WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
1/001
Booking Hall
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
Due to age of construction assumed NAD
1/004
Ticket Hal
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/012
Ticket Office
W3 - Boarding 
11/05/2015
-
-
(0.75m²) to low 
-
level boxing - 
NADIS
W3 - 3 x boarding to boxing above windows - NADIS
-
11/05/2015
-
-
1/013
Ticket Office
None Visible
No Access
Solid
Supalux Ceiling Tiles
Metal Work, PVC 
c1
Survey Required
Cables
Survey Required
1/014
Ticket Office
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/020
Ticket Office
None Visible
Concrete, Supalux 
Solid
Supalux Ceiling Tiles
Metal Work, PVC 
02/10/2017
-
-
debris panel 2m2 
Cables
-
to floor NADIS
1/021
Pom
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/022
Pom
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/023
Pom
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/029
Pom
None Visible
False Plaster Tiles No Access
W1 Solid, Concrete;  Suspended Concrete,  Concrete
c1
W2-4 Concrete; W2  Supalux
Fire Door; W3 
Supalux Boxing; 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Supalux Tiles 
above Automated 
Machines
1/030
Pom
None Visible
Concrete
Solid
supalux ceiling tiles
Metal Work, PVC 
-
-
Cables
-
1/032
Kitchen
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/033
Mess Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/035
Mess Room
None Visible
Concrete
Solid
supalux ceiling tiles
Metal Work, PVC 
-
-
Cables
-
1/036
Toilet
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/037
Toilet
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/038
Toilet
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/040
Toilet
None Visible
Concrete
Solid
supalux ceiling tiles
Metal Work, PVC 
-
-
-
Cables
1/055
Mess Room
None Visible
Ceramic tiled, PVC 
Tiled ceramic
Tiles Supalux
Block, Concrete, 
-
-
cabled, cable tray
plaster, PVC 
cables, lagging, 
-
rock wool, conduit, 
air con
1/066
Lobby
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/067
Lobby
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/071
Circulating  Area
None Visible
Solid 
Ceramic tiled
Metal
Metal trunking & 
-
-
Concrete, 
-
Cables - PVC
-
-
-
1/072
Circulation Area
None Visible
Solid 
Ceramic tiled
Metal
Metal trunking & 
-
-
-
Concrete, 
16 Cable sleeves - Large Concrete, Cables  - PVC
-
-
-
Manhole No 1 - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Manhole No 2 - All cable sleeves terracotta, all cables plastic, fibreglass lagging
-
-
-
Manhole No 3 - All cable sleeves terracotta, all cables plastic, fibre glass lagging
-
-
-
above false ceiling ,  None Visible
rock wool fire stop metal pipes
-
-
by supervisor's 
-
office
1/074
Circulation Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/081
Lobby
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/087
Circulation Area
None Visible
Solid Concrete
Ceramic tiles 
supalux ceiling tiles
No Access
-
-
-
15/06/2016
HMU Re-Inspection - No Access
Previously Lobby
Manhole No. 6 - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/088
Circulation Area
None Visible
Solid Concrete
Ceramic tiles 
supalux ceiling tiles
No Access
-
-
-
15/06/2016
HMU Re-Inspection - No Access
Manhole No. 4 - Tile damage, No access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Manhole No 5 - Tile damage, No access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/089
Circulation Area
None Visible
Solid Concrete
Ceramic tiles 
supalux ceiling tiles
No Access
-
-
-
15/06/2016
HMU Re-Inspection - No Access
1/090
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/091
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/092
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/093
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/094
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/095
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/096
Service Route
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/097
Corridor
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
1/098
Lobby
Not surveyed
New (Previously part of 1/971)
-
-
-
1/116
Lift
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/131
Lift Motor Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/136
Lift Shaft
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/151
Umc Access
None Visible
Concrete & steel
Concrete & steel,
Concrete & steel
-
-
Ducts at high level 
-
wal  - Porcelain to 
1/662
Using existing cable tray - Down escalator 4, all cables PVC tray work metal
-
-
-
Using existing J-hangers at high - Level  down escalator 6
-
-
-
Flammable store bin - Durasteel lid - Non asbestos, No asbestos cables
-
-
-
Lead Paint
Stairs - Grey oil based - 5sqm
-
16/05/2007
-
-
15/06/2016
Upstand girder - Grey based oil - 10 Lm
Umc 4&6
Asbestos - SP
Concrete
Wal  1 - clay cable  Plywood panel above  No access
sleeves
stairs & Concrete,
Asbestos - SP 
Concrete & tunnel 
LOW
06/12/2005
C
Reinspect
15/06/2016
Rings, Concrete 
sealed, presume 
caulking behind,
Existing cable tray - NAD
-
-
-
2m² Flammable store bin - Durasteel lid - Non asbestos
-
-
1/152
Umc Access
Asbestos - SP
Concrete
Concrete
Concrete
-
-
-
Escalators 1,2&3
2m² Storage bin lid - Durasteel - Non asbestos
-
-
-
200mm x 200mm cementitious board containing amosite asbestos. the board is
-
25/03/2010
-
-
Removed by Econ
24/08/2010
Asbestos - SP - Cable sleeves in wall by vent grid, no access to take sample
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Asbestos - SP - All Rings Tunnel rings with Concrete and presumed caulking behind
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
1 x transformer box
LOW
?
C
Reinspect
HMU Re-Inspection - OK
Multiple electrical boxes
LOW
?
C
Reinspect
HMU Re-Inspection - OK
Lead Paint
Pipe work - Red oil based - 40Lm
-
16/05/2007
-
Reinspect
15/06/2016
HMU Re-Inspection - OK
Girder - Cream/red oil based paint - 40Lm
-
16/05/2007
-
Reinspect
15/06/2016
HMU Re-Inspection - OK
Walls - Cream emulsion - 110sqm
-
16/05/2007
-
Reinspect
15/06/2016
HMU Re-Inspection - OK
Escalators 1
6 panels down from  None Visible
Solid Concrete
-
-
-
top arch
<2m2 - Dust sample off bottom metal rail used to mount VE panels - NADIS (two samples taken)
-
-
-
Behind VE panel
None Visible
Solid brick and 
-
-
-
Dust swab of base of tunnel ring and VE panels - NADIS, Structural support - Metal, Panels to rear of VE -
-
-
-
Behind VE panel no  None Visible
Concrete / metal 
-
-
-
3
struts
Behind hand rail trough - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Behind VE panel 
None Visible
Concrete / metal 
-
-
-
Behind hand rail trough - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
1 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Behind VE panel Asbestos
Asbestos - K  ~5m Cement Severley damaged were bolted onto wall (brackets)
-
10/12/2008
-
-
Removed
02/01/2009
Behind VE panel no  No Access
>1m2 Dust of surfaces - NADIS
-
-
-
15/16
Below hand rail trough
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
22 panels down 
Asbestos
Asbestos - P
Solid Concrete
-
10/12/2008
-
-
Removed
02/01/2009
from top arch
Removed
2m2 - Dust sample off bottom rail - NADIS, 2m² Dust sample off top rail - NADIS
-
-
-
Escalators 3
bottom panel
Asbestos
3m² Debris behind panel - NADIS
-
-
-
Removed
Asbestos - SP - Panel with void at high level - restricted access
16/09/2008
-
-
02/01/2009
-
Removed
10/12/2008
behind viewing 
None Visible
Concrete & brick
-
-
-
panel 2
<1m2 Dust - NADIS, Structural support, struts and buttress - Metal, Below hand rail trough - run along 
-
-
-
entire length of escaltor - no access
behind viewing 
Asbestos
Concrete & brick
-
-
-
panel 5
Removed
Asbestos - K - <0.5m2 - Dust and rubble
-
10/12/2008
-
-
Removed
02/01/2009
behind viewing 
Asbestos
Concrete & brick
-
-
-
panel 7
Removed
Asbestos - K - Dust & rubble
-
10/12/2008
-
-
Removed
02/01/2009
behind viewing 
Asbestos
Structural support, struts & buttress
-
-
-
panel 9, 11,13
Removed
Asbestos - K - <0.5m2 Dust & rubble
-
10/12/2008
-
-
Removed
02/01/2009
behind viewing 
None Visible
Ceramic tile finish, 
-
-
-
panel 17
Concrete and brick
<1m2 Dust & rubble - NADIS
-
-
-
1/153
Umc Access
Asbestos - K
Brick, By door - 
-
-
-
Supalux panel
Cables - PVC
-
-
-
Asbestos - SP -Caulking on Brick & Tunnel rings.
LOW
06/12/2005
C
06/12/2005
15/06/2016
HMU Re-Inspection - OK
Asbestos - K - Chrysotile - 1x60mm white woven insulated cable
06/12/2005
C
06/12/2005
15/06/2016
LOW
HMU Re-Inspection - OK
Escalator 8
No asbestos detected to front motor.  No board, paper etc
-
-
-
Removal of Arc Shutes from Escalator Controllers 7&8
2002
-
-
08/01/2010
-
Removed by Econ Construction (ES2443)
Asbestos - K - <1m2 Paper lining to auxillary break switch
-
24/02/2009
-
-
Removed by Econ Construction (ES2443)
08/01/2010
Asbestos - K - <1m2 - Debris (paper lining) under auxillary
-
24/02/2009
-
-
Removed by Silver, ES2315
01/03/2009
Escalator 7
No asbestos detected to front motor.  No board, paper etc.  No visible debris present to floor below 
-
-
-
Removal of Arc Shutes from Escalator Controllers 7&8
-
2002
-
-
Removed by Econ Construction (ES2443)
08/01/2010
Asbestos - K - <1m2 - Paper lining to auxillary break switch within red box - Has been 
-
24/02/2009
-
-
Removed by Econ Construction (ES2443)
08/01/2010
1/154
Umc Access, 
Asbestos - SP
Concrete
  
Asbestos - SP 
Metal, Concrete
Escalators 9,10,11
(Chrysotile)Concr
ete & tunnel 
Rings, Concrete 

LOW
06/12/2005
C
06/12/2005
15/06/2016
HMU Re-Inspection - No Access
sealed, presume 
caulking behind
Bricks

1/155
Umc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/156
Umc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/172
Escalator Incline  Asbestos - SP
Asbestos - SP - Tunnel ring caulking all rings - caulking suspected in ring joints throughout 
C
LOW
06/12/2005
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/173
Shafts
incline shaft and UMC/LMC's
1/172
Escalator Shaft
Asbestos - SP
Concrete
Asbestos - SP - 
Metal stairs
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/173
Escalator Shaft
Asbestos - SP
Asbestos - SP - 
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/174
Escalator Shaft
Asbestos - SP
Concrete
Asbestos -SP 
Metal of escalator
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Removed
Chrysotile cement Fire Break above metal escalator panelling
03/08/2008
-
-
03/08/2008
-
Removed by Eurocom as part of there works
1/175
Escalator Shaft
Asbestos - SP
Concrete
Asbestos - SP 
Metal stairs
C
(Chrysotile)
All rings - Tunnel 
rings with 

LOW
06/12/2005
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Concrete & 
presumed 
caulking behind.

1/205
Passage
None Visible
Breeze Block
-
-
-
 Breeze Block - intrusive - Non asbestos, Intrusive cement - Non asbestos, Glazed Block - Intrusive - Non 
-
-
-
asbestos
Trunking - No access inside
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/206
Passage
Asbestos - K
Cement, glazed 
Plaster layer to 
Asbestos- K 
-
-
Removed
brick - Intrusive - 
Concrete ceiling - Non  (Chrysotile) Entry 
Non asbestos
asbestos
to passage 
Corrugated 

-
30/01/2003
06/12/2005
Removed by Silverdell
25/09/2008
cementitous 
sheeting

At risers, 1/206 &  Asbestos - P
Asbestos - P 
-
-
into 1/205 & 1/611 Removed
Corrugated steel 
-
30/01/2003
06/12/2005
Removed by Silverdell
25/09/2008
sheets, no access 
above

Riser adjacent to 
None Visible
Residue to pipe - Non asbestos, Debris adjacent to pipe - Non asbestos
-
-
-
-
1/206
 Bitumen material & Boarding located within riser passageway - NAD,
Roofing along 
Asbestos - K
Asbestos - K 50m² 
corridor towards  Removed
Corrugated 
09/03/2006
Jubilee - 1/206& 
cementitous 
-
15/11/2001
-
-
Removed by Silverdell
25/09/2008
06/12/2005
1/205 &1/611
sheeting
1/207
Circulating Area
None Visible
Cable trunking - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Manhole No.7 - Cable troughing metal, Cables - plastic & rubber
-
-
-
Manhole No. 8 -Cable troughing - metal, Cables - plastic &rubber
-
-
-
1/208
Corridor
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/230
Passage
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/231
Passage
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/232
Passage
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/237
Corridor
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/239
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/240
Over bridge
None Visible
Solid
Passage -Fixing to  Metal corrugated 
No Access
c1
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Wall 1 - Tiles on 
sheets
Cables - PVC, Trunking - Metal & Concrete
-
-
-
1/241
Passage
Asbestos - K
Solid
Solid
Solid
Asbestos - K
Corrugated 
cementitous 
Chrysotile 

06/12/2005
LOW
30/01/2003
C
Reinspect
HMU Re-Inspection - No Access
sheeting near 
15/06/2016
1/611, 1/206&1/205
New cable tray
-
-
-
1/242
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/244
Corridor (nwr)
Asbestos - K
Asbestos - K - 
C
Corrugated 
sheets, Chrysotile

Network Rail - N115-14s
LOW
30/01/2003
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
2 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
1/245
Corridor
None Visible
Quarry tiles
Ceramic tile, brick,  Metal, False ceiling -
Water pipe, PVC 
-
-
plaster.
Supalux tiles.
cable,
Wal s above false 
Block, plaster
-
ceiling - 
Block/Plaster
Boxing - Supalux, Pipe lagging - Rock wool, Conduit - Metal
-
-
-
1/246
Plant Room
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/247
Corridor
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/248
Over bridge
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/250
Corridor
None Visible
Ceramic toilet, PVC 
Concrete
Concrete
-
-
-
1/251
Corridor
Demolished
Ceramic toilet, 
Solid
supalux ceiling tiles
Metal Work, PVC 
-
-
Now part of 
PVC cable, cable 
Cables
-
1/250
tray
1/252
Lobby
None Visible
Concrete
Solid
supalux ceiling tiles
Metal Work, PVC 
-
-
Cables
-
1/253
Lmc Access
Demolished
Concrete
Brick, Wal  4 - 
Concrete, wood
-
-
-
Asbestos -SP - All tunnel rings caulking presumed behind Concrete
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/254
Lobby
None Visible
Quarry tiles
Tiles, Concrete
Supalux tiles
Breeze Block
-
-
-
Cables - PVC
-
-
-
1/255
Lobby
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/257
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/258
Corridor
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/259
Corridor
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/260
Corridor
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/291
Office
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/302
Office
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/311
Office
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/316
Locker Room
Not surveyed
Network Rail Staff Accommodation - N115-13s
-
-
-
Non JNP Asset
1/317
Locker Room
Not surveyed
Network Rail Staff Accommodation - N115-13s
-
-
-
Non JNP Asset
1/319
Mess Room
Demolished
Not surveyed - Now part of 1/331
-
-
-
Demolished
1/320
Locker Room
None Visible
Quarry tiles
Partition wall - Tiles,  Metal, Supalux tiles
Al  wal s - Breeze 
-
-
-
Concrete
Block
Boxing - Supalux, Cable - PVC, Pipe work - Metal
-
-
-
1/321
Sink Room
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/331
Mess Room
None Visible
Quarry tiles
Tiles, Concrete, 
Supalux tiles
No Access
-
-
15/06/2016
brick, breeze Block
-
HMU Re-Inspection - No Access
Boxing - Supalux, Cable - PVC, Lagging - Rock wool, All pipe - Metal/copper, Door - Metal
-
-
-
1/332
Mess Room
Not surveyed
Network Rail Staff Accommodation - N115-14s
-
-
-
Non JNP Asset
1/333
Kitchen
None Visible
Concrete
Solid
Supalux ceiling tiles
Solid
-
-
-
1/334
Tea Point
Not surveyed
-
-
New
-
Due to age of construction assumed NAD
1/351
Mess Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/396
Svc
Not surveyed
Not surveyed
c1
Survey Required
15/06/2016
Bolted Flanged Joints to Pipework removed 
26/04/2015
Survey Required
Bolted Flanged Gaskets to Pipework was removed at Projects Request
by Econ
1/397
Svc
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/402
Store
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/403
Bin Store
Not surveyed
-
-
New - JLE
-
Due to age of construction assumed NAD
1/404
Tenancy
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/406
Cleaners
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/407
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/411
Store
Non visible 
Concrete floor tiles
Breeze blocks and  False supalux ceiling  Metal conduits and 
c1
Survey Required
15/06/2016
plaster
panels NADIS. Metal  metal tray, new 
sheeting
metal ventilation 
Survey Required
HMU Re‐Inspection ‐ No Access
ducts, PVC cables, 
supalux board 
NADIS
1/412
Store
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/413
Cleaners Room
Not surveyed
-
-
Duplicate SID 
New Construction as part of the Shell Ticket Hall Redevelopment
-
Due to age of construction assumed NAD
ON STATION 
LAYOUT
1/413
S & T Depot
Asbestos - P
Network Rail - N115-14s
Asbestos - P 
Corrugated steel 

LOW
30/01/2003
C
15/06/2016
HMU Re-Inspection - No Access
sheets - No access 
above

1/414
Store
None Visible
Solid
Concrete
Concrete
-
-
-
1/415
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/419
Toilet/lobby
None Visible
Quarry tiles
Ceramic tiles,
Supalux tiles
Plaster, breeze 
-
-
Partition wall void - 
Block
-
Breeze Block, brick, 
copper pipe
Toilet door - Metal, Lagging - Rock wool, Boxing - Supalux, Cable - PVC
-
-
-
1/420
Toilet/lobby
None Visible
Quarry tiles
Ceramic tiles, 
Metal ,Supalux tiles,
breeze Block, 
plaster, brick
No Access
-
-
-
15/06/2016
HMU Re-Inspection - No Access
Wall 3 void - 
Breeze Block, Pipe - 
copper
Cables - PVC, Pipe Lagging  -Rock Wool, Panel -Supalux, Boxing - Supalux
-
-
-
1/421
Toilet
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/422
Lobby
None Visible
Concrete
Solid
Metal, Supalux ceiling  Solid
-
-
-
tiles
1/423
Toilet
None Visible
Concrete
Solid
Supalux ceiling tiles
Solid
-
-
-
1/425
Sink Room
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/426
Lobby/Plant room
None Visible
Quarry tiles, 
Concrete/Breeze 
Concrete
-
-
No SID No - 
Concrete
Block,
-
R71927. Room 
Wal  3 Boxing - 
number added 
Supalux
by RS, but not 
Stairs - Metal, Board around top of stairs - Supalux, Lagging - Rock wool,  4m² Storage box lid - Durasteel-
-
-
-
Non asbestos, Board over door - Supalux
on Station 
Layout

Extractor floor
Wal  2 - Breeze 
-
-
-
Block
Pipe Lagging - 20m² New vermiculite, Water tank - Metal
-
-
-
1/427
Shower
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/428
Shower
None Visible
Concrete
Solid
Supalux ceiling tiles
Solid
-
-
-
1/435
Office
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/436
Reception
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/453
Tenancy
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/454
ATM
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
3 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
1/480
Tenancy
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/481
ConSolidation
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/482
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/483
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/484
Loading Bay
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/486
Kiosk/office
Demolished
No Asbestos Detected
-
-
-
Due to age of construction assumed NAD
1/501
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/510
Stairs
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/540
Stairs
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/577
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/578
Stairs
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/601
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/605
Stairs
None Visible
Solid
Concrete & ceramic  Supalux ceiling tiles
Solid
-
-
-
tiles
1/606
Stairs
None Visible
Solid
Concrete & ceramic  Supalux ceiling tiles
Solid
-
-
-
tiles
1/607
Stairs
None Visible
Solid
Concrete & ceramic  Supalux ceiling tiles
Solid
-
-
-
tiles
1/609
Ramp
None Visible
Solid
Concrete & ceramic  Solid
-
-
-
tiles
1/610
Switch Cupboard
Not surveyed
-
-
Duplicate SID 
New Construction as part of the Shell Ticket Hall Redevelopment
-
Due to age of construction assumed NAD
ON STATION 
LAYOUT
1/610
Ramp
None Visible
Solid
Concrete & ceramic  Solid
-
-
-
tiles
1/611
Stairs 
Asbestos - K
Not Surveyed
Not Surveyed
Asbestos -K 
Corrugated sheets 

06/12/2005
LOW
30/01/2003
C
Reinspect
HMU Re-Inspection - OK
- By pillar near/at 
15/06/2016
stairs
1/631
Access
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
1/632
Access
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
1/633
Stairs
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/636
Over bridge
Asbestos - P
No access but presumed corrugated sheeting based on 1/205 findings
LOW
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/663
Switch Room
None Visible
Concrete, Floor tiles
Concrete
Steel covered with 
-
-
-
Supalux
14 x Grey fuse switch, 2x Bus Bar Chamber, 
-
-
-
1/664
Switch Room
Asbestos - SP
Concrete, Floor 
Asbestos SP 
LOW
21/03/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
tiles - NADIS
Mellactite 18 sqm
21/03/2007
Asbestos -SP - 18x Switch boxes-Electrical equipment, including bus bar
LOW
06/12/2005
C
Reinspect
HMU Re-Inspection - OK
15/06/2016
1/665
Switch Room
Asbestos - SP
Concrete
Solid
Solid
-
-
-
-
Non visible
06/12/2005
-
-
09/03/2006
New electrical equipment has been installed 
Asbestos -SP - Electrical equipment, including bus bar
-
& considered to new to contain asbestos
1/666
Office/locker
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/667
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/668
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/669
Battery Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/670
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/671
Switch Cupbpard
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/672
Switch Room
Not Surveyed
Under duct - No impact
LOW
C
Reinspect
Due to age of construction assumed NAD
1/673
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/674
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/675
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/678
Disused
Not surveyed
New (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/679
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/680
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/681
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/682
Switch Cupbpard
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/711
CER
Not Surveyed
Not Surveyed - No Access,
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/731
CER
Asbestos - K
Breeze Block
-
-
-
Asbestos -K 10x Cable sleeves
13/03/2003
C
Reinspect
06/12/2005
LOW
HMU Re-Inspection - OK
15/06/2016
Asbestos -SP -Fuse switches
13/03/2003
C
Reinspect
10/06/2003
LOW
HMU Re-Inspection - OK
15/06/2016
Cables - in cable tray - Plastic
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
1/732
CER
Asbestos - SP
Rubber tiles on 
Wall 1 & 2 - Solid
Solid
-
-
-
chip wood
Asbestos - SP - Isolators, possible asbestos rope & flash guards,
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1/733
MDF
None Visible
No impact
False floor - 
-
-
computer tile,  
-
below Ducting - 
Ceramic 
Cables - PVC, Ducting down from ducts in circulating area - No impact
-
-
-
1/734
CER MDF
Asbestos - K
Solid,
Brick, Breeze Block Solid
10/06/2003
Around 15 cable sleeves have been 
Asbestos - K
30/06/2003
LOW
13/03/2003
C
Reinspect
removed/replaced according to survey report
10x cable sleeves 
06/12/2005
HMU Re-Inspection - OK
filled
15/06/2016
Cables in cable tray - plastic
-
-
-
Asbestos - K -3x Fuse Switches
LOW
13/03/2003
C
Reinspect
06/12/2005
Asbestos -SP -2x Fuse box grey
LOW
06/12/2005
C
Reinspect
Duct Near 1/734
Asbestos - K
Asbestos - K - 25x Cable sleeves (12 by passage, 1away from passage far side, 12 in duration)
30/06/2003
LOW
10/06/2003
C
Reinspect
HMU Re-Inspection - OK
15/06/2016
Duct Near 1/734
Asbestos - K
Asbestos - K - Cable sleeve
30/06/2003
LOW
10/06/2003
C
Reinspect
HMU Re-Inspection - OK
15/06/2016
1/736
CER
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/737
CER
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/740
Lobby
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/741
Telecom Room
None Visible
Computer tiles
No Access
Solid
Solid
-
-
15/06/2016
-
HMU Re-Inspection - No Access
SDP
Core into room via Block wal
-
-
-
1/747
Svc
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/748
Scr
None Visible
Concrete slab to 
Wall1-4 - Solid,
Concrete slab to solid 
c1
solid floor
Wal  3 , heater - 
ceiling
Non asbestos, air 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
vent - Fibreglass 
lagging & metal 
duct
1/749
Scr
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/754
Station Control 
None Visible
Concrete
Solid
Supalux tiles
metal work &PVC 
-
-
-
Room
cables
1/755
Lobby
None Visible
Concrete
Solid
supalux tiles
metal work &PVC 
-
-
-
cables
1/756
Station Building-
None Visible
New raised floor
Concrete
Breeze Block
Metal panels
Breezeblocks to 
-
-
Signal Control 
wal  above alse 
-
Centre
ceiling
Metal door to entrance. New A/C unit. New Electgrical Boxs. PVC cables, metal conduits and cable tray. 
-
-
-
1/757
Cupboard
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/761
Plant Room
Not surveyed
Network Rail  - N115-14s
-
-
-
1/762
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/763
SVC
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/770
Plant Room
None Visible
Concrete
Breeze Block
Concrete
-
-
-
1/771
Plant Room
Asbestos - P
Concrete and 
Concrete and brick,  Concrete slab, metal 
-
-
15/06/2016
quarry tiles
breeze block to wal   beams
-
HMU Re‐Inspection ‐ No Access
4
Metal tray and PVC cables, metal conduits and pipes, New machine room box ventilation panels, new 
Snots/residue throughout to brick wal  NADIS
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
4 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Asbestos - P - 1x Rope within combination fuse sitch box to wall by entrance
LOW
18/11/2019
C
Reinspect
18/11/2019
1/772
Ccu
None Visible
Concrete
Breeze Block
Concrete
-
-
-
1/776
Vent Plant
None Visible
Concrete
Breeze Block
Concrete
-
-
-
1/777
Plant Room
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/778
Lobby
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
Duplicate SID 
-
Due to age of construction assumed NAD
ON STATION 
LAYOUT
1/778
Fan Room
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/779
Fan Control Room
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/780
Services
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/781
Transformer Room Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/782
Transformer Room Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/785
Compressor Room Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/786
Cable Duct
Not Surveyed
Not Surveyed - No Access
c1
Survey Required
15/06/2016
Survey Required
HMU Re-Inspection - No Access
1/787
Service Route
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/788
Service Route
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/789
Cable Basement
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/790
Service Route
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/791
Service Area
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/793
Service Area
Not surveyed
New - JLE (Mepham Street)
-
-
-
Due to age of construction assumed NAD
1/801
Locker Room
None Visible
Quarry tiles
Concrete, Breeze 
Metal, Supalux tiles
Air con
-
-
-
Block
Panel - Supalux
-
-
-
1/802
Office
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/803
Training Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/820
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/821
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/822
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/823
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/824
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/825
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/900
Locker/office
None Visible
Solid, plaster on 
Solid, plaster on 
Solid, plaster on 
-
-
-
Concrete
Concrete
Concrete
Metal CMS, All cables - Plastic sheathed
-
-
-
1/901
Staff 
Not surveyed
Network Rail Staff Accommodation - N115-14s
-
-
-
Non JNP Asset
Accommodation
1/902
Miscel aneous
Not surveyed
Network Rail Staff Accommodation - N115-14s
-
-
-
Non JNP Asset
1/903
Gymnasium
Asbestos - K
Network Rail Staff Accommodation - N115-14s
Asbestos - K - 
Corrugated Sheets

LOW
30/01/2003
C
Non JNP Asset
1/905
Corridor
None Visible
Solid, plaster on 
Solid, plaster on 
Solid, plaster on 
-
-
-
Concrete
Concrete
Concrete
Metal CMS, All cables - Plastic sheathed, equipment new style gaskets presumed Non asbestos
-
-
-
1/906
Disused
Removed
28 CAF Gaskets 14 No to red pipework flages
01/09/2016
Reinspect
15/06/2016
20/10/2016
Previously Supply 
Tanks
Removed by Edenbeck ES9422
Sprinkler Room
Sprinkler Room
CAF Gaskets 6 no to large flanges to pipework
01/09/2016
Reinspect
15/06/2016
Removed by Edenbeck ES9422
20/10/2016
Concrete slab to wal  1 NADIS
01/09/2016
Green CAF Gaskets 12no to burgundy pipework flanges NADIS
01/09/2016
01/09/2016
Reinspect
15/06/2016
All electrical boxes/equipment inspected 
11/11/2016
Removed
Materials within control panel 1no to pumps by door
internally in Sprinkler Room 1/906 have been 
surveyed

01/09/2016
Reinspect
15/06/2016
All electrical boxes/equipment inspected 
11/11/2016
Removed
Materials within control panel 1no to pumps 
internally in Sprinkler Room 1/906 have been 
surveyed

Plasterboard - MMMF within matrix 1m2 loose to floor by wal  1 door way NADIS
01/09/2016
Concrete slab to floor and wood base NADIS
01/09/2016
All electrical boxes/equipment inspected internally in Sprinkler Room 1/906 - NADIS
11/11/2016
         Gaskets 1m2 to flanges of metal pipework tank/system RTV64 in Sprinkler Room NADIS
13/10/2016
Gaskets 1m2 to flanges of metal pipework water tank/system RTV63 in Sprinkler Room NADIS
13/10/2016
Gaskets 1m2 to flanges of metal pipework water tank/system RTV57 in Sprinkler Room NADIS
13/10/2016
Gaskets 1m2 to flanges of metal pipework water tank/system RTV50 in Sprinkler Room NADIS
13/10/2016
1/907
Lobby
Demolished
Not surveyed
-
-
-
Demolished
1/908
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/909
Service Void Area
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re‐Inspection ‐ No Access 
1/910
Service Riser
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/911
Service Void
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/912
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/913
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/914
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/915
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/916
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/918
Atm
Not surveyed
New (Pre1996/97 Layout)
-
-
-
Due to age of construction assumed NAD
1/919
Umc Vent
None Visible
Brick& Concrete
Brick & Concrete
-
-
-
Metal  tray work, all cables - Plastic sheathed, 
-
-
-
1/920
Drainage Chamber Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/921
Cupboard
None Visible
Concrete
Concrete
Solid
-
-
-
1/922
Store
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/923
Store
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/924
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/925
Store
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/929
Toilet
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/930
Toilet
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/951
Service Area
None Visible
Solid
Block work, 
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
1/956
Service Void
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
1/971
Tunnel
Demolished
Solid, Supalux 
Solid
Solid, metal panels
-
-
-
debris
1/TA1
Trading Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/TA2
Trading Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
1/TA3
Trading Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
2/071
Circulating  Area
None Visible
Compartmented trunking - Metal - Non asbestos
-
-
-
Due to age of construction assumed NAD
2/072
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/073
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/074
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/075
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/076
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/081
Circulating  Area, 
None Visible
Cavity behind Facia Panels - No Asbestos Detected
-
-
-
2/082
Circulating Area
Asbestos - K
Metal sheets - Contain 
-
-
-
Cables continues through containment & into room 2/792 through new core hole - N.A.D
-
-
-
Asbestos - K -4x Ducts under manhole into 2/202 x2 ducts
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
7 x cement sleeves, under manhole bottom of escalator 7&8
06/12/2005
LOW
13/03/2003
C
Reinspect
HMU Re-Inspection - No Access
15/06/2016
2/083
Lift Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/084
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/085
Lobby
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
2/121
Platform Invert
None Visible
Not Surveyed
20m up - Brick
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
No asbestos detected
-
-
-
2/161
Lmc Access 7&8
Asbestos - K
Concrete
Concrete, Supalux  Asbestos - K 
No Access
13/03/2003
C
Reinspect
06/12/2005
boarding
Corrugated cellactile 
15/06/2016
LOW
HMU Re-Inspection - No Access
sheeting
Supalux boarding
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
5 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Asbestos - K - 1x 60mm cable & 1x 40mm cable, other cables - plastic & rubber
13/03/2003
C
Reinspect
06/12/2005
LOW
15/06/2016
HMU Re-Inspection - No Access
Asbestos - SP-2x Circuit breakers
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re‐Inspection ‐ No Access
tunnel rings with presumed caulking behind Concrete
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re‐Inspection ‐ No Access
Lead Paint
Girder - Red based paint
-
16/05/2007
-
-
15/06/2016
HMU Re‐Inspection ‐ No Access
LMC  7&8 Back 
Asbestos - K
Loose lagging on  Asbestos - K 
13/03/2003
C
Reinspect
06/12/2005
room
floor - Fibre glass Cable sleeves
15/06/2016
Wall 1 - 10x 
LOW
HMU Re-Inspection - No Access
Wall 2 - 5x
2x Terracotta
06/12/2005
Asbestos - SP - 1x40mm Cable
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
LMC  Undercroft Asbestos - K
Concrete debris
Concrete block
-
-
4x Porcelain cable entry from 2/202 to undercroft. PVC cables to ducts and cable run. MMMF firestop to 
-
-
Asbestos - K - 10x cement ducts to wall at cable exit point
LOW
24/07/2018
C
Reinspect
24/07/2018
Asbestos - K - 1x50m braided cable to cement duct (1no)
LOW
24/07/2018
C
Reinspect
24/07/2018
2/162
Lmc Access
Asbestos - K
Concrete
Wal 1 & 3 Concrete, Concrete
-
-
breeze Block,
Wal  3 - Cable 
-
sleeves - Non 
asbestos
Ducts - Concrete & steel, Conduit /cable trays & cables - PVC
-
-
-
Asbestos - K - Tunnel rings caulking behind tunnel ring No2/6/10 (Chrysotile) All other tunnel 
14/04/2014
LOW
06/12/2005
C
Reinspect
HMU Re-Inspection - No Access
rings should be strongly presumed to contain asbestos 
15/06/2016
2/163
Lmc Access
Asbestos - SP
Concrete
Concrete, White 
Concrete slab. 
-
-
boarding on wal  - 
Orcelain duct with 
Metal. Concrete 
PVC cables to ceiling 
breezeblock, 
cable exit. MMMF 
concrete slab, 
firestop to porcelain 
concrete duct & 
duct.
-
firestop & metal 
cable troughing to 
wal  of proposed 
cable entry point. 
Cast iron tunnel ring 
to wal  1 & 2.
Ducts - Concrete, steel, conduit & cable tray - PVC, cables on cable run - Plastic & rubber, Lagging - 
-
-
-
Supalux board and firestop to wal  4 of proposed cable entry point NADIS
-
-
-
Wood and concrete caulking within tunnel ring joints NADIS
-
-
-
Asbestos -SP-All tunnel rings with presumed caulking behind Concrete
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/164
Lmc Access
Asbestos - SP
Concrete
Asbestos - SP All  Concrete, Supalux
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/165
LMC
Asbestos - SP
Concrete
Asbestos -SP 
Concrete
All tunnel rings 
caulking 

LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
presumed behind 
Concrete,
Supalux

2/201
Passage
Asbestos - K
Solid
Solid
Metal
Metal work & Solid 
-
-
Concrete all cables - 
-
PVC
Ducts in manhole by stairs near 2/791 - New bitumen
-
-
-
All cables in Manhole - PVC
-
-
-
Asbestos - K - Ducts going into room 2/791
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Asbestos - K - Ducts into 2/082 - 2x 100mm
LOW
14/09/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/202
Passage
Non visible 
Cable sleeves - Terracotta
Survey Required
c1
2/203
Passage
None Visible
Metal panels. PVC 
c1
Survey Required
15/06/2016
cables. Metal 
Survey Required
HMU Re-Inspection - No Access
conduits. Metal tray.
2/204
Passage
Asbestos - K
Metal and ceramic tiles to floor manhole cover. MMMF firestop debris within manhole.
Asbestos- K-12x Cable sleeves
10/06/2003
C
Reinspect
06/12/2005
LOW
HMU Re-Inspection - No Access
15/06/2016
Asbestos- K - 10x cement ducts cable enter point in passage manhole
LOW
24/07/2018
C
Reinspect
24/07/2018
Asbestos- K - 10x cement ducts cable exit point in passage manhole
LOW
24/07/2018
C
Reinspect
24/07/2018
Asbestos- K - 1x50m braided cable to 1 duct in passage manhole
LOW
24/07/2018
C
Reinspect
24/07/2018
2/205
Passage
None Visible
Metal panels
Metal tray, metal 
c1
Survey Required
15/06/2016
conduits, PVC 
Survey Required
HMU Re-Inspection - No Access
cables
2/206
Passage
None Visible
Not Surveyed
Not Surveyed
Metal
Trunking metal all 
c1
Survey Required
15/06/2016
cables PVC, ceiling 
Survey Required
HMU Re-Inspection - No Access
Concrete
2/207
Passage
None Visible
Ducts - Metal & rubber/plastic cables
-
-
-
Cable Trunking - No Access
c1
Survey Required
15/06/2016
Survey Required
HMU Re-Inspection - No Access
4 x cable trays running up to Platform 4 inverts -  cables - PVC, cable tray - metal, no duct just Concrete 
-
-
-
2/211
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/212
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/213
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/214
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/236
Lobby
Asbestos - K
Quarry tiles
Solid
Solid
-
-
-
Cables - PVC, Above door - Supalux panel
-
-
-
Asbestos - K - 8x Ducts top of stairs 2/606 
06/12/2005
C
Reinspect
15/06/2016
LOW
HMU Re-Inspection - No Access
2/237
Access
Not surveyed
New - See 2/162
-
-
-
A/C metal ductwork -
13/06/2016
MMMF insulation to 
-
wall 3
Supalux panels on 
13/06/2016
metal framework 6m2 
to suspended ceiling
Metal corrugated on 
13/06/2016
concrete on metal 
tunnel rings to ceiling 
false ceiling
Plaster with 
13/06/2016
hessian/Plaster on 
wire mesh to wal  3 in 
false ceiling
Supalux panel 
Grey mastic 
13/06/2016
1/4m2 to wal  3 
throughout to metal 
2/256
Lobby
Asbestos - K
MMMF debris. 
Metal conduit. PVC 
Concrete slab and 1x metal duct to wal  of proposed cable entry. Concrete and breezeblock to wal  of 
proposed cable exit. Concrete duct and firestop to breezeblock wal  at cable exit point
Cement firestop to metal duct NADIS
Supalux board firestop to breezeblock wal  at cable exit point NADIS
Switches
LOW
15/06/2020
Asbestos - K -Wall 2 - 4x cable sleeves
10/06/2003
C
Reinspect
30/06/2003 
LOW
06/12/2005
HMU Re-Inspection - OK
15/06/2016
Asbestos -SP - Iron clad isolators 
30/06/2003
C
Reinspect
06/12/2005
LOW
HMU Re-Inspection - OK
15/06/2016
2/264
Platform 4,
Asbestos - K
Asbestos - K - 0.20mm Cable
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Southbound 
Tunnel caulking to tunnel rings NADIS
-
-
Southbound 
None Visible
Cable sleeves -13x  Head wal  plastic/ 1x ceramic, cables - rubber,
-
-
-
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
6 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Platform4 Invert, 
Asbestos - SP
06/12/2005
by 2/761 through 
Asbestos - SP -Caulking 
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1st hatch
through  2nd 

Asbestos - SP
06/12/2005
Hatch
Asbestos - SP -Caulking 
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
through 4th Hatch Asbestos - SP
16x Cable sleeves - Wood
-
-
-
Asbestos - SP - 1x 80mm
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
through 5th Hatch,  Asbestos - SP
2x Cable - Material like - Non asbestos
-
-
-
at end near 2/667
Caulking Tunnel rings - Non asbestos
-
-
-
Asbestos - SP - All cable sleeves
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Asbestos - SP - 1x 80mm Cable (From platform side 40m towards middle arch)
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Trackside in tunnel  None Visible
Cable sleeves - wood, Cable wrap - Non asbestos
-
-
-
near 2/663
Trackside in tunnel  None Visible
Cables - Rubber/plastic, cable sleeves - Metal
-
-
behind floodgate 
-
(behind 2/761)
2/265
Platform 26
None Visible
New electrical 
Supalux panels false  Concrete and brick 
-
-
equipment. 
ceiling panes high 
to wal  above false 
level on platform 
ceiling. Metal 
NADIS
conduits. PVC 
cables. Metal trays. 
PVC cables out of 
electrical 
-
equipment. Metal 
pipes and ductwork. 
Metal sheet. 
Supalux firebreak 
above false ceiling 
NADIS
2/266
Platform 25
None Visible
New electrical 
Supalux panels false  Concrete and brick 
-
-
equipment. 
ceiling panes high 
to wal  above false 
-
2/291
Office
None Visible
Concrete, Solid
Concrete with 
Not Surveyed
c1
Survey Required
plaster,
Acoustic pads 
Survey Required
15/06/2016
HMU Re-Inspection - No Access
under sink - Non 
asbestos bitumen
2/292
Disused
None Visible
Concrete, Solid
Concrete with 
Not Surveyed
c1
Survey Required
plaster,
Acoustic pads 
Survey Required
15/06/2016
HMU Re-Inspection - No Access
under sink - Non 
asbestos bitumen
2/331
Mess Room
None Visible
Solid & tiled 
Solid & tiled 
Solid, ceramic tiled
-
-
-
ceramic
ceramic
2/341
Disused
None Visible
CEC equipment to 
Concrete  & Debris - Not Surveyed
c1
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
floor area
Non Asbestos
2/381
Store
None Visible
Solid & tiled 
Concrete
Tiled,
Not Surveyed
c1
ceramic, SEC 
Top wal  panels - 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
equipment
Supalux, 
2/391
Switch Room
Not Surveyed
Not Surveyed - No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/406
Store
None Visible
Tunnel dust & 
Not Surveyed
Boarding - Non 
c1
debris - Non 
asbestos
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
asbestos
2/407
Disused
Not Surveyed
Refurbished new build - No ACM suspected
-
-
-
Due to age of construction assumed NAD
2/411
Toilet
None Visible
Tunnel dust & 
Not Surveyed
Boarding - Non 
debris - Non 
asbestos
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
asbestos
2/413
Store
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/414
Disused
Not Surveyed
Condemned - Not safe to access
09/03/2006
0
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/416
Lobby
None Visible
Solid & ceramic 
Solid & ceramic tiles Solid & ceramic tiles - 
-
-
tiles - Non 
- Non asbestos
Non asbestos
-
asbestos
2/417
Toilet
None Visible
Solid & ceramic 
Solid & ceramic tiles Solid & ceramic tiles - 
-
-
tiles - Non 
- Non asbestos
Non asbestos
-
asbestos
2/485
Service Duct
Not surveyed
New - JLE (Alaska Street)
Due to age of construction assumed NAD
2/486
Service Duct
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
2/546
Store
None Visible
Not Surveyed
No Access
No asbestos detected. No asbestos 
c1
End of arrivals 
detected cted. 
platform - Supalux,
Cables - PVC,
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
False ceiling boxing - 
new vermiculite 
cladding.
2/601
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
c1
cables, Solid & 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Concrete
2/602
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
c1
cables, Solid & 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Concrete
2/603
Stairs
Asbestos - K
Solid
Solid
Metal
Metal work & PVC 
-
-
cables, Solid & 
-
Concrete
Ducts in manhole by stairs near 2/791 - New bitumen
-
-
-
Asbestos - K - Ducts into 2/082 - 2x 100mm
LOW
14/09/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/604
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
c1
Survey Required
cables, Solid & 
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/605
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
c1
cables, Solid & 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Concrete
2/606
Stairs
None Visible
Not Surveyed
Not Surveyed
Metal ceiling panels. 
Metal work & PVC 
c1
Metal tray
cables, Solid & 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
C
t M t l
Dust throughout to false ceiling panels NADIS
2/607
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/608
Stairs
None Visible
Not Surveyed
Not Surveyed
No Access
Metal work & PVC 
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/609
Stairs
None Visible
Not Surveyed
Not Surveyed
Ceiling tiles - Non 
Metal work & PVC 
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/636
Over bridge
None Visible
Metal ceiling panels. 
Concrete to ceiling 
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Dust throughout to false ceiling panels NADIS
2/637
Over bridge
Lead Paint
Over bridge- Black oil based - 4sqm
-
16/05/2007
-
-
15/06/2016
HMU Re‐Inspection ‐ OK
Not surveyed
Not surveyed
c1
Survey Required
15/06/2016
Survey Required
HMU Re-Inspection - OK
2/638
Over bridge
None Visible
Metal panels
Metal cable tray, 
-
-
metal conduits, PVC 
-
cables
2/639
Over bridge
None Visible
Not Surveyed
Not Surveyed
Metal sheets & 
c1
Survey Required
15/06/2016
existing trunking - No 
Survey Required
HMU Re-Inspection - No Access
asbestos detected
2/661
Switch Room
None Visible
Solid
Solid
Solid
-
-
-
New electrical system
-
-
-
2/662
Switch Room
None Visible
Solid. Metal and 
Walls 1-9 - Solid
Solid
-
-
concrete to 
-
manhole cover
New Electrical  equipment - No asbestos. PVC cables within manhole.
-
-
-
1 no x 6 concrete duct & firestop within manhole NADIS
2/663
Cable Room
Asbestos - SP
Concrete
Concrete, Plaster
Concrete
-
-
-
Cables - PVC,  cables on run - plaster & rubber, pipe work metal.
-
-
-
Cable sleeves - Wood,  1m cable wrap - Non asbestos, cable sleeve on floor - terracotta
-
-
-
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
7 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Asbestos - SP -  1 x Westlinghouse break box 
LOW
13/03/2003
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
2/664
Switch Cupboard
Not Surveyed
Refurbished new build - No ACM suspected
-
-
-
Due to age of construction assumed NAD
2/665
Switch Room
Not Surveyed
Refurbished new build - No ACM suspected
-
-
-
Due to age of construction assumed NAD
2/666
Switch Room
None Visible
Not Surveyed
Wal  6, boarding - 
Not Surveyed
c1
Survey Required
15/06/2016
Survey Required
HMU Re-Inspection - No Access
Supalux
2/667
Switch Room
Asbestos - K
Concrete
ceramic tiles & 
Concrete
-
-
-
Removed
breeze Block
Fibreglass lagging, trunking, breeze Block
-
-
-
06/12/2005
-
Reinspect
15/06/2016
Removed By Others
-
HMU Re-Inspection - No Access
2/683
Switch Cupboard
Not Surveyed
New
-
03/11/2016
-
-
Due to age of construction assumed NAD
2/684
Switch Cupboard
None Visible
New
03/11/2016
Due to age of construction assumed NAD
2/685
Switch Cupboard
None Visible
New
03/11/2016
Due to age of construction assumed NAD
2/712
Disused
None Visible
Concrete
Breeze blocks and  Ceramic tiles
c1
Survey Required
15/06/2016
Survey Required
HMU Re-Inspection - No Access
plaster
Metal cable tray, metal conuits, PVC cables, New electrical box, new firestop. Metal door by entrance
2/713
Imr
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
2/714
Disused (Waterloo  None Visible
Concrete
Brickwork
Concrete
-
-
& city departure 
-
platform)
2/715
SER
Asbestos - P
See 2/162 for details
2/162 Presumed to contain caulking  - therefore it is possible that 2/715 could contain caulking
-
Was part of 
-
-
15/06/2016
HMU Re-Inspection - No Access
2/162
2/731

CER
Asbestos - K
Concrete
Concrete
Concrete & Supalux
No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Asbestos - K - 13 x Cables sleeves on floor & Wall 1
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
2/732
CER
None Visible
Concrete
Concrete
Concrete
-
-
-
2/733
Access Area
Asbestos -K
Solid
Breezeblock to wal   Solid, ceiling by wall 1 
of proposed able 
&3 -Supalux panel
entry
10/06/2003
C
06/12/2005
Asbestos - SP Wall 1&3 - Caulking between tunnel rings
LOW
Reinspect
HMU Re-Inspection - OK
15/06/2016
10/06/2003
C
06/12/2005
Asbestos - K- Cable sleeves - Wall 3
LOW
Reinspect
HMU Re-Inspection - OK
15/06/2016
All cables - PVC. New cable management system, conduits and tray to passage. Kevlar cloth to wal  at 
-
-
-
Supalux debris to floor under cable tray NADIS
Cement firestop within metal duct NADIS
Near 2/733
None Visible
Supalux
-
-
-
2/734
Cer
None Visible
Solid
Solid & Brickwork
Solid
-
-
-
2/751
Disused
None Visible
Quarry tiles
Solid
Supalux NADIS
Concrete slab. PVC 
cables. Metal cable 
management 
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
system, trunking 
and pipework
Supalux A/C duct boxing and debris above false ceiling NADIS
2/761
Floodgate Room
Asbestos - K
Concrete
Asbestos - SP 
10/06/2003
C
Wall 2&4, 4x 
30/06/2003
Westlinghouse 
06/12/2005
LOW
Reinspect
HMU Re-Inspection - OK
boxes,
15/06/2016
Solid, Wall 4&5 - 
2x wood panels

Asbestos - SP - 2x 0.01m² Cable within switch box on Wall 4
10/06/2003
C
06/12/2005
LOW
Reinspect
HMU Re-Inspection - OK
15/06/2016
Asbestos - SP - Insulation inside floodgate mechanism
10/06/2003
C
06/12/2005
LOW
Reinspect
HMU Re-Inspection - OK
15/06/2016
Asbestos - K - 1x 2mm Cable on floodgate
10/06/2003
C
06/12/2005
LOW
Reinspect
HMU Re-Inspection - No Access,Not Found,
15/06/2016
2/771
Pump Room
Demolished
Not surveyed
-
-
-
Demolished
2/786
Cable Chamber
None Visible
Concrete
Concrete
Concrete
-
-
-
All cables sleeves - Ceramic, Trunking - Metal
-
-
-
2/791
Shaft
Asbestos - K
Solid, Tunnel dust 
Concrete  & Debris - Boarding -Supalux - 
-
-
-
All cable ducts - Non asbestos previously sampled
-
-
-
Sampled previously Non asbestos Tunnnel ring 
06/12/2005
Asbestos - SP -Tunnel rings 
-
14/09/2005
-
-
caulking SP on the later Survey report.
15/06/2016
HMU Re-Inspection - OK
10/06/2003
C
30/06/2003 
Asbestos - K -2X Cable sleeves (other sleeves are present which maybe asbestos but not within room)
LOW
Reinspect
06/12/2005
HMU Re-Inspection - OK
15/06/2016
Lead Paint
Wall panels at entrance - Green matt 
19/09/2003
-
-
-
15/06/2016
Entrance & exit to Lift, above entrance - Cream gloss
HMU Re-Inspection - OK
2/792
Vent Shaft
Lead Paint
Solid, Dust & 
Concrete  & Debris - Concrete, metal 
-
Suplaux debris - 
Non Asbestos
panels
-
-
Non asbestos
12 x Cable sleeves - Wood, Tunnel rings/caulking - Non asbestos
-
-
-
4x Ducts under stairwell - Concrete cores - Non asbestos
-
-
-
Wall panels at entrance - Green matt 
19/09/2003
-
-
-
15/06/2016
HMU Re-Inspection - OK
Entrance & exit to Lift, above entrance - Cream gloss
Cable duct 
Asbestos - K
Asbestos - K - Cable Duct
06/12/2005
C
LOW
Reinspect
15/06/2016
Not Found
outside
2/793
Fan Shaft
Asbestos - SP
Asbestos - SP
Brickwork & Debris - 
20/01/2010
C
10x Bitumen 
Non asbestos
LOW
Reinspect
Inspection carried out by Paul Hewit
Cable ducts on 
lower level floor

Asbestos -SP - Tunnel cooling fan equipment - flash guards & gaskets - Intermediate level
LOW
20/01/2010
C
Reinspect
Inspection carried out by Paul Hewit
Asbestos - SP - Pipe-work gaskets  intermediate level
LOW
20/01/2010
C
Reinspect
Inspection carried out by Paul Hewit
Asbestos - SP - Durasteel panels upper level
LOW
20/01/2010
C
Reinspect
Inspection carried out by Paul Hewit
2/794
Fan Shaft
None Visible
Solid
Brickwork & Debris - 
-
-
Non asbestos, 
Tunnel ring caulking 
-
- Non asbestos 
Middle Section - Spark guards within cooling fan starter <1 sqm
LOW
29/09/2015
C
Reinspect
15/06/2016
Not Found
Middle Section - Paper lining within cooling fan starter <1 sqm
LOW
29/09/2015
C
Reinspect
15/06/2016
Not Found
Middle Section - Bakelite type boarding within cooling fan starter - NADIS
-
29/09/2015
-
-
Middle Section - Fuses from within cooling fan starter - NADIS
29/09/2015
-
-
-
Comments: Assessment of fuses on the outer area
Middle Section - Paper within cooling fan starter - NADIS
-
29/09/2015
-
-
Middle Section - Insulating Board 1 sqm - Floor within Cooling Fan Starter - NADIS
-
29/09/2015
-
-
All cable ducts - Non asbestos previously sampled
-
-
-
Lead Paint
Fan - Blue oil based paint - 60sqm
-
16/05/2007
-
-
15/06/2016
HMU Re-Inspection - OK
2/903
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
2/951
Cable Room
Asbestos - SP
Cables around splice box - Plastic, Cables on cable run - plastic on metal
-
-
-
Asbestos - SP - Westlinghouse break box
LOW
13/03/2003
C
Reinspect
06/12/2005
HMU Re-Inspection - OK
2/972
Disused Tunnel
Demolished
Solid, Supalux 
Solid
Solid & Metal panels
-
-
-
debris
3/081
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/121
Platform Invert
Not surveyed
Not surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access 
3/151
Umc
Not surveyed
New - JLE
-
-
-
Demolished
3/152
Umc
None Visible
Concrete
Block
Concrete
-
-
-
Tunnel rings  - No caulking, Trunking - Metal
-
-
-
3/153
Mc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/161
Lmc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/162
Lmc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/163
Mc
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
8 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
3/171
Escalator  Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/172
Escalator Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/173
Auto Walk
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/201
Passage
None Visible
Solid
Solid
Concrete & metal 
-
-
trunking
-
3/202
Passage
Asbestos - K
Solid
Solid
Concrete & metal 
-
-
trunking
-
Asbestos - K-Ducts 
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/203
Passage
None Visible
Solid
Solid
Concrete & metal 
-
-
-
trunking
3/204
Passage
Asbestos - K
Solid
Solid
Concrete & metal 
-
-
trunking
-
Cables - PVC
-
-
-
Asbestos - K - 12 x Ducts
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/205
Passage
None Visible
Solid
Solid
Concrete & metal 
-
-
-
trunking
3/206
Passage
None Visible
Solid
Solid
Concrete & metal 
-
-
-
trunking
3/207
Passage
Asbestos - K
Solid
Solid
Concrete & metal 
-
-
-
trunking
Cables - PVC
-
-
-
Asbestos - K -8x Cable sleeves
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Asbestos - K - Broken ducts & debris within manhole
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/208
Emer Escape
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/209
Emer Escape
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/210
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/211
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/261
Platform 1
-
-
-
Tunnel caulking to tunnel rings NADIS
-
Near 3/714
None Visible
Cable - plastic with wrap around rubber - Non asbestos (Pit side)
-
-
-
Northern line 
Asbestos - K
Cable sleeves into MDF - Concrete, 2 x Cable wrap - Hessian,
-
-
-
Platform 1 invert
Asbestos - K - 1x 20mm white cable,
06/12/2005
C
LOW
Reinspect
15/06/2016
HMU Re-Inspection - No Access
1x 20mm white cable pit side,
Asbestos - K - 6x Cable sleeves 14m down into cross passage
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/262
Platform 2
Tunnel caulking to tunnel rings NADIS
-
-
Platform 2, 
Asbestos - K
Trackside cable run - Cables - PVC
-
-
-
Southbound 
Asbestos K -4x Cable ducts by manhole halfway along platform
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Northern Line 
Asbestos - K - Platform side cable run -Cables - 5x 30mm/3x 40mm - 30 mm cables only run half the 
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Platform 2 Frieze  None Visible
Metal frieze panels  Concrete. Metal tray. 
-
-
Panels
to wal  high level
Metal conduits. PVC 
-
cables.
Dust to metal frieze panels on platform NADIS
-
-
-
3/263
Platform 3 BL
None Visible
No Asbestos Detected
-
-
-
Platform 3, Invert
None Visible
Cable ducts throughout Invert - Non asbestos
-
-
-
Cables - PVC
-
-
-
3/381
Store
None Visible
Solid
Concrete
Concrete
-
-
-
3/382
Store
None Visible
Solid
Concrete
Concrete
-
-
-
3/481
Access
Not surveyed
New - JLE (East Escape Stairs)
-
-
-
Due to age of construction assumed NAD
3/482
Access
Not surveyed
New - JLE (East Escape Stairs)
-
-
-
Due to age of construction assumed NAD
3/483
Access
Not surveyed
New - JLE (East Escape Stairs)
-
-
-
Due to age of construction assumed NAD
3/484
Access
Not surveyed
New - JLE (East Escape Stairs)
-
-
-
Due to age of construction assumed NAD
3/576
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/577
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/578
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/601
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/602
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/603
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/604
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/631
Stairs
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
3/632
Stairs
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
3/633
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/634
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/661
Switch Room
None Visible
Solid, Concrete &  
Solid, Concrete &   Supalux sealed ceiling No Access
c1
plaster
plaster,
New equipment. 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Supalux panel to 
A/C duct, wal  and 
above door NADIS
Wooden door and frame. PVC cables. New electrical panel. MMMF insulation to trunking. Metal pipe, 
3/662
Switch Room
Asbestos - SP
Solid, Concrete &  
Solid, Concrete & 
Supalux
No Access
c1
plaster
plaster. Supalux 
panel to wal  and 
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
above internal door 
NADIS
MMMF insulation within trunking. PVC cables.
Asbestos - SP - 5x Combination fuse switches
LOW
08/10/2007
C
Reinspect
15/06/2016 
HMU Re-Inspection - OK
Switches 2x30 2x 60
02/06/2016
C
LOW
Reinspect
Asbestos - SP - 4x ducts to floor
LOW
09/07/2018
C
Reinspect
09/07/2018
3/663
Switch Room
Asbestos - SP
Solid, Concrete &  
Solid, Concrete & 
Supalux
No Access
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Asbestos - SP - 3x Combination fuse switches
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
3/664
Disused
Asbestos - SP
Solid, Concrete & 
Solid, Concrete & 
Supalux sealed
No Access
c1
Survey Required
Survey Required
15/06/2016
HMU Re-Inspection - No Access
plaster
plaster
Asbestos - K - Cement board on Wall
-
06/12/2013
-
-
Removed by Edenbeck ES6233
16/01/2014
Asbestos - SP - Electrical equipment
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
3/665
Switch Room
None Visible
No ACM's found
-
-
-
3/666
Switch Room
Asbestos - SP
Asbestos -SP - 7x Isolators (flash guards/rope seal)
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/667
Switch Room
Not surveyed
New - JLE
-
-
-
3/668
Switch Room
Not surveyed
New - JLE
-
-
-
3/669
Switch Cupb'd
Asbestos - SP
Asbestos - SP - 5x Isolators
06/12/2005
-
Reinspect
15/06/2016
Removed
-
Removed
Removed By Others
3/670
Switch Room
Asbestos - P
Concrete slab
Brick and block. 
Concrete slab to solid 
S
l
l t
ili
Metal trunking. New electrical equiment. Metal pipework. PVC cables. MMMF insulation within trunking to 
ll W
d
d
d f
Asbestos - P - Electrical equipment - New Room
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
3/711
Relay Room
Asbestos - SP
Solid, Concrete 
Solid, Concrete with  Solid, Concrete with 
-
-
-
with plaster
plaster
plaster
Asbestos - SP - 4x Westlinghouse boxes
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Asbestos - SP - 2x 75mm woven cable insulation - Terminating in equipment & entering invert
-
08/10/2007
-
Reinspect
15/06/2016
Removed
Asbestos -SP - 2x 0.5m² panels under live equipment
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
PCB's - SP
8 x PCB's - Fair Condition Serial Nos None Visible
09/06/2015
09/06/2015
-
-
-
15/06/2016
HMU Re-Inspection - No Access door stuck
17/01/2017
3/712
Relay Room
Asbestos - K
Solid
Solid, Wall 2 - 
Solid
-
-
-
Supalux panel
Asbestos - K -1x Cable - White, un-encapsulated (left hand side of MDF)
27/01/2005
C
Reinspect
06/12/2005
LOW
HMU Re-Inspection - OK
15/06/2016
Asbestos - K - Cable sleeves
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Asbestos - SP - 4x Westlinghouse boxes
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Asbestos - SP - 2x 75mm woven cable insulation - Terminating in equipment & entering invert
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
Asbestos -SP - 2x 0.5m² panels under live equipment
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
PCB's - SP
09/06/2015
09/06/2015
PCB's covered by a silver tempoary 
protection sheeting

4 x PCB's - Fair Condition Serial Nos None Visible
-
-
-
15/06/2016
HMU Re-Inspection - OK
17/01/2017
HMU Re-Inspection-Fair Conidtion
3/713
Switch Room
Asbestos -SP
Solid, Concrete 
Solid, Concrete with  Solid, Concrete with 
-
-
-
with plaster
plaster
plaster
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
9 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Asbestos - SP - 4x Westlinghouse boxes
LOW
08/10/2007
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
3/714
Relay Room
PCB's - SP
10/06/2015
-
-
10/06/2015
Added upon PCB Inspection
3 x PCB's - Fair Condition - 3 x Silver Cylinder PCB's - wall mounted
-
15/06/2016
HMU Re-Inspection - OK
17/01/2017
No Access wrong key
3/715
Relay Room
None Visible
Concrete
Brick work
Concrete
-
-
-
All cables - PVC, Duct 4 - Concrete
-
-
-
3/716
Relay Room
None Visible
Concrete
Brickwork
Concrete
-
-
-
All cable - PVC, Duct 5 - Concrete
-
-
-
3/731
CER
Asbestos - P
Quarry tiles
Metal & ceramic 
Supalux panels
No asbestos 
-
-
-
tiles
detected
Asbestos - P - Insulated cables
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - OK
3/761
Floodgate Room
Asbestos - SP
Solid, Concrete & 
Solid, Concrete & 
Solid, Concrete & 
-
-
-
plaster
plaster
plaster
Asbestos - SP - Westlinghouses & Equipment
08/10/2007
C
Reinspect
15/06/2016
LOW
HMU Re-Inspection - OK
3/762
Floodgate Room
None Visible
Solid
Brick
Solid
28/03/2012
-
-
-
Bitumen duct - 
NADIS
West end invert 
Asbestos - K
Cable sleeves - Concrete
-
-
-
wall
Asbestos - K - 1 x 50mm white Cable Platform side
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
Asbestos - K - 3x 30mm Green Cable Platform side
LOW
06/12/2005
C
Reinspect
15/06/2016
HMU Re-Inspection - No Access
3/763
Floodgate Room
None Visible
All cables - PVC, new core hole Concrete
-
-
-
3/771
Pump Room
Asbestos - P
Concrete. Bitumen 
Concrete and brick  Concrete to ceiling on 
-
-
-
Asbestos - P - 1x earth terminal box to concrete wall
LOW
18/11/2019
C
Reinspect
Asbestos - P - 1x combination fuse switch box to concrete wall
LOW
18/11/2019
C
Reinspect
3/786
Service Riser
None Visible
NO ACM Visible
-
-
-
3/787
Service Route
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/788
Service Riser
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
3/789
Service Riser
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
3/790
Service Riser
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
3/901
Access
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
3/902
Stretcher
None Visible
Concrete
Concrete
Solid
-
-
-
Due to age of construction assumed NAD
4/071
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/072
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/073
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/074
Circulating Area
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/081
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/082
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/083
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/137
Lift Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/138
Lift Shaft
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
4/201
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/202
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/203
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/204
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/205
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/206
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/207
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/208
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/209
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/210
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/211
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/212
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/213
Passage
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/265
Platform 5 JL
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/266
Platform 6 JL
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/406
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/411
Store
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/481
Sundry
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
4/576
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/577
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/634
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/661
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/662
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/776
Lift Pump Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/790
Service Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/791
Vent Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/792
Vent Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/793
Vent Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/794
Vent Shaft
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/795
Sump Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/796
Vent Tunnel
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/797
Vent Tunnel
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/798
Vent Tunnel
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
4/901
Service Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
5/081
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/082
Lobby
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/121
Platform Invert
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/122
Cable Trench
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/123
Platform Invert
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/161
Lmc
None Visible
End wall -Block
-
-
-
Due to age of construction assumed NAD
5/162
Lmc
None Visible
Concrete
-
-
-
Due to age of construction assumed NAD
Metal trunking
-
-
-
Due to age of construction assumed NAD
5/236
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/237
Corridor
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/371
Office
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/576
Stairs
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/661
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/662
Switch Room
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/663
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
5/706
Imr
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/731
Cer
Not surveyed
New - JLE
-
-
-
Due to age of construction assumed NAD
5/772
Lift Pump Room
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
5/901
Sump Room
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
5/902
Corridor
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
5/903
Sump Room
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
5/904
Corridor
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
5/906
Access
Not surveyed
-
New - JLE
-
-
Due to age of construction assumed NAD
A/081
Lobby
None Visible
Brickwork & 
Brickwork & 
No ceiling
-
-
-
Due to age of construction assumed NAD
Concrete
Concrete
A/082
Lobby
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/151
Umc Access
None Visible
Concrete
Concrete, Supalux  Concrete
-
-
-
panel
Cables/Cable tray  -
-
-
-
PVC
A/171
Escalator Shaft
Asbestos - P
Concrete. New 
Brick and concrete.  Concrete and metal 
c1
Survey Required
15/06/2016
escalator control er 
New switch boards slabs
Survey Required
HMU Re-Inspection - No Access
units.
Metal conduits and metal tray to ceiling and walls. PVC cabled and metal pipes to ceiling and walls. 
-
-
-
Asbestos - P - 1x switch panel to wall
LOW
18/11/2019
C
Reinspect
18/11/2019
A/201
Passage
Not Surveyed
Network Rail - N115-14s
-
-
-
Non JNP Asset
A/202
Subway
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/202
Subway
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/204
Passage
Not Surveyed
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
A/205
Passage
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/230
Passage
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/236
Lobby
None Visible
Concrete
Brick
Metal
No access
-
-
-
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
10 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
A/350
Mes/Kitchen
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/410
Store
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/411
Gas & Water
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/440
Toilet
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/441
Toilet
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/576
Stairs
Not surveyed
New - JLE (Alaska Street)
-
-
-
Non JNP Asset
A/601
Stairs
Not Surveyed
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
A/602
Stairs
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/603
Stairs
Not Surveyed
Network Rail - N115-14s?
-
-
-
Non JNP Asset
A/608
Stairs
None Visible
Solid
Concrete
-
-
-
Lead Paint
Ceiling - Grey/cream emulsion 46sqm
-
16/05/2007
-
-
15/06/2016
HMU Re-Inspection - No Access
A/611
Stairs
None Visible
Solid
Concrete
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
A/612
Stairs
None Visible
Solid
Concrete
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
A/613
Stairs
Not Surveyed
Network Rail - N115-14s?
-
-
-
15/06/2016
HMU Re-Inspection - No Access
A/661
Switch Room
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/777
Fan Room
Not surveyed
New - JLE (Colonnade Fan Room)
-
-
-
Due to age of construction assumed NAD
A/778
Fan Room
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
A/779
Fan Room
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
A/780
Plant Enclosure
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
A/781
Plant Room
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/793
Plenum
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
A/794
Plenum
Not surveyed
New - JLE (Alaska Street)
-
-
-
Due to age of construction assumed NAD
A/801
Disused
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/820
Service Riser
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/900
Office
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/901
Void
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/903
Service Void
Not surveyed
New Construction as part of the Shell Ticket Hall Redevelopment
-
-
-
Due to age of construction assumed NAD
A/926
Service Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/927
Service Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/928
Service Area
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
A/951
Disused
Not surveyed
Not Surveyed
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
THE SHELL TICKET HALL WAS DEMOLISHED AND REVELOPED. THE AREAS BELOW NO LONGER EXIST.
THE INFORMATION BELOW IS FOR HISTORIC INFORMATION ONLY.
1/001
Booking Hall
Asbestos - K
Solid, Ceramic
Solid, Ceramic
Vitreous Enamel 
Asbestos - SP
06/12/2005
-
-
25/09/2008
-
Removed
Removed²
Panels
1/011
Ticket Office
None Visible
Concrete
Solid
Supalux Ceiling Tiles;  Metal Work, PVC 
-
-
Vent Shaft
Cables
-
1/021
Pom
None Visible
Solid
Solid
Fireboard
Concrete
-
-
-
1/031
Office/mess
Asbestos -SP
Solid
Brick
Metal sheets
Concrete,
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
Asbestos - SP 
data is Inactive
Ducts - Fibreglass lagged
-
-
-
1/036
Toilet
None Visible
Concrete
Solid
Supalux Ceiling Tiles
Metal Work, PVC 
-
-
-
Cables
1/081
Lobby
None Visible
Concrete
Solid
Supalux Ceiling Tiles
Metal Work, PVC 
-
-
-
Cables
1/082
Lobby
None Visible
Concrete
Solid/Brick
Supalux Ceiling Tiles,  Concrete, Metal 
-
-
-
1/083
Lobby
None Visible
Concrete
Solid
Supalux Ceiling Tiles
Metal Work, PVC 
-
-
-
Cables
Void behind cash  Asbestos - K
Dust - Non asbestos
-
-
-
dispenser
Removed²
Asbestos - K - Dust
-
23/01/2008
-
-
Removed
25/09/2008
1/099
Circulating Area
Asbestos - K
Solid, Ceramic
Solid, Ceramic
Vitreous Enamel 
Asbestos - SP
-
06/12/2005
-
-
Removed
25/09/2008
Removed²
Firebreak, across top bulkhead of both escalators 4 & 6, Shell Centre Station NADIS
14/10/2014
1/236
Lobby
None Visible
No Access
Tiles
Concrete
Survey Required
c1
Survey Required
15/06/2016
HMU Re-Inspection - No Access
Cables - PVC, tray work - metal
-
-
-
1/238
Lobby
Asbestos - P
Not Surveyed
Brick
Fibreboard
Concrete,
LOW
06/12/2005
C
Reinspect
15/06/2016
Due to Major works at Shell Centre survey 
Ducts - Fibreglass lagging
-
-
-
1/301
Office/mess
None Visible
Solid
Solid
Fireboard
Concrete
-
-
-
1/401
Switch Cupboard Asbestos - SP
Solid
Concrete
Supalux ceiling tiles 
Asbestos - SP
06/12/2005
C
Reinspect
ACM under 
LOW
sprayed coatings 
& voids

Asbestos -SP -2x Iron clad Isolators
LOW
06/12/2005
C
Reinspect
15/06/2016
Due to Major works at Shell Centre survey 
1/402
Store
Asbestos - SP
Brick
Metal sheet
Concrete,
Asbestos - SP, 
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
below Vermiculite 
data is Inactive
sprayed coating.   
1/404
Bin Store
Asbestos - SP
Concrete,
Asbestos - SP, 
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
below Vermiculite 
data is Inactive
sprayed coating.   
Void behind store 
Non visible 
Dust - Non asbestos
-
-
-
1/404
1/412
Store
None Visible
Solid
Solid
Fireboard
Concrete
-
-
-
1/416
Toilet
Asbestos - SP
Brick
Metal sheets
Concrete,
Asbestos - SP, 
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
below Vermiculite 
data is Inactive
sprayed coating.   
1/417
Toilet
Asbestos - SP
Brick
Metal sheets
Concrete,
Asbestos - SP, 
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
below Vermiculite 
data is Inactive
sprayed coating.   
1/451
Switch Room E35 Asbestos - SP
Solid
Concrete
Supalux ceiling tiles 
Asbestos - SP
ACM under 

Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
sprayed coatings 
data is Inactive
& voids
1/452
Disused Tenancy
None Visible
Solid
Solid & Block work
Solid
Concrete
-
-
-
1/454
Atm
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
1/661
Switch Room
Asbestos - K
Asbestos - K
Concrete
Asbestos - P
Marley Floor tiles
Concrete, ACM's 
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
under sprayed 
data is Inactive
coatings & voids
Due to Major works at Shell Centre survey 
Asbestos -SP,16 Westling house boxes
LOW
06/12/2005
C
Reinspect
15/06/2016
data is Inactive
All cables & Tray work - Metal/PVC
-
-
-
1/662
Switch Room E14
None Visible
Concrete
Concrete
Supalux
Steal/PVC cables
-
-
-
Ticket hall void 
Asbestos - P
Due to Major works at Shell Centre survey 
Asbestos - P - ACM's under sprayed coatings & voids
LOW
C
Reinspect
15/06/2016
above  1/662
data is Inactive
1/746
Scr
Asbestos - SP
Concrete
Supalux ceiling tiles 
Asbestos - SP
Due to Major works at Shell Centre survey 
LOW
06/12/2005
C
Reinspect
15/06/2016
ACM under 
data is Inactive
Area above SCR
Non visible 
Dust - Non asbestos
-
-
-
1/762
Svc
Asbestos - SP
Solid
Concrete
Supalux ceiling tiles 
Asbestos - SP
Due to Major works at Shell Centre survey 
-
06/12/2005
-
Reinspect
15/06/2016
ACM under 
data is Inactive
1/792
Service Void
Not surveyed
New
-
-
-
Due to age of construction assumed NAD
Shell Ticket 
Area 1
Asbestos - P
Area 1 all new metal works beams sprayed with fire proof material, no obvious evidence of 
-
Reinspect
15/06/2016
Due to Major works at Shell Centre survey 
Hall
previously asbestos present but all access to all RSJ beams not possible
-
data is Inactive
Area 1, left hand 
Loose debris, foam - Non asbestos 
-
-
15/06/2016
-
In-active
side of door
Loose debris, fibrous material - Non asbestos
-
-
-
15/06/2016
In-active
Area 1, right hand  Asbestos - K
Loose debris board - Non asbestos
-
-
15/06/2016
-
In-active
side door
Removed
Large SEM Wal  1
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
11 of 12

WATERLOO STATION
SUMMARY OF KNOWN/SUSPECTED HAZARDOUS MATERIALS
The purpose of this summary report is to detail the presence of any known (K) Asbestos Containing Materials (ACMs) within the Asset
Any areas inaccessible during the Management survey are presumed (P) or strongly presumed (SP) to contain ACMs until known otherwise.
Colour Key to Summary Sheet
All inaccessible areas will need to be surveyed prior to work being undertaken in these areas. 
This sheet was last updated Sept 2020 and is provided for information only.
Prior to any intrusive works commencing a F3333 must be submitted to the Hazardous Materials TfL Engineering team.
Asbestos/Lead paint was present in room/location but was removed. 
Historically asbestos has been used in unusual application throughout LUL (JNP) network. Therefore, all contractors 
All contractors working on JNP property must remain vigilant during their works and if any suspect material is encountered which
must remain vigilant during the course of their work and if any suspect materials are encountered, the Hazardous 
is likely to be disturbed, the Hazardous Materials TfL Engineering team must be contacted before continuing.
Materials TfL Engineering team must be contacted before continuing.
NOTE: Information added from March 2016 onwards (date at top of Summary Sheet indicates when the sheet was last updated) 
excludes Premises material assessments, i.e only includes information related to asbestos (or those materials suspected to contain 
asbestos) and other hazardous materials.

For further guidance contact the HMU - Email:xxxxxxxx@xxxxxxxxx.xxx 
Asbestos is Presumed (P) Strongly Presumed (SP) or Known (K) to be present in location
View/Hide Materials/Priority Assessments
N115 - WATERLOO
Lead paint is present in room/location
Jubilee Line
Below false 
Ceilings/False 
Above False 
Risk 
Date 
ACA 
Management 
Last Re-
ID. No.
Description
Comments
Floors
Walls
Mitigation
Date
Floors
Ceiling
ceilings
Assessment
Identified
Rating
Option
inspection
Asbestos - K - Corner between wall 1&2 loose debris 
-
23/01/2008
-
-
15/06/2016
Removed by Silverdell
25/09/2008
Area 2
Asbestos - K
Asbestos - K - Fibrous debris taken from back wall in rectangular area left hand side
23/01/2008
-
-
15/06/2016
25/09/2008
-
Removed by Silverdell
Removed
Area 3
Non visible 
Corner of wal  1-2 - fibrous debris - Non asbestos
-
-
15/06/2016
SEM in corner of wal  1-2 taken off beam - Non asbestos
-
In-active
Area 3 all remain street sprayed with fire resistant insulation all.  New metal wal  2 brick with low level 
void)
²Shell Centre Booking Office 
Asbestos
All Asbestos above the false ceiling has been removed, However the perimeter brick work could 
06/12/2005
-
Reinspect
15/06/2016
25/09/2008
Areas N115-04
not be thoroughly cleaned and so these areas have been encapsulated; Asbestos contamination 
Due to Major works at Shell Centre survey 
-
may also be present beneath sprayed coating on RSJ's
data is Inactive
Risk Assessment Priority Scores
Risk
Value
High
18 or Higher
Manage ACM and carry out planned remedial action to reduce the risk score, typical y within 6 months or less, to below risk 
score 18 in accordance with the asbestos management policy
Medium
12 to 17 or higher
Manage as high risk but remedial action can be deferred until maintenance regimes change or demolition or major 
refurbishment is planned.
Low
11 or less
Manage and consider removal if the item falls within falls within a demolition,  major refurbishment or maintenance regimes 
change and works are likely to disturb the material
UNCONTROLLED COPY - PLEASE CONTACT THE HAZARDOUS MATERIALS TfL ENGINEERING TEAM TO CONFIRM LATEST INFORMATION
Produced by the Hazardous Materials TfL Engineering team
12 of 12