Compensation Events Agreed
£
Agreed Compensation Events - Reductions
Deletion of the Private Access Track from Middle Fen Drove to Station Road Swavesey
-26,711 
Deletion of Longstanton Haul Road
-20,123 
Time critical early design works carried out by Arup
-74,758 
Delete requirement for demolition of Histon Station Building and construction of Car Park by removing 
-90,851 
the Canopy and Platform & Monitoring of Histon Station for Settlement
IT and Site Secretary (1 workstation instead of 12 required with effect from 01-Apr-08)
-82,947 
Bus Shelters: Glazing panels to be supplied by Artist
-1,350 
Cambridge Station Forecourt – Temporary Short Stay Car park
-526 
Agreed Compensation Events - Additions
Replace bridleway crossing with pedestrian burst thro. crossing, St Audrey's Close
8,233
Revision to the Design Fee (agreed at time of contract being awarded, 2006, following Cabinet
3,168,457
approval)
Civil engineering works for Global Crossing to be undertaken by Nuttall
0
Amendment to Oakington Junction showing alternative access arrangement
21,672
Proposed access to Northstowe Development - recharged to developer
130,167
Construction of new Footway / Cycleway at Park Lane Junction, Histon
13,885
Design and Construction of Traffic Signals to Cater for Diagonal Crossing at Oakington Junction
4,846
Headroom at Long Road cycle underpass
2,932
Alternative street lighting design at Oakington Junction
3,922
Network Rail proposal for a fourth rail track at Addenbrooke's Link Bridge
2,017
Change to Network Rail specification associated with Telecoms
31,957
Accommodation Works Histon Stables
2,001
Design costs for solutions to restricted width & noise barriers at Histon
7,920
Additional Design of Longstanton Park & Ride
1,532
Alternative Design of St Ives Park & Ride
1,820
Additional Drawing for Land Negotiations at Longstanton P & R
547
Relocation of St Audrey's Close Pedestrian Crossing
4,573

Compensation Events Agreed
£
Change to Addenbrooke's Embankment side slopes - recharged to developer
38,003
Accommodation Works Oakington Station
289
Change to Eastern Parapet detail at Histon Overbridge (Design work only)
3,044
Junction options in addition to the Reference Design for Oakington Junction
5,388
Fencing at St Audrey's Close
5,469
Ducts for EDF Energy at Oakington Junction - rechanrged to developer
11,088
Cambridge Regional College junction-additional preliminary design work
933
Provision of a diagonal pedestrian/cyclist crossing at Histon junction
11,506
Removal of Rails and Sleepers by Others
26,521
Oakington Junction ducts - recharged to third party
5,645
Realignment of guideway/busway at Cambridge Railway station
4,572
Additional design work Longstanton Park and Ride Layout
7,797
MOVA requirements at A1096 and Park Lane, Girton Junctions
35,058
No left turn requirements at A1096, Station Road, St Ives
2,798
Condition survey of AWS Pumping Station at Meadow Lane, St Ives
452
No left turn for guided busway to Histon at Girton Junction
2,219
New guideway moulds and spare guideway beams to be deleted from the Works Information
97
Supply of Decelerometer and Operative for Guideway Working Trials
38,141
Review of alignment to Guideway/Busway at Cambridge Station
520
Survey of BT plant at Milton Road underpass
2,479
Provision of Noise Expert at meetings
7,785
EDF Ducts at Park Lane Junction, Histon
11,132
Additional Property Condition Surveys
452
Ducts for Cambridge Water main diversion at Oakington and Histon
12,040
Condition Survey of Histon Station Building
856
Installation of NAL sockets for Signal Poles
13,085
Support for Guideway Trials
8,896
Condition Survey, St Ives
2,069
Solar Panels to Swavesey bus stop canopies
15,717
Diversions at Windmill Bridge
3,572
Advance notice to Trumpington Cutting residents
2,308
Additional Bus Trialling
1,653

Compensation Events Agreed
£
Road Furniture at Milton Road
7,595
Extend Operation of SCOOT Control on Milton Road
27,842
Reduction of maintenance Track behind CRC north platform
0
Ride Quality Presentation
2,087
Relocation of Bus Stop and Shelter at Milton Road
0
Repair Gravel Bridge Road Carriageway
23,627
Supply of bricks from Windmill Bridge
317
Additional traffic management
159
Ride Quality Data - Construction Gap Analysis
4,338
Move Heras Fencing in car park
1,002
B1050 Junctions - Future Cable Linkage Facility
2,727
Modification of Signals Work at C.R.C
3,251
Histon – replace Heras fencing
326
Additional Condition Surveys
1,716
Installation of additional ducts across Addenbrooke’s link Bridge - recharged to developer
6,212
UTMC Enhanced Image Cameras
7,869
Accommodation Works - Longstanton Station
5,548
Additional Bus Trials on 09, 11 and 12 June 2008
1,529
Additional offices for the Project Manager
3,309
Increase in Fuel levy imposed by the Government (two submissions)
58,332
Increase in Aggregates Levy imposed by the Government (two submissions)
108,605
Increase in Landfill Tax imposed by the Government
82,195
Change of Vehicle provided for Project Manager
1,642
Enhanced CCTV and UTMC Requirements
23,296
Services and Foundations for temporary buildings at Park & Ride sites
36,296
Provision of Additional ducts across Hobson's Brook bridge - recharged to developer
3,065
Precast Concrete Moulds - Retained by the Employer
7,048
Arbury Link - Avoid land encroachment - recharged to developer
1,256
Compensation Events Assessed (or decision made) by the Project Manager - 
Reductions
Installation of Marker Posts deleted from Works Information
-27,359 

Compensation Events Agreed
£
Compensation Events Assessed (or decision made) by the Project Manager - 
Additions
Meadow Lane Carriageway Geometry
1,593
Temporary opening of Park Lane Junction, Girton - Xmas period, 2007
7,654
Cancellation of Instruction - Providing 2 No. 40mph repeater signs at Longstanton
459
Changes to Land at CRC Stop
0
Northstowe Junction – 3m wide Cycleway - recharged to developer
3,726
Temporary Management Centre at St Ives
3,507
Histon Station Access Requirements
46,088
Additional Communications ducts
2,406
Communications cable jointing all fibres
5,777
Artwork in Paving Slabs at Bus Stops
546
Increase in Climate Change Levy imposed by the Government
275
Provision of Drawings to Countryside Properties for Clay Farm
238
Provision of ducts for mounting post for IBIS Passenger Information Units
13,911
Station Forecourt LoD outside Murdoch House
373
Station Forecourt Service Ducts and Drains - recharged to developer
40,692
Installation of CSM Cellular Router at CCTV Control Centre in St Ives
624
Nuttall Compensation Event Quotations about which the Project
Manager has made a Decision

Delay in release of land plot 286
0
Change to the Limits of Deviation at Longstanton Park & Ride
0
Potential unexploded Ordnance in the vicinity of Longstanton Airfield
0
Non requirement reports for MOVA
0
Jet Washing for Milton Road Drainage Survey
0
Road Safety Audits at both St Ives and Longstanton Park and Rides
0
Road Safety Audits at Junctions
0
Requirement for a Metered Electricity Supply to Junctions
0
Re-alignment of Guideway between Histon and Milton Junctions due to protruding foundations at the 
0
A14 bridge
Noise Expert requirements and additional noise survey
0

Compensation Events Agreed
£
Approval of non-standard traffic signs
0
Atkins Compensation Events Issued, not Agreed - Reductions
Delete of the provision for a fuelling facility for buses at the St Ives Park and Ride
Delete Second Drove under-bridge-replace with uncontrolled vehicular crossing
Arbury Link maintenance track downgraded to cycleway
Delete requirement for Bridleway widening
Deletion of Guideway Boundary Fencing and Revised Fencing Schedule 
Proposals for Arbury Link - Gauge Widening option replaced by Unguided Option
Addenbrooke's Medipark Boulevard/Robinson Way Unguided
Addenbrooke's Medipark Boulevard/Robinson Way Link deleted
Bus Shelters - delete the requirement for bespoke bus shelters at Park and Ride sites and guideway 
stops
Arbury Junctions 1, 2 and 3 - Omit Signals Design
Reduction of Work Scope at A1096
Communication Ducts to be installed within central reserve. (Excludes maintenance track savings)
Omit Depot Building from St Ives Park and Ride
Omission of St Ives Park & Ride Building
Omission of Longstanton Park & Ride Building
Station Road St Ives/ Harrison Way junction A1096, amendments - Replace Rising Bollards with Car 
Traps
Revision to Ticketing System
Reinstatement of Road Markings at Hills Road
LEM L - Removal from Site Area
LEMs M, B & P Removal from site area
Atkins Compensation Events Issued, not Agreed - Additions
Replace bridleway crossing at Middle Fen Drove with uncontrolled vehicular crossing
Upgrade surfacing to Maintenance Track Milton Road to Park Lane (Now Drainage only)
Street Lighting amended to current standards
Conversion of the Provisional Sums for the Park and Ride Buildings into Actual Cost
Change of guideway alignment at Histon

Compensation Events Agreed
£
Abortive Design and Construction of gauge widened guideway trial
Detailed Design of realignment to Guideway/Busway at Cambridge Station
Intermediate Guideway Texture Trials on the Guideway Assembly Area
Footway/Cycleway Crossing at Arbury Park
Guideway Burst Throughs at Middle Fen, Lairstall Drove, Mow Fen
Re-design left turn lane A1096
Delay to Site Clearance on A1096 at adjacent to The Wilderness, St Ives
Design of busway at Cambridge Station
Change the order and sequence of working in the tender programme from a North – South – North 
strategy to a North – North – South strategy
Retesting of texture on assembly area beams
Quotes for changes to CCTV Specification
Revision of CCTV Specification
Defer construction of Swavesey Kiss and Ride
Change to Ticketing Systems Specification
Arbury North (1) Junction - Modification to cycleway Alignment
Access to land  (Superseded by ATK)
Revised Provision of Piped Culvert beyond site boundary to facilitate Land Access
Installation of steel guide kerbs across Northstowe Junction
Bus Guideway Trials – 6th to 19th April 2009
Amphibian Mitigation Measures, Histon
Installation of RTPI Pre-emption Request Equipment
Delay to Award
Provision of Drawings for Cambridge Station Forecourt
Relocation of Camera
Histon Noise Barriers - additionla design
Provide Kissing Gate in fence at Eastern end of Impington Copse
Amend kerb detail for Bus Stops at St Ives Park and Ride
Swavesey Stop Fencing
Change to Limit of site at Addenbrooke's Link
Communications Interfaces at St Ives Control Room
Station Forecourt Trial Holes and Ducts for Additional Bus Shelters
Cancellation of Preparatory Works
Nuttall Compensation Event Quotations, not Agreed - Additions

Compensation Events Agreed
£
Resubmission of C4 quotations for Oakington junction
Network Rail Failure to Provide Isolations on Possession of 17th June 2007
Proposed change to River Great Ouse Viaduct
Abortive work associated with approval of the AIP for Lift and Shift
Abortive work with fibre cabling on 8&9 Sept 07
Problems with NR possession on 8&9 Sept 07
Change to signalling requirements by Network Rail
New Works Testers regarding New Works Testing for Signalling
Preliminary quotations for the Employer
'Upgrade' the aesthetic appearance to Parapets on the Addenbrooke's Link Bridge
Nuttall mgmt time dealing with Employers responsibilities at Arbury Park
Changes in the revised Ecological Management Plan
Additional cost incurred due to the Changes in Longstanton Park & Ride Junction
High Containment Barrier at Cambridge Station
MOVA requirements at both B1050 Junctions (Guideway and Park & Ride)
Street Lighting for Harrison Way & Meadow Lane
Additional Cost of working an extra 5 weeks 4 days as Preferred Bidder
Inadequate land to accommodate required platform length at Histon bus stops
Additional design work carried out to meet Environment Agency requirements over and above those 
required within the Works Information
Required changes in LEM I
Investigation into the adequacy of specified guideway texture depth
Relocation of Gas Supply, Kiosk and Heaters, Hills Road
Abortive work associated with Fibre cabling works 07/12/07
Middle Fen Drove - Options Report
Public Right of Way within Site Boundary
Monitoring of Histon Station for settlement
Relocation of Virgin Media Chamber at Histon Junction
"The Site" and CDM obligations related thereto
High Containment Barrier Delay Costs
Standing charge at Park Lane Junction
Delays and disruption caused by Stats at Addenbrooke's bridge
National Grid (Gas) Diversion - Long Road
Extended Hire of Varioguard Safety Barrier at Long Road Bridge
Windmill Bridge Delay and Acceleration Costs
Abortive costs associated with Station Forecourt Area design
Street Lighting specification for Cambridge Regional College Junction

Compensation Events Agreed
£
Planning approval at Histon Junction
Street Lighting to specification to Milton Road junction
Assessment of Contractors resources associated with evaluating/negotiating 'Change'
Windmill Bridge - EDF Energy original diversion over the structure 
Diversion of irrigation conduit and electric cable from Chivers Culvert
Delays caused by National Grid - Gas diversion T8 (Station Road, Histon)
Hills Road - Delay in National Grid (Gas) in identifying unknown services
Windmill Bridge - BT Diversion BT5
Delay to Underpass Construction Works at Hills Road
Additional Culvert ref: C0941 at Chainage 9410
Additional Culvert ref: C0903 at Chainage 9033
Additional Culvert ref: C0454 at Chainage 4+547
Additional Culvert ref: C0540 at Chainage 5+412
Additional Culvert ref: C0671 at Chainage 6+710
Additional Culvert ref: C0678 at Chainage 6+780
Additional Culvert ref: C4171A (C4171/1) at Chainage 41+729
Additional Culvert ref: C4171B (4171/2) at Chainage 41+694
Additional Culvert ref: C6042 at Chainage 60+426
Longstanton Station - Gresley House - Underpinning works not included in the Works Information at 
Tender
Contaminated Material at St Ives
EDF Diversion at UNEX House, Hills Road Bridge
EDF Diversion at Milton Road Junction
Milton Road Junction - EDF Diversion - Additional Apparatus not included in C4 Estimate
EDF Cable Changeover - Hills Road Underpass
Additional works at St Ives Park and Ride site due to contamination issues
Maintenance Track - Review of further options
Milton Road - EDF failed trench reinstatement to HV cable diversion
Milton Road - EDF Diversion
Milton Road - Existing BT Pole at Chainage 30, delaying permanent footpath works
Milton Road - BT 9 way duct works
Providing assistance to the Employer in compiling the Contract Documents
Design and Build Cambridge Water Service /Protection Trough
Additional Works to Cambridge Water Service Protection Trough
Generation of Computer Generated Automatic Calculation Errors in Appendix 1/16
Disruption to Neighbouring Land Surveys

Compensation Events Agreed
£
Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (England) 
Regulations 2008
Junctions - Additional design of Car Traps due to CCC amendment to the accepted design
Longstanton Junction - Production of Additional Drawings
Confirmation of Costs for Items listed in Appendix 1/16 as (to be confirmed).  EDF Energy Diversion 
EDF2: Park and Ride Junction, Meadow Lane
Confirmation of Costs for Items listed in Appendix 1/16 as (to be confirmed).  BT Openreach Diversion 
BT2: Park and Ride Junction, Meadow Lane
Confirmation of Costs for Items listed in Appendix 1/16 as (to be confirmed).  BT Openreach Diversion 
BT7a: Longstanton Park and Ride Junction, Station Road
Confirmation of Costs for Items listed in Appendix 1/16 as (to be confirmed).  BT Openreach Diversion 
BT7a: Cambridge Water Diversion CW11a, Longstanton Park & Ride Junction, Station Road
Confirmation of Costs for Items listed in Appendix 1/16 as (to be confirmed).  EDF Energy Diversion 
EDF12a: Longstanton Park & Ride Junction, Station Road
Unidentified BT Cable at Histon Junction
Obtain discharge consent to Culvert C0672
Histon Water Main Diversion
Trumpington Cutting - National Grid Gas
Sheet Pile Retaining Wall at St Ives Park and Ride 
Maintenance Track - Testing Requirements
Programme for Acceptance Week 83 - No reply from the Project Manager
Programme for Acceptance Week 88 - No reply from the Project Manager
Programme for Acceptance Week 93 - No reply from the Project Manager
Programme for Acceptance Week 113 - No reply from the Project Manager
Programme for Acceptance Week 119 - No reply from the Project Manager
Arbury Kings Hedges Road Junction 3; Provision of an Additional Island to create a staggered junction
Cambridge Railway Station; Station Forecourt re-design
12" Water Main Diversion between Beck Brook and Park Lane
Flooding to Properties adjacent to LEM D
Envoy Gas Main at Kings Hedges Junction No. 3
Kings Hedges Road Junction No. 4 - BT Diversion
Iceni Way, Arbury Link - Cambs Water Company Diversion
Additional Services found in north verge of Meadow Lane
Passive Provision Ducting for Cambridge Water Company - Arbury Link
Passive Provision Ducting for Cambridge Water Company - Lairstall Drove, Swavesey

Compensation Events Agreed
£
Non-acceptance of PFA Week 132
Graham Road, Arbury Link - EDF Energy
Iceni Way, Arbury Link - EDF Energy
Kings Hedges Road Junction No. 3 - BT Diversion
Pre-existing Leak to National Grid Gas Main at Milton Road
BT Distribution Poles at Arbury Link
Passive Provision of Ducting for Cambridge Water Company - B1050 Station Road, Longstanton
The Working Time (Amendment) Regulations 2007
The Excepted Vehicles (Amendment of Schedule 1 to Hydrocarbon Oil Duties Act 1979) Order 2007
Increase in Fuel Levy imposed by the Government - Substantiation of Contractors Entitlement to a 
Compensation Event
Kings Hedges Road / Graham Road (Kings Hedges Junction No. 1) - BT Diversion
Additional Bus Trials on 15 and 19 May 2009
Kings Hedges Junctions 1, 2, 3, 5 - Traffic Signal Design
Abortive Works associated with Bus Priority Programme
Additional Foul Drainage Manhole - Meadow Lane, St Ives
Provision of a Geotechnical Engineer for Trumpington Cutting Ground Investigation Works
Kings Hedges Road / Chieftain Way (Kings Hedges Junction No. 2) BT Diversion
Re-introduction of Swavesey Kiss and Ride Construction Works
Trumpington Park & Ride Highway Junction - BT Diversion
Trumpington Park & Ride Highway Junction - CWC Diversion
Cancelled Possession by Network Rail for PPS Week 49
Programme for Acceptance Week 141 - No Reply from the Project Manager
Kings Hedges Road/Graham Road - Unchartered Pumped Foul Sewer
Additional Works required at Northstowe junction
Additional Culvert Ref C6026 at Chainage 60268
Change in Street Lighting Specification to Arbury Link Junctions
Kings Hedges Road Junction No. 5 - Concrete protection works to services
Drainage works - Oakington Junction 
Interface between Milton Road Junction and the Cowley Road Scheme
Additional Length of Existing Culverts due to Skew
Connection of Existing PSTN line at CRC junction
Longstanton Park & Ride Drainage Consent - South Cambs District Council
Virgin Media Chamber - B1050 Longstanton
Programme for Acceptance Week 146 - No reply from the Project Manager
Arbury Link - Unadopted Drain

Compensation Events Agreed
£
Programme for Acceptance Week 150
EDF Ducts - Arbury Link
Cambridge Railway Station - National Grid Gas Diversion
Traffic Signals - Change in model of 'above ground' vehicle detection
Programme for Acceptance Week 150 - No reply from the Project Manager
Additional Drainage Manhole - between Milton Road and CRC
Station Forecourt - Changed Parking Arrangements
Station Forecourt - Network Revision to lighting along station forecourt area
Busway Visits
Backfill of Guideway Beams
Non-Acceptance of Certificate 716
Texture to Guideway - Revised Specification
Programme for Acceptance Week 158 - No reply from the Project Manager
Texture to Guideway - Confirmation from the Project Manager
Marker Posts adjacent to PMA
Knee Rail Fencing at Longstanton Park and Ride
Additional Hoods to Street Lighting at B1050
Programme for Acceptance Week 162
Installation of CSM Cellular Router at CCTV Control Centre in St Ives
Passive Provision Ducting for Cambridge Water Company - Swavesey Crossing
Passive Provision Ducting for Cambridge Water Company - Park Lane Girton Crossing
Passive Provision Ducting for Cambridge Water Company - Impington/Histon Crossing
Passive Provision Ducting for Cambridge Water Company - Milton Road
EDF Energy Diversion EDF5 - Swavesey, Station Road
Programme for Acceptance Week 166 - No reply from the Project Manager
358 to 376 - EDF Energy Diversions
Coring at B1050
Addenbrooke's guideway to guideway junction
Drainage at Longstanton Park and Ride
Hills Road Underpass - Change from 2 phase to 3 phase construction
Hills Road Underpass - Wing Wall Construction
Non-Acceptance of Programme for Acceptance Week 166
Discharge of Planning Condition 5 Lighting by South Cambridgeshire District Council
Cambridge Railway Station - Network Rail Water Main
Lighting on the approach to Trumpington Park and Ride
Design Certificate 713 - No reply from the Project Manager
Bridlepath Crossings at Rampton Road and West Holywell Ferry

Compensation Events Agreed
£
Amended kerbing detail at Bus Stops at Cambridge Station
Shortfall in 'Data Room' Documents
RSA at Meadow Lane, Additional Fence
397 to 407 Transco Diversions (11 No)
408 to 419 BT Diversions (12 No)
420 to 421 Cable and Wireless Diversions (2 No)
Transco Diversion T19 - Station Approach
423 to 425 Redstone Diversions (3 No)
Energis Diversion UKG1 - Hills Road, North Footway
427 to 432 NTL Diversions (6 No)
433 to 438 Cambridge Water Diversions (6 No)
EDF Energy 11kV Service Diversion: Trumpington P&R
Design Certificate 738 - No reply from the Project Manager
BT Diversion BT7 - B1050 Station Road, Longstanton
Transco Diversion T16 - Milton Road, Level Junction
443 to 445  BT Diversions (3 No)
Cable and Wireless Diversion Me3 - Long Road
Redstone Diversion - Long Road
448 to 449 NTL Diversions (2 No)
450 to 465 Cambridge Water Diversions (16 No)
EDF Energy 11kV Service Diversion EDF6: Swavesey Railway Station
EDF Energy Service Diversion EDF12: Longstanton Station
Station Forecourt - Uncharted brick drain culvert
Station Forecourt - Uncharted brick drain culvert (2)
Station Forecourt - Uncharted leaking water main
Station Forecourt - Concrete support to Cambridge water main
EDF Energy Service Diversion EDF38: Homerton/Purbeck University Press
Longstanton Bypass - Attendance of Liaison Meetings
Transco Service Diversion T6: Station Road/Oakington Road Crossing
Transco Service Diversion T7: Cambridge Road, Impington
Station Forecourt - Station Roof Drainage
Transco Service Diversion T8: Cambridge Road, Impington
Transco Service Diversion T15: Milton Road level junction
Station Forecourt - Near Miss
Transco Service Diversion T21: Hills Road track level
Trumpington Park and Ride: Unrecorded service 6" salt glazed pipe
Station Forecourt - Unchartered brick drain culvert (3)

Compensation Events Agreed
£
Amphibians at Chivers Lake