1 5
35
6 3
36
40
50
52
2
7
2
3
4
9 3
2
62
9 4
76
7 5
WINTER AVENUE
14
5
1 7
2
30
3 8
5 8
12
Club
3 1
1 to 8
18
H
299a
A
Mosque
RT
2
L
299
309
EY
295
to
A
to
301
V
297
EN
291
1
UE
281
7
4
8 8 2
2 8 2
3
2a
1
2 7 2
265
263
BARKING ROAD
0 7 2
259 261
257
2 6 2
255
253
4 5 2
245
2 5 2
241
239
237
4 4 2
1
2
2 4 2 o t 6 3 2
4 3 2
B
1
ARTLE
0 2 2
2
E
A
R
VE
1
N
3
N
H
AL
U
O
b
1
D
E
2
C
2
A
K
V
LE
E
Y
N
0 2
U
A
E
VE
4
N
1
17
UE
11
2
CLIENT
General Notes
Revision
Date
Description
The data contained in this document includes proprietary rights of Mæ. Any party in
P01
30/09/20
Planning submission
Key:
Populo Living
receipt of the document shal receive and hold the same in confidence and agrees
Redline planning
not to duplicate or otherwise reproduce the document in whole or in part, nor
boundary
disclose the contents of the same without the written consent of Mæ.
PROJECT NAME
Notes:
Hartley Centre
1. Measurements are based on metric system.
2. Al levels are in meters to Ordnance Datum Newlyn (ODN) unless noted otherwise.
3. Do not scale off the drawing and CAD file.
PROJECT NO.
STAGE
4. Al shown figure dimensions are to be fol owed.
5. Do not use for construction unless expressly permitted.
1826
3
6. This drawing shows design intent only.
DRAWING NAME
7. Contractor should verify al conditions, levels and dimensions on site and notify
contract administrator of any variations from dimensions before construction and/
Existing Drawings, Site
or fabrication.
8. Any discrepancies on this drawing should be reported to Mæ before proceeding to
fabrication.
Location Plan
SCALE
DATE
9. Drawings to be read in conjunction with al relevant documents, which include but
are not exhaustive - MEP, Structures, shop/fabrication drawings and CDM
30/09/2020
documents.
1:1250 @ A4
10. This drawing may contain colour data. Please refer to original electronic
1 Naoroji Street · London · WC1X 0GB
DRAWN BY
CHECKED BY
REV / STATUS
document.
+44 (0)20 7704 6060
11. These are architectural drawings only. Refer to consultant drawings for further
MR
HC
P01
FOR INFORMATION
information.
office@mae.co.uk · www.mae.co.uk
DRAWING NO.
12. Existing buildings to be measured on site and confirmed by contractor.
13. Also refer to accompanying Mæ Schedules and drawings.
HYC-MAE-XX-XX-DRG-04002
Document Outline