Information about Almacantar's bid to redevelop Centre Point apartments

The request was successful.

Dear Camden Borough Council,

Please provide:

1. Correspondence between Camden council and Almacantar property investment and development company regarding the latter’s bid to redevelop the Centre Point apartments.

2. Internal communications within Camden council (including but not limited to emails, memos, letters, minutes and agenda) relating to the bid from Almacantar.

3. The details of Almacantar’s proposed redevelopment of the Centre Point apartments.

If the decision is made to withhold some of this data using exemptions in the Data Protection Act, please inform me of that fact and cite the exemptions used.
If some parts of this request are easier to answer than others, I would ask that you release the
If you need any clarification then please do not hesitate to contact me. Under Section 16 it is your duty to provide advice and assistance and so I would expect you to contact me if you find this request unmanageable in any way.
I would be grateful if you could confirm in writing that you have received this request, and I look forward to hearing from you within the 20-working day statutory time period.

Kind regards,

Matthew Lambert

Peck, Amanda, Camden Borough Council

Matthew,

Your freedom of information request has been received and I am the officer looking into this.

Can I confirm what you mean by your reference to a 'bid' in points 1 and 2? I am presuming that you are referring to Almacanter's planning application at the Centre Point site?

With regard to point 3 I can confirm that the applications were refused at our DC committee meeting on 20th September and further information can be found on our website at the following link (committee report and presentation) http://democracy.camden.gov.uk/ieListDoc...
All of the application documents and plans submitted can be found on our website at the following link using planning application reference 2012/2895/P and listed building consent reference 2012/2897/L: http://planningrecords.camden.gov.uk/Nor...

Regards

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

This e-mail may contain information which is confidential, legally privileged and/or copyright protected. This e- mail is intended for the addressee only. If you receive this in error, please contact the sender and delete the material from your computer.

Dear Peck, Amanda,

I can confirm that, in reference to a 'bid' in points 1 and 2, I am referring to Almacanter's planning application at the Centre Point site.

Yours sincerely,

Matthew Lambert

Peck, Amanda, Camden Borough Council

5 Attachments

Mr Lambert,

 

I attach a number of emails, letters, meeting notes etc in response to
your first two questions (please note that there are many, many
attachments and I will have to send these in many emails due to the size
of each document).

 

Please note that the financial viability information has not been
disclosed because this information is exempt under Section 43: Trade
Secret and Commercial Interests. This exemption applies because the
disclosure under the Act would be likely to prejudice the commercial
interests of Almacantar and the information is commercially sensitive for
Almacantar.  The public interest argument for releasing this information
is to encourage transparency in the Council’s decision making processes. 
The public interest arguments for withholding the information is that the
applicant’s position in a competitive environment would be weakened by
revealing market-sensitive information or information of potential
usefulness to its competitors.  It is considered that the public interest
in withholding the information outweighs the public interest in disclosing
it.

 

As stated in my email of 14 November, with regard to point 3 I can confirm
that the applications were refused at our DC committee meeting on 20th
September and further information can be found on our website at the
following link (committee report and presentation):
[1]http://democracy.camden.gov.uk/ieListDoc...
All of the application documents and plans submitted can be found on our
website at the following link using planning application reference
2012/2895/P and listed building consent reference 2012/2897/L:
[2]http://planningrecords.camden.gov.uk/Nor...

 

Regards

 

Amanda Peck
Principal Planning Officer
Planning and Public Protection
Culture and Environment
London Borough of Camden

Telephone:   020 7974 5885
Web:             [3]camden.gov.uk

Town Hall Extension (Environment)
Argyle Street
London WC1H 8EQ

Please consider the environment before printing this email.

 

This e-mail may contain information which is confidential, legally
privileged and/or copyright protected. This e- mail is intended for the
addressee only. If you receive this in error, please contact the sender
and delete the material from your computer.

References

Visible links
1. http://democracy.camden.gov.uk/ieListDoc...
2. http://planningrecords.camden.gov.uk/Nor...
3. http://www.camden.gov.uk/

Peck, Amanda, Camden Borough Council

6 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

8 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

55 Attachments

  • Attachment

    New Oxford St 101 103 Centre Point 2012 09 18 re SDG comments on Comm Report SC.xls

    35K Download View as HTML

  • Attachment

    Fw please call Dan Johnson at TFL Mayor enquiry.html

    2K Download

  • Attachment

    RE Centre Point Tower.html

    17K Download

  • Attachment

    FW Centre Point Development Transport Issues.html

    11K Download

  • Attachment

    image001.jpg

    1K Download

  • Attachment

    Re TCR Centrepoint application.html

    4K Download

  • Attachment

    Centre Point dm minutes ap comments.docx

    27K Download View as HTML

  • Attachment

    FW Centre Point Development Transport Issues.html

    11K Download

  • Attachment

    attachment.html

    8K Download

  • Attachment

    RE centre point policy questions.html

    10K Download

  • Attachment

    RE Centre Point Development Transport Issues.html

    16K Download

  • Attachment

    RE Centre Point Response Add Transport Info FOR REVIEW.html

    17K Download

  • Attachment

    RE Centre Point Response Add Transport Info FOR REVIEW.html

    15K Download

  • Attachment

    RE Centrepoint Housing.html

    14K Download

  • Attachment

    RE centre point planning report reference to Gillespies study.html

    13K Download

  • Attachment

    Transport Assessment centre point.html

    13K Download

  • Attachment

    RE Centre Point lift wheelchair access.html

    13K Download

  • Attachment

    RE 2 quick questions on Centre Point.html

    15K Download

  • Attachment

    RE Centrepoint Transport Meeting LB Camden TfL Steer Davies Gleave Gerald Eve.html

    16K Download

  • Attachment

    RE Centre Point DM Forum draft minutes.html

    3K Download

  • Attachment

    RE Centrepoint.html

    9K Download

  • Attachment

    Centre Point Traffic Modelling.html

    2K Download

  • Attachment

    RE D4 Scheme for Tottenham Court Road.html

    18K Download

  • Attachment

    RE Committee 20 September Centre Point.html

    16K Download

  • Attachment

    RE Centre Point Development Transport Issues.html

    21K Download

  • Attachment

    RE Centre Point Response Add Transport Info FOR REVIEW.html

    17K Download

  • Attachment

    RE Centre Point planning application submitted.html

    6K Download

  • Attachment

    RE Centre Point planning application and links with Gillespie s study.html

    8K Download

  • Attachment

    RE Centre Point Development Control Committee.html

    11K Download

  • Attachment

    RE car parking numbers.html

    24K Download

  • Attachment

    Pub Quiz Question.html

    1K Download

  • Attachment

    RE Pub Quiz Question.html

    2K Download

  • Attachment

    RE Centrepoint pre meet..html

    4K Download

  • Attachment

    RE Centrepoint s106 Agreement.html

    5K Download

  • Attachment

    Centre Point Transport Issues.html

    4K Download

  • Attachment

    Centre Point and The West End Project.html

    5K Download

  • Attachment

    RE Centre Point Transport Issues.html

    6K Download

  • Attachment

    RE Pub Quiz Question.html

    2K Download

  • Attachment

    RE Centrepoint s106 Agreement.html

    8K Download

  • Attachment

    RE draft reasons for refusal centre point.html

    11K Download

  • Attachment

    RE site notices centre point application 2012 2895.html

    3K Download

  • Attachment

    RE centre point applicant response to your comments Motorcycle Parking.html

    4K Download

  • Attachment

    Centre Point Transport Issues Follow Up.html

    4K Download

  • Attachment

    This may be useful.html

    6K Download

  • Attachment

    RE draft reasons for refusal centre point.html

    5K Download

  • Attachment

    RE Centre Point Development Transport Issues.html

    11K Download

  • Attachment

    RE Centre Point planning application future meetings.html

    9K Download

  • Attachment

    RE Centre Point planning application future meetings.html

    6K Download

  • Attachment

    RE centre point applicant response to your comments Motorcycle Parking.html

    8K Download

  • Attachment

    RE proposed traffic solution Earnshaw street.txt

    7K Download View as HTML

  • Attachment

    RE Centre Point Tower 2012 2895 P.html

    8K Download

  • Attachment

    RE Pub Quiz Question.html

    9K Download

  • Attachment

    RE proposed traffic solution earnshaw street.txt

    8K Download View as HTML

  • Attachment

    RE centre point applicant response to your comments.html

    12K Download

  • Attachment

    RE proposed traffic solution earnshaw street.html

    5K Download

Hi David

I have just had a look at the Linsig results and they do look
encouraging.  Obviously we are in TfL’s hands here.  I assume you have
followed TfL modelling guidance etc.

 

It would be interesting to see Linsig results for the existing arrangement
for comparison purposes.

 

I would also be interested to see what impact the proposed arrangement
would have on the St Giles High Street junction with new Oxford Street,
and the St Giles Circus junction.  Such impacts could also be demonstrated
using Linsig.

Regards

Steve

 

 

Steve Cardno
Principal Transport Planner

Telephone: 020 7974 8800

--------------------------------------------------------------------------

From: Bowers, David [mailto:[email address]]
Sent: 21 August 2012 12:24
To: Cardno, Steve
Cc: Twelftree, Peter; Goodall, Rob; [email address];
[email address]; Cazes-Potgieter Patricia
([email address])
Subject: Re: Centre Point Development - Transport Issues

 

Steve, thanks for your response.  I have added some further details into
your e-mail below and attached the relevant LINSIG analysis as requested.

 

We look forward to discussing this further tomorrow.

 

David

 

 

From: Cardno, Steve [1][mailto:[email address]]
Sent: Monday, August 20, 2012 03:24 PM
To: Twelftree, Peter
Subject: RE: Centre Point Development - Transport Issues
 

Hi Peter

Thanks for circulating these revised proposals.  I will look forward to
discussing these at the meeting this Wednesday.  I do have a few issues
which I would like to discuss as follows:

o The loading bay to the east side of Centre Point Tower is to be
removed and a replacement facility does not appear to be proposed.  I
assume Centre Point Tower would be serviced from the ramp adjacent to
Earnshaw Street and/or the loading bay to be retained on the west side
of St Giles High Street.

This is correct – but please note that the refurbishment of Centre Point
Tower requires the entire tower to be emptied of tenants /users etc.  This
of course means that there will be no need for servicing once
refurbishment begins and hence there is no need for a servicing facility
(although as you note a loading bay remains on the west side of St Giles
High Street).

o We previously discussed providing a temporary loading bay on the
southeast side of the Charing Cross Road diversion.  I assume this no
longer necessary.

We have not included one in our design as we do not consider it to be
necessary.  A loading bay could though potentially be provided on the
Charing Cross Road diversion just in advance of the proposed stopline. 
The construction of the Consolidated scheme would of course eliminate the
need for a loading bay in this area.

o I note that the signalised pedestrian crossings would be amended to an
all red phase.  I wonder if zebra crossings could be used instead
(better for pedestrians but maybe not for vehicles).

We are willing to consider the use of zebra crossings but as you say
although this would be good for pedestrians the crossing would have the
potential to increase delays for vehicles as pedestrians have priority. 
TfL are likely to take a view on this.

o The Construction and Logistics Plan should adhere to the transport
considerations for Construction Management Plans described in our
Camden Planning Guidance; specifically CPG6 (Amenity).

Understood and we will ensure the revised document follows this guidance.

 

The Linsig results for the amended signals sound encouraging.  I would
appreciate a copy of the modelling results (I’m sure TfL will want to see
them as well). 

Copies of the LINSIG results are attached and it should be noted that the
modelled degree of saturation is less than 40% on all arms of the junction
i.e. well below TfL’s target of 80%.

 

I will look forward to seeing you on Wednesday.

Regards

Steve

 

Steve Cardno
Principal Transport Planner

Telephone: 020 7974 8800

show quoted sections

Peck, Amanda, Camden Borough Council

29 Attachments

  • Attachment

    Realignment of St Giles High Street Basic Results Summary.pdf

    98K Download View as HTML

  • Attachment

    St Giles High Street Existing Basic Results Summary.pdf

    90K Download View as HTML

  • Attachment

    0773 001.pdf

    134K Download View as HTML

  • Attachment

    image001.gif

    21K Download

  • Attachment

    centre point committee report 2012.doc

    283K Download View as HTML

  • Attachment

    centre point committee report 2012.doc

    337K Download View as HTML

  • Attachment

    Letter to Alex Williams 16 08 12.pdf

    69K Download View as HTML

  • Attachment

    Letter to Alex Williams 10 08 12.pdf

    86K Download View as HTML

  • Attachment

    22409501 SK009.dwg Layout1.pdf

    339K Download View as HTML

  • Attachment

    552 CPA 12002 SDG 120525.pdf

    485K Download View as HTML

  • Attachment

    RE Centre Point Comments Cycle Parking Spaces REVISED.html

    79K Download

  • Attachment

    Re Centre Point Development Transport Issues.html

    15K Download

  • Attachment

    RE centre point re development.html

    38K Download

  • Attachment

    RE Centre Point Development Transport Issues.html

    21K Download

  • Attachment

    RE Centre Point consultee responses.html

    61K Download

  • Attachment

    RE Centre Point Comments Cycle Parking Spaces REVISED.html

    97K Download

  • Attachment

    RE Centre Point Comments Cycle Parking Spaces REVISED.html

    110K Download

  • Attachment

    RE case for case conf next week.html

    18K Download

  • Attachment

    Centre Point planning application and links with Gillespie s study.html

    6K Download

  • Attachment

    RE Public Realm Proposals for St Giles Circus.html

    25K Download

  • Attachment

    RE Hold for Centrepoint meeting St Giles High St closure bus stands.html

    3K Download

  • Attachment

    FW Centrepoint road closures.html

    11K Download

  • Attachment

    FW Centre Point house committee report.html

    11K Download

  • Attachment

    RE Centre Point report and reasons for refusal.html

    6K Download

  • Attachment

    FW Centre Point Development Transport Issues.html

    9K Download

  • Attachment

    Centre Point Development Transport Issues.html

    5K Download

  • Attachment

    RE Centrepoint meeting St Giles High St closure bus stands Confirmed.html

    10K Download

  • Attachment

    Centre Point Development Bus Stands with E W Ped Link.html

    7K Download

  • Attachment

    RE Centre Point Planning Application and meeting 13 July 2012 ref TfL comments.html

    4K Download

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

45 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

18 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

62 Attachments

  • Attachment

    image001.jpg

    1K Download

  • Attachment

    120723 letter to Geoff Taylor Almacantar Centrepoint Tower.pdf

    95K Download View as HTML

  • Attachment

    Letter to Alex Williams 10 08 12.pdf

    86K Download View as HTML

  • Attachment

    Centre Point Tower COMMENTS.V1.doc

    37K Download View as HTML

  • Attachment

    FW Centrepoint Housing.html

    13K Download

  • Attachment

    FW Centrepoint Housing.html

    11K Download

  • Attachment

    FW Centrepoint road closures.html

    11K Download

  • Attachment

    FW meeting on Monday.html

    12K Download

  • Attachment

    RE Centre Point planning application submitted.html

    6K Download

  • Attachment

    FW Centre Point planning application submitted.html

    5K Download

  • Attachment

    RE Centrepoint confirmed.html

    13K Download

  • Attachment

    FW Centrepoint confirmed.html

    16K Download

  • Attachment

    RE Centrepoint Transport.html

    7K Download

  • Attachment

    FW Centrepoint Transport.html

    7K Download

  • Attachment

    RE Centrepoint Transport.html

    15K Download

  • Attachment

    RE Centrepoint Transport.html

    13K Download

  • Attachment

    Centrepoint Tower Centrepoint Link and Centrepoint House 101 103 New Oxford Street and 5 24 St Giles High Street London WC1A 1DD.html

    3K Download

  • Attachment

    Athlone house details re off site aff housing.html

    2K Download

  • Attachment

    Centre Point.html

    2K Download

  • Attachment

    Centre Point 2012 2895 P.html

    3K Download

  • Attachment

    centre point my draft list of issues for committee report.html

    16K Download

  • Attachment

    Centre Point decision.html

    2K Download

  • Attachment

    Centre Point Development Transport Issues.html

    2K Download

  • Attachment

    centre point listed building and planning reasons for refusal.html

    5K Download

  • Attachment

    centre point meeting today.html

    2K Download

  • Attachment

    Centre Point planning application submitted.html

    3K Download

  • Attachment

    Centre Point planning application submitted.html

    3K Download

  • Attachment

    Centre Point S106 meeting draft agenda.html

    3K Download

  • Attachment

    centre point update.html

    4K Download

  • Attachment

    Centrepoint.html

    0K Download

  • Attachment

    Centrepoint affordable housing meeting.html

    5K Download

  • Attachment

    Centrepoint Pre meeting.html

    2K Download

  • Attachment

    Centrepoint redline plan and application process.html

    5K Download

  • Attachment

    Centrepoint Development Impacts for Matilda Apartments.html

    5K Download

  • Attachment

    Committee 20 September Centre Point.html

    2K Download

  • Attachment

    Dowry and service charges.html

    2K Download

  • Attachment

    draft reasons for refusal centre point.html

    7K Download

  • Attachment

    FW Centerpoint Affordable Housing.html

    8K Download

  • Attachment

    FW Centre Point Affordable Housing.html

    12K Download

  • Attachment

    FW Centre Point House Viewing.html

    7K Download

  • Attachment

    FW Centre Point planning application and links with Gillespie s study.html

    11K Download

  • Attachment

    FW Centre Point planning application submitted.html

    2K Download

  • Attachment

    FW Centre Point Refurbishment Comments Bloomsbury Association.html

    1K Download

  • Attachment

    FW Centrepoint.html

    9K Download

  • Attachment

    FW Centrepoint W.Central Post Office affordable housing requirements.html

    19K Download

  • Attachment

    FW proposed traffic solution Earnshaw street.txt

    5K Download View as HTML

  • Attachment

    FW proposed traffic solution earnshaw street.html

    21K Download

  • Attachment

    RE proposed traffic solution earnshaw street.html

    25K Download

  • Attachment

    RE Centrepoint meeting St Giles High St closure bus stands Confirmed.html

    3K Download

  • Attachment

    RE Centrepoint confirmed.html

    6K Download

  • Attachment

    Centrepoint Transport.html

    5K Download

  • Attachment

    RE Centrepoint Transport.html

    11K Download

  • Attachment

    RE Centrepoint Transport.html

    10K Download

  • Attachment

    RE Centrepoint Transport.html

    18K Download

  • Attachment

    Centre Point Ownership.html

    6K Download

  • Attachment

    centre point listed building refusal.html

    3K Download

  • Attachment

    Centre Point pre application meeting Wednesday 28th March 2012.html

    6K Download

  • Attachment

    Centrepoint.html

    5K Download

  • Attachment

    Centrepoint.html

    4K Download

  • Attachment

    FW Centre Point ED CTS comments.html

    16K Download

  • Attachment

    FW Centre Point Response Add Transport Info FOR REVIEW.html

    11K Download

  • Attachment

    FW centre point re development.html

    9K Download

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

22 Attachments

  • Attachment

    img 926095457 0001.pdf

    166K Download View as HTML

  • Attachment

    Response to LCC Comments.01.06.12.docx

    118K Download View as HTML

  • Attachment

    image001.jpg

    47K Download

  • Attachment

    New Oxford St 101 103 2012 06 18 D A Lighting Strategy.pdf

    2.7M Download View as HTML

  • Attachment

    New Oxford St 101 103 2012 06 18 D A Lighting Details.pdf

    932K Download View as HTML

  • Attachment

    image001.gif

    21K Download

  • Attachment

    image001.jpg

    34K Download

  • Attachment

    120710 Centrepoint initial comments final.pdf

    57K Download View as HTML

  • Attachment

    RE Centre Point Strategic Meetings.html

    14K Download

  • Attachment

    FW tel mes centre point.html

    4K Download

  • Attachment

    RE Centre Point Redevelopment draft Transport Assessment SDG responses to comments from LBC.html

    18K Download

  • Attachment

    FW St Giles Circus Centre Point application 2012 2895 P docs not on website.html

    30K Download

  • Attachment

    Centre Point Traffic Modelling.html

    2K Download

  • Attachment

    Centre Point Planning Application.html

    2K Download

  • Attachment

    Centrepoint planning application..html

    1K Download

  • Attachment

    Centre Point House.html

    1K Download

  • Attachment

    Centre Point planning application and links with Gillespie s study.html

    6K Download

  • Attachment

    RE Public Realm Proposals for St Giles Circus.html

    25K Download

  • Attachment

    FW Centre Point LB Camden TfL s initial comments.html

    8K Download

  • Attachment

    attachment.html

    14K Download

  • Attachment

    agenda for tomorrow s meeting.html

    4K Download

  • Attachment

    FW Affordable housing in Centrepoint.html

    13K Download

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:01
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

5 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:02
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:01
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

12 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:02
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:02
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:01
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

5 Attachments

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:02
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 12:01
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections

Peck, Amanda, Camden Borough Council

62 Attachments

  • Attachment

    image001.jpg

    1K Download

  • Attachment

    120723 letter to Geoff Taylor Almacantar Centrepoint Tower.pdf

    95K Download View as HTML

  • Attachment

    Letter to Alex Williams 10 08 12.pdf

    86K Download View as HTML

  • Attachment

    Centre Point Tower COMMENTS.V1.doc

    37K Download View as HTML

  • Attachment

    FW Centrepoint Housing.html

    13K Download

  • Attachment

    FW Centrepoint Housing.html

    11K Download

  • Attachment

    FW Centrepoint road closures.html

    11K Download

  • Attachment

    FW meeting on Monday.html

    12K Download

  • Attachment

    RE Centre Point planning application submitted.html

    6K Download

  • Attachment

    FW Centre Point planning application submitted.html

    5K Download

  • Attachment

    RE Centrepoint confirmed.html

    13K Download

  • Attachment

    FW Centrepoint confirmed.html

    16K Download

  • Attachment

    RE Centrepoint Transport.html

    7K Download

  • Attachment

    FW Centrepoint Transport.html

    7K Download

  • Attachment

    RE Centrepoint Transport.html

    15K Download

  • Attachment

    RE Centrepoint Transport.html

    13K Download

  • Attachment

    Centrepoint Tower Centrepoint Link and Centrepoint House 101 103 New Oxford Street and 5 24 St Giles High Street London WC1A 1DD.html

    3K Download

  • Attachment

    Athlone house details re off site aff housing.html

    2K Download

  • Attachment

    Centre Point.html

    2K Download

  • Attachment

    Centre Point 2012 2895 P.html

    3K Download

  • Attachment

    centre point my draft list of issues for committee report.html

    16K Download

  • Attachment

    Centre Point decision.html

    2K Download

  • Attachment

    Centre Point Development Transport Issues.html

    2K Download

  • Attachment

    centre point listed building and planning reasons for refusal.html

    5K Download

  • Attachment

    centre point meeting today.html

    2K Download

  • Attachment

    Centre Point planning application submitted.html

    3K Download

  • Attachment

    Centre Point planning application submitted.html

    3K Download

  • Attachment

    Centre Point S106 meeting draft agenda.html

    3K Download

  • Attachment

    centre point update.html

    4K Download

  • Attachment

    Centrepoint.html

    0K Download

  • Attachment

    Centrepoint affordable housing meeting.html

    5K Download

  • Attachment

    Centrepoint Pre meeting.html

    2K Download

  • Attachment

    Centrepoint redline plan and application process.html

    5K Download

  • Attachment

    Centrepoint Development Impacts for Matilda Apartments.html

    5K Download

  • Attachment

    Committee 20 September Centre Point.html

    2K Download

  • Attachment

    Dowry and service charges.html

    2K Download

  • Attachment

    draft reasons for refusal centre point.html

    7K Download

  • Attachment

    FW Centerpoint Affordable Housing.html

    8K Download

  • Attachment

    FW Centre Point Affordable Housing.html

    12K Download

  • Attachment

    FW Centre Point House Viewing.html

    7K Download

  • Attachment

    FW Centre Point planning application and links with Gillespie s study.html

    11K Download

  • Attachment

    FW Centre Point planning application submitted.html

    2K Download

  • Attachment

    FW Centre Point Refurbishment Comments Bloomsbury Association.html

    1K Download

  • Attachment

    FW Centrepoint.html

    9K Download

  • Attachment

    FW Centrepoint W.Central Post Office affordable housing requirements.html

    19K Download

  • Attachment

    FW proposed traffic solution Earnshaw street.txt

    5K Download View as HTML

  • Attachment

    FW proposed traffic solution earnshaw street.html

    21K Download

  • Attachment

    RE proposed traffic solution earnshaw street.html

    25K Download

  • Attachment

    RE Centrepoint meeting St Giles High St closure bus stands Confirmed.html

    3K Download

  • Attachment

    RE Centrepoint confirmed.html

    6K Download

  • Attachment

    Centrepoint Transport.html

    5K Download

  • Attachment

    RE Centrepoint Transport.html

    11K Download

  • Attachment

    RE Centrepoint Transport.html

    10K Download

  • Attachment

    RE Centrepoint Transport.html

    18K Download

  • Attachment

    Centre Point Ownership.html

    6K Download

  • Attachment

    centre point listed building refusal.html

    3K Download

  • Attachment

    Centre Point pre application meeting Wednesday 28th March 2012.html

    6K Download

  • Attachment

    Centrepoint.html

    5K Download

  • Attachment

    Centrepoint.html

    4K Download

  • Attachment

    FW Centre Point ED CTS comments.html

    16K Download

  • Attachment

    FW Centre Point Response Add Transport Info FOR REVIEW.html

    12K Download

  • Attachment

    FW centre point re development.html

    9K Download

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:54
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:53
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:51
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

--------------------------------------------------------------------------

From: Peck, Amanda
Sent: 07 December 2012 11:50
To: '[FOI #137479 email]'
Subject: RE: Freedom of information request - Centre Point

 

 

 

Amanda Peck
Principal Planning Officer

Telephone: 020 7974 5885

show quoted sections