Risk Assessment of Hanson Aggregates Kidlington Rail Depot

High Speed Two (HS2) Limited did not have the information requested.

Dear High Speed Two (HS2) Limited,

I understand that Hanson Aggregates Kidlington rail Depot at Oxford Parkway Park and Ride site provides crushed rock for HS2 construction. I would like to know whether Hanson Aggregates has carried out a formal risk assessment of operations related to this site. If such risk assessment has been carried out, I would like a copy of the risk assessment.

Yours faithfully,

Peter Barnett

FOI Request, High Speed Two (HS2) Limited

Dear Peter Barnett

 

Thank you for your email to HS2 Ltd. We are considering your request under
the Freedom of information Act 2000 and aim to reply as soon as possible
and no later than 14 March 2022.

 

Your reference number for the request is FOI 22-4546.

 

Regards

 

 

 

Briefings, Correspondence and Freedom of Information (BCFOI) advisor | HS2
Ltd      

Tel: 08081 434 434 (Freephone number)|[1][HS2 request email]|
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , Two Snow Hill, Snow Hill Queensway,
Birmingham, B4 6GA  | [5]www.gov.uk/hs2

 

 

References

Visible links
1. mailto:[HS2 request email]
2. http://www.facebook.com/HS2ltd
3. http://www.twitter.com/hs2ltd
4. http://www.linkedin.com/company/high-spe...
5. http://www.gov.uk/hs2

FOI Request, High Speed Two (HS2) Limited

1 Attachment

Dear Peter Barnett

 

Please see the attached correspondence.

 

Kind Regards

 

 

Briefings, Correspondence and Freedom of Information (BCFOI) advisor | HS2
Ltd      

Tel: 08081 434 434 (Freephone number)|[1][HS2 request email]|
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , Two Snow Hill, Snow Hill Queensway,
Birmingham, B4 6GA  | [5]www.gov.uk/hs2

 

 

References

Visible links
1. mailto:[HS2 request email]
2. http://www.facebook.com/HS2ltd
3. http://www.twitter.com/hs2ltd
4. http://www.linkedin.com/company/high-spe...
5. http://www.gov.uk/hs2