Environmental Information Regulations 2004 
  
Your request for information has been considered by Warwickshire County Council 
under the Environmental Information Regulations 2004. 
  
Please be advised that some of the information you requested is not held by 
Warwickshire County Council. Therefore regulation 12(4)(a) applies to your request. 
Regulation 12(4)(a) provides an exception to the duty to disclose information when 
information is not held.  
  
You asked us: 
  
Road works, Heath End Road, Nuneaton 
  
The following information is in respect of the Greenmoor Road junction scheme that we 
believe your request is in respect of. 
 
Please provide information on the following:  
 
1.) when are the permanent traffic lights going to be installed and functioning? 
  
The traffic signals infrastructure has been installed and we are scheduled to 
commission this on the 4th November 2024. 
  
2.) why is there a five minute delay on the lights changing? 
  
 

We have assumed that this is in reference to the temporary lights. This could be the 
setting for a whole cycle to be completed considering it is a three-arm junction. We have 
notified the Traffic Management contractor, Traffix, about this and I understand they 
have made adjustments for the lights to have a maximum green phase for each arm of 
the junction to keep the traffic flowing. The lights are monitored daily. 
  
3.) why has there been a stop on work being carried out? 
  
The main part of the works has been completed by our Contractor. We currently have a 
sub-contractor out on site undertaking various pieces of works such as electrical 
connections to supply lighting columns and another sub-contractor working on getting 
the permanent signals commissioned. Our main contractor is in and out of the site 
carrying out various pieces of work to rectify identified defects. We are schedule 
complete all these remaining pieces of work by 1st November 2024. 
 
4.) when are the paths including manhole covers going to be completed and 
made safe?
 
  
All these works are parts of the works being completed by our main contractor and they 
will be on site from 24th October 2024 with a view to completing these works by 1st 
November 2024. 
 
5.) why has work seemingly stopped on this project? 
  
Our contractor encountered some issues with the programming however as mentioned 
in point 2 and 3 above they will be on site from 24th October to complete remaining 
works. 
  
  
6.) are WCC monitoring the traffic flow and serious congestion since work 
began?
 
  
We would not normally monitor during roadworks as these are temporary impacts.  We 
however currently have monitoring devices out on site, collecting data as this is needed 
for updating traffic models. Unfortunately, there is never a perfect time to undertake 
surveys as there is always some level of disruption on the network. The key focus is 
monitoring of the permanent works as that gives us the indication of whether we are 
meeting our objectives set out from our transport assessments. 
 
7.) are WCC monitoring car exhaust emissions and pollution (due to traffic being 
at a standstill) compared to previous readings?
 
  
With regards to emissions monitoring, again these are temporary impacts and 
emissions monitoring would not normally take place in these circumstances. 
  
Please be advised that emissions monitoring is the responsibility of the borough council; 
Nuneaton and Bedworth Borough Council (NBBC) and not the county council WCC. 
Therefore you will need to contact NBBC for any emissions monitoring information held 
by them, for whom contact details are available via their website at: 
 

https://www.nuneatonandbedworth.gov.uk/info/21004/access_to_information/93/freedo
m_of_information_act
 
  
8.) how have the delays impacted ambulances who attend patients and who have 
to relay them to the GE hospital?
 
We make every effort where possible to ensure emergency vehicles are able to go 
through the lights with minimal delay if any. As with general traffic it is hoped that other 
motorists are considerate and move aside to allow emergency vehicles through. The 
traffic signal sub-contractor has an operative on site who is monitoring the traffic and is 
able to adjust the settings to help traffic flow through if a particular section is becoming 
congested. In the event of an emergency vehicle needing to get through, this would help 
the situation. 
  
  
If you are dissatisfied with the handling of your request, you have the right to ask for an 
internal review. Internal review requests should be submitted within 40 days of the date 
of receipt of the response to your original letter and should be addressed to: 
  
Information Management 
Shire Hall  
Warwick  
CV34 4RL 
xxxxxxxxxx@xxxxxxxxxxxx.xxx.xx  
  
If you are not content with the outcome of the internal review, you have the right to 
apply directly to the Information Commissioner for a decision. The Information 
Commissioner can be contacted at: 
  
The Information Commissioner's Office, Wycliffe House, Water Lane, Wilmslow, 
Cheshire, SK9 5AF. 
Phone: 0303 123 1113 
Website: https://ico.org.uk/make-a-complaint/ 
  
I will now close your request as of this date. 
  
  
Yours sincerely 
  
  
Jonathan Sheward 
Information Rights Officer