This is an HTML version of an attachment to the Freedom of Information request 'Asbestos survey report for Burnside Primary school, Cramlington'.





ENVIRONMENTAL CONSULTANTS LTD 
 
 
Report No: AR/10/01568   
 
 
 
Page 1 of 8 
 
BURNSIDE PRIMARY SCHOOL 
CRAMLINGTON 
MANAGEMENT ASBESTOS SURVEY 
 
 
 
Survey to identify asbestos based materials 
carried out on behalf of Northumberland County Council 
 
Issue Date: 20 July 2010 
 
 
 
Registered Office:  Church Buildings, Station Road, Seaton Delaval,  
Whitley Bay, TYNE & WEAR, NE25 0PT 
Tel: (0191) 298 0198      Fax: (0191) 298 0199 
 
Visit our Web-site at:  http://www.vegaec.co.uk   e-mail:  xxxx@xxxxxx.xx.xx 
  
 
 
        1634               278 

Report No. AR/10/01568 
 
 
 
 
 
Page No.  2  of  8 
 
 
Contents 
 
 
 
 
 
Page No 
Introduction ---------------------------------------------------------------------------------------- 3 
Asbestos Register --------------------------------------------------------------------------------- 4 
Executive Summary ------------------------------------------------------------------------------ 5-8 
Appendices 
Appendix A – Survey Report Data Record Sheets 
Appendix B – Material Algorithm 
Appendix C – Bulk analysis and sample locations 
Appendix D - Insurance Information 
Appendix E – Asbestos Management Plan 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Procedure ASB/6 Appendix E, Page 1 of 1, Issue No.2, Issue Date 23/04/10, Issued by VEGA. 
 
 




Church Buildings 
 
OCCUPATIONAL HYGIENE CONSULTANTS 
Station Road 
Asbestos Surveys, Analysis and Monitoring 
Seaton Delaval 
COSHH Audits, Assessments and Surveys 
Whitley Bay 
Indoor Air Quality, Environmental Testing 
TYNE & WEAR 
 
NE25 0PT 
CLEANROOM TESTING CONSULTANTS 
 
DOP/PSL Testing of HEPA/ULPA Filters 
 
HLF, VLF, MSC and Fume Cupboard Testing 
Tel: 
(0191) 298 0198 
Validating/Testing of Pharmaceutical Process Isolators 
Fax: 
(0191) 298 0199 
 
 
 
CONFIDENTIAL 
 
ASBESTOS SURVEY REPORT    
 Page  3  of  8 
 
INTRODUCTION 
 
Report No: AR/10/01568 
Date of Issue:                    20/07/10 
 
 
Client: John Warwick 
Clients Order No               
 
Northumberland County Council 
 
 
Property Services Section (Asbestos) 
Date(s) of Survey:             04/03/10 
 
Resources Department  Performance 
 
 
County Hall 
Establishment Surveyed: Burnside 
Morpeth 
Primary School, Cramlington, 
NE61 2EF 
Northumberland. 
 
Area(s) Surveyed:
 See Report Summary for details of the scope, limitations and areas surveyed. 
 
Type  of  Survey:    Management  (minor  intrusive  with  some  disturbance)  survey  or  Refurbishment  or 
Demolition  (fully  intrusive  with  destructive  inspection)  survey  (see  Additional  Information  section  for 
definition) 
 
Purpose, Aims and Objectives 
This survey was undertaken to establish the presence and nature of asbestos based materials in the 
area(s) surveyed.  Surveying, sampling and assessment of asbestos-containing materials was carried 
out in accordance with HSG 264 Asbestos: ‘The Survey Guide’. 
 
Representative bulk and - if applicable - air samples were taken from the locations detailed in the 
following  pages  of  this  report.    The  bulk  samples  were  subject  to  a  careful  cleaning  procedure 
involving  disintegration  of  the  sample,  acid  washing,  solvent  washing,  filtration  etc.,  in  order  to 
expose fibres in a form suitable for microscopic analysis.  Analysis was carried out in accordance 
with HSG 248 – ‘Asbestos: The analysts’ guide for sampling, analysis and clearance procedures.’ 
by documented in-house procedures. 
 
Vega  Environmental  Consultants  Ltd  cannot  accept  responsibility  for  any  errors  or 
misinterpretations  introduced  into  a  survey,  or  any  resulting  conclusions,  as  a  result  of  a  reduced 
sampling frequency specified by a client. 
 
This survey attempts to identify all asbestos materials within the agreed scope of work.  
 
This report must not be reproduced except in full, without written approval of Vega Environmental 
Consultants Ltd 
 
Surveyor:________________ 
   Authorised By: ________________ 
                  M. Steadman 
                      E Brown (Technical Director) 
 
Procedure  ASB/6 APPENDIX A,  Page 1 of 2, Issue No.14,  Issue Date 14/06/10, Issued by VEGA 
  
 
 
        1634               278 
Directors: E. Brown., B.Sc., M.Sc., DipOH, MFOH, A. Brown, B.Sc., M.R.Pharm.S. & R Brown 
Reg. No. 2319141 England 





ASBESTOS REGISTER – MATERIAL ASSESSMENT         Page  4  of  8 
 
Report No: AR/10/01568 
 
For the materials identified in the summary we would recommend the following actions as determined 
solely by the initial risk assessment score: / prior to refurbishment or demolition: 
 
 
 
 
s
r
s
o
 
it
ce
n
ial
ac f
Mo 
 
ater

 
d
m
n
an
 
 
Ms
 
d

P/ID)
isr
ed
e
ly
g
b
a
AC
r
P/S
eb
 
 
lar
(
d
n
f
u
 
tu
am
estrictior o 
is

f
eg
I
o
d
n
d
r
 
 
 

 
 
f
p
f
latio
r
n
o
u
o
u
al
iate 
 
 
s
us
v
Un
latio
el 
air
p
o
ed
o

atio
p
ca
clo
m
v
u
ev
lean
n
n
em
/is
ea
Area / Component / Sample Identifier 
 
L
 
C
Re
E
E
R
mI to
L
Sit
Year 5 & 6 Building, Hall / Skylights - not accessed 

 
 
 
 
 
 
 
 
(due to height) 
 
 
CODE 
ACTION 
 
Remove ASAP 
 
Repair/Encapsulate ASAP 
 
Leave Undisturbed and Monitor Situation Regularly 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Procedure ASB/6 Appendix F, Page 1 of 1, Issue No. 4, Issue Date 11/06/10, Issued by VEGA


 
CONFIDENTIAL 
          Page  5  of  
 
EXECUTIVE SUMMARY 
 
Report No:
   AR/10/01568 
 
Survey Specification: 
 
Management Survey Survey: 
 
Definition: 
Management  (minor  intrusive  with  some  disturbance)  survey:  
Company Procedure ASB/3 and ASB/6:  
The surveyor will do a general 
walk around the whole area and look at  all readily accessible areas. From 
his  experience  the  surveyor  will  attempt  to  identify  any  asbestos  and/or 
asbestos products without the need for sampling. The areas will be assessed 
and  where  appropriate  will  be  presumed  to  contain  asbestos.  Where  it 
appears highly likely that materials will contain asbestos, there should be a 
strong  presumption  that  it  does.  All  materials  that  are  presumed  to 
contain  asbestos  must  be  assessed  using  the  Material  Assessment 
Algorithm.    Where  practicable,  representative  samples  will  then  be  taken 
from  all  materials  in  accordance  with  full  sampling  frequency 
recommendations,  for  analysis.    Sample  points  will  be  made  safe  but 
redecoration will not be carried out. 
 
Area(s) Surveyed / Excluded: 
 
The details  of the scope, limitations and areas surveyed during the course of this survey 
are outlined below: 
 
On  4  March  2010,  a  Management  survey  was  carried  out  at  Burnside  Primary  School, 
Cramlington,  Northumberland.    The  premises  surveyed  were  erected  in  the  1980’s,  of 
single storey construction with brick walls and pitched tiled roof. 
 
YEAR 5 & 6 BUILDING 
 
 
Hall  -  Skylights  were  not  accessed  due  to 
height,  therefore  we  must  presume  they 
contain  asbestos.    It  is  recommended  an 
inspection  take  place  prior  to 
any 
refurbishment work. 
 
 
 
 
Level 
Sample 
Extent 
Product 
Condition 
Surface 
Asbestos 
Score 
Access 
Action 
of ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 








DA 
A3 
 
 
Procedure  ASB/6 APPENDIX D,  Page 2 of 2, Issue No. 3, Issue Date 23/04/10, Issued by VEGA 

CONFIDENTIAL 
          Page  6  of  
 
Report No: AR/10/01568 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note: 
Vega  Environmental  Consultants  Ltd  recommends  all  work  with  asbestos 
based  materials  be  undertaken  by  a  licensed  asbestos  removal  company, 
with relevant air sampling carried out by a laboratory accredited by UKAS 
for both sampling and airborne fibre counting.  Any waste produced from 
removal activities should be disposed of in accordance with the Hazardous 
Waste Regulations 2005. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Procedure  ASB/6 APPENDIX D,  Page 1 of 2, Issue No. 5, Issue Date 23/04/10, Issued by VEGA   
 


 
CONFIDENTIAL 
          Page  7  of  
 
Report No:   AR/10/01568 
 
DRAWING TO DEPICT ASBESTOS CONTAINING MATERIALS 
AND ASBESTOS SAMPLE POINT LOCATIONS 
 
Burnside Primary School 
 
 
 
Mixed 
Community 
Toilet 1 
 
Room 
Veg 
 
Lobby 
Mixed 
Store 
 
Toilet 2 
Kitchen 
Store 
Toilet  
Room 
Larder 
Staff 
Plant 
Main 
Base 1 
Base 2 
Room 
Room 
Kitchen/ 
Kitchen 
Corridor 1 
Community 
Staff 
Room 
Office 
Rear 
Lobby 2 
Deputy 
P.E. Store 1 
P.E. Store 2 
Corridor 5 
Head 
Female 
Meters 
Toilet 1  Cleaners 
Cupboard 
Store 5 
Cloakroom 1 
Head 
Base 3 
Male 
Teacher 
Girls 
Boys 
Toilet 
Toilet 2 
Toilet 2 
Access 
 
4
P.E. Hall 
Toilet 
 ro
Entrance 
Store 6 
Waiting 
di
P.E. Store 3 
rr
Area 
Cloakroom 
o
C
Base 4 
Store 8 
School 
Office 
Studio 
Admin 
    1 
Circulation 
Corridor 3 
Store
Rear 
Print 
7A 
Lobby 
Room 
Staff 
Study 
Base 6 
Base 5 
Library 
Nursery 
 
Nursery 
Toilet 
2 rodirr
Nursery 
o
Year 5 
C
Kitchen 
Entrance 
Boys 
Reception 
Reception 
Toilet 1 
Toilet 
Year 1 
Girls 
Toilet 1 
Store 7 
 
 
 
 
 
 
 
 
 
Procedure  ASB/6 APPENDIX H,  Page 1 of 1, Issue No. 2, Issue Date 08/05/07, Issued by VEGA 


 
CONFIDENTIAL 
          Page  8  of  
 
Report No:   AR/10/01568 
 
DRAWING TO DEPICT ASBESTOS CONTAINING MATERIALS 
AND ASBESTOS SAMPLE POINT LOCATIONS 
 
Year 5 & 6 Building 
 
 
 
 
 
 
Base 8 
Plant Room 2 
Base 9 
Entrance 
Lobby 
Girls 
Toilet 
Store 9 
Cloaks 
Base 10 
Disabled 
Boys 
Toilet 
Toilet 
Hall 
Base 12 
Base 11 
Tank 
Store  
Store  
Room 
   10 
   11 
 
 
 
 
 
 
 
KEY 
 
 
       Skylights - not accessed (due to height), presumed to contain asbestos 
 
 
 
 
 
 
 
 
 
 
Procedure  ASB/6 APPENDIX H,  Page 1 of 1, Issue No. 2, Issue Date 08/05/07, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
ASBESTOS SURVEY  -  DATA RECORD SHEET 
             
 
 
Page  1  of  40 
 
 

Report No: AR/10/01568 
Contact: John Warwick 
Date of survey: 04/03/10 
 
 
Survey Type:    Management 
Client:  Northumberland County Council 
 
Surveyor:          M Steadman and L Batty 
 
Property Services Section (Asbestos)   
 
 
Resources Department, Performance 
 
Site Location: Burnside Primary School, Cramlington, 
 
County Hall 
 
Northumberland. 
Morpeth 
NE61 2EF 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL 
 
 
 
 
 
 
 
 
 
 
 
 
 
Entrance 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Corner boxing to walls - wood 






NA 



 
 
Floors - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Lagged pipe work - hessian and 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Waiting Area 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Boxing to wall - plasterboard 






NA 



(Counter Area) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                               
                                                                Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 1 of 2, Issue No. 10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  2  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Waiting Area 
Yes  
Window soffit - plasterboard 






NA 



(cont) 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Below 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Office 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard 






NA 



 
 
Boxing - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard 






NA 



 
 
Lagged pipe work - foil and 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Corridor 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  3  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Corridor 1 
 
Walls - brick and plasterboard 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Head Teacher 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Low level boxing - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Lagged pipe work - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes 
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Meters 
Yes  
Ceiling - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Lagged pipe work - MMMF  






NA 



 
 
Electrical boxes 






NA 



 
 
Floor - concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Deputy Head 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  4  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Deputy Head 
Yes  
Walls - plasterboard and plaster 






NA 



(cont) 
over brick 
 
 
Boxing - wood 






NA 



 
 
Panel to window - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Staff Room 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Panels to wall - insulation board  
ID 
BS/01 




NA 



 
 
Sink unit - modern vibration pad 






NA 



 
 
Floor - vinyl covering and carpet 






NA 



over concrete  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  5  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Walls - polystyrene, brick and 






NA 



Staff Room 
plasterboard 
(cont) 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Riser/boxing (adjacent sink unit) - 






NA 



wood 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Female Toilet 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plaster over brick 






NA 



 
 
Boxing - wood and plasterboard  






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Toilet cistern x 3  
ID 
BS/02 




NA 



 
 
Floor - ceramic tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  6  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cleaners  
Yes  
Ceiling - MMMF suspended tiles 






NA 



Cupboard 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Floor - tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Pipe work - foil covered MMMF 






NA 



insulation 
 
 
Duct work - metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Male Toilet 
Yes 
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard over brick 






NA 



 
 
Cistern - ceramic 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Pipe work - foil covered MMMF 






NA 



insulation 
 
 
Duct work - metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Access Toilet 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  7  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Access Toilet 
Yes  
Walls - plasterboard 






NA 



(cont) 
 
Boxing - wood 






NA 



 
 
Cistern - ceramic 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
School Admin 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick and brick 
 
 
Panel to wall - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Waste pipe - plastic 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  8  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Print Room 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard 






NA 



 
 
Modern electrical boxes 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Lagged pipe work - hessian and 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nursery 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick, plasterboard and 






NA 



plaster over brick  
 
 
Panels to wall - wood 






NA 



 
 
Sink Unit - modern vibration pad 






NA 



 
 
Panels below windows - 
SP 
As BS/01 




NA 



insulation board  
 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  9  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Pipe insulation - foil covered 






NA 



Nursery 
MMMF 
(cont) 
 
Waste pipe - plastic 






NA 



 
 
Fire break - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nursery  
Yes  
Ceiling - MMMF suspended tiles 






NA 



Kitchen 
 
Walls - plasterboard 






NA 



 
 
Boxing (adjacent kitchen unit) - 






NA 



wood 
 
 
Electrical boxes - modern 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - polystyrene, brick and 






NA 



plasterboard 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Waste pipe - plastic 






NA 



 
 
Fire break - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nursery Toilet 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard, plaster over 






NA 



brick and ceramic tiles 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  10  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nursery Toilet 
Yes  
Un lagged pipe work 






NA 



(cont) 
 
Boxing - wood 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Pipe work insulation - foil 






NA 



covered MMMF 
 
 
Fire break - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Reception 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick, plasterboard and 






NA 



plaster over brick 
 
 
Sink units - modern vibration pad 






NA 



 
 
Boxing to wall - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Waste water pipe - plastic 






NA 



 
 
Pipe work insulation - hessian 






NA 



covered foil 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  11  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



Reception 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Reception  
Yes  
Ceiling - MMMF suspended tiles 






NA 



Toilet 
 
Walls - brick and plasterboard  






NA 



 
 
Panels to wall - insulation board 
SP 
As BS/01 




NA 



 
 
Boxing - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Waste water pipe - plastic 






NA 



 
 
Pipe work insulation - hessian 






NA 



covered foil 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 7 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  12  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick, plasterboard and 






NA 



plaster over brick 
 
 
Sink units - modern vibration pad 






NA 



 
 
Boxing to wall - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Waste water pipe - plastic 






NA 



 
 
Pipe work insulation - hessian 






NA 



covered foil 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Corridor 2 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  13  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Girls Toilet 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Walls - plasterboard and ceramic 






NA 



tiles 
 
 
Low level boxing - wood 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick  
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Boys Toilet 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Walls - plasterboard and ceramic 






NA 



tiles 
 
 
Low level boxing - wood 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick  
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  14  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Pipe insulation - foil covered 






NA 



Boys Toilet 1 
MMMF 
(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year 5 Entrance 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Floor - part carpet and modern 






NA 



vinyl covering  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Debris - insulation board  
SP 
As BS/01 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Circulation 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard, plaster over 






NA 



brick and brick 
 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  15  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Circulation 
 
Walls - plasterboard and brick 






NA 



 
 
Fire break - MMMF 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Library 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Boxing/riser - wood 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Staff Study 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Panels adjacent window - 
SP 
As BS/01 




NA 


 
insulation board 
 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  16  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
Fire break - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Studio 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Panels adjacent window - 
SP 
As BS/01 




NA 


 
insulation board 
 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick, plasterboard and 
SP 
As BS/01 




NA 


 
insulation board  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 7A 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Fire break - MMMF 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  17  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 8 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Fire break - MMMF 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Corridor 3 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Sink pad - modern 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 6 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  18  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 6 
Yes  
Floor - modern vinyl covering 






NA 



(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 6 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard, plaster over 
SP 
As BS/01 




NA 



brick, brick and insulation board  
 
 
Boxing - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Drainage goods - plastic 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  19  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 5 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard, plaster over 
SP 
As BS/01 




NA 



brick, brick and insulation board  
 
 
Boxing - wood 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Corridor 4 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Cladding to columns - wood 






NA 



 
 
Sink pads - modern 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Rear Lobby 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  20  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Rear Lobby 
 
Walls - brick 






NA 



 
 
Pipe insulation - hessian covered 






NA 



MMMF 
 
 
Boxing to wall - wood 






NA 



 
 
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cloakroom 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Un lagged pipe work 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick, plasterboard and 






NA 



MMMF 
 
 
Fire break - insulation board  
SP 
As BS/01 




NA 



 
 
Pipe insulation - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Boys Toilet 2 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Walls - plasterboard and ceramic 






NA 



tiles 
 
 
Low level boxing - wood 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  21  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Boys Toilet 2 
 
Walls - plasterboard and plaster 






NA 



over brick  
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Girls Toilet 2 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Walls - plasterboard and ceramic 






NA 



tiles 
 
 
Low level boxing - wood 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick  
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 4 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Boxing - wood and plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  22  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Base 4 
 
Walls - brick and polystyrene tiles 






NA 



 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 3 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Boxing - wood and plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  23  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cloakroom 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Skylight upstands - plasterboard 






NA 



 
 
Walls - brick 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick, plasterboard and 






NA 



MMMF 
 
 
Fire break - insulation board  
SP 
As BS/01 




NA 



 
 
Pipe insulation - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Rear Lobby 2 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - hessian covered 






NA 



MMMF 
 
 
Boxing to wall - wood 






NA 



 
 
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  24  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 2 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Boxing - wood and plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 1 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Boxing - wood and plasterboard 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  25  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Pipe insulation - foil covered 






NA 



Base 1 
MMMF 
(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Corridor 5 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 5 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe work - plastic 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  26  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Walls - brick 






NA 



Store 5 
 
Fire break - insulation board 
SP 
As BS/01 




NA 



(cont) 
 
Pipe insulation - MMMF 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P.E. Hall 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick and steel columns 






NA 



 
 
Columns to wall - insulation 
SP 
As BS/01 




NA 



board  
 
 
Panels to wall - wood 






NA 



 
 
Panels above servery hatches - 






NA 



wood 
 
 
Window soffit - plasterboard 






NA 



 
 
Pipe penetration panel - wood 






NA 



 
 
Un lagged pipe work - metal 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and polystyrene tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Tank - metal 






NA 



 
 
Tank insulation - polystyrene 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  27  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Pipe insulation - foil covered 






NA 



P.E. Hall 
MMMF 
(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P.E. Store 1 
Yes  
Roof - corrugated metal 






NA 



 
 
Steel structural beams 






NA 



 
 
Walls - brick and plasterboard 






NA 



 
 
Drainage goods - plastic 






NA 



 
 
Pipe insulation MMMF, foil and 






NA 



cloth 
 
 
Electric boxes - modern 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P.E. Store 2 
Yes  
Ceiling - plasterboard  






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Columns to wall - insulation 
SP 
As BS/01 




NA 



board  
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Floor - modern vinyl covering 
SP 
As BS/01 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P.E. Store 3 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  28  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
P.E. Store 3 
Yes  
Floor - modern vinyl covering 






NA 



(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kitchen/ 
Yes  
Ceiling - MMMF suspended tiles 






NA 



Community  
 
Skylight upstands - plasterboard 






NA 



Room 
 
Walls - plasterboard 






NA 



 
 
Sink pads - modern 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store Room 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - plasterboard  






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  29  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



Store Room 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
No suspect material identified  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Community 
Yes 
Ceiling - MMMF suspended tiles 






NA 



Room Lobby 
 
Walls - brick and plasterboard 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
 
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Mixed 
Yes  
Ceiling - MMMF suspended tiles 






NA 



Toilet 1 
 
Walls - plaster over brick and 






NA 



plasterboard 
 
 
Boxing - wood 






NA 



 
 
Toilet cistern - ceramic 






NA 



 
 
Floor - modern vinyl covering  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  30  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Walls - brick and plasterboard  






NA 



Mixed Toilet 1 
 
Pipe insulation - foil  






NA 



(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Mixed 
Yes  
Ceiling - MMMF suspended tiles 






NA 



Toilet 2 
 
Walls - plaster over brick and 






NA 



plasterboard 
 
 
Panels to wall - wood 






NA 



 
 
Boxing - wood 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick and plasterboard  






NA 



 
 
Pipe insulation - foil  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Main Kitchen 
Yes  
Ceiling - plasterboard tiles 






NA 



 
 
Walls - ceramic tiles, plaster over 






NA 



brick  
 
 
Panels to walls - wood 






NA 



 
 
Un lagged pipe work - metal 






NA 



 
 
Panels above servery hatches - 
SP 
As BS/01 




NA 



insulation board  
 
 
Bitumen covering (to underside of 
ID 
BS/03 




NA 



sink) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  31  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Main Kitchen 
Yes  
Cooking equipment - modern 






NA 



(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plasterboard and brick 






NA 



 
 
Fire break above servery area - 
SP 
As BS/01 




NA 



insulation board  
 
 
Pipe insulation - hessian and foil 






NA 



covered MMMF 
 
 
Duct work - metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Staff Office 
Yes  
Ceiling - plasterboard  






NA 



 
 
Walls - plaster over brick 






NA 



 
 
Skylight upstands - insulation 
SP 
As BS/01 




NA 



board (and plasterboard) 
 
 
Floor - stone tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  32  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kitchen 
Yes  
Ceiling - plasterboard  






NA 



Toilet 
 
Walls - plaster over brick 






NA 



 
 
Skylight upstands - insulation 
SP 
As BS/01 




NA 



board (and plasterboard) 
 
 
Toilet cistern 
SP 
As BS/02 




NA 



 
 
Floor - stone tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Veg Store 
Yes  
Ceiling - plasterboard tiles 






NA 



 
 
Walls - plaster over brick 






NA 



 
 
Floor - quarry tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Larder 
Yes  
Ceiling - plasterboard tiles 






NA 



 
 
Walls - plasterboard 






NA 



 
 
Floor - quarry tiles 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - plaster over brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  33  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Fire break - insulation board  
SP 
As BS/01 




NA 



Larder 
 
 
 
 
 
 
 
 
 
 
 
 
(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Plant Room 
Yes  
Roof - corrugated metal 






NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil and cloth 






NA 



covered MMMF 
 
 
Plant machinery - modern 






NA 



 
 
Electrical boxes - modern 






NA 



 
 
Panels to walls above doorway - 






NA 



polystyrene 
 
 
Floor - concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
EXTERIOR 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exterior 
Yes  
Roof - felt 
ID 
BS/04 




NA 



 
 
Walls - brick 






NA 



 
 
Fascia - plastic and wood 






NA 



 
 
Soffits - insulation board  
ID 
BS/05 




NA 



 
 
Part soffits - wood 






NA 



 
 
Damp proof course  
ID 
BS/06 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  34  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL 
 
 
 
 
 
 
 
 
 
 
 
 
 
Entrance Lobby 
Yes  
Ceiling - plasterboard 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Floors - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 9 
Yes  
Ceiling - plasterboard 






NA 



 
 
Walls - plasterboard and plaster 






NA 



over brick 
 
 
Floors - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Disabled Toilet 
Yes  
Ceiling - plasterboard  






NA 



 
 
Walls - ceramic tiles 






NA 



 
 
Toilet cistern - ceramic 






NA 



 
 
Boxing - wood 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - plastic covering over wood 






NA 



 
 
Walls - brick 






NA 



 
 
Ducting - metal 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cloaks 
Yes  
Ceiling - insulation board (over 
SP 
As BS/01 




NA 



MMMF and plasterboard) 
 
 
Skylight upstands - plasterboard 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  35  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cloaks 
Yes  
Walls - brick 






NA 



(cont) 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Walls - brick (Upper walls - 






NA 



wood) 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Tank Room 
Yes  
Ceiling - insulation board  
SP 
As BS/01 




NA 



 
 
Walls - insulation board (over 
SP 
As BS/01 




NA 



brick) 
 
 
Tank - metal 






NA 



 
 
Tank insulation - polystyrene 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Floor - wood 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Girls Toilets 
Yes  
Ceiling - MMMF tiles 






NA 



 
 
Walls - ceramic tiles and plaster 






NA 



over brick  
 
 
Toilet cisterns - ceramic 






NA 



 
 
Low level boxing - wood 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  36  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - sarking felt (over MMMF 
ID 
BS/07 




NA 



Girls Toilets 
insulation) 
 
 
Walls - insulation board (over 
SP 
As BS/01 




NA 



brick) 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Boys Toilets 
Yes  
Ceiling - MMMF tiles 






NA 



 
 
Walls - ceramic tiles and plaster 






NA 



over brick  
 
 
Toilet cisterns - ceramic 






NA 



 
 
Low level boxing - wood 






NA 



 
 
Floor - modern vinyl covering 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above  
Yes  
Roof - sarking felt (over MMMF 
SP 
As BS/07 




NA 



insulation) 
 
 
Walls - insulation board (over 
SP 
As BS/01 




NA 



brick) 
 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hall 
Yes  
Ceiling - wood 






NA 



 
 
Skylights (not accessed too high) 








DA 
A3 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  37  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hall 
Yes  
Ceiling boxing - insulation board 
SP 
As BS/01 




NA 



(cont) 
 
Walls - brick 






NA 



 
 
Floor - carpet over wood  






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 8 
Yes  
Ceiling - plasterboard 






NA 



 
 
Ceiling boxing - insulation board 
SP 
As BS/01 




NA 



 
 
Walls - brick 






NA 



 
 
Boxing above doorway - wood 






NA 



 
 
Sink unit - modern 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 9 
Yes  
Ceiling - plasterboard 






NA 



 
 
Ceiling boxing - insulation board 
SP 
As BS/01 




NA 



 
 
Walls - brick 






NA 



 
 
Boxing above doorway - wood 






NA 



 
 
Sink unit - modern 






NA 



 
 
Floor - carpet over concrete 






NA 



Void Behind 
Yes  
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  38  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 10 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Sink unit - modern 






NA 



 
 
Floor carpet and modern vinyl 






NA 



covering 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - sarking felt 
SP 
As BS/07 




NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
Walls - brick 






NA 



 
 
Boxing - insulation board  
SP 
As BS/01 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 11 
Yes  
Ceiling - plasterboard 






NA 



 
 
Ceiling boxing - insulation board 
SP 
As BS/01 




NA 



 
 
Walls - brick 






NA 



 
 
Sink unit - modern 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Un lagged pipe work 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 10 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Toilet cistern - ceramic 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  39  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 10 
Yes  
Floor - brown vinyl floor tiles  
ID 
BS/08 




NA 



(cont) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - sarking felt 
SP 
As BS/07 




NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Store 11 
Yes  
Ceiling - MMMF suspended tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Toilet cistern - ceramic 






NA 



 
 
Floor - brown vinyl floor tiles  
SP 
As BS/08 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Above 
Yes  
Roof - sarking felt 
SP 
As BS/07 




NA 



 
 
Walls - brick 






NA 



 
 
Pipe insulation - foil covered 






NA 



MMMF 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base 12 
Yes  
Ceiling - plasterboard 






NA 



 
 
Ceiling boxing - insulation board 
SP 
As BS/01 




NA 



 
 
Walls - brick 






NA 



 
 
Sink unit - modern 






NA 



 
 
Floor - carpet over concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
APPENDIX A 
 
 
 
  ASBESTOS SURVEY  -  DATA RECORD SHEET - continued          
 
 
Page  40  of  40 
 
Report No: AR/10/01568 
Date of survey: 04/03/10 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Area ID 
Surveyed 
Location of sample point /  
Level of 
Sample 
Extent  
Product   Condition 
Surface 
Asbestos 
Score 
Access 
Action 
 
Yes/No 
Description 
ID 
ID 
(m/m2/m3) 
Type 
(0,1,2,3) 
Treatment 
Type 
(DA,OA,EA) 
(A1,A2,A3) 
of suspect material 
(P/SP/ID) 
(1,2,3) 
(0,1,2,3) 
(1,2,3) 
 
YEAR 5 & 6 BUILDING - BURNSIDE PRIMARY SCHOOL (continued) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Void Behind 
Yes  
Un lagged pipe work 






NA 



Base 12 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Plant Room 2 
Yes  
Ceiling - insulation board  
SP 
As BS/01 




NA 



 
 
Walls - brick 






NA 



 
 
High level panels to walls 
SP 
As BS/01 




NA 



(adjacent doors) - insulation board  
 
 
Calorifier boiler - modern 






NA 



 
 
Electrical equipment - modern 






NA 



 
 
Pipe insulation - modern foil 






NA 



covered MMMF 
 
 
Gasket - modern 






NA 



 
 
Floor - concrete 






NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
EXTERIOR 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exterior 
Yes  
Roof - concrete tiles 






NA 



 
 
Walls - brick 






NA 



 
 
Soffits - wood 






NA 



 
 
Fascia - wood 






NA 



 
 
Undercloaking - cement  
ID 
BS/09 




NA 



 
 
Damp proof course  
ID 
BS/10 




NA 



 
 
 
 
 
 
 
 
 
 
 
 
 
Level of ID: P – Presumed, SP – Strongly Presumed, ID – Identified.  Access: DA – Difficult Access, OA – Occasionally Accessed, EA – Easily/Regularly Accessed 
Asbestos Type: NA –  Non-Asbestos  Action: A1 – Remove ASAP, A2 – Repair/Encapsulate ASAP, A3 – Leave Undisturbed and Monitor Situation 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                              
 
 
Surveyor – M Steadman 
 
 
Procedure  ASB/6 APPENDIX B,  Page 2 of 2, Issue No.10, Issue Date 23/04/10, Issued by VEGA 

APPENDIX B 
 
VEGA ENVIRONMENTAL CONSULTANTS LTD 
 
MATERIAL ASSESSMENT ALGORITHM – FOR MANAGEMENT SURVEY 
Sample Variable 
Score 
Main Examples 
Product Type 

Asbestos  reinforced  composites  (plastic,  resins,  mastics,  roofing 
felts,  vinyl  floor  tiles,  semi-rigid  paints  or  decorative  finishes, 
asbestos cement etc.) 
 
 

Asbestos insulating board, mill boards, other low-density insulation 
boards,  asbestos  textiles,  gaskets,  ropes  and  woven  textiles, 
asbestos paper and felt. 
 
 

Thermal insulation (e.g. pipe and boiler lagging), sprayed asbestos, 
loose asbestos, asbestos mattresses and packing. 
 
Condition 

Good condition: no visible damage 
 
 

Low  damage:  a  few  scratches  or  surface  marks;  broken  edges  on 
boards, tiles etc. 
 
 

Medium damage: significant breakage of materials or several small 
areas  where  material  has  been  damaged  revealing  loose  asbestos 
fibres. 
 
 

High  damage  or  delamination  of  materials,  sprays  and  thermal 
insulation. Visible asbestos debris. 
 
Surface Treatment 

Composite  materials  containing  asbestos:  reinforced  plastics, 
resins,  vinyl  tiles,  painted  or  asbestos  cement  (with  exposed  face 
painted or encapsulated) 
 
 

Enclosed  sprays  and  lagging,  AIB  (with  exposed  face  painted  or 
encapsulated), asbestos cement sheets etc. 
 
 

Unsealed AIB, or encapsulated lagging and sprays. 
 
 

Unsealed lagging and sprays. 
 
Asbestos Type 

Chrysotile. 
 
 

Amphibole asbestos excluding crocidolite. 
 
 

Crocidolite. 
 
 
INITIAL ACTION PLAN 
MATERIAL  ASSESSMENT 
ACCESS 
SCORE 
Difficult 
Occasionally  Easily/Regularly 
Access 
Accessed 
Accessed 
Very Low Risk: < 5 
A3 
A3 
A3 
Low Risk: 5-6 
A3 
A3 
A2 
Medium Risk: 7-9 
A3 
A2 
A1 
High Risk: 10-12 
A2 
A1 
A1 
 
 
 
Procedure  ASB/6 APPENDIX C,  Page 1 of 1, Issue No. 4, Issue Date 18/05/10, Issued by VEGA 



Church Buildings 
 
OCCUPATIONAL HYGIENE CONSULTANTS 
Station Road 
Asbestos Surveys, Analysis and Monitoring 
Seaton Delaval 
COSHH Audits, Assessments and Surveys 
Whitley Bay 
Indoor Air Quality, Environmental Testing 
TYNE & WEAR 
 
NE25 0PT 
CLEANROOM TESTING CONSULTANTS 
 
DOP/PSL Testing of HEPA/ULPA Filters 
 
HLF, VLF, MSC and Fume Cupboard Testing 
Tel: 
(0191) 298 0198 
Validating/Testing of Pharmaceutical Process Isolators 
Fax: 
(0191) 298 0199 
 
 
 
CONFIDENTIAL 
 
APPENDIX C 
 
ASBESTOS ANALYSIS REPORT  
Page  1  of  2 
 
 
Report No:  AR/10/01568 
Date of Issue:  
20/07/10 
 
 
 
Client:  John Warwick 
Date Sample Received: 
04/03/10 
 
Northumberland County Council 
 
 
 
(Asbestos) 
Date Analysed: 
09/03/10 
 
Resources Department, Performance 
 
 
 
County Hall 
Laboratory: 
Permanent 
 
Morpeth 
 
 
 
NE61 2EF 
Order/Contract No. 
 
 
 
 
 
Origin of bulk sample: 
Burnside Primary School, Cramlington, Northumberland. 
 
Samples taken by:
 
M Steadman 
Company: 
Vega Ltd 
 
 
 
 
Samples analysed by 
R Walton 
 
 
Sample ID 
Location of Sample Point 
Analysis 
 
 
 
BS/01 
Staff Room, Panels to wall - 
No asbestos detected  
insulation board  
 
 
 
BS/02 
Female Toilet 1, Toilet cisterns  No asbestos detected  
x 3 
 
 
 
BS/03 
Main Kitchen, Bitumen 
No asbestos detected  
covering (to underside of sink) 
 
 
 
 
Analysis was carried out in accordance with HSG248: February 2005  – ‘Asbestos: The analysts’ guide 
for sampling, analysis and clearance procedures’ by documented in-house procedure Number ASB/3.
 
VEGA cannot accept responsibility for the information on, or condition of, bulk samples taken/supplied 
by non-Vega personnel or the effect such information or condition may have on the analysis of fibrous 
content. 
Checked By: __________________      
Authorised By: _________________ 
 
 
E Brown 
 
 
 
 
   E Brown 
 
 
 
 
 
 
 
 
   (Technical Director) 
 
This report must not be reproduced except in full, without written approval of Vega 
 
Procedure ASB/3 APPENDIX B,  Page 1 of 2, Issue No.10, Issue Date 08/05/07, Issued by VEGA 
 
 
 
 
1634 
Directors: E. Brown., B.Sc., M.Sc., DipOH, MFOH, A. Brown, B.Sc., M.R.Pharm.S. & R Brown  
Reg. No. 2319141 England 


CONFIDENTIAL 
 
APPENDIX C 
ASBESTOS ANALYSIS REPORT - CONTINUED 
Page  2  of  2 
 
Report No. AR/10/01568 
 
Sample ID 
Location of Sample Point 
Analysis 
 
 
 
BS/04 
Exterior, Roof - felt 
No asbestos detected  
 
 
 
BS/05 
Exterior, Soffits - insulation 
No asbestos detected  
board 
 
 
 
BS/06 
Exterior - damp proof course  
No asbestos detected  
 
 
 
BS/07 
Year 5 & 6 Building, Girls 
No asbestos detected  
Toilets, Void Above, Roof - 
sarking felt 
 
 
 
BS/08 
Year 5 & 6 Building, Store 10, 
No asbestos detected  
Floor - brown vinyl floor tiles  
 
 
 
BS/09 
Year 5 & 6 Building, Exterior -  No asbestos detected  
cement uncloaking 
 
 
 
 
Year 5 & 6 Building, Exterior -  No asbestos detected  
damp proof course  
 
 
 
 
Analysis was carried out in accordance with HSG248: February 2005  – ‘Asbestos: The analysts’ guide 
for sampling, analysis and clearance procedures’ by documented in-house procedure Number ASB/3.
 
VEGA cannot accept responsibility for the information on, or condition of, bulk samples taken/supplied 
by non-Vega personnel or the effect such information or condition may have on the analysis of fibrous 
content. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Procedure ASB/3 APPENDIX B, Page 2 of 2, Issue No. 10, Issue Date 08/05/07, Issued by VEGA 
1634 
 
 

APPENDIX D 
                    INSURANCE INFORMATION 
 
 
 
Issue No: 6 
Form No: 098 
Issue Date: 14/06/10 
Page No: 1 of 1 
Insurance Information 
Issued By: Andrea Scott  
 
Report No: AR/10/01568 
 
Appendix 
 
Vega  Environmental  Consultants  Ltd  hold Professional  Indemnity  Insurance.    This  policy  is  provided  by  Miles 
Smith (Policy No. B0740531090010).  This report is issued with the following Caveats: 
 
Every  effort  has  been  made  to  identify  all  asbestos  materials  as  far  as  was  reasonably  practical  to  do  so 
within the scope of the survey and the attached report.  Methods used to carry out the survey were agreed 
with the client prior to any works being commenced. 
 
Survey  techniques  used involve  trained  and  experienced  surveyors  using  the  combined  approach with  regard  to 
visual  and  other  physical  examination  and  necessary  bulk  sampling.    It  is  always  possible  after  a  survey  that 
asbestos  based  materials  of  one sort  or  another  may  remain  in  the  property  or  area  covered  by  that  survey,  this 
could be due to various reasons: 
 
 
Where a localised survey is carried out, the extent of the survey will be highlighted by a drawing.  All 
areas outside the highlighted areas will not be covered by the report and are therefore outside the scope 
of the survey. 
 
Management  surveys  are  not  fully  intrusive  surveys  and  ACMs  may  be  hidden  or  obscured  by  other 
items e.g. overboarding / disguising or ACMs behind other ACMs (e.g. asbestos pipe insulation behind 
AIB boxing).  In theses cases detection will be impaired. 
 Refurbishment  /  demolition  surveys  are  fully  intrusive  surveys.    However,  where  ACMs  are 
 identified  or  suspected  the  surveyor  cannot  remove  these  items  to  inspect  behind  them  (e.g.  AIB 
ceilings and boxing) for additional ACMs. 
 
Asbestos may well be hidden as part of the structure to a building (e.g. within concrete slab expansion 
joints hidden beneath other structural elements) and not visible until the structure is dismantled at a later 
date. 
 
Where an area has been previously stripped of asbestos (e.g. plant rooms, ducts etc) and new coverings 
added, it must be pointed out that asbestos removal techniques have improved steadily over  the  years 
since  its  introduction.    Most  notably  would  be  the  Control  of  Asbestos  Regulations  2006  or  other 
similar subsequent Regulations laying down certain enforceable guidelines.  Asbestos removal prior to 
this  regulation  would  not  be  of  today’s  standard  and  therefore  debris  may  be  present  below  new 
coverings.    A  management  survey  is  unlikely  to  detect  this  material  whereas  in  a  refurbishment  / 
demolition survey inspections will be carried out below the newer insulation. 
 
This survey (management or refurbishment / demolition) will detail all areas accessed and all samples 
taken.  For a management survey an area not covered will be due to no access for one reason or another, 
e.g. working operatives, sensitive location or just simply no access.  It may have been necessary for the 
limits of the surveyor’s authority to be confirmed prior to the survey. 
 
The survey report will clearly identify the specific areas included and / or excluded from the scope of 
the survey.  However, for management surveys access to some areas may be restricted for many reasons 
beyond  our  control  such  as  height,  inconvenience  to  others,  immoveable  obstacles  or  confined  space.  
Where  electrical  equipment  is  present  and  presumed  in  the  way  of  the  survey  no  access  will  be 
attempted until proof of its safe  state is  given.  In these instances it  may be necessary to presume  the 
presence  of  asbestos.    Our  operatives  have  a  duty  of  care  under  the  Health  &  Safety  at  Work  etc  Act 
1974 for both themselves and others. 
 
In the building where asbestos has been located and it is clear that not all areas have been investigated, 
any  material  that  is  found  to  be suspicious  in  these  areas  should be  treated  with  caution  and  sampled 
accordingly.  Areas of the building that have not been surveyed (clearly defined as not part of the scope 
of  the  survey)  may  contain  ACMs  and  this  is  particularly  important  where  the  survey  has  identified 
ACMs in other areas of the building. 
 
Certain  materials  contain  asbestos  to  varying  degrees  and  some  may  be  less  densely  contaminated  at 
certain locations (e.g. textured coatings).  In situations where this is suspected, composite samples may 
be taken from various locations of the ACM.   
 
Where  a  survey  is  carried  out  under  the  guidance  of  the  owner  of  the  property,  or  his  representative, 
then  the  survey  will  be  as  per  his  instructions  and  guidance  at  that  time.    The  report  will  reflect  any 
deviations from the guidance (HSG 264). 
 
Vega Environmental Consultants Ltd cannot be held responsible for any damage caused as part of this 
survey  carried  out  on  your  behalf.    Due  to  the  nature  and  necessity  of  sampling  for  asbestos  some 
damage is unavoidable and will be limited to just that necessary for the taking of the sample. 
 
 
References 
 
1. 
Miles Smith Certificate of Insurance ref: MSPI0505. 
Vega Environmental Consultants Ltd