Shapley Heath Funding Announcement

The request was successful.

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath Garden Village was made on 7th June 2021. This was somewhat less than the £406K requested in the Capacity Funding application.

https://www.hart.gov.uk/the-council/news...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that informed the Council of this award of funding?

Yours faithfully,

David Turver

FOI User, Hart District Council

Thank you for contacting FOI at Hart District Council. 

We aim to deal with all requests for information promptly and within 20
working days whenever possible. If we require more information or
clarification of your request, we will write to you.

 

 

FOI User, Hart District Council

Dear David

Your FOI has been logged and allocated to an officer.

 

Reference:  22/01995

 

Please quote the above in any future correspondence relating to this FOI
request.

Kind regards,

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 17 October 2022 16:30
To: FOI User <[Hart District Council request email]>
Subject: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath
Garden Village was made on 7th June 2021. This was somewhat less than the
£406K requested in the Capacity Funding application.

[4]https://eur02.safelinks.protection.outlo...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Yours faithfully,

David Turver

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[FOI #908274 email]

Is [Hart District Council request email] the wrong address for Freedom of Information requests
to Hart District Council? If so, please contact us using this form:

[5]https://eur02.safelinks.protection.outlo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[6]https://eur02.safelinks.protection.outlo...

For more detailed guidance on safely disclosing information, read the
latest advice from the ICO:

[7]https://eur02.safelinks.protection.outlo...

[8]https://eur02.safelinks.protection.outlo...

Please note that in some cases publication of requests and responses will
be delayed.

If you find this service useful as an FOI officer, please ask your web
manager to link to us from your organisation's FOI page.

-------------------------------------------------------------------

References

Visible links
1. http://www.hart.gov.uk/
2. https://twitter.com/HartCouncil
3. https://www.facebook.com/HartDistrictCou...
4. https://eur02.safelinks.protection.outlo...
5. https://eur02.safelinks.protection.outlo...
6. https://eur02.safelinks.protection.outlo...
7. https://eur02.safelinks.protection.outlo...
8. https://eur02.safelinks.protection.outlo...

FOI User, Hart District Council

Dear David
The officer on your case has asked for clarification. Which phase of
funding are you enquiring about?

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 09:07
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David

Your FOI has been logged and allocated to an officer.

 

Reference:  22/01995

 

Please quote the above in any future correspondence relating to this FOI
request.

Kind regards,

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[4]www.hart.gov.uk
Twitter: [5]@HartCouncil
Facebook: [6]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 17 October 2022 16:30
To: FOI User <[Hart District Council request email]>
Subject: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath
Garden Village was made on 7th June 2021. This was somewhat less than the
£406K requested in the Capacity Funding application.

[7]https://eur02.safelinks.protection.outlo...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Yours faithfully,

David Turver

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[FOI #908274 email]

Is [Hart District Council request email] the wrong address for Freedom of Information requests
to Hart District Council? If so, please contact us using this form:

[8]https://eur02.safelinks.protection.outlo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[9]https://eur02.safelinks.protection.outlo...

For more detailed guidance on safely disclosing information, read the
latest advice from the ICO:

[10]https://eur02.safelinks.protection.outlo...

[11]https://eur02.safelinks.protection.outlo...

Please note that in some cases publication of requests and responses will
be delayed.

If you find this service useful as an FOI officer, please ask your web
manager to link to us from your organisation's FOI page.

-------------------------------------------------------------------

References

Visible links
1. http://www.hart.gov.uk/
2. https://twitter.com/HartCouncil
3. https://www.facebook.com/HartDistrictCou...
4. http://www.hart.gov.uk/
5. https://twitter.com/HartCouncil
6. https://www.facebook.com/HartDistrictCou...
7. https://eur02.safelinks.protection.outlo...
8. https://eur02.safelinks.protection.outlo...
9. https://eur02.safelinks.protection.outlo...
10. https://eur02.safelinks.protection.outlo...
11. https://eur02.safelinks.protection.outlo...

Dear FOI User,

Hi Claire,

I am seeking information about the £130K of funding that was announced in June 2021. I understand that the Council was informed, under embargo, that it would receive the funding in February 2021. I further understand that this award was in response to the Capacity Funding request for additional funding of c. £400K submitted in late 2020.

I am seeking confirmation of the actual date of the communication and release of the actual communication, in full, that informed the Council it would receive that funding.

Yours sincerely,

David Turver

FOI User, Hart District Council

Dear David
Apologises, you were not given the information yesterday about when we
need this clarification by

Further to your freedom of Information request, reference 22/01995/FOI,
dated 18/10/2022

  

I have received a request from the allocated officer, in which we require
further information and/or clarification on your request “Please can you
clarify what you mean by Compliance officer” 

  

Your FOI request is now on hold. You have 3 months (until19/12/2022) to
respond to the clarification request. Once clarification is received a new
20 working day time limit will commence. If we do not hear from you the
FOI will be closed and you will have to request the information again. 

Apologises again

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 15:10
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David
The officer on your case has asked for clarification. Which phase of
funding are you enquiring about?

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[4]www.hart.gov.uk
Twitter: [5]@HartCouncil
Facebook: [6]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 09:07
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David

Your FOI has been logged and allocated to an officer.

 

Reference:  22/01995

 

Please quote the above in any future correspondence relating to this FOI
request.

Kind regards,

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[7]www.hart.gov.uk
Twitter: [8]@HartCouncil
Facebook: [9]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 17 October 2022 16:30
To: FOI User <[Hart District Council request email]>
Subject: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath
Garden Village was made on 7th June 2021. This was somewhat less than the
£406K requested in the Capacity Funding application.

[10]https://eur02.safelinks.protection.outlo...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Yours faithfully,

David Turver

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[FOI #908274 email]

Is [Hart District Council request email] the wrong address for Freedom of Information requests
to Hart District Council? If so, please contact us using this form:

[11]https://eur02.safelinks.protection.outlo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[12]https://eur02.safelinks.protection.outlo...

For more detailed guidance on safely disclosing information, read the
latest advice from the ICO:

[13]https://eur02.safelinks.protection.outlo...

[14]https://eur02.safelinks.protection.outlo...

Please note that in some cases publication of requests and responses will
be delayed.

If you find this service useful as an FOI officer, please ask your web
manager to link to us from your organisation's FOI page.

-------------------------------------------------------------------

References

Visible links
1. http://www.hart.gov.uk/
2. https://twitter.com/HartCouncil
3. https://www.facebook.com/HartDistrictCou...
4. http://www.hart.gov.uk/
5. https://twitter.com/HartCouncil
6. https://www.facebook.com/HartDistrictCou...
7. http://www.hart.gov.uk/
8. https://twitter.com/HartCouncil
9. https://www.facebook.com/HartDistrictCou...
10. https://eur02.safelinks.protection.outlo...
11. https://eur02.safelinks.protection.outlo...
12. https://eur02.safelinks.protection.outlo...
13. https://eur02.safelinks.protection.outlo...
14. https://eur02.safelinks.protection.outlo...

Dear FOI User,

Hi Claire,

I think there might be some mix up here. I have not mentioned "Compliance Officer" in any of my correspondence relating to this request, so I am not sure why you are asking me to clarify what I mean by it.

If you would like to telephone me to discuss, please let me know and I will send you an offline email with my number.

Yours sincerely,

David Turver

FOI User, Hart District Council

Good Afternoon Mr Turver
Apologises for the confusion, we are only asking for clarification of what
phase of funding you are asking about.

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 19 October 2022 10:11
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David
Apologises, you were not given the information yesterday about when we
need this clarification by

Further to your freedom of Information request, reference 22/01995/FOI,
dated 18/10/2022

  

I have received a request from the allocated officer, in which we require
further information and/or clarification on your request “Please can you
clarify what you mean by Compliance officer” 

  

Your FOI request is now on hold. You have 3 months (until19/12/2022) to
respond to the clarification request. Once clarification is received a new
20 working day time limit will commence. If we do not hear from you the
FOI will be closed and you will have to request the information again. 

Apologises again

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[4]www.hart.gov.uk
Twitter: [5]@HartCouncil
Facebook: [6]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 15:10
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David
The officer on your case has asked for clarification. Which phase of
funding are you enquiring about?

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[7]www.hart.gov.uk
Twitter: [8]@HartCouncil
Facebook: [9]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 09:07
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David

Your FOI has been logged and allocated to an officer.

 

Reference:  22/01995

 

Please quote the above in any future correspondence relating to this FOI
request.

Kind regards,

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[10]www.hart.gov.uk
Twitter: [11]@HartCouncil
Facebook: [12]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 17 October 2022 16:30
To: FOI User <[Hart District Council request email]>
Subject: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath
Garden Village was made on 7th June 2021. This was somewhat less than the
£406K requested in the Capacity Funding application.

[13]https://eur02.safelinks.protection.outlo...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Yours faithfully,

David Turver

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[FOI #908274 email]

Is [Hart District Council request email] the wrong address for Freedom of Information requests
to Hart District Council? If so, please contact us using this form:

[14]https://eur02.safelinks.protection.outlo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[15]https://eur02.safelinks.protection.outlo...

For more detailed guidance on safely disclosing information, read the
latest advice from the ICO:

[16]https://eur02.safelinks.protection.outlo...

[17]https://eur02.safelinks.protection.outlo...

Please note that in some cases publication of requests and responses will
be delayed.

If you find this service useful as an FOI officer, please ask your web
manager to link to us from your organisation's FOI page.

-------------------------------------------------------------------

References

Visible links
1. http://www.hart.gov.uk/
2. https://twitter.com/HartCouncil
3. https://www.facebook.com/HartDistrictCou...
4. http://www.hart.gov.uk/
5. https://twitter.com/HartCouncil
6. https://www.facebook.com/HartDistrictCou...
7. http://www.hart.gov.uk/
8. https://twitter.com/HartCouncil
9. https://www.facebook.com/HartDistrictCou...
10. http://www.hart.gov.uk/
11. https://twitter.com/HartCouncil
12. https://www.facebook.com/HartDistrictCou...
13. https://eur02.safelinks.protection.outlo...
14. https://eur02.safelinks.protection.outlo...
15. https://eur02.safelinks.protection.outlo...
16. https://eur02.safelinks.protection.outlo...
17. https://eur02.safelinks.protection.outlo...

Dear FOI User,

OK. I did reply about the phase of funding yesterday. Have you now got enough information to progress this FOI request?

Yours sincerely,

David Turver

FOI User, Hart District Council

Dear David
I will clarify with the officer exactly what they need or if the
information sent yesterday is actually sufficient

Kind regards,

Claire Lord

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 19 October 2022 14:53
To: FOI User <[Hart District Council request email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear FOI User,

OK. I did reply about the phase of funding yesterday. Have you now got
enough information to progress this FOI request?

Yours sincerely,

David Turver

show quoted sections

FOI User, Hart District Council

1 Attachment

Dear David,

Further to your Freedom of Information request reference: 22/01995/FOI

Re: “Shapley Heath Funding Announcement”

The Council does hold the requested information and our response is as
follows:

----------------------------------------------------------------------------------------------------------------------------------------------------------------

1. When was the Council made aware of this funding award?

4^th June 2021 - Please see attached document

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

We do not hold this information

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Please see attached document

----------------------------------------------------------------------------------------------------------------------------------------------------

If you are unhappy with the way your request for information has been
handled, you can request a review. Please write in the first instance to:

FOI Co-Ordinator

Hart District Council

Civic Offices

Fleet

GU51 4AE

[Hart District Council request email]

If you remain dissatisfied with the handling of your request or complaint,
you have a right to appeal to the Information Commissioner at:

Information Commissioner’s Office

Wycliffe House

Water Lane

Wilmslow

Cheshire

SK9 5AF

Telephone 0303 123 1113 or 01625 545 745 www.ico.gov.uk

There is no charge for making an appeal.

Kind regards,

Ellen

FOI Co-Ordinator

Hart District Council

Harlington Way
Fleet
GU51 4AE

[1]www.hart.gov.uk
Twitter: [2]@HartCouncil
Facebook: [3]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: FOI User <[Hart District Council request email]>
Sent: 18 October 2022 09:07
To: David Turver <[FOI #908274 email]>
Subject: Re: Freedom of Information request - Shapley Heath Funding
Announcement
 
Dear David

Your FOI has been logged and allocated to an officer.

 

Reference:  22/01995

 

Please quote the above in any future correspondence relating to this FOI
request.

Kind regards,

FOI Co-Ordinator
Hart District Council
Harlington Way
Fleet
GU51 4AE

[4]www.hart.gov.uk
Twitter: [5]@HartCouncil
Facebook: [6]/HartDistrictCouncil

══════════════════════════════════════════════════════════════════════════

From: David Turver <[FOI #908274 email]>
Sent: 17 October 2022 16:30
To: FOI User <[Hart District Council request email]>
Subject: Freedom of Information request - Shapley Heath Funding
Announcement
 
CAUTION: This email originated from outside of Hart District Council. Do
not click links or open attachments unless you recognise the sender and
know the content is safe.

'

Dear Hart District Council,

The announcement of £130K of additional funding for the Shapley Heath
Garden Village was made on 7th June 2021. This was somewhat less than the
£406K requested in the Capacity Funding application.

[7]https://eur02.safelinks.protection.outlo...

1. When was the Council made aware of this funding award?

2. What reasons were given for not awarding the full amount requested in
the Capacity Funding bid?

3. Can you please release the letter and/or any other communications that
informed the Council of this award of funding?

Yours faithfully,

David Turver

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[FOI #908274 email]

Is [Hart District Council request email] the wrong address for Freedom of Information requests
to Hart District Council? If so, please contact us using this form:

[8]https://eur02.safelinks.protection.outlo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[9]https://eur02.safelinks.protection.outlo...

For more detailed guidance on safely disclosing information, read the
latest advice from the ICO:

[10]https://eur02.safelinks.protection.outlo...

[11]https://eur02.safelinks.protection.outlo...

Please note that in some cases publication of requests and responses will
be delayed.

If you find this service useful as an FOI officer, please ask your web
manager to link to us from your organisation's FOI page.

-------------------------------------------------------------------

References

Visible links
1. http://www.hart.gov.uk/
2. https://twitter.com/HartCouncil
3. https://www.facebook.com/HartDistrictCou...
4. http://www.hart.gov.uk/
5. https://twitter.com/HartCouncil
6. https://www.facebook.com/HartDistrictCou...
7. https://eur02.safelinks.protection.outlo...
8. https://eur02.safelinks.protection.outlo...
9. https://eur02.safelinks.protection.outlo...
10. https://eur02.safelinks.protection.outlo...
11. https://eur02.safelinks.protection.outlo...