Road Safety Audit Stage 3 
Isherwood Road Junction Section 106 Works 

CO00201439 / RSA 3/2022/006 
29/09/2022 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 



 
Document Control Sheet 
Project Name: 
Isherwood Road Junction Section 106 Works 
Project Number: 
CO00201439 
Report Title: 
Road Safety Audit Stage 3 
Report Number: 
RSA 3/2022/006 
 
Issue 
Status/Amendment  Prepared 
Reviewed 
Approved 
First issue 
Name:  
Name:  
Name:  
… 
… 
… 
Signature:  
Signature:  
Signature:  
 
 
 
 
 
 
 
 
 
Date: 27/09/2022 
Date: 27/09/2022 
Date: 27/09/2022 
Name:  
Name:  
Name:  
 
 
 
Signature:  
Signature:  
Signature:  
 
 
 
 
 
 
 
Date:  
Date:  
Date:  
Name:  
Name:  
Name:  
 
 
 
Signature:  
Signature:  
Signature:  
 
 
 
 
 
 
 
Date:  
Date:  
Date:  
Name:  
Name:  
Name:  
 
 
 
Signature:  
Signature:  
Signature:  
 
 
 
 
 
 
 
Date:  
Date:  
Date:  
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
 

link to page 5 link to page 5 link to page 6 link to page 7 link to page 8 link to page 8 link to page 8 link to page 10 link to page 12 link to page 12 link to page 13 link to page 14 link to page 15 link to page 16 link to page 17 link to page 18 link to page 19 link to page 20 link to page 21 link to page 22 link to page 5 link to page 21 link to page 6 link to page 8 link to page 10 link to page 10 link to page 8 link to page 9 link to page 9 link to page 11 link to page 12 link to page 12 link to page 12
 
Contents 
1. Introduction ............................................................................................................................... 3 
1.1. Commission and Terms of Reference ............................................................................................. 3 
1.2. Scheme Description ...................................................................................................................... 4 
1.3. Audit Management ........................................................................................................................ 5 
2. Matters Raised at Previous Road Safety Audit Stage ................................................................ 6 
2.1. Previous Audits ............................................................................................................................. 6 
2.2. Problem 1 – (as numbered and written in the Stage 1/2) ................................................................ 6 
2.3. Problem 2 – (as numbered and written in the Stage 1/2) ................................................................ 8 
3. Items Identified at this Stage 3 Road Safety Audit ................................................................. 10 
3.1. Problem 1 .................................................................................................................................. 10 
3.2. Problem 2 .................................................................................................................................. 11 
3.3. Problem 3 .................................................................................................................................. 12 
3.4. Problem 4 .................................................................................................................................. 13 
3.5. Problem 5 .................................................................................................................................. 14 
3.6. Problem 6 .................................................................................................................................. 15 
3.7. Problem 7 .................................................................................................................................. 16 
3.8. Problem 8 .................................................................................................................................. 17 
4. Audit Team Statement ............................................................................................................. 18 
Appendix A. 
Scheme Documentation ...................................................................................... 19 
Appendix B. 
Problem Location Plan ......................................................................................... 20 
Tables 
Table 1: Audit Team Membership ......................................................................................................... 3 
Table 2: List of documents ................................................................................................................. 19 
Figures 
Figure 1.2-1:  Extent of Road Safety Audit Stage 3 ................................................................................ 4 
Figure 2.2-1 :Intervisibilty is reduced by setback junction ...................................................................... 6 
Figure 2.3-1:  Adverse deflection travelling southwest through the junctions ........................................... 8 
Figure 2.3-3: Adverse deflection travelling southwest through the junctions ............................................ 8 
  
Photos 
 
Photo 2.2-1: Ackers Lane junction would not be seen from northeast approach ...................................... 6 
Photo 2.2-2: Intervisibility between Isherwood Rd and Ackers Ln is obscured by hedge row .................... 7 
Photo 2.2-3: Intervisibilty from Ackers Lane to Isherwood Road is obscured by hedge row ...................... 7 
Photo 2.3-1: Hedgerow not cut back and bollard not installed ................................................................ 9 
Photo 3.1-1: Western most radius section of unfinished bell mouth ...................................................... 10 
Photo 3.1-2: Eastern most radius section of unfinished bell mouth ....................................................... 10 
Photo 3.1-3: Western radius of unfinished bell mouth is directly ahead - day ........................................ 10 

Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 


link to page 12 link to page 13 link to page 14 link to page 14 link to page 15 link to page 15 link to page 16 link to page 16 link to page 17 link to page 17 link to page 18 link to page 19
 
Photo 3.1-4: Western radius of unfinished bell mouth is directly ahead - night ...................................... 10 
Photo 3.2-1: Bell mouth has no delineation putting pedestrians at risk of being struck by vehicles ......... 11 
Photo 3.3-1: Western radius is in a state that presents a trip hazard .................................................... 12 
Photo 3.3-2: Eastern radius is in a state that presents a trip hazard ..................................................... 12 
Photo 3.4-1: Footway area with trip hazard at the rear edge – facing west ........................................... 13 
Photo 3.4-2: Footway area with trip hazard at the rear edge – facing east ............................................ 13 
Photo 3.5-1: Original white lining showing through - eastbound ........................................................... 14 
Photo 3.5-2: Original white lining showing through - westbound .......................................................... 14 
Photo 3.6-1: Intervisibility pre-scheme implementation 2020................................................................ 15 
Photo 3.6-2 : Intervisibility post-scheme implementation 2022 ............................................................. 15 
Photo 3.7-1: Loose tactile paving slab will become a slip, trip and fall hazard over a period of time ........ 16 
Photo 3.8-1: Speed limit gateway sign is obstructed in westbound direction .......................................... 17 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 



 
1. Introduction 
1.1. Commission and Terms of Reference 
1.1.1 This report results from a Stage 3 Road Safety Audit carried out on the Isherwood Road Junction Section 
106 Works scheme at the request of … on behalf of the Overseeing Organisation, Trafford Council. 
1.1.2 The Audit Team membership approved by … on 1/09/2022, who also issued / approved the brief, for this 
road safety audit was:  
Membership 
Name 
Details 
Audit Team Leader 
xxx 
IEng, FIHE, RegRSA(IHE) 
Audit Team Member 
xxx 
FIHE, BSc (Hons) Civil Engineering 
Table 1: Audit Team Membership 
1.1.3 Both members of the Audit Team hold a Road Safety Certificate of Competency meeting the requirements of 
the European Directive 2008/96/EC and GG119 Rev.2. 
1.1.4 It is confirmed that this is a Stage 3 Road Safety Audit and was undertaken in accordance with the 
requirements of GG119 Rev.2. The audit comprised an examination of the completed works together with 
the documents provided, and these are listed in Appendix A.  
1.1.5 A site visit was completed by the audit team during daylight hours on Tuesday 13/09/2022 between 2:00pm 
and 4:00pm. The weather was fine and the road surface was dry. Traffic conditions were free flowing. The 
site visit during the hours of darkness took place on the same day between 8:15pm and 9:15pm. The 
weather was fine and the road surface was dry. 
1.1.6 Invites were issued to Greater Manchester Police and to the maintaining agent for the overseeing 
organisation, Trafford Council. … representing the maintaining agent for Trafford Council attended, however, 
the Police were unavailable on this occasion. 
1.1.7 The terms of reference of the audit are described in GG119 Rev.2. The team has examined and reported 
only on the road safety implications of the scheme as presented in the provided documents (Appendix A) 
and has not examined or verified the compliance of the designs to any other criteria. 
1.1.8 All comments contained in the report with regard to Traffic Signs will be in accordance with the Traffic Signs 
Regulations and General Directions (TSRGD), 2016 or revisions thereof. Diagram numbers will be referred to 
if necessary. 
1.1.9 This is the Second known audit for the scheme. A previous Stage 1/2 Road Safety Audit was undertaken in 
July 2020 by Amey and any relevant matters will be reported in Section 2. 
1.1.10 The comments and suggestions for road safety improvements made in this report are aimed to address 
matters that might have an adverse effect on road safety in the context of the chosen design. To clearly 
explain a safety problem or a recommendation to resolve a problem, the Audit Team may, on occasion, refer 
to a Design Standard. In addition, the Audit Team may provide an illustrative sketch to clarify a 
recommendation particularly in the event of a complex recommendation. Such sketch illustrations do not 
represent any design solution. 
1.1.11 Any recommendations included within this report should not be regarded as being prescriptive design 
solutions to the problems raised. They are intended only to indicate a proportionate and viable means of 
eliminating or mitigating the identified problem, in accordance with GG 119 Rev.2, and in no way, imply that 
a formal design process has been undertaken. There may be alternative methods of addressing a problem 
which would be equally acceptable in achieving the desired elimination or mitigation and these should be 
considered when responding to this report. 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 


link to page 6

 
1.2. Scheme Description 
1.2.1 The scheme is a section 106 junction improvement on Manchester Road (which becomes Carrington Lane at 
the junction of Isherwood Road) as part of future development and includes:  
▪  An extension of the right turn lane to Isherwood Road 
▪  New junction access to proposed development 
▪  Widening of the carriageway on south side of Manchester Road 
▪  New bus lay-by 
▪  Relocation of gullies in line with new kerb/channels 
▪  Relocation of existing lighting columns 
▪  Associated signals work 
▪  Signing and lining amendments to suit the new carriageway layout  
1.2.2 Figure 1.2-1 indicates the extents of the scheme considered under this Stage 3 Road Safety Audit in 
accordance with the Audit Brief. 
Figure 1.2-1:  Extent of Road Safety Audit Stage 3 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 



 
1.3. Audit Management 
1.3.1 Upon issue of the Road Safety Audit report a Road Safety Audit Response Report in line with GG119 Rev.2 
(Section 4 and Appendix F) shall be produced by the design organisation in collaboration with the 
Overseeing Organisation. A copy of this response report should be issued to the Audit Team within one 
month after their Road Safety Audit report’s submission. 
1.3.2 In addition to the Road Safety Audit report, the Road Safety Audit team shall report to the Overseeing 
Organisation any other issues relating to maintenance defects and those that are not covered by the RSA 
brief. 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 





 
2. Matters Raised at Previous Road Safety Audit Stage 
2.1. Previous Audits 
2.1.1 The previous Stage 1/2 Road Safety Audit which was undertaken in July 2020 by Amey, identified 7 
problems. 
2.1.2 A designers response was provided. After inspecting the constructed works, it was deemed five of the 
problems were either addressed or deemed to be no longer an issue and two remain either partly or fully 
unaddressed and are reiterated as follows: 
2.2. Problem 1 – (as numbered and written in the Stage 1/2) 
Location:  Visibility of Ackers Lane junction from the signalled junction 
Summary: Intervisibilty of Ackers Lane junction from the signalled junction 
Details: The ahead / right turn lane on the northeast bound approach to the signalled junction is to be 
extended back across the junction of Ackers lane. This requires carriageway widening which has been taken 
from the south side of Manchester Road. This will set back the give way line of the Ackers Lane junction by 
a few metres. 
Ackers Lane junction would not be 
seen from northeast approach 
Boundary fence causing obstruction 
 
 
Figure 2.2-1 :Intervisibilty is reduced by setback junction 
Photo 2.2-1: Ackers Lane junction would not be seen from 
northeast approach 
 
Consequently, this will reduce the intervisibilty of the Ackers Lane junction to the approach from the 
signalled junction. The rear boundary fence of the properties would appear to be the main feature causing 
the obstruction (see Figure 2.2-1 and Photo 2.2-1). The remaining intervisibility is deemed inadequate for 
the existing speed limit. It is possible drivers travelling at speed through the signalled junction from the 
north east could approach Ackers Lane too fast, particularly towards the end of the green stage when 
drivers tend to accelerate to avoid stopping at the signals which could potentially result in a side impact type 
collisions.    
Recommendation: 
Adequate intervisibilty for the expected speeds should be provided by amending the design accordingly. 
Designers Response: 
The removal of the existing hedge as already included in the design will benefit the visibility from the 
signalised junction to Ackers Lane. Change in alignment not possible due to existing position of highway 
boundary between Ackers Lane and the signalised junction. 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 





 
Comment at this Stage 3 Road Safety Audit
Even though the designer’s response states the alignment cannot be improved due to the highway 
boundary, it could be seen during the site visit, that the existing hedge row due for removal had not been 
done and is still obscuring the intervisibility between the bell mouth of Acker Lane junction and vehicles 
approaching from the Isherwood Road signalled junction, as shown in Photos 2.2-2 and 2.2-3. 
 
 
Photo 2.2-2: Intervisibility between Isherwood Rd and Ackers 
Photo 2.2-3: Intervisibilty from Ackers Lane to Isherwood Road 
Ln is obscured by hedge row 
is obscured by hedge row 
Therefore, as per the site clearance drawing, the foliage should be cut back as far as possible to increase 
and achieve maximum intervisibility between the two junctions. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 





 
2.3. Problem 2 – (as numbered and written in the Stage 1/2) 
Location:  Southwest bound approach through the signalled junction and past Ackers Lane junction 
Summary: Adverse deflection between signalled junction and Ackers Lane 
Detail: The carriageway widening on the southeast side of the signalled junction will create a new 
alignment for the southwest bound approach from the signalled junction as it nears the junction with Ackers 
Lane. 
Adverse horizontal deflection 
Ackers Lane 
 
Figure 2.3-1:  Adverse deflection travelling southwest through the junctions 
Such severe deflection could potentially cause a vehicle travelling at speed to lose control or potentially 
encroach into the adjacent lane and have a head-on collision with a vehicle approaching in the opposing 
direction. 
Additionally it was observed, as existing there is no keep left bollard on the south west bound exit from the 
signalled junction which is where the new alignment & deflection begins as shown below. 
 
Figure 2.3-2: Adverse deflection travel ing southwest through the junctions 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 




 
Recommendation: 
The adverse change in alignment should be reduced if possible and highlighted to approaching drivers 
together with installing a keep left bollard to help channelise drivers accordingly. For example contrast could 
be added to the carriageway to help make its alignment more prominent. 
Designer’s comments: Comment accepted. Change in alignment not possible due to existing position of 
highway boundary between Ackers Lane and the signalised junction. Therefore, design change will be 
inclusion of new ‘keep left’ bollard on the pedestrian island as mentioned in the above recommendation. 
Furthermore, current elements within the design including the removal of the hedge and the dragons teeth 
markings will contribute to reducing the effect of the adverse alignment. 
Comment at this Stage 3 Road Safety Audit
Even though the designer’s response states the alignment cannot be improved due to the highway 
boundary, it could be seen during the site visit, that the existing hedge row had not been removed and is 
still obscuring the intervisibilty between the bell mouth of Acker Lane junction and vehicles approaching from 
the Isherwood Road signalled junction as shown below. Also, the proposed keep left bollard had not been 
installed (see Photo 2.3-1).  
Hedgerow not cut 
Keep left bollard not installed 
back 
 
Photo 2.3-1: Hedgerow not cut back and bollard not installed 
Therefore, the foliage should be cut back as far as possible to increase and achieve maximum intervisibility 
between the two junctions and the keep left bollard should be installed. 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 







 
3. Items Identified at this Stage 3 Road Safety Audit 
3.1. Problem 1 
Location: Western end of the scheme at the unfinished bell mouth into the proposed development. 
Summary: The western most radius of the new bell mouth is directly in the line of travel of westbound 
vehicles whereby drivers could collide head on into it and lose control. 
Detail: There is an unfinished bell mouth for the junction of a future development yet to be constructed. 
Sections of the radii corners for this junction are partly installed as shown in Photos 3.1-1 and 3.1-2. 
 
 
Photo 3.1-1: Western most radius section of unfinished bell 
Photo 3.1-2: Eastern most radius section of unfinished bell 
mouth 
mouth 
However, the kerb alignment on the southern side of Manchester Road places the western radius section 
directly in the line of travel of westbound drivers, whereby they could collide head on into it. This ‘head on’ 
alignment is shown in Photos 3.1-3 and 3.1-4 from the dashcam for both day and night. 
Drivers could drive directly into this kerb 
 
 
 
Photo 3.1-3: Western radius of unfinished bell mouth is directly 
Photo 3.1-4: Western radius of unfinished bell mouth is directly 
ahead - day 
ahead - night 
  
Recommendation: Guidance, such as an edge of carriageway marking to delineate the edge of the driven 
lane should be provided to align drivers accordingly. 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
10 



 
3.2. Problem 2 
Location: Western end of the scheme at the unfinished bell mouth into the proposed development. 
Summary: The bell mouth has no delineation to show the edge of carriageway, whereby vehicles might 
enter this area and collide with pedestrians crossing the newly formed junction. 
Detail: Further to the previous problem, the bell mouth leaves a rather wide-open area of live carriageway 
for pedestrians to cross with no delineation of the edge of carriageway for passing drivers, as shown in 
Photo 3.2-1.  
Bell mouth has no delineation for edge of carriageway 
 
Photo 3.2-1: Bell mouth has no delineation putting pedestrians at risk of being struck by vehicles 
It is possible drivers could drive into this area without realising and put pedestrians at risk of being struck. 
Recommendation: Guidance such as an edge of carriageway marking to delineate the edge of the main 
line should be provided to align drivers away from the bell mouth area.  
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
11 




 
3.3. Problem 3 
Location: Western end of the scheme at the unfinished bell mouth into the proposed development. 
Summary: The bell mouth edges are in a state that present a slip, trip and fall hazard for pedestrians. 
Detail: The installed radius sections of the bell mouth edges have been left in a state that present an 
unsafe transition from footway to carriageway as shown in Photos 3.3-1 and 3.3-2. 
Trip hazards 
 
 
Photo 3.3-1: Western radius is in a state that presents a trip 
Photo 3.3-2: Eastern radius is in a state that presents a trip 
hazard 
hazard 
 
It is possible that pedestrians could slip, trip and fall at these transition points particularly during the hours 
of darkness. 
Recommendation: The transition points of the footway to carriageway should be made safe for 
pedestrians to safely cross. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
12 




 
3.4. Problem 4 
Location: Western end of the scheme on south side of Manchester Road. 
Summary: An area of footway has an unfinished rear edge, presenting a slip, trip and fall hazard to 
pedestrians. 
Detail: Towards the western end of the scheme, west of the new bell mouth, there is an area of footway 
that is left in such a state that it presents a slip, trip and fall hazard as shown in Photos 3.4-1 and 3.4-2. 
Trip hazard 
 
 
Photo 3.4-1: Footway area with trip hazard at the rear edge – 
Photo 3.4-2: Footway area with trip hazard at the rear edge – 
facing west 
facing east 
 
It is possible that pedestrians could slip, trip and fall at this location. 
Recommendation: The area at the rear of the footway should be made safe. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
13 




 
3.5. Problem 5 
Location: A6144 Manchester Road – west arm of signalled junction with Isherwood Road / Carrington Lane. 
Summary: The original road markings are still showing on the west arm of the signalled junction which 
could mislead drivers into the wrong position and cause head-on and side-swipe type collisions. 
Detail: The west arm of the signalled junction has the original white lining still showing as shown in Photos 
3.5-1 and 3.5-2. 
Original markings are still visible 
Original markings are still visible 
 
 
Photo 3.5-1: Original white lining showing through - eastbound 
Photo 3.5-2: Original white lining showing through - 
westbound 

 
It is possible the original lining could mislead drivers and cause them to follow the previous alignment, 
potentially causing head-on and side-swipe type collisions. 
Recommendation: The original white lining should be properly removed. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
14 




 
 
3.6. Problem 6 
Location: East of Ackers Lane. 
Summary: Pedestrian intervisibility between approaching traffic from the signalled junction is obscured by 
foliage. 
Detail: It was observed that pedestrian / vehicle intervisibility, east of Ackers Lane, is obscured by foliage 
when stood at the corner of the junction, more than how it was prior to scheme implementation as shown in 
Photos 3.6-1 and 3.6-2. 
 
 
Photo 3.6-1: Intervisibility pre-scheme implementation 2020 
Photo 3.6-2 : Intervisibility post-scheme implementation 2022 
If left like this is, it could cause pedestrian / vehicular conflicts if a left turning vehicle into Ackers Lane 
emerges from the Isherwood Road junction at speed, as a pedestrian is just about to step into the 
carriageway. The speed limit sign is also partially obscured at this location. 
Recommendation: The foliage should be removed to improve intervisibility and to make the sign more 
visible. 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
15 



 
 
3.7. Problem 7 
Location: Western corner of Ackers Lane. 
Summary: Loose tactile paving slab could present a slip, trip and fall hazard. 
Detail: It was observed there was a tactile paving slab which was beginning to come loose which moved as 
it was walked upon. The slab is shown in Photo 3.7-1. 
Loose tactile paving slab 
 
Photo 3.7-1: Loose tactile paving slab will become a slip, trip and fall hazard over a period of time 
Even though it did not present a significant problem at the time of the site visit it is likely to deteriorate over 
a period of time and possibly become a slip, trip and fall hazard. 
Recommendation: The tactile paving slab should be rectified accordingly so it is no longer loose. 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
16 



 
 
3.8. Problem 8 
Location: A6144 Manchester Road - westbound exit from signalled junction with Isherwood Road / 
Carrington Lane. 
Summary: Westbound 30mph speed limit gateway sign is obstructed by foliage whereby drivers could drive 
at inappropriate speeds causing tail end type shunts. 
Detail: The speed limit gateway sign informing drivers of a drop in the speed limit from 40mph to 30mph 
on the western arm of the signalled junction is obscured by foliage in the westbound direction as shown in 
Photo 3.8-1. 
 
Photo 3.8-1: Speed limit gateway sign is obstructed in westbound direction 
Notwithstanding there is a speed limit roundel marking on the carriageway, it is possible drivers could miss 
this and continue to travel at inappropriate speeds, whereby a tail end shunt, side-swipe or loss of control 
type collision could occur. 
Recommendation: The foliage on the approach to this sign should be permanently removed. 
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
17 


 
4. Audit Team Statement 
4.1.1 We certify that this audit has been carried out in accordance with GG119 Rev.2. 
 
Road Safety Audit Team Leader 
… 
Signed:  
 
Date:    
 
Road Safety Audit Team Member 
… 
Signed:  
 
Date:    
 
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
18 


 
Appendix A.  Scheme Documentation 
The Road Safety Audit was conducted using the documents listed in the table below: 
Drawing Number 
Revision 
Details 
HW-201293-001-04 
C2 
Site Clearance and Earthworks 
HW-201293-001-05 
C1 
Drainage 
HW-201293-001-06 
C2 
Construction Plan and Details 
HW-201293-001-07 
C2 
Kerbing 
SL-201293-001-01 
C0 
Lighting Layout 
TR-201293-001-01__A 
C2 
Proposed Road Markings 
TR-201293-001-01__B 
C2 
Site Clearance Road Markings 
TR-201293-001-02 
C1 
Proposed Traffic Signs and Signs Site Clearance 
TR-201293-001-03 
C0 
Proposed traffic signs 
 
 
 
Documentation 
RSA 3 Brief 
Isherwood Road ESA 
IsherwoodRd_RSA12 with designers comments amended 
 
Table 2: List of documents
Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
19 




 
Appendix B.  Problem Location Plan 
 
Stage 3 RSA problems 

Previous Stage 1/2 RSA Problems 









Project Name: Isherwood Road Junction Section 106 Works 
Document Title: Road Safety Audit Stage 3 
20