This is an HTML version of an attachment to the Freedom of Information request 'Decision criteria used for developing the proposals for Junction 18a onto M4'.





 
South Gloucestershire Council 
15 June 2017 
Note of Meeting 
 
 
 
 
M4 Junction 18a Link Study  
Stakeholder Briefing 
Location: Armada House, Bristol 
Attendees:  Highways England: Rob Llewellyn, Mark Arberry, Colin Bird.  SGC: 
Steve Evans, Mark King, Lisa Price.  SUSCOM: Ann O’Driscoll.  Business West: 
Roger Key.  NSC: Paul Paton.  BCC: Adam Crowther.  WECA: Pete Davis. 
Project Team: Emma Blackham, Alistair Rice, Helen Spackman, Bruce Slattery, 
Andrew Linfoot. 
 
1.  It would be helpful to have more information on the performance of the two 
options (e.g. cost, BCR). 
2.  Need to draw out the linkages to the other JTS schemes and present to the 
public in this context. 
3.  Sensitivity tests will not only be undertaken for the link to Yate, but also for 
completing the Ring Road to the south.  
4.  Whilst not a public transport scheme, it would create space for sustainable 
transport modes on other routes. 
5.  The M4 north of Bristol is the most challenging part of Highways England’s 
network in the south-west; this scheme could help. 
6.  Need to explain why the central option was dropped (in the public consultation 
material).   
7.  At this time, there is no preferred option. 
8.  The traffic forecasts include developments in the emerging JSP. 
9.  There would be environmental impacts for both options, but they would differ in 
by option.   
   
 
 
 
 
 
 
 
 

 
G:\T&SP\Projects\3. Major Schemes\M4 J18a inc M32 J1\1. Project Management\2. Stakeholders\11. 
Workshop 2 Jun'17\M4 J18a Link Study Stakeholder Meeting Notes Jun'17.docx 