Dear Transport for London,

This FoI request relates to the removal and subsequent re-installation of Pedestrian Guardrail (PGR) at the junction of A1 Archway Road and B550 Southwood Lane, near to Highgate Underground station and The Woodman public house.

1. Please provide a copy of the Guardrail Risk Assessment Form (GRAF) relating to the initial removal of this PGR

2. How much was spent on the initial removal of the 12 metre and 8 metre PGR sections at this junction?

3. How many representations to TfL were made from members of the public requesting this PGR be reinstated?

4. How many representations were made from local councillors, MPs and/or AMs requesting this PGR be reinstated; and who were those local politicians?

5. How much was spent on the re-installation of the 12 metre and 8 metre PGR sections at this junction?

Note that I have already been sent the Stage 1/2 Road Safety Audit (with Designers Response) Ref: 1438.96/031/A1/TLRN/2013 and do not require this again.

Yours faithfully,

J Patrick (Mr)

FOI, Transport for London

Dear Mr Patrick

 

Our ref:  FOI-0052-1415

 

Thank you for your email received on 8 April 2014 asking for information
about the removal and subsequent re-installation of Pedestrian Guardrail
(PGR) at the junction of A1 Archway Road and B550 Southwood Lane.

 

Your request will be processed in accordance with the requirements of the
Freedom of Information Act and our information access policy. 

 

A response will be provided to you by 9 May 2014.

 

In the meantime, if you would like to discuss this matter further, please
do not hesitate to contact me.

 

Yours sincerely

 

Graham Hurt

FOI Case Officer

 

FOI Case Management Team | Transport for London

Windsor House, 42-50 Victoria Street, London SW1H 0TL

[1][TfL request email]

 

 

 

show quoted sections

FOI, Transport for London

1 Attachment

Dear Mr Patrick

 

Our ref:  FOI-0052-1415

 

Thank you for your email received on 8 April 2014 asking for information
about the removal and subsequent re-installation of Pedestrian Guardrail
(PGR) at the junction of A1 Archway Road and B550 Southwood Lane.

 

Your request has been considered under the requirements of the Freedom of
Information Act 2000 and our information access policy. I can confirm that
we do hold the information you require.

 

1.    Please provide a copy of the Guardrail Risk Assessment Form (GRAF)
relating to the initial removal of this PGR

The PGR was removed based on the safety audit process. The road safety
audit has already been provided to you, and you have confirmed you do not
require this again.

 

2.    How much was spent on the initial removal of the 12 metre and 8
metre PGR sections at this junction?

The cost of removal was £136.92 – this also includes Highgate Woods gate
and associated PGR.

 

3.    How many representations to TfL were made from members of the public
requesting this PGR be reinstated?

Nine representations were made to TfL, of which some were group
representations.

 

4.    How many representations were made from local councillors, MPs
and/or AMs requesting this PGR be reinstated; and who were those local
politicians?

Three such representations were received; from Peter Forrest MP, Cllr
Rachel Allison and Caroline Pidgeon AM.

 

5.    How much was spent on the re-installation of the 12 metre and 8
metre PGR sections at this junction?

The cost for reinstallation was of £2434.43 – this also includes Highgate
Woods gate and associated PGR

 

If this is not the information you are looking for please do not hesitate
to contact me.

 

If you are not satisfied with this response please see the attached
information sheet for details of your right to appeal.

 

Yours sincerely

 

Graham Hurt

FOI Case Officer

 

FOI Case Management Team | Transport for London

Windsor House, 42-50 Victoria Street, London SW1H 0TL

[1][TfL request email]

 

 

 

From: J Patrick [[2]mailto:[FOI #206248 email]]
Sent: 08 April 2014 12:48
To: FOI
Subject: Freedom of Information request - Pedestrian Guardrail

 

Dear Transport for London,

 

This FoI request relates to the removal and subsequent re-installation of
Pedestrian Guardrail (PGR) at the junction of A1 Archway Road and B550
Southwood Lane, near to Highgate Underground station and The Woodman
public house.

 

1. Please provide a copy of the Guardrail Risk Assessment Form (GRAF)
relating to the initial removal of this PGR

 

2. How much was spent on the initial removal of the 12 metre and 8 metre
PGR sections at this junction?

 

3. How many representations to TfL were made from members of the public
requesting this PGR be reinstated?

 

4. How many representations were made from local councillors, MPs and/or
AMs requesting this PGR be reinstated; and who were those local
politicians?

 

5. How much was spent on the re-installation of the 12 metre and 8 metre
PGR sections at this junction?

 

Note that I have already been sent the Stage 1/2 Road Safety Audit (with
Designers Response) Ref: 1438.96/031/A1/TLRN/2013 and do not require this
again.

 

Yours faithfully,

 

J Patrick (Mr)

 

show quoted sections

 

References

Visible links
1. mailto:[TfL request email]
2. mailto:[FOI #206248 email]
3. http://www.tfl.gov.uk/corporate/about-tfl/

Looking for an EU Authority?

You can request documents directly from EU Institutions at our sister site AskTheEU.org . Find out more .

AskTheEU.org