This is an HTML version of an attachment to the Freedom of Information request 'Forbes Road accident saving scheme design and brief'.

REQUEST FOR TASK ORDER (DESIGN SERVICE) 
Job No:  SD-2015-0234 
 
Job/Scheme Title: 
1861 LTP Langsett Road Pedestrian Crossing near Forbes Road  
Scheme Sub Title: 
Early Action Scheme 
Design Client 
TTAPS, Sheffield City Council 
Contact Name 
James Burdett 
Tel:  0114 273 6170 
 
 
 
Email:  xxxxx.xxxxxxx@xxxxxxxxx.xxx.xx  
 
 
 
Date:  29 June 2015 
PCS Code: 
TP/LT207 
Issued to HMD 
29 June 2015 
Project Leader 
Susie Pryor 
Quotation  
 
SD Business Unit: 
TP/LT207 
Issue Contract 
 
OEO Code: 
92769 
Service Complete 
 
 
 
 
 
£ 
Complexity  
High/Med/Low 
High 
Quotation/Fixed Price   
 
 
 
Final Price 
 
 
Description of Job 
The client is currently completing a feasibility study to identify if any improvements can be made to improve road 
safety at the pedestrian crossing on Langsett Road near Forbes Road. 
 
There are major issues with pedestrian safety when crossing Langsett Road. Large numbers of pedestrians 
partially cross the carriageway whilst on the red man symbol and wait adjacent to the bollards and the splitter 
island for a gap in traffic.  This is likely to be a contributing factor to many of the collisions that have taken place, 
especially as some of the pedestrians appear to be confused by the layout and can be seen only checking for 
traffic in one direction.  
 
An indicative layout has been developed to address the issue (see sketch overleaf), however Amey’s assistance is 
required due to the presence of tram tracks and associated infrastructure. The design may well be completely 
influenced by these factors. 
 
An inception meeting has already been held with Dave Popple and Howard Saffer. The work is likely to comprise 
site visits and provision of background information and advice. The work is to be charged at an hourly rate to a 
maximum of £1000.  
 
If possible, a site visit would be preferable on Friday 3 July 2015. 
 
  
Outputs 
1. 
To assist the client in the development of a feasibility layout 
 
Timescales/Milestones 
Budget 
As above 
 
 
Supporting Documents