Infrastructure and Projects Authority Review Document

High Speed Two (HS2) Limited did not have the information requested.

Dear High Speed Two (HS2) Limited,

Please send me a copy of Jun 2019 IPA Review document as described in the NAO HS2 Report Jan 2020 High Speed Two: Page 28, figure 6 , 2019 Jun

https://www.nao.org.uk/report/high-speed...

"The Infrastructure and Projects Authority undertakes a review and concludes that successful delivery is unachievable"

Yours faithfully,

Mike Haville

FOI Request, High Speed Two (HS2) Limited

Dear Mike Haville, 

Thank you for your email to HS2 Ltd. 

We are considering your request under the Environmental Information
Regulations 2004 and aim to reply as soon as possible and no later than
17/05/2022. 

Your reference number for the request is  FOI-22-4622.

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

show quoted sections

FOI Request, High Speed Two (HS2) Limited

1 Attachment

Dear Mike Haville, 

Thank you for your email to HS2 Ltd. 

Please find attached our response.

Your reference number for the request is  FOI-22-4622.

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

show quoted sections