East-West Cycle Superhighway proposals for Hyde Park's North Carriage Drive

Mrs K McYarnington made this Freedom of Information request to Transport for London

This request has been closed to new correspondence from the public body. Contact us if you think it ought be re-opened.

Transport for London did not have the information requested.

Mrs K McYarnington

Dear Transport for London,

I understand that Transport for London's East-West Cycle Superhighway project includes the following proposals for Hyde Park's North Carriage Drive.

From https://consultations.tfl.gov.uk/cycling...
"- North Carriage Drive one-way only for eastbound vehicles (except cycles)
- Dedicated cycle track on North Carriage Drive, separated from other traffic by a surface level horse ride
- Provision for cyclist when North Carriage Drive is closed through traffic."

And from https://consultations.tfl.gov.uk/cycling...
"- Introduction of raised kerb segregation on North Carriage Drive between the traffic lane/horse track and the cycle track, which allows for a permanent cycle track to be maintained throughout the year, including during events
- Reduction of the northern footway on North Carriage Drive in order to maintain the minimum carriageway width required for event operations. The footway will be a minimum of 2.7m wide"

Could I please request a schedule/programme for work to design and implement the above proposals on North Carriage Drive and any other documents that your authority holds concerning the progress of this work?

Yours faithfully,

Mrs K McYarnington

FOI, Transport for London

 

Dear Mrs McYarnington

 

TfL Ref: 0818-1819

 

Thank you for your request received by Transport for London (TfL) on 26
June 2018 asking for a schedule/programme for work to design and implement
the above proposals on North Carriage Drive and any other documents that
TfL holds concerning the progress of this work.

 

Your request will be processed by TfL, the Greater London Authority and
its subsidiaries to provide you with a response in accordance with the
Freedom of Information Act 2000 and our information access policy.

 

A response will be sent to you by 25 July. We publish a substantial range
of information on our website on subjects including operational
performance, contracts, expenditure, journey data, governance and our
financial performance. This includes data which is frequently asked for in
FOI requests or other public queries. Please check
[1]http://www.tfl.gov.uk/corporate/transpar... to see if this helps you.

 

We will publish anonymised versions of requests and responses on the
[2]www.tfl.gov.uk website. We will not publish your name and we will send
a copy of the response to you before it is published on our website.

 

In the meantime, if you would like to discuss this matter further, please
do not hesitate to contact me.

Yours sincerely

 

 

Sara Thomas

FOI Case Management Team

General Counsel

Transport for London

 

 

 

show quoted sections

FOI, Transport for London

1 Attachment

Dear Mrs McYarnington

 

TfL Ref: 0818-1819

 

Thank you for your request received by Transport for London (TfL) on 26
June 2018 asking for a schedule/programme for work to design and implement
the above proposals on North Carriage Drive and any other documents that
TfL holds concerning the progress of this work.

 

Your request has been considered in accordance with the requirements of
the Freedom of Information (FOI) Act and our information access policy.  I
can confirm we do hold some of the information you require.  You asked:
Could I please request a schedule/programme for work to design and
implement the above proposals on North Carriage Drive and any other
documents that your authority holds concerning the progress of this work?

 

In response to the first part of your request, we do not have a programme
of works yet. TFL and The Royal Parks are working together to agree a
suitable design that meets the needs of cyclists and pedestrians and
accommodates for events logistics within Hyde Park. Once a design is
agreed we will develop a programme of works around the key events within
Hyde Park.  

 

With regard to the second part of your request when you ask for ‘any other
documents that your authority holds concerning the progress of this work’,
unfortunately, to provide the information you have requested would exceed
the ‘appropriate limit’ of £450 set by the Freedom of Information
(Appropriate Limit and Fees) Regulations 2004.

 

Under section 12 of the FOI Act, we are not obliged to comply with a
request if we estimate that the cost of determining whether we hold the
information, locating and retrieving it and extracting it from other
information would exceed the appropriate limit. This is calculated at £25
per hour for every hour spent on the activities described.

 

We have estimated that it would significantly exceed the cost limit to
provide a response to your current request. This is because the design has
been in progress since 2015 with more than 10 design options, planning
permission documentation, consultation material, traffic counts and 3
years worth of meeting notes.  It is estimated that it would take 28 hours
to retrieve and compile the information you have requested which falls
within the scope of your request.

 

To help bring the cost of responding to your request within the £450
limit, you may wish to consider narrowing its scope so that we can more
easily locate, retrieve and extract the information you are seeking. If
you want to refine your request or make a Freedom of Information Act
request in future, please bear in mind that the Freedom of Information Act
allows you to request recorded information held by us. You should identify
the information that you want as clearly and concisely as you can,
specifying the types of document that you are looking for. You might also
consider limiting your request to a particular period of time,
geographical area or specific departments of the organisation.

 

Although your request can take the form of a question, rather than a
request for specific documents, we do not have to answer your question if
it would require the creation of new information or the provision of a
judgement, explanation, advice or opinion that was not already recorded at
the time of your request.

 

Please note that we will not be taking further action until we receive
your revised request.

 

In the meantime, if you have any queries or would like to discuss your
request, please do not hesitate to contact me.

 

Please see the attached information sheet for details of your right to
appeal as well as information on copyright and what to do if you would
like to re-use any of the information we have disclosed.

 

Yours sincerely

 

Sara Thomas

FOI Case Management Team

General Counsel

Transport for London

 

 

 

 

 

 

 