Dear Natural England,

Can please provide me with the following documents in regard to licenses which have been issued in Hastings and Bexhill local area. These licenses provided should only be provided if the protected species carried conditions required for the protected species to be translocated on the existing development site.

Site examples of this would be Hawthorn Road, but there are many others in these two localities.

Please provide copies of the licenses attached as documents only not the grid reference or site name in a separate list.

Yours faithfully,
CEO Mr. Newbold

FOI (NE), Natural England

Dear Mr Newbold,
 
Access to information request – Acknowledgement – Request No RFI 3228
 
Thank you for your request for the information detailed in your email
below, which we received on 30 December 2015. We are dealing with your
request under the Environmental Information Regulations Act 2004.
 
Your request is being considered and we will send out our response within
the legal deadline of 20 working days which is 29 January 2016. If for any
reason, we are unable to meet the deadline we will keep you fully informed
of the reasons for this.
 
Yours sincerely
 
Sarah
 
Sarah Waterfield
Lead Adviser – Access to Information
Legal Services,
Natural England,
Mail Hub Block B,
Whittington Road, Worcester, WR5 2LQ
 
Natural England is accredited to the Cabinet Office Customer Service
Excellence Standard
 
Make a request for information to Natural England
 
We are here to secure a healthy natural environment for people to enjoy,
where wildlife is protected and England’s traditional landscapes are
safeguarded for future generations.
 
In an effort to reduce Natural England's carbon footprint, I will,
wherever possible, avoid travelling to meetings and attend via audio,
video or web conferencing.
 
In an effort to reduce Natural England's carbon footprint, I will,
wherever possible, avoid travelling to meetings and attend via audio,
video or web conferencing.
 

show quoted sections

Mitigation, EPS (NE), Natural England

1 Attachment

Dear Mr Newbold,
 
Further to your request of 30^th December (ref: RFI 3228), we require a
little more information from you before we are able to provide a full
response. Please could you confirm the following:
 
1) The only Great Crested Newt mitigation licence we are able to locate
for this area is for the ‘Hastings to Bexhill Link Road project’ (ref:
2015-13924-EPS-MI). Please would you confim if a copy of the licence for
this site would suffice?
 
2) Would you require copies of any Dormouse mitigation licences in the
Hasting and Bexhill area?
 
We look forward to receiving your response shortly, however please do not
hesitate to contact us if you have any further queries.
 
Regards
 
Wildlife Licensing
Technical Services
Natural England
Temple Quay House
2 The Square
Bristol
BS1 6DG
Tel: 0300 060 3900
 
Our Customer Services Team has been awarded the Customer Service
Excellence Standard
 
We are here to secure a healthy natural environment for people to enjoy,
where wildlife is protected and England's traditional landscapes are
safeguarded for future generations.
 
In an effort to reduce Natural England's carbon footprint, I will,
wherever possible, avoid travelling to meetings and attend via audio,
video or web conferencing.
 
Natural England is accredited to the Cabinet Office Customer Service
Excellence Standard
 
[1]www.gov.uk/natural-england
 
 
 
 
 

show quoted sections

CEO Mr Newbold (Account suspended)

Dear Mitigation, EPS (NE),

Thank you for your response, my understanding is that there is a case reference you quoted EPSM2012-41719-E / 2015-13924-EPS-MIT September 2015 Can you tell me if these references concern Great Crested Newts at the pond at the end of Whiteworth Road or another location on the Link Road can you provide documents in relation to these licenses including any monitoring records and work sheet for signing off including sign off completion date. Can you provide in the case these do not deal with the pond at whiteworth Road supply copy of documents license, work sheet , sign off completion date, Annex documents translocation details maps and documents.

In regard to 2015-8590-EPS-MIT June 2015 could you please provide documents in regard to this license/ any translocation documents and any monitoring documents and the license and work sheet, Annex documents that have been submitted for signing off including sign of completion date?

In regard to the Reference for Dormouse 2015-8387-EPS-MIT Can you tell me if the completion of this work has been finished. Please provide documents in regard to this license/ any translocation documents and any monitoring documents and the license and work sheet that have been submitted for signing off including sign of completion date, Supply license, Annex documents. Can you additionally tell me if there is a requirement of this license to familiarize the holder of this license with aby literature on Dormouse before work commencement and if this was not conformed with would this breach any terms license.
Yours sincerely,

CEO Mr. Newbold

Mitigation, EPS (NE), Natural England

2 Attachments

Thank you for your email to: European Protected Species Wildlife
Licensing, Technical Services, Natural England. If you have submitted an
application form please accept this email as an acknowledgment of receipt.
Please however contact us if you have not received a formal
acknowledgement within 5 working days.
 
We currently aim to process your application/resubmission/modification
within 30 working days for all species.
 
There is no ‘fast track’ to obtaining a licence. We request that you do
not contact us before the above decision date to check on the progress of
your application.
 
Please note that a number of factors can influence the processing time in
respect of your application. These include the complexity of the
application submitted, the quality of the information provided and any
requests for additional information that we consider necessary to make a
decision on your licence application.
 
If your e-mail and attachments are in excess of 5Mb they are unlikely to
have been delivered. If your e-mail is in excess, or near to this limit,
it is recommended that you contact us to confirm receipt.
 
***PLEASE NOTE - PUBLICATION OF THE NEW GREAT CRESTED NEWT (GCN)
MITIGATION LICENCE METHOD STATEMENT TEMPLATE***
We are pleased to announce that this will be available on .[1]GOV.UK in
early December. From 30 January 2016 we expect all new GCN applications to
be submitted with a Method Statement using this new template. Any new
applications submitted on the ‘April 2013 template’ after this time will
be sent back to the applicant with a request to re-submit on the new
template. We will, however, accept re-submissions using the existing
‘2013’ format until such time a licence is granted.
 
Document submission checklists:  Please see the following checklists to
aid your application submission
 
PLEASE NOTE:  If your application or modification is incomplete and you
receive an email requesting the missing documentation you will have 3
weeks to respond to the email.
If we do not receive the missing documents within 3 weeks, the documents
already submitted will be deleted from our records and you will need to
resubmit your application/modification in its entirety.
 
Please note: All Application Forms and Reasoned Statements submitted must
now be on the new templates, we are no longer accepting applications using
the old templates. New Application Form and Reasoned Statement templates
are available on our [2]website. 
 
[3][email address] [European protected species
mitigation licensing]
 
[4][email address] [Birds, badgers, deer, falconry, seals,
non-native species and sales licensing]
 
[5][email address] [Science, education and
conservation licensing]
 
We will keep our customers updated with latest news via our website:
[6]www.gov.uk/natural-england
 
 
 
 
 

This email and any attachments is intended for the named recipient only.
If
you have received it in error you have no authority to use, disclose,
store or copy any of its contents and you should destroy it and inform the
sender. Whilst this email and associated attachments will have been
checked for known viruses whilst within the Natural England systems, we
can accept no responsibility once it has left our systems. Communications
on Natural England systems may be monitored and/or recorded to secure the
effective operation of the system and for other lawful purposes.

References

Visible links
1. https://www.gov.uk/government/publicatio...
2. https://www.gov.uk/wildlife-licences
3. mailto:[email address]
4. mailto:[email address]
5. mailto:[email address]
6. http://www.gov.uk/natural-england

Mitigation, EPS (NE), Natural England

Dear Mr Newbold,

Thank you for your response. Due to the size of the requested information we will need to write the documents to a CD and forward these to you by post. We will therefore require you to confirm a postal address that we can use to forward these documents.

Please could you therefore respond to this email, providing details of your postal address.

We look forward to receiving your response shortly, however please do not hesitate to contact us if you have any questions regarding this matter.

Regards

Wildlife Licensing
Technical Services
Natural England
Temple Quay House
2 The Square
Bristol
BS1 6DG
Tel: 0300 060 3900

Our Customer Services Team has been awarded the Customer Service Excellence Standard

We are here to secure a healthy natural environment for people to enjoy, where wildlife is protected and England's traditional landscapes are safeguarded for future generations.

In an effort to reduce Natural England's carbon footprint, I will, wherever possible, avoid travelling to meetings and attend via audio, video or web conferencing.

Natural England is accredited to the Cabinet Office Customer Service Excellence Standard

www.gov.uk/natural-england

show quoted sections

CEO Mr Newbold (Account suspended)

Dear Mitigation, EPS (NE),

Please send them to the address you have registered with Friends of Speckled Wood Managment Trust in corrspondence you have this in letters and in email in any doubt please contact Claire Newell.

Yours sincerely,

CEO Mr Newbold

Mitigation, EPS (NE), Natural England

2 Attachments

Thank you for your email to: European Protected Species Wildlife
Licensing, Technical Services, Natural England. If you have submitted an
application form please accept this email as an acknowledgment of receipt.
Please however contact us if you have not received a formal
acknowledgement within 5 working days.
 
We currently aim to process your application/resubmission/modification
within 30 working days for all species.
 
There is no ‘fast track’ to obtaining a licence. We request that you do
not contact us before the above decision date to check on the progress of
your application.
 
Please note that a number of factors can influence the processing time in
respect of your application. These include the complexity of the
application submitted, the quality of the information provided and any
requests for additional information that we consider necessary to make a
decision on your licence application.
 
If your e-mail and attachments are in excess of 5Mb they are unlikely to
have been delivered. If your e-mail is in excess, or near to this limit,
it is recommended that you contact us to confirm receipt.
 
***PLEASE NOTE - PUBLICATION OF THE NEW GREAT CRESTED NEWT (GCN)
MITIGATION LICENCE METHOD STATEMENT TEMPLATE***
We are pleased to announce that this will be available on .[1]GOV.UK in
early December. From 30 January 2016 we expect all new GCN applications to
be submitted with a Method Statement using this new template. Any new
applications submitted on the ‘April 2013 template’ after this time will
be sent back to the applicant with a request to re-submit on the new
template. We will, however, accept re-submissions using the existing
‘2013’ format until such time a licence is granted.
 
Document submission checklists:  Please see the following checklists to
aid your application submission
 
PLEASE NOTE:  If your application or modification is incomplete and you
receive an email requesting the missing documentation you will have 3
weeks to respond to the email.
If we do not receive the missing documents within 3 weeks, the documents
already submitted will be deleted from our records and you will need to
resubmit your application/modification in its entirety.
 
Please note: All Application Forms and Reasoned Statements submitted must
now be on the new templates, we are no longer accepting applications using
the old templates. New Application Form and Reasoned Statement templates
are available on our [2]website. 
 
[3][email address] [European protected species
mitigation licensing]
 
[4][email address] [Birds, badgers, deer, falconry, seals,
non-native species and sales licensing]
 
[5][email address] [Science, education and
conservation licensing]
 
We will keep our customers updated with latest news via our website:
[6]www.gov.uk/natural-england
 
 
 
 
 

This email and any attachments is intended for the named recipient only.
If
you have received it in error you have no authority to use, disclose,
store or copy any of its contents and you should destroy it and inform the
sender. Whilst this email and associated attachments will have been
checked for known viruses whilst within the Natural England systems, we
can accept no responsibility once it has left our systems. Communications
on Natural England systems may be monitored and/or recorded to secure the
effective operation of the system and for other lawful purposes.

References

Visible links
1. https://www.gov.uk/government/publicatio...
2. https://www.gov.uk/wildlife-licences
3. mailto:[email address]
4. mailto:[email address]
5. mailto:[email address]
6. http://www.gov.uk/natural-england

CEO Mr Newbold (Account suspended)

Dear Mitigation, EPS (NE),

I still have not recieved my correspondence in post that you promissed to send me on CD as you suggested that this was easier. Can you please tell me what the delay is in this and why i Have not recieved the correspondence you promissed.

Yours sincerely,

CEO Mr Newbold

Mitigation, EPS (NE), Natural England

2 Attachments

Thank you for your email to: European Protected Species Wildlife
Licensing, Technical Services, Natural England. If you have submitted an
application form please accept this email as an acknowledgment of receipt.
Please however contact us if you have not received a formal
acknowledgement within 5 working days.
 
We currently aim to process your application/resubmission/modification
within 30 working days for all species.
 
There is no ‘fast track’ to obtaining a licence. We request that you do
not contact us before the above decision date to check on the progress of
your application.
 
Please note that a number of factors can influence the processing time in
respect of your application. These include the complexity of the
application submitted, the quality of the information provided and any
requests for additional information that we consider necessary to make a
decision on your licence application.
 
If your e-mail and attachments are in excess of 5Mb they are unlikely to
have been delivered. If your e-mail is in excess, or near to this limit,
it is recommended that you contact us to confirm receipt.
 
***PLEASE NOTE - PUBLICATION OF THE NEW GREAT CRESTED NEWT (GCN)
MITIGATION LICENCE METHOD STATEMENT TEMPLATE***
We are pleased to announce that this will be available on .[1]GOV.UK in
early December. From 30 January 2016 we expect all new GCN applications to
be submitted with a Method Statement using this new template. Any new
applications submitted on the ‘April 2013 template’ after this time will
be sent back to the applicant with a request to re-submit on the new
template. We will, however, accept re-submissions using the existing
‘2013’ format until such time a licence is granted.
 
Document submission checklists:  Please see the following checklists to
aid your application submission
 
PLEASE NOTE:  If your application or modification is incomplete and you
receive an email requesting the missing documentation you will have 3
weeks to respond to the email.
If we do not receive the missing documents within 3 weeks, the documents
already submitted will be deleted from our records and you will need to
resubmit your application/modification in its entirety.
 
Please note: All Application Forms and Reasoned Statements submitted must
now be on the new templates, we are no longer accepting applications using
the old templates. New Application Form and Reasoned Statement templates
are available on our [2]website. 
 
[3][email address] [European protected species
mitigation licensing]
 
[4][email address] [Birds, badgers, deer, falconry, seals,
non-native species and sales licensing]
 
[5][email address] [Science, education and
conservation licensing]
 
We will keep our customers updated with latest news via our website:
[6]www.gov.uk/natural-england
 
 
 
 
 

This email and any attachments is intended for the named recipient only.
If
you have received it in error you have no authority to use, disclose,
store or copy any of its contents and you should destroy it and inform the
sender. Whilst this email and associated attachments will have been
checked for known viruses whilst within the Natural England systems, we
can accept no responsibility once it has left our systems. Communications
on Natural England systems may be monitored and/or recorded to secure the
effective operation of the system and for other lawful purposes.

References

Visible links
1. https://www.gov.uk/government/publicatio...
2. https://www.gov.uk/wildlife-licences
3. mailto:[email address]
4. mailto:[email address]
5. mailto:[email address]
6. http://www.gov.uk/natural-england

Mitigation, EPS (NE), Natural England

1 Attachment

Dear Mr Newbold,
 
Thank you for your follow-up email requesting an update on our response to
your Freedom of Information request (RFI 3228). We can confirm that our
response has been sent to you today. This response relates to your request
for information relating to the mitigation licences for EPSM2012-4719 E &
2015-13924-EPS-MIT (Bexhill to Hastings Link Road), and
2015-8590-EPS-MIT-1 (Queensway Road & Seddlescombe Way).
 
Please accept our apologies for the delay in responding to your request,
which was due to internal correspondence concerning the correct postal
address to use. Due size of the requested documents, they have been burned
to a CD which has been sent to you via Royal Mail First Class Recorded
Delivery today. The tracking reference of this envelope is: KX 2116 3052
4GB, and its status can be tracked at the Royal Mail website link below.
 
[1]https://www.royalmail.com/track-your-item
 
Please note that we will be sending our response for your second request
(RFI 3263 – Dormouse / 2015-8387-EPS-MIT) separately. The deadline for us
to respond to that request is 23rd February.
 
We hope the supplied documents fully address your request, however please
do not hesitate to contact us if you require any further information.
 
Regards
 
Wildlife Licensing
Technical Services
Natural England
Temple Quay House
2 The Square
Bristol
BS1 6DG
Tel: 0300 060 3900
 
Our Customer Services Team has been awarded the Customer Service
Excellence Standard
 
We are here to secure a healthy natural environment for people to enjoy,
where wildlife is protected and England's traditional landscapes are
safeguarded for future generations.
 
In an effort to reduce Natural England's carbon footprint, I will,
wherever possible, avoid travelling to meetings and attend via audio,
video or web conferencing.
 
Natural England is accredited to the Cabinet Office Customer Service
Excellence Standard
 
[2]www.gov.uk/natural-england
 
 
 

show quoted sections

CEO Mr Newbold (Account suspended)

ear Mitigation, EPS (NE),

Thank you for your correspondence dated 9th Feb 2016 I note you provided me details on CD of EPSM2012-4719/2015-13924-EPS-MIT (Great Crested Newt) and 2015-8590-MIT-1(BAT).

The first licenses EPSM2012-4719/2015-13924-EPS-MIT seems to cover the Hastings Link road only and I believe there must be a separate license for Crested Newts on the BHLR which has been issued. I would be grateful you provide the associated documents including Annex Documents Site Maps and translocation maps and Grid Reference locations.

The second license is in regard to the BLHR. However no translocation material was sent to me in regard to the translocation site Grid Reference and maps in regard to donor site monitoring visit diaries.

I would be grateful you supply this along with full documents for 2015-8387-EPS-MIT including translocation sites Grid References / Maps for the donor site.

Yours sincerely,

CEO Mr Newbold

Mitigation, EPS (NE), Natural England

2 Attachments

Thank you for your email to: European Protected Species Wildlife
Licensing, Technical Services, Natural England. If you have submitted an
application form please accept this email as an acknowledgment of receipt.
Please however contact us if you have not received a formal
acknowledgement within 5 working days.
 
We currently aim to process your application/resubmission/modification
within 30 working days for all species.
 
There is no ‘fast track’ to obtaining a licence. We request that you do
not contact us before the above decision date to check on the progress of
your application.
 
Please note that a number of factors can influence the processing time in
respect of your application. These include the complexity of the
application submitted, the quality of the information provided and any
requests for additional information that we consider necessary to make a
decision on your licence application.
 
If your e-mail and attachments are in excess of 5Mb they are unlikely to
have been delivered. If your e-mail is in excess, or near to this limit,
it is recommended that you contact us to confirm receipt.
 
***PLEASE NOTE - PUBLICATION OF THE NEW GREAT CRESTED NEWT (GCN)
MITIGATION LICENCE METHOD STATEMENT TEMPLATE***
We are pleased to announce that this will be available on .[1]GOV.UK in
early December. From 30 January 2016 we expect all new GCN applications to
be submitted with a Method Statement using this new template. Any new
applications submitted on the ‘April 2013 template’ after this time will
be sent back to the applicant with a request to re-submit on the new
template. We will, however, accept re-submissions using the existing
‘2013’ format until such time a licence is granted.
 
Document submission checklists:  Please see the following checklists to
aid your application submission
 
PLEASE NOTE:  If your application or modification is incomplete and you
receive an email requesting the missing documentation you will have 3
weeks to respond to the email.
If we do not receive the missing documents within 3 weeks, the documents
already submitted will be deleted from our records and you will need to
resubmit your application/modification in its entirety.
 
Please note: All Application Forms and Reasoned Statements submitted must
now be on the new templates, we are no longer accepting applications using
the old templates. New Application Form and Reasoned Statement templates
are available on our [2]website. 
 
[3][email address] [European protected species
mitigation licensing]
 
[4][email address] [Birds, badgers, deer, falconry, seals,
non-native species and sales licensing]
 
[5][email address] [Science, education and
conservation licensing]
 
We will keep our customers updated with latest news via our website:
[6]www.gov.uk/natural-england
 
 
 
 
 

This email and any attachments is intended for the named recipient only.
If
you have received it in error you have no authority to use, disclose,
store or copy any of its contents and you should destroy it and inform the
sender. Whilst this email and associated attachments will have been
checked for known viruses whilst within the Natural England systems, we
can accept no responsibility once it has left our systems. Communications
on Natural England systems may be monitored and/or recorded to secure the
effective operation of the system and for other lawful purposes.

References

Visible links
1. https://www.gov.uk/government/publicatio...
2. https://www.gov.uk/wildlife-licences
3. mailto:[email address]
4. mailto:[email address]
5. mailto:[email address]
6. http://www.gov.uk/natural-england

CEO Mr Newbold (Account suspended)

Dear Mitigation, EPS (NE),

Can you please note that I am requesting this information for donor site and receptor site not just the donor site please?
----------------------------------------------------------------------------------------------------------------------------------------
I wrote to you informing you:
Thank you for your correspondence dated 9th Feb 2016 I note you
provided me details on CD of EPSM2012-4719/2015-13924-EPS-MIT
(Great Crested Newt) and 2015-8590-MIT-1(BAT).

The first licenses EPSM2012-4719/2015-13924-EPS-MIT seems to cover
the Hastings Link road only and I believe there must be a separate
license for Crested Newts on the BHLR which has been issued. I
would be grateful you provide the associated documents including
Annex Documents Site Maps and translocation maps and Grid Reference
locations.

The second license is in regard to the BLHR. However no
translocation material was sent to me in regard to the
translocation site Grid Reference and maps in regard to donor site
monitoring visit diaries.

I would be grateful you supply this along with full documents for
2015-8387-EPS-MIT including translocation sites Grid References /
Maps for the donor site.

Yours sincerely,

CEO Mr Newbold

Mitigation, EPS (NE), Natural England

2 Attachments

Thank you for your email to: European Protected Species Wildlife
Licensing, Technical Services, Natural England. If you have submitted an
application form please accept this email as an acknowledgment of receipt.
Please however contact us if you have not received a formal
acknowledgement within 5 working days.
 
We currently aim to process your application/resubmission/modification
within 30 working days for all species.
 
There is no ‘fast track’ to obtaining a licence. We request that you do
not contact us before the above decision date to check on the progress of
your application.
 
Please note that a number of factors can influence the processing time in
respect of your application. These include the complexity of the
application submitted, the quality of the information provided and any
requests for additional information that we consider necessary to make a
decision on your licence application.
 
If your e-mail and attachments are in excess of 5Mb they are unlikely to
have been delivered. If your e-mail is in excess, or near to this limit,
it is recommended that you contact us to confirm receipt.
 
***PLEASE NOTE - PUBLICATION OF THE NEW GREAT CRESTED NEWT (GCN)
MITIGATION LICENCE METHOD STATEMENT TEMPLATE***
We are pleased to announce that this will be available on .[1]GOV.UK in
early December. From 30 January 2016 we expect all new GCN applications to
be submitted with a Method Statement using this new template. Any new
applications submitted on the ‘April 2013 template’ after this time will
be sent back to the applicant with a request to re-submit on the new
template. We will, however, accept re-submissions using the existing
‘2013’ format until such time a licence is granted.
 
Document submission checklists:  Please see the following checklists to
aid your application submission
 
PLEASE NOTE:  If your application or modification is incomplete and you
receive an email requesting the missing documentation you will have 3
weeks to respond to the email.
If we do not receive the missing documents within 3 weeks, the documents
already submitted will be deleted from our records and you will need to
resubmit your application/modification in its entirety.
 
Please note: All Application Forms and Reasoned Statements submitted must
now be on the new templates, we are no longer accepting applications using
the old templates. New Application Form and Reasoned Statement templates
are available on our [2]website. 
 
[3][email address] [European protected species
mitigation licensing]
 
[4][email address] [Birds, badgers, deer, falconry, seals,
non-native species and sales licensing]
 
[5][email address] [Science, education and
conservation licensing]
 
We will keep our customers updated with latest news via our website:
[6]www.gov.uk/natural-england
 
 
 
 
 

This email and any attachments is intended for the named recipient only.
If
you have received it in error you have no authority to use, disclose,
store or copy any of its contents and you should destroy it and inform the
sender. Whilst this email and associated attachments will have been
checked for known viruses whilst within the Natural England systems, we
can accept no responsibility once it has left our systems. Communications
on Natural England systems may be monitored and/or recorded to secure the
effective operation of the system and for other lawful purposes.

References

Visible links
1. https://www.gov.uk/government/publicatio...
2. https://www.gov.uk/wildlife-licences
3. mailto:[email address]
4. mailto:[email address]
5. mailto:[email address]
6. http://www.gov.uk/natural-england

CEO Mr Newbold (Account suspended)

Dear Natural England,

Please pass this on to the person who conducts Freedom of Information reviews.

I am writing to request an internal review of Natural England's handling of my FOI request 'Can please provide me with the following documents in regard to licences issued in Hastings'. I am stil not being provided with all of thisinformation.

A full history of my FOI request and all correspondence is available on the Internet at this address: https://www.whatdotheyknow.com/request/c...

Yours faithfully,

CEO Mr Newbold

FOI (NE), Natural England

Dear Mr Newbold,
 
Internal Review – Acknowledgement – Request no 3169
 
Under the Environmental Information Regulations 2004 you have a right to
have our decision reconsidered if you express dissatisfaction about what
information was provided. This is done by way of an internal review.
 
As a result of your email below I will ask a colleague to conduct an
internal review.
 
This review will be undertaken as quickly as possible and within the legal
deadline of 40 working days which is 03 May 2016.
 
If you have any queries about this email please contact me.
 
Yours sincerely
 
Sarah
 
Sarah Waterfield
Lead Adviser – Access to Information
Legal Services
Finance and Governance
Tel: 0300 060 1083  [mobile number]
 
Natural England is accredited to the Cabinet Office Customer Service
Excellence Standard
 
 

show quoted sections