ANNEX  A  – RELEASE  OF INFORMATION relating to FoI202000058749   
 
  
Scottish Government/DF Barnes Phone Call – 6 April  2020   
  
Present  
DF Barnes  
Jason Fudge   
Scottish Government   
Andrew  Hogg    
[Redacted]   
[Redacted]   
Minute of Meeting 
Points made – general:    
•  Jason Fudge (JF) - MacRoberts considered to be taking a [Redacted] o Andrew 
Hogg  (AH)  reply  –  MacRoberts  should  be  engaging  in  a  collaborative  way, 
[Redacted]   
•  AH  reiterated  that [Redacted] relies on us getting  the agreement signed  off 
  
Points made in relation  to specific areas [Redacted]   
•  [Redacted]   
•  [Redacted]    
[Redacted]    
•  [Redacted]    
•  [Redacted]    
•  AH  agreed to take JVD view back to advisors, but also asked JF/JVD  to reflect 
on above  points   
•  JF - MacRoberts  need  to clearly  articulate  how this would [Redacted]   
  
[Redacted]    
•  JF – [Redacted]   
•  JF acknowledged  that [Redacted]   
•  AH  – purpose here is [Redacted]  It is not for SG to assume [Redacted] 
•  JF noted  that [Redacted] . Agreed  to take  back and  discuss   
•  AH  closed  off  this  discussion by  noting  [Redacted]  keeps  the  route  to  future 
work going 
   
 

  
Actions arising  from call  
1.  Andrew  (SG) to speak to MacRoberts  to ask how [Redacted]   
2.  SG  to  feedback  to  MacRoberts  and  Grant  Thornton  re  points  below  – 
[Redacted]  articulated  to TW – [Redacted]  will  action  [unless Andy wants  call 
set up AH-
[Redacted]]   
  
     
 
   
 

Scottish Government/BiFab/Grant Thornton Regular Call – 6 April  2020  
  
Present  
BiFab  
[Redacted]   
Grant  Thornton   
[Redacted]   
Scottish Government   
[Redacted]    
[Redacted]   
  
Minute of Meeting  
  
•  Long  Term  Trading  Forecasts (LTTF)  –  Jason  had  a  lot  of  input  in  to  these; 
[Redacted]   
•  [Redacted] – there has been no discussion between  local management (Martin 
Adam,  [Redacted]  & [Redacted])  and  Jason  on  the  [Redacted]  in light  of new 
[Redacted]  –  [Redacted]  sees this as something  Jason needs  to engage  with 
SG on   
•  Revised Short Term Cash Flow (STCF) to be received  by Wed – [Redacted]    
•  [Redacted]  by  Monday  &  should  have  20  days  thereafter  to  close  off  any 
actions on BiFab  
•  First  E&P  (FEP)  –  dialogue  between  BiFab  and  client  ongoing.  FEP 
understanding  of BiFab’s position    
•  Call next week to include Martin  & [Redacted] for further detail  on Covid impact, 
FEP status update,  Moray  East update,  etc.  
  
     
 
 
   
 

Call with DF Barnes and Grant Thornton – 30 March 2020  
  
Present  
DF Barnes  
Jason Fudge   
Grant  Thornton   
[Redacted]   
[Redacted]    
Scottish Government   
Andy  Hogg   
[Redacted]   
  
Minute of Meeting  
  
[Redacted]    
•  Grant  Thornton  (GT)  flagged  they  were  conscious  the  [Redacted]  is still  there 
and  they  are  currently  reviewing  the  [Redacted]  on  behalf  of  Scottish 
Government  (SG).  [Redacted]  are  now  showing  a  [Redacted]  which  is 
[Redacted] is put in place and there is an [Redacted]. GT/SG need to understand 
[Redacted].   
•  Jason  flagged  there  is a  lot  of  movement  so it's hard  to  define  exactly  what  is 
required.  Especially  with COVID-19  and  what this means for  projects and staff. 
Looking  at a range of possibilities  it is possible [Redacted]. 
•  GT further flagged  the [Redacted]sent by [Redacted] are not currently taking  into 
account  the  effects  of  COVID-19  and  the  [Redacted].  How  do  BiFab  take  into 
account the impacts of COVID-19?  [Redacted].   
•  Jason  responded  that  the  [Redacted]and  is happy  to  speak  with  [Redacted]to 
get  a  better  understanding  of  where  things  are.  There  are  a  wide  range  of 
possibilities  that we are trying to navigate  when we don’t know what wil  happen 
in the next few weeks never mind months.  
•  GT understood  but highlighted  [Redacted].  Understands  that it’s a starting point 
but we need to look  at it and move things [Redacted]  Probably challenging  given 
COVID-19  and the effect this has on  it. Just wanted  to know if there  is anything 
GT should take  into account in their thinking/reporting.   
•  Jason suggested BiFab [Redacted].  Jason will work with Scott on getting  to that 
[Redacted].  From a project work point of view, [Redacted].    
•  SG mentioned  that we would have to take back final details from GT [Redacted]. 
Need  to  know  in detail  [Redacted]  so we need  to take  this to  Ministers  quickly 
   
 

and  get their  views.  Keen to  avoid  providing  anything  that  doesn’t  have  a clear 
understanding  and level  of detail.   
•  Jason made the point  that as soon as BiFab  [Redacted].   
•  SG stressed it’s important  that evidence  base and forecasts match up with your 
thinking  and we have  an audit  trail which shows Minister's  clearly.   
•  Jason agreed to work with [Redacted]on  a range of possible outcomes and send 
the documents by the end of the week.   
•  Grant  Thornton  asked if [Redacted]  
•  Jason  responded  that  based  on  current  information  it  is more likely  it won't  be 
needed  and will be [Redacted].   
  
[Redacted]    
•  SG asked where BiFab were with the [Redacted].   
•  [Redacted].   
  
Board Meeting   
•  The  board  meeting  for  8th April  is cancelled  due  to  Covid-19  circumstance and 
we will look  to get a new date in the diary  end of April  for a virtual  meeting.   
  
Actions  
1.  Jason to discuss [Redacted]with [Redacted]and  look at different  possibilities and 
send something by the end of this week.   
2.  Jason and Andy  to discuss [Redacted].   
3.  Jason to circulate agenda/dial  in details  for board meeting.   
  
     
 
 
   
 

Scottish Government officials  introductory  meeting with Cabinet Secretary for 
Economy,  Fair Work and Culture – 12 March 2020   
  
Attendees:   
Cabinet  Secretary for Economy, Fair Work and Culture   
Andrew  Hogg  (AH)   
[Redacted]   
[Redacted]   
Stewart Maxwell   
  
  
Minute of Meeting  
  
Actions arising  from the meeting;   
•  Prepare factual briefing for Cab Sec/Richard Leonard meeting.  Focus will likely 
be on industrial  strategy (gone)   
•  Update  the [Redacted] (if required)  and resend   
•  Prepare  a [Redacted]  – to be as wide  as possible  eg  include  green  hydrogen 
sites [Redacted]   
•  Give  consideration  [Redacted]   
•  Send  copy  of  Clare  Baker  Parliamentary  Question  (PQ)  from the  prior  week  
[Redacted]   
•  Pick up  with  JV  Driver  (JVD)  re alternative  dates  for  a meeting  with Cab  Sec 
(on leave  for 8 April).   
•  [Redacted]   
Strategy    
•  A  steer given  to make  sure [Redacted].  AH  noted  that  State  aid a huge  factor 
in this – and [Redacted].  One for further  consideration    
•  Agreement  for  officials  to  proceed  with  exploring  and  progressing  with  work 
[Redacted]   
  
Other points to note   
•  Cabinet  Secretary  (Cab Sec) noted  that  she wanted  a [Redacted]  for  input  to 
this and other considerations  – wants to make sure there is [Redacted]  before 
decisions with financial  implications are made   
•  In  all  our  narrative  –  fundamental  that  it  sets  out  why  we  are  progressing  a 
proposed  course of action   
•  Consider  how  BiFab  sits in  the  Just  Transition  narrative  /  backdrop  in  more 
detail    
•  Keep Cab Sec up to date  on [Redacted] as the detail  develops    
  
  
  
     
   
 

Scottish Government/Scottish Enterprise/Highlands and Islands  Enterprise  
Strategy Meeting - 24 February 2020   
  
Actions arising  from meeting and  already actioned 
Actions   
•  Engage  with  Sean  Power  and  re-establish  frequent  catch  ups,  for  greater 
visibility  on his plans and upcoming meetings.    
•  Share readouts  of BiFab  board meetings going  forward with the group    
•  Lead  on developing  Project Management  Office (PMO) function  and  timelines 
for group  
•  Group  meetings to be established  (project  group), approx.  monthly    
•  Confirm when draw in other  stakeholders  (eg, Fife Council)   
•  Issue comms to Martin  Adam re the meeting   
Points already  actioned   
•  [Redacted] to share [Redacted]  proposal [Redacted] with Scottish Government 
(SG)    
•  Scottish  Enterprise  (SE)/Highlands  and  Islands  Enterprise  (HIE)  account 
managers following up to see [Redacted] as part of existing training programme 
•  Andrew  Hogg  to catch up with Jason  Fudge   
  
Points raised which  may form the basis of future discussion points and/or  actions  
•  [Redacted]   
•  [Redacted]  to bid  for work [Redacted] 
•  Could  the  Arnish  yard  in  future  be  linked  in  to  Stornoway  Deep  Water  Port 
being  developed?    
•  How is BiFab  planning  on using its core staff resource [Redacted]  during the 
upcoming care & maintenance  period?   
•  How does BiFab explore  opportunities  arising from nuclear,  decommissioning, 
Carbon Capture,  Utilisation  and Storage  (CCUS) and hydrogen?   
•  Does BiFab’s current [Redacted]  prevent  further  enterprise  agency support?    
•  Scottish Offshore Wind Energy  Council  (SOWEC) offshore wind  summit work 
– who leads with follow  up on this for maximum benefit  for BiFab?   
•  Has  anyone  looked  at areas  of  price differential  BiFab/European  competitors 
to others?   
o  SE  feedback  suggested  some  awareness,  eg  that  BiFab  typically 
[Redacted]   
•  [Redacted]  feedback  [Redacted] Arnish  yard  noted   
•  Infrastructure  group no longer  meets   
   
 

•  Repeated  comments that it is not clear on [Redacted]    
•  Clarified  in discussions that [Redacted]   
•  [Redacted]  risk that training  funds can’t be delivered  within  current timescales 
[Redacted] 
•  [Redacted]  &  [Redacted]  in  recent  correspondence  with  both  HIE  &  SE. 
[Redacted].   
•  Need  to consider [Redacted] as we consider.  
  
     
 
   
 

Call with BiFab Local Management – 7 February 2020   
  
Present  
   
Martin  Adam – BiFab  
Jason Fudge  – DF Barnes  
Andy  Hogg  – Scottish Government   
[Redacted]  – Scottish Government   
[Redacted]  – Scottish Government   
[Redacted]  – Scottish Government   
[Redacted]  – Scottish Government   
   
  
  
Minute of Meeting:  
   
•  General  updates  given  re Canada.  Jason Fudge’s new title as President of DF 
Barnes (DFB) was noted   
•  [Redacted]  o [Redacted]  o [Redacted] o [Redacted]  
•  [Redacted]    
•  [Redacted]   
•  Moray  east o  Last  piles  sailed  on  Tuesday  night.    o Given  (i)  more  positive 
direction  of  travel  of  recent  discussions,  (ii)  number  left  and  (iii)  wish  to 
demonstrate  to  market  its  ability  to  complete  its  first  job  post-Beatrice, 
[Redacted]    
o  w/c 17th  feb for commercial meeting - dialogue  ongoing  re getting  to an 
agreed  [Redacted]   
o  [Redacted]  o [Redacted]   o [Redacted]   o [Redacted]   
o  [Redacted]  JF engaging  with comms on this   
•  First E&P – sail away  date of 21 March  agreed  with client. Mostly  paint  works 
remaining;  complete in 2nd week of March    
•  Staffing  –  a  lot  more  downmanning  in  next  couple  of  weeks.  Headcount  of 
[Redacted]  by end of Feb   
•  Board – SG  ran through  suggested  names. To email  to Jason  and thereafter 
Andy  &  Jason  to  agree  how  to  assess/prioritise.  Want  to  have  progressed 
materially  prior  to next  board meeting.   
•  DFB in Scotland:   
o  Jason  to be  across in  next  few  weeks; would  like  to meet  in person  to 
discuss board  strategy with Andy   
o  Next  board  meeting likely  to be 7 / 8 April.   
     
 
 
   
 

Offshore Wind Supply  Chain Summit  – 16 January  2020  
Actions  agreed to by  attendees  
  
1.  Scottish Offshore Wind Energy Council will instigate  a short independent 
review  of the key  actions and  recommendations of the summit, including  the 
recommendations of the Offshore Wind Growth  Partnership’s Strategic 
Capabilities  Assessment of the foundations  sector in the UK.    
2.  Crown Estate Scotland  announced  it will require  developers  to outline 
supply  chain commitments when applying  for future offshore  wind leases.   
3.  Offshore Wind Industry  Council will publish a roadmap to 60% lifetime  UK 
content and  a response to the Martin Whitmarsh Supply Chain  Review,  to 
be published  by the end of March  2020.   
4.  Representatives  from the manufacturing  sector should be included  in future 
cross-party discussions.  
  
Introduction    
  
•  The Cabinet  Secretary for Finance,  Economy & Fair Work and Minister  for 
Energy,  Connectivity  & the Islands  highlighted  supply  chain succ esses since 
the last summit. Both also acknowledged  that current levels  of local content  in 
offshore wind projects remain disappointing.   
•  The Cabinet  Secretary made clear that he intends on using all the levers at 
his disposal  to maximise Scottish content  in offshore  wind projects, and 
introduced  Simon Hodge  of Crown Estate Scotland  (CES) to speak.    
  
CES update  
  
•  CES  used  the  summit  to  announce  that  it  will  require  developers  to  outline 
supply  chain commitments when applying  for future offshore wind leases, with 
further  details to follow  in the coming months through  the upcoming ScotWind 
Leasing  Round.   
•  CES  was  clear  that  developers  would  face  consequences  if  they  breach 
commitments made in these  statements. CES will have  the power to revoke  a 
licence.   
•  The  Cabinet  Secretary  stated  that  CES’  announcement  demonstrated  how 
seriously  the  Scottish  Government  (SG)  takes  the  issue  of  current  levels  of 
local  content  in  offshore  wind  projects,  and  demonstrates  progress  made  by 
SG  in  addressing  the  issue  since  the  last  summit,  within  the  limits  of  its 
devolved  competence.   
  
BEIS update   
  
•  Declan  Burke,  Director  (Clean  Power,  Strategy  and  Deployment)  in  the  UK 
Government’s  Department  for  Business,  Energy  and  Industrial  Strategy 
   
 

(BEIS) spoke  on behalf  of Andrea  Leadsom, Secretary  of State for Business, 
Energy  and Industrial  Strategy.   
•  BEIS told  the summit that the economic opportunities  of decarbonisation  and 
growth  in  renewables  was high  on  the  agenda  during  discussions with  UK 
Ministers  on renewable  power deployment.   
•  UK  Ministerial  priorities  included  the  publication  of  an  Energy  White  Paper 
which, from an  offshore  wind  perspective,  would  set out  future  ambitions  for 
the UK’s offshore wind capacity in the context  of delivering  net zero.  
•  BEIS Indicated  that a potential  review  of the supply  chain plan process would 
be  included  in  the  Contracts  for  Different  Allocation  Round  4  consultation, 
which is to be published  in due course.   
  
Sector update  
  
•  Scottish  Offshore  Wind  Energy  Council  (SOWEC)  presented  its  vision  and 
goals, and explained  how it interacts with the sector in Scotland.   
•  SOWEC agreed to instigate  a short independent  review of the key actions and 
recommendations of the summit, including  the recommendations set out in the 
OWGP’s review  of the foundations  sector in the UK.   
•  Brian McFarlane  (SOWEC co-chair) stated that this work will be led by a senior 
member of the sector or Government,  and sponsored  by SOWEC’s cochairs.  
•  Jonathan  Cole [attending  on behalf  of Offshore Wind Industry  Council (OWIC)] 
emphasised that its membership fully  recognises and supports the aims of the 
summit and  stated that building  a strong indigenous  supply chain has been  an 
imperative  for a long time.   
•  OWIC  stated  that  the  methodology  that  is  currently  used  by  the  sector  to 
measure  UK  content  is not  fit  for  purpose  and  does  not  provide  an  accurate 
measurement.  OWIC is currently  examining  this  methodology  with  a  view  to 
identify  a more effective  model to measure UK content.  
•  OWIC also outlined  its intention  to issue a response  to  the Martin  Whitmarsh 
Supply  Chain Review  and a UK Content Roadmap  to 60%  lifetime UK content 
in offshore wind projects.    
•  Andy Macdonald  presented the recommendations of the Offshore Wind Growth 
Partnership’s  Strategic Capability  Assessment of the foundations  sector in the 
UK,  during  which  it  said  that  there  is  significant  capacity  for  UK  monopile 
production  and therefore  scope for a monopile  facility  to be based in the UK.    
  
Discussion  / close   
  
•  Trade Unions  challenged  developers  on their  efforts to bring  work to Scottish 
yards  and  emphasised  the  reputational  cost  of  not  awarding  contracts  to 
Scottish companies.  
•  There  was  general  agreement  from  developers  and  tier  1s  that  there  was 
sufficient  opportunity  for  the  creation  of  a  monopole  foundation  facility  in 
Scotland  or elsewhere  in  the UK  but that  this would  require  coordinated  and 
collaborative  efforts from industry  and government.   
•  Developers  also agreed that significant investment  in port infrastructure  in the 
UK will be necessary to bring  additional  contracts to Scotland.   
   
 

•  The Cabinet  Secretary stated  that developers  and tier  1s must consider how 
much  importance  they  place  on  their  relationship  with,  and  their  public  
perception  in, Scotland.     
•  All  agreed  that  representatives  of  the  manufacturing  sector  should,  where 
appropriate,  be involved  in future discussions around  increasing local content 
in offshore wind projects.  
  
List of Attendees  
 
 
Cabinet  Secretary for Finance,  Economy and Fair 
1. Derek Mackay  MSP  
Work  
2. Paul Wheelhouse 
Minister  for Energy,  Connectivity  and the Islands   
MSP   
3. Declan Burke  
BEIS  
4. Fiona Mettam   
BEIS  
5. Simon Hodge   
Crown Estate Scotland   
6. Malcolm  Rutter  
DEME  Offshore  
7. Dean Lockhart MSP   
Economy, Energy  and Fair Work Committee  
8. Donald Mackay   
EDF Energy  Renewables   
9. Dan Finch   
EDPR  
10. Sophie  Banham  
Equinor   
11. Hazel  Nolan   
GMB   
12. Jim McPhillimy   
GMS  Wind  
13. Rainer Broering   
GE Renewable  Energy   
14. Audrey  Maciver   
Highlands  and Islands  Enterprise  
15. Alastair  Gill   
Innogy   
16. Dr Norman  Skillen   
Jan De Nul  
17. Mary  Thorogood   
MHI  Vestas Offshore Wind  
18. Andrew  MacDonald   
Offshore Wind Growth  Partnership  
   
 

19. Jonathan  Cole  
Offshore Wind Industry  Council  
20. Andrew  Jamieson  
ORE Catapult   
21. Jane  Cooper  
Orsted  
22. Adam Ezzamel  
Red Rock Power  
23. Paolo  Formica  
Saipem  
24. Andy  McDonald   
Scottish Enterprise   
25. David  Stevenson    
Scottish Government   
26. Andrew  Hogg   
Scottish Government   
27. Mike  Palmer  
Scottish Government   
28. Brian McFarlane   
Scottish Offshore Wind Energy Council  
29. Claire Mack   
Scottish Renewables  
30. Jim Smith  
SSE Renewables   
31. Lloyd  Duthie   
Subsea 7  
32. David  Moxham   
Scottish Trades Union  Congress  
33. Pat Rafferty   
Unite  The Union   
34. Ben Robinson  
Van  Oord  
35. Danielle  Lane   
Vattenfall   
  
In attendance  
  
36. Allan  Taylor  
BEIS  
37. Karl John   
Department  for International  Trade  
38. Vicki  Carson  
Scottish Government   
39. Andrew  Young   
Scottish Government   
40. Claire Martin   
Scottish Government   
   
 

41. Stewart Maxwell   
Scottish Government   
42. Greig  Liddell   
Scottish Parliament Information  Centre   
43. Nick Sharpe   
Scottish Renewables  
  
     
 
   
 

BiFab Board of Directors Meeting – 14 January  2020  
  
•  [Redacted],  simply  the  delay  hasn’t  had  any  impact  on  the  overal   project.   
BiFab  will  undertake  a lessons learnt  exercise  which  will  stand  them in  good 
stead for the [Redacted].  
•  Meeting  with [Redacted]  on 23rd January  to close out the commercials.  
•  [Redacted]  due to visit methyl on 16th January  to progress the [Redacted].   
•  Suggestion  that Subsea 7 have  won the Seagreen  installation  contract, which 
they  may  potentially  [Redacted].  [Redacted]  due  to  speak  to  [Redacted]  later 
in the week 
•  Concreting of Methil  yard 40% complete, targeting end of March for completion. 
[Redacted]  & Jason to speak next week  to reach a solution re [Redacted].   
•  Scottish Government  suggested some names for Board of Directors (BoD)and 
would email to confirm these and potentially  others shortly.   
•  Next  Board  meeting  targeted  for end March/beginning  of April,  by which point 
hopefully  identified  2-3  BoD  candidates  and  possibly  secure  meeting  with 
Minister.   
     
 
   
 

Cabinet Secretary and Minister meeting with Unions  – 9 January  2020  
  
Present  
  
Scottish Government   
Cabinet  Secretary for Finance,  Economy & Fair Work   
Minister  for Energy,  Connectivity  & the Islands   
Andrew  Hogg   
[Redacted]   
Stewart Maxwell  (Special  Advisor)   
  
Scottish Traded Union  Congress (STUC)  
David  Moxham   
  
GMB  Scotland    
Hazel  Nolan   
  
Derek  Mackay  (DM)  passed  on  Pat  Rafferty’s  (Unite  the  Union)  apologies  for  not 
being  able to attend.   
  
DM  &  Hazel  Nolan  (HN)  expressed  concern  at  the  future  of  BiFab  following  the 
completion  of current contracts.  
  
DM  stated  that  BiFab  were  tendering  from further  contracts but  as yet  nothing 
confirmed.  Cabinet  Secretary reaffirmed  Scottish Government’s  commitment to 
support the company.  
  
DM  &  HN  stated  that  the  developers  were  being  critical  of  the  fabrication  sector in 
Scotland/UK  stating that it is no longer viable/competitive.   
  
DM confident  that  further work would be secured and  reinforces the message to the 
developers/tier  1s  that  they  should  be  supportive  of  the  Scottish  supply  chain  in 
awarding  contracts and standing  by their Sector Deal commitments.  
  
DM and  Paul Wheelhouse both  said they  would be emphasising  this point  again  at 
the Offshore Wind Summit this week.  Important  that all are supportive  of our 
indigenous  supply chain in the build  out of offshore wind.   
      
 
 
   
 

BiFab Methil Site Visit  – 16 December 2019  
  
Present  
  
BiFab  
Martin  Adam  
[Redacted]   
  
Scottish Government   
Andrew  Hogg   
[Redacted]   
[Redacted]   
[Redacted]   
  
Martin  Adam  gave  a brief  update  on  the Moray  East pin  piles contract  – transfer  of 
piles from Arnish  to Methil  now complete. He anticipates  that last piles will be ready 
to go 21 January  2020.   
  
Four members of staff will be retained  at Arnish to maintain  the kit.   
  
[Redacted]   
 
In mid-January,  numbers at Methil  will reduce, the unions are aware of this. Likely  that 
numbers will remain low through  February  and  March.   
 
[Redacted]   
  
It  was  raised  by  Martin  that  there  is  an  opportunity  for  Scottish  companies  to 
compete for contracts in Nigeria  and Andy  said that he would raise this point  with 
Scottish Development  International.    
  
Agreement  that Scottish Government  officials  should meet with [Redacted]  in 
January  to find out  who he  has been  talking  to and to identify  individuals  and 
organisations  he should  be approaching.   
  
Discussions with  Highlands  and  Islands  Enterprise  regarding  equipment  upgrade  at 
Arnish  are ongoing.    
  
A senior project manager  will start at BiFab on 20 January  2020.