 
 
 
 
 
Grand Total Expenditure 
804,539 
544,163 
-260,376    
7,636,802 
7,874,109 
237,307    
7,874,109 
97 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Budgeted Deficit 
  
-189,750 
 
 
 
 
 
 


 
 
 
 
 
 
Variance Notes and Explanation 
 
Code 

Description 
Variance Reason 
Action Required 
001 & 
Teaching and Associate Staff 
Both cost centres are showing significant 
Take new assumptions forward into 2016 -
002 
underspends, this is due to changes in 
2017 
staffing over the year reducing costs and a 
re-evaluation of Nation Insurance 
assumptions used for budgeting. 
 
006 
Supply Staff Other Authorised 
Spend of £31k against zero budget due to 
Re code to 003 
coding 
007 
Lunch Cover 
Spend of 8k agansit zero budget due to 
Re code to 002 
coding 
011 
Recruitment 
Overspend of £7,275 – the budgeted figure 
Use some underspend from elsewhere to 
was set low with the assumption that we 
cover the cost – 2016 – 17 budget to 
would use cheaper recruitment methods – 
reflect this actual spend 
we found that the planned savings resulted 
in a poor quality of applicant – if any 
applicant. 
 
015& 
Capital Improvement Fund 
Budget for summer roof works – awaiting 
Add income to cost centre when funds 
018 
income from EFA 
arrives 
 
10 

022 
Property Projects 
Zero budget but spend of £48k, this is due 
Replace with funds from sale of land 
to permission being given to spend against 
funds generated from sale of land 
040 
Professional Services 
Overspend of £13.5k – due cost of planning  Use some underspend from elsewhere to 
for sale of ears of land and MAT 
cover the cost 
finance/legal work  
065  
Transport PE activities 
Overspent by £1,175 – due to cost of sports  Use some underspend from elsewhere to 
day and travel to sporting activates 
cover the cost 
070 
Examination Fees 
Overspent by £5,496 – Exams have cost 
Use some underspend from elsewhere to 
more than budgeted 
cover the cost – 2016 – 17 budget to 
reflect this actual spend 
410 
Primary Enterprise 
Income has been given from donations – 
Further donations to be made 
budget has overspent by £253 
433 
Summer School 
Spend of £173 against zero budget 
Funds to come form Pupil Premium 
451  
Careers 
Overspend of £1,811 due to cost of 
Use some underspend from elsewhere to 
transport to careers event and subscription 
cover the cost – budget reflects this next 
to services 
year 
 
11 

484 
Alder Centre 
Spend of £67 against zero budget 
Funds to come from Admin 
492 
LAC (Looked After Children) 
Funds arrived from Walsall Council following  Funds assigned to income code but need 
bid by JRO 
to move to expenditure code at year end 
495 
SLT Residual 
Zero budget but spend of £5,261 – this is 
Cost to be recouped form underspend 
being used for agreed spend to cover cost of  elsewhere. 
new curriculum specification 
 
12 

2015-16 Year End Forecast Detail 
 
Expenditure - Staffing  
 
 Full Year  
 
 
  Forecast   
 
 Description  
 Forecast Budget  
 % Spent  
  Spend   
 Variance   
 
 
Teaching Staff 
4,997,262 
95 
4,767,058 
230,204 
 
 
Associate Staff 
1,200,625 
97 
1,166,725 
33,900 
 
 
Supply Staff - Illness 
100,000 
39 
38,602 
61,398 
 
 
Supply Staff - Maternity/Pat'nty 
69,200 
48 
33,100 
36,100 
 
 
Supply Staff - Other Authorised 

31,775 
-31,775 
 
 
 
Lunchcover 
 

 
 
8,107 
-8,107 
Employee Related Costs 
7,000 
63 
4,381 
2,619 
 
 
Recruitment 
4,000 
282 
11,275 
-7,275 
 
 
Staffing Total 
  
6,378,087 
95 
  
6,061,023 
317,064 
   
 
 
 
 
 
 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 
 Budget  
 %Spent  
 
  Spend   
 Variance  
Welfare and Hospitality 
10,000 
50 
4,996 
5,004 
 
 
Simply Health 
10,740 
97 
10,460 
280 
 
 
Capital Improvment Fund 
22,994 
96 
22,152 
842 
 
 
Capital Mainenance Round 2 
 
2,000 

 

2,000 
Capital Maintenance Fund 2016 
 

 
 
220,820 
-220,820 
Devolved Formula Capital (Exp) 
29,886 

29,886 

 
 
Operational Maintenance 
60,000 
97 
58,295 
1,705 
 
 
Grounds Maintenance 
15,000 
99 
14,877 
123 
 
 
Property Projects 

48,215 
-48,215 
 
 
 
Water and Sewerage 
 
14,168 
74 
 
10,550 
3,618 
Energy 
 
144,120 
73 
 
104,935 
39,185 
Other Occupation Costs 
40,000 
99 
39,425 
575 
 
 
Cleaning and Caretaking 
138,000 
99 
136,134 
1,866 
 
 
Insurance 
54,452 
98 
53,437 
1,015 
 
 
Rates 
36,501 
59 
21,533 
14,968 
 
 
Premises and Occupation Costs Total 
  
577,861 
129 
  
775,715 
-197,854 
   
 
 
 
 
 
 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 Budget  
 %Spent  
  Spend   
 Variance  
 
 
Admin Supplies 
 
19,854 
59 
 
11,811 
8,043 
Communications 
 
20,800 
90 
 
18,676 
2,124 
ICT Consumables 
5,000 
100 
4,993 

 
 
ICT Curriculum Development 
38,000 
100 
37,838 
162 
 
 
ICT Network Support 
114,837 
93 
106,435 
8,402 
 
 
BYOD 
7,459 
-41 
-3,035 
10,494 
 
 
Professional services 
 
48,458 
128 
 
62,027 
-13,569 
Governance Expenses 
 
8,300 
10 
 
790 
7,510 
Admissions and Marketing 
15,460 
99 
15,247 
213 
 
 
Admission appeals 
3,825 


3,825 
 
 
Library 
10,000 
99 
9,919 
81 
 
 
Resources 
15,438 
86 
13,213 
2,225 
 
 
Furniture & Equipment 
 
3,000 
98 
 
2,929 
71 
Minibus Operating costs 
 
6,000 
59 
 
3,513 
2,487 
Transport PE activities-external 
5,000 
124 
6,175 
-1,175 
 
 
Examinations Fees 
139,000 
104 
144,496 
-5,496 
 
 
Free School Meals 
84,028 
80 
66,804 
17,224 
 
 
Bursary 16-19 Distribution 
16,802 
39 
6,544 
10,258 
 
 
Administration Total 
  
561,261 
91 
  
508,374 
52,887 
   
 
 
 
 
 
 
13 

 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 
 Budget  
 %Spent  
 
  Spend   
 Variance  
Faculty of English 
1,500 
20 
299 
1,201 
 
 
English Department 
10,500 
79 
8,324 
2,176 
 
 
Media Studies 
 

 
 
-282 
282 
Faculty of Mathematics 
 
3,000 
47 
 
1,404 
1,596 
Mathematics Department 
9,000 
107 
9,649 
-649 
 
 
Maths Futures 
1,400 


1,400 
 
 
Faculty of Science 
1,500 
96 
1,441 
59 
 
 
Science Department 
17,000 
93 
15,806 
1,194 
 
 
Faculty of BusComm 
 
3,000 
78 
 
2,336 
664 
Business Studies 
 
1,500 
41 
 
622 
878 
ICT Department 
1,500 
46 
692 
808 
 
 
MFL Department 
3,500 
87 
3,032 
468 
 
 
Psychology/Sociology 
1,000 
88 
884 
116 
 
 
Health & Social 
1,000 
67 
672 
328 
 
 
Faculty of Humanities 
 
1,500 
100 
 
1,502 
-2 
Geography Department 
 
3,250 
75 
 
2,432 
818 
History Department 
3,250 
91 
2,960 
290 
 
 
RST Department 
2,500 
89 
2,215 
285 
 
 
Citizenship 
250 
103 
258 
-8 
 
 
LAW 
250 
57 
143 
108 
 
 
Faculty of Performance 
 
1,500 
89 
 
1,341 
159 
PE Department 
 
5,000 
97 
 
4,845 
155 
Music Department 
5,000 
98 
4,925 
75 
 
 
Walsall/Other Music Support 
45,000 
96 
43,231 
1,769 
 
 
Drama Department 
1,000 
83 
832 
168 
 
 
Faculty of Design 
1,500 


1,500 
 
 
D&T Department 
 
18,000 
99 
 
17,769 
231 
Art Department 
 
6,100 
90 
 
5,519 
581 
EPQ 
1,000 


1,000 
 
 
Student Development Department 
3,000 
94 
2,830 
170 
 
 
Student Development Social Club 

-11 
11 
 
 
 
Student Dev. Foundation Learning 
500 
93 
463 
37 
 
 
Curriculum Capitation Total 
  
154,000 
88 
  
135,821 
18,179 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
   
 
 
 
 
 
 
14 

 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 
 Budget  
 %Spent  
 
  Spend   
 Variance  
Revision and Boosters 
4,000 
37 
1,495 
2,505 
 
 
Improving T&L 
5,000 
70 
3,480 
1,520 
 
 
Planners 
 
3,000 
77 
 
2,317 
683 
Primary Enterprise 
 

 
 
253 
-253 
Curriculum Development GM 
1,000 
44 
439 
561 
 
 
Surveys 
2,000 


2,000 
 
 
CPD 
10,000 
98 
9,808 
193 
 
 
NQT 
4,000 
90 
3,618 
382 
 
 
Science and Engineering 
 
4,500 
97 
 
4,356 
144 
Summer School 
 

 
 
173 
-173 
Alternative Provision 
40,000 
60 
24,163 
15,837 
 
 
Sixth Form Funding 
5,000 
77 
3,861 
1,139 
 
 
Careers 
18,000 
110 
19,811 
-1,811 
 
 
UCAS 

-218 
218 
 
 
 
Rewards and Consequences 
 
8,000 
100 
 
7,999 

Aldridge Partnership 
 
1,300 
16 
 
213 
1,087 
Barr House 
200 
78 
157 
43 
 
 
Daniels House 
200 
64 
129 
71 
 
 
Linley House 
200 
99 
198 

 
 
Scott House 
200 
93 
186 
14 
 
 
Alder Centre 
 

 
 
67 
-67 
PSHCE 
 
300 
59 
 
176 
124 
Pastoral/Attendance 
1,000 
37 
372 
628 
 
 
LAC 

26,153 
-26,153 
 
 
 
SLT Residual 

5,261 
-5,261 
 
 
 
Pupil Premium Exp 
95,000 
75 
71,290 
23,710 
 
 
SLT Capitation Total 
  
202,900 
92 
  
185,755 
17,145 
   
 
 
 
 
 
Grand Total Expenditure 
  
7,874,109 
95 

7,666,688 
207,421 
   
 
 
 
 
 
Budgeted Surplus 
  
-189,750 
 
 
 
 
 
 
 
 
 
 
 
Forecast Surplus 
  
17,671 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Full Year  
  Forecast   
 
 
 
 
 
 Description  
 Budget  
 % Received  
  Spend   
 Variance  
 
 
GAG Income 
 
7,599,914 
101 
 
7,599,914 

Developed Formula Capital 
29,886 
158 
29,886 

 
 
Total Restricted Income 
  
7,629,800 
104 
  
7,629,800 

Lettings & Rental Income 
25,231 
112 
25,231 

 
 
Bank interest 
7,000 
144 
7,000 

 
 
Other Employee Income 
22,328 
11 
22,328 

 
 
 Total Unrestricted Income  
  
54,559 
75 
  
54,559 

   
 
 
 
 
 
Total Income 
  
7,684,359 
104 
  
7,684,359 

 
 
 
 
15 

 
 
2015-16 Forecast Summary 
 
 
Income  
  
 Full Year  
 
 
 
Forecast   
 
 Forecast 
 % 
 Description  
 Income    Variance   
 
Budget  
Received    
 Total Restricted Income  
 7,629,800  
 104  
 7,629,800  
 -    
 
 
  Total Unrestricted Income   
 54,559  
 75  
 54,559  
 -    
 
 
 Total Income     
 7,684,359  
 104     
 7,684,359  
 -    
   
 
 
 
 
 
 Expenditure  
  
 Full Year  
 
 
 
Forecast   
 
 Forecast 
 Description  
 % Spent  
 Income    Variance   
 
Budget  
 
 Staffing Total  
 6,378,087  
 95  
 6,061,023  
 317,064  
 
 
 Premises and Occupation Costs Total  
 577,861  
 129  
 775,715  
-197,854  
 
 Administration Total  
 561,261  
 91  
 508,374  
 52,887  
 
 
 Curriculum Capitation Total  
 154,000  
 88  
 135,821  
 18,179  
 
 
 SLT Capitation Total  
 202,900  
 92  
 185,755  
 17,145  
 
 
 Grand Total Expenditure     
 7,874,109  
 97     
 7,666,688  
 207,421  
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Budgeted Deficit 
  
-189,750  
     
 
 
 
 
 
 
 
 
Forecast Surplus 
  
 17,671  
 
 
 
 
 
 
 
16