Policy Context
LCR Transport Network
PCT and Walkability Toolkit
g
Travel to Work Patterns
m
atherin
Trip Generators & Attractors
Ipsun G
Liverpool City Region
emtio
Travel to School Data
Lor
Informa
Road Traffic Accident Data
Deprivation
Car Ownership
Air Quality
LCWIP Prioritisation
Effectiveness
Forecast Increase in walking and cycling trips:-
• Cycle trips can be taken from PCT using government
target intervention
• How do we forecast increase in walking?
Population who directly benefit from the intervention –
Buffer around intervention. Bike Life uses 125m, should we
adopt this?
Policy
Improves road safety
Serves a school or major employment area/site
Tourism link
Area of deprivation
Area of low car ownership
Improved transport connections
Economic
Cost of construction
Proximity to a major development site
Value for money (using AMAT)
Deliverability
Scheme feasibility
Effectiveness
Criteria
Score 0
Score 1
Score 2
Score 3
Forecast Increase in <100 pedestrians or
walking and cycling cyclists / day (one
100-200 pedestrians 200 - 500 pedestrians >500 pedestrian or
trips
way trips)
or cyclists
or cyclists
cycle trips
Population who
<1000 residents
directly benefit from within a 200m buffer
the intervention
(2001 census)
1000 - 2000 residents 2000 - 3000 residents >3000 residents
Policy
Criteria
Score 0
Score 1
Score 2
Score 3
Includes actions to
Significant actions to
improve road safety
improve road safety, such
Smaller scale
such as improved
as crossing points,
Improves road safety
improvements such as crossing points,
segregated routes AND
or makes DDA
improved lighting,
segregation etc or
where a an existing known
compliant
No improvement
signage
makes DDA compliant
road safety issue exists
Serves a school or
Would provide part of a Scheme covers majority Scheme feeds directly into
major employment
journey to school or
of journey to a school or school or major trip
area/site
No link
major trip attractor
major trip attractor
attractor
Scheme will provide a Scheme will provide a car-
Scheme will indirectly car-free alternative to free alternative to tourist
link to tourist
tourist destinations
destinations (REGIONAL
Tourism link
No improvement destinations
(LOCAL significance)
significance).
<25th percentile
Area of deprivation
IMD
25-75th percentile
75-90th percentile
90th - 100th percentile
Area of low car
<13% households
ownership
without car
13-20%
20-40%
>40%
Would provide part of a Scheme covers majority
Improved transport
journey to a transport of journey to a transport Links to key transport
connections
No improvement interchange
interchange
interchanges
Economic
Criteria
Score 0
Score 1
Score 2
Score 3
Cost of construction >£1m
£500k - £1m
£100k - £500k
<£100K
Route serves a large Committed S106 or
Proximity to a major No private sources of Possible future
proposed residential other source of
development site
funding likely
development
or employment site private funding
Value for money
(using AMAT)
Very poor
Poor / low
Medium
High
Deliverability
Criteria
Score 0
Score 1
Score 2
Score 3
Dependent on
another scheme/ land Dependent scheme
Land ownership or
ownership which is or landship
No issues, scheme
other issue unlikely to likely to delay the
ownership issue likely feasible to be
Scheme feasibility
be overcome
scheme
to be overcome
undertaken