This is an HTML version of an attachment to the Freedom of Information request 'correspondence between the Strategic Flood Authority and the District Council between Jan 1 2019 and November 2019 on the Halloughton Road Southwell'.

 
 
012 
 
No  residential  unit  or  'supported  living  unit'  hereby  permitted  shall  be  occupied  until  its 
associated private access/driveway/parking area is constructed with provision to prevent the 
unregulated discharge of surface water from the access/driveway/parking area to the public 
highway in accordance with details first submitted to and approved in writing by the LPA. The 
provision to prevent the unregulated discharge of surface water to the public highway shall 
then be retained for the life of the development. 
 
Reason: To ensure surface water from the site is not deposited on the public highway causing 
dangers to road users. 
 
The details pursuant to this condition are required to be submitted and approved in writing 
by the Local Planning Authority prior to the occupation
 of any residential unit or 'supported 
living unit'. At this time this condition should therefore be noted and details of the proposed 
provision  to  prevent  the  unregulated  discharge  of  surface  water  from  the 
access/driveway/parking area to the public highway should be agreed in writing with teyh 
Local Planning Authority and the condition formally discharged prior to the occupation of 
any residential or supported living unit.      
 
013 
 
No  part  of  the  development  hereby  permitted  shall  be  commenced  until  details  of  the 
drainage and outfall proposals for the new residential access road have been submitted to 
and  approved      in  writing  by  the  Local  Planning  Authority.  The  development  shall  be 
implemented  in  accordance  with  these  details  to  the  satisfaction  of  the  Local  Planning 
Authority. 
 
Reason: To ensure the development is constructed to adoptable standards. 
 
Drainage details pursuant to this condition have been deposited – drg. ref:  Drawing HALL-
BSP-ZZ-XX-DR-C-240-P2.  Following  consultation  with  Nottinghamshire  County  Council 
Highway Authority I can confirm that the submitted details are acceptable as proposed. The 
development shall be implemented in complete accordance with these details.
 
 
014 
 
Before the development is commenced drainage plans for the disposal of surface water and 
foul sewerage drainage and precise drainage design details in accordance with the Flood Risk 
Assessment dated July 2015 and the Flood Risk Assessment Addendum dated 18th December 
2015 and the comments of the Nottinghamshire County Council Flood Authority have been 
submitted to and approved in writing by the Local Planning Authority. The development shall 
be  implemented  in  accordance  with  these  details  to  the  satisfaction  of  the  Local  Planning 
Authority. 


 
Reason: To ensure that the development is provided with a satisfactory means of drainage as 
well as to reduce the risk of creating or exacerbating a flooding problem and to minimise the 
risk of pollution in accordance with Core Policies 9 and 10 of the Newark and Sherwood Core 
Strategy  DPD  2011)  and  Policy  So/Ho/2  of  the  Newark  and  Sherwood  Allocations  and 
Development Management DPD 2013). 
 
The following documents have been deposited pursuant to this condition:- 
 

 Drainage Strategy produced by bsp Consulting dated 01/12/19  
 
 Storm Sewer Design produced by bsp Consulting dated 04.03.19 
 
 Additional correspondence dated 03/04/19 from bsp Consulting  
 
 Private Drainage Layout plan (bsp consulting) drg. ref. HALL-BSP-22-XX-DR-C-240 rev 
P2 
 
Following consultation with Nottinghamshire County Council Lead Local Flood Authority I 
can confirm that the submitted details are acceptable as proposed. Provided development 
is implemented in complete accordance with these details, this condition is discharged.