This is an HTML version of an attachment to the Freedom of Information request 'Ground Support Equipment Weapons'.



UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
2nd Edition Dated August 2017
(Superseding 1st Edition Dated April 2015)
GUIDED WEAPON LOADING PLATFORM
(4GA/1440-99-2557798)
GENERAL AND TECHNICAL INFORMATION (-1)
GENERAL ORDERS AND MODIFICATIONS (-2)
Sponsored for use in the
United Kingdom Ministry of Defence
and Armed Forces
by
Defence Equipment and Support (DE&S) - Air Commodities Team
Publication Organisation
Air Commodities Team
UNCONTROLLED COPY WHEN PRINTED
Page (i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
CONDITIONS OF RELEASE
This information is released by the UK government for Defence purposes only.
This information must be afforded the same degree of protection as that afforded to
information of an equivalent classification originated by the recipient Government or as
required by the recipient Government's National Security regulations.
This information may be disclosed only within the Defence Department of the recipient
Government, except as otherwise authorised by the Ministry of Defence.
This information may be subject to privately owned rights.
THIS DOCUMENT IS THE PROPERTY OF HER BRITANNIC MAJESTY'S GOVERNMENT, and
is issued for the information of such persons only as need to know its contents in the course of
their official duties. Any person finding this document should hand it in to a British Forces unit or
to a British police station for its safe return to the Ministry Of Defence (Departmental Security
Officer), Main Building, Whitehall, LONDON, SW1A 2HB, with particulars of how and when
found. THE UNAUTHORISED RETENTION OR DESTRUCTION OF THIS DOCUMENT COULD
BE AN OFFENCE UNDER THE OFFICIAL SECRETS ACT OF 1989. (When released to
persons outside Government service, this document is issued on a personal basis. The
recipient to whom it is entrusted in confidence, within the provisions of the Official Secrets
Act 1989, is personal y responsible for its safe custody and for seeing that its contents are
disclosed only to authorised persons).
© CROWN COPYRIGHT RESERVED
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i )

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
AMENDMENT RECORD
Amdt
Incorporated
Incorporated
No
By (Signature)
Date
Amdt
No
By (Signature)
Date
1
17
2
18
3
19
4
20
5
21
6
22
7
23
8
24
9
25
10
26
11
27
12
28
13
29
14
30
15
31
16
32
SERVICE AMENDMENT LEAFLET (SAL)
Identity
Identity
of SAL
Date Received Deleted by Amdt
or SAL
of SAL
Date Received Deleted by Amdt
or SAL
This 2nd Edition was created by AACE under contract to MEL Aviation with Air Commodities Team.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
CONTENTS
Preliminary material
Page
Front cover (title page) .....................................................................................................
(i)
Amendment record sheet .................................................................................................
(i i)
SAL record sheet
.............................................................................................................
(i i)
Contents (this list)
............................................................................................................
(iv)
Preface .............................................................................................................................
(v)
Associated publications
...................................................................................................
(vi)
Warnings and Cautions ....................................................................................................
(vi )
Modification record ...........................................................................................................
(vi i)
GENERAL AND TECHNICAL INFORMATION (-1)
Title page
.........................................................................................................................
(i)
Chapter
1
Description and operation
GENERAL ORDERS AND MODIFICATIONS (-2)
Title page
.........................................................................................................................
(i)
Preface .............................................................................................................................
(i )
General Orders
General Orders (title page)
..............................................................................................
(i)
General Orders List ..........................................................................................................
1
Modifications
Modifications (title page) ..................................................................................................
(i)
Equipment Modification List .............................................................................................
1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (iv)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
PREFACE
AMENDMENTS
1
Each page of this publication bears the date of issue. Red Indicating arrows bracketing red text
(
) wil indicate new or amended technical matter. The amendment process is detailed in
MAP-01.
2
Queries concerning the content of this publication, or proposals for amendment, are to be
addressed to the Air Commodities Team Engineering Authority, AC AFV2a2.
COPYRIGHT
3
This work is Crown copyright and the intel ectual property rights for this publication belong
exclusively to the Ministry of Defence (MOD). No material or information contained in this publication
should be reproduced, stored in a retrieval system or transmitted in any form outside MOD
establishments except as authorised by both the Sponsor and MOD where appropriate.
SECURITY
4
This document is issued for the information of such persons who need to know its contents in the
course of their official duties. Any person finding this document should hand it in to a British Forces unit or
to a British police station for its safe return to the Ministry Of Defence (Departmental Security Officer),
Main Building, Whitehal , LONDON, SW1A 2HB, with particulars of how and when found. THE
UNAUTHORISED RETENTION OR DESTRUCTION OF THIS DOCUMENT COULD BE AN OFFENCE
UNDER THE OFFICIAL SECRETS ACT OF 1989.
AUTHORITY
5
This publication is issued under the overall direction of the Secretary of State for Defence. It is a
MOD Approved Code of Practice (ACOP). Where issues of health and safety are concerned it takes into
account the provisions of the Health and Safety at Work Act 1974.
DISTRIBUTION
6
As directed by the publication sponsor.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (v)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
ASSOCIATED PUBLICATIONS
Reference
Title
MAP-01
Manual of Maintenance and Airworthiness Process
JDP 0-01.1
United Kingdom Glossary of Joint and Multinational Terms and
JSP 375
MOD Health and Safety Handbook
JSP 515
MOD Hazardous Stores Information System Definitions
JAP(D) 100E-10
Management of Ground Support Equipment
AP 100B-01
RAF Engineering Policy and Regulations
AP 100C-10
RAF Quality and Assurance Activity Manual
DAP 110H-0005-2(NR)
Armament Ground Support Equipment
DAP 119F-0001-5F
Aircraft GSE, General Information, Maintenance Schedules
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (vi)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
WARNINGS AND CAUTIONS
CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)
7
Make sure you know the safety precautions and first aid instructions before you use a hazardous
substance.
7.1
Read the label on the container in which the substance is supplied.
7.2
Read the data sheet applicable to the substance.
7.3
Obey local orders and regulations.
WARNINGS
NONE.
CAUTIONS
None.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (vi )

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-12
MODIFICATION RECORD
8
The fol owing record confirms that this publication incorporates al technical changes necessitated
by the modifications listed below. Information on modification titles, classification categories and mark
application is given in DAP 110H-0248-2.
Mod No
Modification title
WE 12254
To Increase the SWL to 500 kg
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (vi i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
TOPIC -1
GENERAL AND TECHNICAL INFORMATION
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
CHAPTER 1
DESCRIPTION AND OPERATION
CONTENTS
Para
LEADING PARTICULARS
1
Introduction
2
Description
3
Platform assembly
6
Supports
7
Upright assemblies
8
Upright support assemblies
9
Lower support assemblies
10
Handles
11
Earthing
12
Method of use
13
Dismantling/assembly
14
Support assemblies
16
Upright assemblies
18
Castors
20
Earthing leads
22
Servicing
Table
Page
1
Assemblies
..............................................................................................................
3
Fig
1
Guided Weapon Loading Platform
..........................................................................
2
LEADING PARTICULARS
Reference No ........................................................................................................... 4GA/1440-99-2557798
Manufacturer's Part No ......................................................................................................... 0-0WE-208237
GSE Type Code ................................................................................................................. N/A (Minor GSE)
Length (one handle extended) ....................................................................................... 3890 mm (153.2 in)
Width .................................................................................................................................. 900 mm (35.4 in)
Height (max) ..................................................................................................................... 1400 mm (55.1 in)
Weight ................................................................................................................................... 195 kg (429 lb)
Safe working load ................................................................................................................ 500 kg (1102 lb)
Chap 1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 1



UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
Fig 1 Guided Weapon Loading Platform
Chap 1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 2

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
INTRODUCTION
1
The guided weapon loading platform is used to facilitate the movement and loading/unloading of
weapons in a Hardened Aircraft Shelter (HAS). The platform can support four loading personnel and two
guided missiles.
DESCRIPTION (Fig 1)
2
The platform is comprised of the assemblies listed in Table 1.
TABLE 1 ASSEMBLIES
Assembly
Part No
Qty.
(1)
(2)
(3)
Platform assembly
0-OWE-208238
1
Upright support assembly
1-OWE-208240
2
Lower support assembly
1-OWE-208241
2
Upright assembly
1-OWE-208242
2
Handle assembly
1-OWE-208243
2
Castor
1-OWE-208266
4
Strap assembly
1-OWE-208372
4
Lead earthing
3-OWE-208268
2
Clip, earthing
WE-B-122422
2
Strip, earthing
WE-A-131032
1
Platform assembly
3
The platform assembly comprises a square section steel frame with two mounting spigots welded to
cross members on the centre line, and two pairs of mounting plates welded to the left hand side of the
frame. The decking is formed by three steel tread plates riveted to the top of the frame.
4
Square section steel tubes welded to the underside of each end of the platform provide stowage
and attachment points for two handles.
5
The platform is supported at each corner by ful y castoring braked nylon wheels. Earthing is
provided by means of a rubberized earthing strip attached to a cross member and al owed to lie in contact
with the ground.
Supports
6
Two upright, upright support and lower support assemblies together provide the means to support
two weapons on the platform.
Upright assemblies
7
Two upright assemblies each comprise two square section steel tubes welded to form an inverted
'Y'. The uprights locate, and are secured by nuts and bolts, on the platform mounting spigots; with the
angled limbs secured between pairs of mounting plates on the platform side.
Chap 1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 3

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
Upright support assemblies
8
The upright support assemblies each consist of a square section steel tube welded to a rubber-lined
trough. The supports locate into the upright assemblies, and are secured by nuts and bolts at the desired
height using the appropriate holes in the upright assemblies. Straps are provided to restrain the weapon
when loaded on the support.
Lower support assemblies
9
The lower support assemblies each comprise a steel 'vee' shaped rubber-lined trough. The
supports are secured to the angled limbs on the upright assemblies in one of three positions, depending
upon the desired height, by nuts and bolts. Straps are provided to restrain loaded weapons.
Handles
10
A steel 'T' shaped handle is attached or stowed (see para 4) at each end of the platform. Holes
dril ed at each end of the handle shank enable the handle to be secured by a 'pip' pin, in either the
extended or stowed position, to the handle stowage tube.
Earthing
11
The platform is earthed as described in para 5. When weapons are loaded on to the supports,
earthing cables connected to a stud on one of the upright assemblies are connected by means of a clip to
the weapon suspension lug.
METHOD OF USE
12
The platform has been designed to carry a maximum of two missiles when being moved, and
additional y, to support the weight of four men when stationary during loading/unloading operations as
fol ows:
12.1
Ensure the castor brakes are applied.
12.2
If necessary adjust the height of the upright and lower support assemblies as fol ows:
12.2.1
Remove and retain the nuts and bolts securing the support assemblies to the
upright assemblies.
12.2.2
Adjust the support assemblies to the required height on the upright assemblies.
12.2.3
Secure the support assemblies to the upright assemblies using the nuts and
bolts removed at para 12.2.1.
12.3
Extend one or both handles, as required, by removing the 'pip' pin from the handle
stowage, withdraw the handle until the 'pip' pin can be re-inserted through the stowage and handle.
12.4
Release the castor brakes, manoeuvre the platform to the area where missile loading is to
take place. Apply the castor brakes.
12.5
Load the platform and secure the missiles with the restraining straps. Attach the spring
clips of the earthing leads to the missile suspension lugs.
12.6
Release the castor brakes and move the platform to the aircraft to be loaded, or to the
missile carrier as appropriate.
12.7
Apply the castor brakes. Unload the platform.
Chap 1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 4

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-1
DISMANTLING/ASSEMBLY
13
Dismantling/assembly of the platform is limited to the support assemblies, the upright assemblies,
castors and earthing leads.
Support assemblies
14
Remove and retain the two nuts, washers and bolts securing the support to the upright assembly.
Remove the support assembly from the upright.
15
To assemble, locate the support assembly on the upright limb or angled limb of the upright
assembly as appropriate and secure with the nuts, bolts and washers removed at para 14.
Upright assemblies
16
If necessary remove the support assemblies as detailed in para 14. Remove and retain the two
nuts, bolts and washers securing the angled limb to the mounting plates at the side of the platform.
Remove and retain the two nuts, bolts and washers securing the upright limb to the mounting spigot.
Remove the upright assembly.
17
To assemble, locate the upright assembly on to the mounting spigot with the angled limb located in
the two side mounted mounting plates. Secure using the nuts, bolts and washers removed at para 16.
Refit the support assemblies as detailed in para 15.
Castors
18
Apply the castor brakes. Support the corner of the platform appropriate to the castor being
removed. Remove and retain three nuts, bolts and washers securing the castor to the platform. Remove
the castor.
19
To assemble, locate the castor to the underside of the platform, secure using the three nuts, bolts
and washers removed at para 18. Remove the support from the platform corner.
Earthing leads
20
Remove and discard the pin from the earth stud on the upright assembly. Remove and retain the
wingnut, stiffnut and washer securing the earthing leads. Remove the earth leads.
21
To assemble, locate the earth leads on to the earth stud and secure using the washer, stiffnut and
wingnut removed in para 20. Insert a new pin (NSN 5315-99-1387748) into the earth stud and bend
around the earth stud.
SERVICING
22
The equipment is classified as Minor GSE and the servicing of the equipment is the Users
responsibility,refer to JAP(D) 100E-10. Servicing procedures can be found in AP 118U-0401/0501/1501-5F
for servicing and to missile Topic 5A1 for servicing periods.
Chap 1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 5

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
TOPIC -2
GENERAL ORDERS AND MODIFICATIONS
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
PREFACE
1
Material issued for inclusion in this Topic 2 should be inserted in the fol owing order:
1.1
Preface. This page.
1.2
General Orders. These leaflets are identified by the prefix "GO" to the leaflet numbers and
should be inserted in numerical order.
1.3
Equipment Modification List. This list shows al approved MOD modifications affecting the
subject of this Topic 2, including those for which leaflets wil not be issued. This list wil be re-issued
periodical y. As modification leaflets are inserted, suitable entries should be recorded in the
applicable columns of this list.
1.4
Modification Leaflets. Leaflet's bear numbers al ocated in sequence as the leaflets are sent
to press and should be inserted in numerical order.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i )

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
GENERAL ORDERS
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
GENERAL ORDERS LIST
GO No
General Order Title
Leaflet No
None
None
None
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 1

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
MODIFICATIONS
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page (i)

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
EQUIPMENT MODIFICATION LIST
GUIDED WEAPON LOADING PLATFORM
4GA/1440-99-2557798
GSE TYPE CODE N/A (MINOR GSE)
Mod No
Contract Mod Plate
Mod No Strike No
Modification Title
Class
Leaflet
No
WE12254
To Increase the SWL to 500 kg
C/3
1
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 1

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
To increase the SWL to 500 kg
Leaflet 1
Guided Weapon Loading Platform (4GA/2557798)
Mod No: WE 12254 (Class C/3)
File Ref: D/SMS90/I0/24/63 I
ADP No: GW 122540
Modification Sponsor: SM(WPNS) 18b(RAF)
To increase the SWL to 500 kg.
1.
INTRODUCTION
The Service has reported that when operated, the equipment needs to support four personnel and
two missiles, not three personnel and two missiles as stated in AP 110H-0248-1. This loading may
exceed the permitted safe working load (SWL) of 410 kg.
The contractor has assessed by calculation that the current structure wil meet the new requirement
without structural changes to the equipment. The modification therefore only changes the SWL
marking by replacement of the SWL label.
Proof instal ation is not required for this modification
(1)
This modification does not supersede, partial y supersede or satisfy the work cal ed for by
any other modification, Service Modification, or Special Instruction (Technical).
2.
EMBODIMENT
This modification is to be embodied on receipt of the modification Kit.
3.
APPROXIMATE TIME FOR EMBODIMENT
The work wil take approximately three man-hours. (One to embody and two hours to proof load).
4.
DRAWINGS REQUIRED
Drawing No WE 12254-1 is incorporated in this leaflet.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 1

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
Leaflet 1
5.
PARTS AND SPECIAL TOOLS REQUIRED
(1)
Parts and Materials
(a)
The modification kit which consists of the fol owing contactor supplied items wil be
assembled by No 16MU wider Ref No 4GA/100433.
(i)
Items supplied by the contractor:
Class of
Reference No
Part No
Nomenclature
Qty
Equipment
-
3-0WE-2084 19
Label SWL
1
-
5305-99-1205483
BS4174 Type B
Screw, steel, slotted pan hd,
2
-
No 4 x 6.35 mm lg, zinc-plated
Al Units are to demand their requirements for kits, as listed above, in accordance with their current
supply regulations.
(2)
Special Tools and Test Equipment
No special tools or test equipment are required for the embodiment of this modification,
however, facilities capable of proof loading the Guided Loading Platform to the
requirements of Drawing No WE 12254-1 and the fol owing paragraph 9 are required.
6.
MODIFICATION OF SPARES
No spares are affected by this modification.
7.
CHANGE OF REFERENCE, PART AND ASSEMBLY NUMBERS
There are no changes of reference, part or assembly numbers as a result of this modification.
8.
SEQUENCE OF OPERATIONS
The fol owing is the sequence of operations:
(1)
Remove the two self-tapping screws retaining the SWL label located on the longitudinal
platform. Retain parts for later disposal.
(2)
Clamp the new SWL label, Drawing No: 3-0WE-208419, approximately 6 mm below the
previous position and, using the label as a template, dril two holes 2.6 mm diameter through the
platform and retain label, de-burr holes.
(3)
Attach new label using two self-tapping screws Type B, No 4 x 4 mm long
(5305-99-1205483).
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 2

UNCONTROLLED COPY WHEN PRINTED
DAP 110H-0248-2
Leaflet 1
9.
SPECIAL TESTS AFTER EMBODIMENT
When the modification has been embodied and inspected do the following special tests:
(1)
The Guided Weapon Loading Platform is to be subjected to the proof load indicated below
(which is twice the SWL) and in the proof loading diagram, Figure 1.
(a)
Position the Guided Weapon Loading Platform m a firm and level surface and
ensure that the castors are facing outwards in the longitudinal plane.
(b)
Position the six discrete loads as shown in Figure 1. Maintain the load for a
minimum of one minute.
(c)
On removal of the loads check that no damage or distortion to the structure has
occurred.
(d)
Prepare a Proof Load Certificate.
10. RECORDING ACTION
When this modification has been embodied and tested in accordance with current authorised
procedures, the fol owing recording action is to be taken: Enter embodiment of modification in the
appropriate records and strike-off "2 on the strike-off label.
11. DISPOSAL OF REDUNDANT PARTS
The undermentioned parts rendered redundant by the embodiment of this modification are to be
disposed of as scrap iaw local supply instructions.
Class of
Reference No
Part No
Nomenclature
Qty
Equipment
-
3-0WE208265
Label SWL
1
-
-
BS4174 Type B
Screw, steel, pan hd, self tap,
2
-
No 4 x 6.35 mm lg
12. EFFECT ON MASS AND MOMENT
This modification has no effect on mass or moment.
13. EFFECT ON EQUIPMENT OPERATION AND HANDLING
This modification has the fol owing effect on operation and handling:
(1)
The platform may support four personnel when stationary during loading/unloading
operations.
14. EFFECT ON MAINTENANCE AND GROUND SUPPORT EQUIPMENT
(1)
This modification has no effect on maintenance and ground support equipment.
(2)
Al relevant publications wil be considered for amendment action to account of the changes
introduced by this modification.
Aug 2017
UNCONTROLLED COPY WHEN PRINTED
Page 3







4
age
-0248-2
P
Leaflet1
110H
P
A
D
D
D
TE
TE
IN
IN
R
R
P
P
N
N
E
E
H
12254-1
H
W
E
W
Y
W
Y
P
o
P
O
N
O
C
C
D
ing
D
LLE
raw
D
LLE
O
O
1
TR
TR
N
Fig
N
O
O
C
C
N
N
U
U
2017
ug
A