Rebalancing works in Wendover between EKFB and Align
Dear High Speed Two (HS2) Limited,
In the recent HS2/Align "Building the Colne Valley Viaduct and Chiltern Tunnel" webinar there was disclosure of a change in responsibility from EKFB to Align for Phase 1 MWCC works in the Wendover Area.
Please provide details of the works that will be transferred to Align in the Wendover Parish area, as covered by the EKFB Schedule 17(3) submissions for AVDC packages 03 (Small Dean) and 04 (Nash Lee). This should include the chainage numbers for the interface points between the contractors, the specific works involved, and the timing the transfer of responsibility.
Yours faithfully,
Murray Cooke
Dear Murray Cooke,
Thank you for your email to HS2 Ltd. We are considering your request for information and aim to reply as soon as possible and no later than 24 January 2024.
Your reference number for the request is FOI-23-5397.
Kind regards,
Briefings, Correspondence and FOI Adviser
High Speed Two (HS2) Limited
Tel: 08081 434 434 (Freephone number)|[HS2 request email]| Facebook | Twitter | LinkedIn
High Speed Two (HS2) Limited, Two Snow Hill, Snow Hill Queensway, Birmingham, B4 6GA | www.gov.uk/hs2
Dear Murray Cooke,
Please see attached correspondence with regards to your information
request (FOI-23-5397).
Kind regards,
Briefings, Correspondence and FOI Adviser
High Speed Two (HS2) Limited
Tel: 08081 434 434 (Freephone number)|[1][HS2 request email]|
[2]Facebook | [3]Twitter | [4]LinkedIn
High Speed Two (HS2) Limited, Two Snow Hill, Snow Hill Queensway,
Birmingham, B4 6GA | [5]www.gov.uk/hs2
References
Visible links
1. mailto:[HS2 request email]
2. http://www.facebook.com/HS2ltd
3. http://www.twitter.com/hs2ltd
4. http://www.linkedin.com/company/high-spe...
5. http://www.gov.uk/hs2
We work to defend the right to FOI for everyone
Help us protect your right to hold public authorities to account. Donate and support our work.
Donate Now