Maintenance and repairs

Chris Allen made this Environmental Information Regulations request to Yorkshire Water Services Limited
You only have a right in law to access information about the environment from this authority
This request has been closed to new correspondence. Contact us if you think it should be reopened.

The request was partially successful.

Dear Yorkshire Water Services Limited,

Environment Information Regulations 2004

1. I am requesting information regarding maintenance and repairs to Yorkshire Water Assets in the S71 5LU (Lang Avenue) and the pumping station in the fields behind Lang Avenue. With reference to a response from Zoe Burns-Shore (Director of Customer Experience) to my complaint to CCWater ref: 200326-000032 the response includes a statement as follows:

"CCtv of sewer will take place but will need a period of at least 5 days of dry weather to be able to do this
Pump station looking at resilience measures"
Please advise:
(a) Has the CCtv inspection of sewers taken place and if not why?
(b) What was found as a result of the inspection?
(c) What plans do Yorkshire Water have to repair any issues found?
(d) What was the outcome of the inspection regarding resilience measures to the pumping station and issues found?
(e) What plans do Yorkshire Water have to improve the resilience of the pumping station - if any?

2. Please provide updated information (redacted if necessary)regarding meetings between Yorkshire Water, Barnsley Metropolitan Council and the Environment Agency regarding flooding in the Lang Avenue area including emails, letters, telephone calls and minutes of meetings.

Yours faithfully,

Chris Allen

EIR Compliance, Yorkshire Water Services Limited

Reference Number: EIR 263

 

 

Dear Chris Allen,

 

The Yorkshire Water Services Ltd Data Protection Team acknowledges your
request on 23 July 2020 for information regarding Yorkshire Water Assets
in S71 5LU (Lang Avenue).

 

We will respond to your request for information in compliance with the
Environmental Information Regulations 2004.

 

The Regulations allow us 20 working days to respond to a request from the
date of its receipt.  However, occasionally it is necessary to extend the
20-working-day time limit for issuing a response if the complexity and
volume of the information makes it impractical for us to respond within
the original deadline.  If this is the case we will notify you of this
delay.

 

You will be informed in advance if there is a charge for supplying copies
of the information. We will also provide you with an explanation if we are
unable to disclose and respond to your request.  If the requested
information contains references to any third parties, we may need to
consult with them before deciding whether to release the information.

Should you have any queries regarding your request, please feel free to
contact us quoting reference EIR 263.

 

Yours sincerely,

 

Rebecca Dovener

Data Protection Team

 

Email: [1][email address]

 

 

 

Yorkshire Water customers can get in touch for free via live chat or by
requesting a free call back at [2]https://www.yorkshirewater.com

Save money on your utility bills and help conserve water by requesting a
free water saving pack [3]https://www.yorkshirewater.com/savewater

The information in this e-mail, and any files transmitted with it, is
confidential and may also be legally privileged. The contents are intended
solely for the addressee only and are subject to the legal notice
available at http://www.keldagroup.com/email.htm. This email does not
constitute a binding offer, acceptance, amendment, waiver or other
agreement, or create any obligation whatsoever, unless such intention is
clearly stated in the body of the email. If you are not the intended
recipient, please return the message by replying to it and then delete the
message from your computer. Any disclosure, copying, distribution or
action taken in reliance on its contents is prohibited and may be
unlawful.

Yorkshire Water Services Limited
Registered Office Western House, Halifax Road, Bradford, BD6 2SZ
Registered in England and Wales No 2366682

References

Visible links
1. mailto:[Yorkshire Water request email]
2. https://www.yorkshirewater.com/
3. https://www.yorkshirewater.com/savewater

EIR Compliance, Yorkshire Water Services Limited

1 Attachment

Reference Number: EIR 263

 

Dear Chris Allen,

 

I refer to your request for information submitted to Yorkshire Water dated
23 July 2020.

 

Please find attached the data which you have requested.  Included with
this email are a response to your questions in red.

 

(a) Has the CCtv inspection of sewers taken place and if not why?

 

Numerous CCTV inspections have been carried out over the years following
the flooding that occurs to Lang Avenue, no direct faults have been found
just silt on occasion which you would expect to find as a result of
infiltration from flood waters. The most recent CCTV was attempted in
November 2019, this was abandoned due to the outfall being still
submerged. ER have since made access to the outfall which can now be
inspected.

 

(b) What was found as a result of the inspection?

 

Please see attached a spreadsheet ‘EIR 263.xlsx’ detailing the feedback
from the CCTV inspection's.

 

(c) What plans do Yorkshire Water have to repair any issues found?

 

If any faults are found these would be fixed in line with our policy and
procedures

 

(d) What was the outcome of the inspection regarding resilience measures
to the pumping station and issues found?

 

SPS - The flood resilience work has started and should be finished by the
end of August, this involves raising the pump control panel above the
recorded flood levels enabling the pumps to continue to pump in flood
conditions.

 

We also have operational work planned to resolve an issue on the rising
main air valve in the next few weeks. This has resulted in the valve
chamber surcharging during the operation of one of the pumps

 

(e) What plans do Yorkshire Water have to improve the resilience of the
pumping station - if any?

 

SPS - The flood resilience work has started and should be finished by the
end of August, this involves raising the pump control panel above the
recorded flood levels enabling the pumps to continue to pump in flood
conditions.

 

We also have operational work planned to resolve an issue on the rising
main air valve in the next few weeks. This has resulted in the valve
chamber surcharging during the operation of one of the pumps

 

2. Please provide  updated  information (redacted if necessary)regarding
meetings between Yorkshire Water, Barnsley Metropolitan Council and the
Environment Agency regarding flooding in the Lang Avenue area including
emails, letters, telephone calls and minutes of meetings.

 

Please note: within this section text reading (XXXX) are the names of
third party individuals that we have redacted.

 

Yorkshire Water and BMBC hold regular informal meetings to discuss issues
where collaboration is possible. As these meetings are informal there are
no formal minutes kept, although there are sometimes notes circulated
following the meetings to list key discussion points and outcomes.

 

We have listed the relevant sections of text from the meetings which took
place in 2020:

 

January meeting notes:

 

Recent flooding events across South Yorkshire and Barnsley

o SY S19
o Bid to central gov / joint city region and EA
o 5 assets in Barnsley affected 3 pumping & 2 Waste Water Treatment
Works
o Lang Avenue support
o Flood Risk & Engagement Team with YW (XXXX)
o Need to set out a timescale to resolve YW (XXXX)
o Share the report with YWS when available

 

April Meeting notes:

 

Update on works to be carried out to clear watercourse at Lundwood

Critical that we get the joint works commenced on site before Winter.

YW to provide Woodlands Trust contact for (XXXX)

YW to Establish lead in time to start works through Ecology Survey and
using Interserve

 

August meeting notes:

 

Lang Avenue / Burton grange update

Commissioned topo survey  to look at council land options

All gulleys are confirmed working by BMBC

Clearance of water course - bio survey to be tabled by YWS and to be
approved by BMBC

Damaged manhole - needs looking at YWS dates for this work are required -
completion before Autumn

Vegetation work done

EIR request for the area - raised questions about the pumping station work
- YWS to share copy

Milestone plan required from YWS for works

Doing bi-weekly updates with key stakeholders

Share regular comms with YWS Tim  Myatt

T&F group - MB to get YWS an invite to this as and when

 

Tim Myatt, who was involved in the most recent YW/BMBC meeting, has
offered to be a point of contact for any further questions or concerns you
may have. Tim is copied into this email and is happy for you to contact
him directly.

 

I trust that the provision of this data satisfies your request.  In
accordance with the Environmental Information Regulations 2004, if you are
not satisfied with this reply to your request you can ask for an internal
review.  A request for an internal review must be submitted within 40
working days by contacting the Data Protection Team.

 

Thank you for contacting Yorkshire Water.

 

Yours sincerely,

 

Rebecca Dovener

Data Protection Team

 

Email: [1][email address]

 

Yorkshire Water customers can get in touch for free via live chat or by
requesting a free call back at [2]https://www.yorkshirewater.com

Save money on your utility bills and help conserve water by requesting a
free water saving pack [3]https://www.yorkshirewater.com/savewater

The information in this e-mail, and any files transmitted with it, is
confidential and may also be legally privileged. The contents are intended
solely for the addressee only and are subject to the legal notice
available at http://www.keldagroup.com/email.htm. This email does not
constitute a binding offer, acceptance, amendment, waiver or other
agreement, or create any obligation whatsoever, unless such intention is
clearly stated in the body of the email. If you are not the intended
recipient, please return the message by replying to it and then delete the
message from your computer. Any disclosure, copying, distribution or
action taken in reliance on its contents is prohibited and may be
unlawful.

Yorkshire Water Services Limited
Registered Office Western House, Halifax Road, Bradford, BD6 2SZ
Registered in England and Wales No 2366682