Rebalancing works in Wendover between EKFB and Align

High Speed Two (HS2) Limited did not have the information requested.

Dear High Speed Two (HS2) Limited,

In the recent HS2/Align "Building the Colne Valley Viaduct and Chiltern Tunnel" webinar there was disclosure of a change in responsibility from EKFB to Align for Phase 1 MWCC works in the Wendover Area.

Please provide details of the works that will be transferred to Align in the Wendover Parish area, as covered by the EKFB Schedule 17(3) submissions for AVDC packages 03 (Small Dean) and 04 (Nash Lee). This should include the chainage numbers for the interface points between the contractors, the specific works involved, and the timing the transfer of responsibility.

Yours faithfully,

Murray Cooke

FOI Request, High Speed Two (HS2) Limited

Dear Murray Cooke,

Thank you for your email to HS2 Ltd. We are considering your request for information and aim to reply as soon as possible and no later than 24 January 2024.

Your reference number for the request is FOI-23-5397.

Kind regards,

Briefings, Correspondence and FOI Adviser
High Speed Two (HS2) Limited
Tel: 08081 434 434 (Freephone number)|[HS2 request email]| Facebook | Twitter | LinkedIn
High Speed Two (HS2) Limited, Two Snow Hill, Snow Hill Queensway, Birmingham, B4 6GA | www.gov.uk/hs2

show quoted sections

HS2 FOI, High Speed Two (HS2) Limited

1 Attachment

Dear Murray Cooke,

Please see attached correspondence with regards to your information
request (FOI-23-5397).

Kind regards,

Briefings, Correspondence and FOI Adviser

High Speed Two (HS2) Limited

Tel: 08081 434 434 (Freephone number)|[1][HS2 request email]|
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited, Two Snow Hill, Snow Hill Queensway,
Birmingham, B4 6GA | [5]www.gov.uk/hs2

 

References

Visible links
1. mailto:[HS2 request email]
2. http://www.facebook.com/HS2ltd
3. http://www.twitter.com/hs2ltd
4. http://www.linkedin.com/company/high-spe...
5. http://www.gov.uk/hs2