Breakdown of projected costs
Dear High Speed Two (HS2) Limited,
I note section 2.85 of the Autumn Statement:
“Construction will begin on HS2 during the Parliament, and the Spending Review confirms a funding envelope of £55.7 billion in 2015 prices, which will deliver HS2 from London to Birmingham by 2026, and to Leeds and Manchester by 2033.”
Regarding this, I would like to know the breakdowns, with and without contingency, for the costs of:
Phase 1
Phase 2
Rolling Stock
Yours faithfully,
Joe Rukin
Dear Mr Rukin
Thank you for your email to HS2 Ltd. We are considering your request
under the Freedom of Information Act 2000 and aim to reply no later than
24 December 2015.
Your reference number for the request is FOI15-1444.
Kind regards
Piri Norris (Mr.) | Freedom of Information Adviser | HS2 Ltd
Tel: 020 7944 4908 | [1][email address] | [2]Facebook | [3]Twitter
| [4]LinkedIn
High Speed Two (HS2) Limited, 19th Floor, One Canada Square, Canary Wharf,
London E14 5AB | [5]www.gov.uk/hs2
Dear Mr Rukin
Please find attached our response to your request for information - our ref. FOI-1444.
Kind regards
Piri Norris (Mr.) | Freedom of Information Adviser | HS2 Ltd
Tel: 020 7944 4908 | [email address] | Facebook | Twitter | LinkedIn
High Speed Two (HS2) Limited, 19th Floor, One Canada Square, Canary Wharf, London E14 5AB | www.gov.uk/hs2