Gloucestershire Archives – Completion of Extensions, 
Alterations and External Works following termination of 
employment of original Contractor 
 
Employer’s Requirements 
 
The Employer (Gloucestershire County Council) requires the completion of the already substantially 
completed extension, alteration and external works to form new strong rooms, meeting/training 
facility, new main entrance and internal alterations to create improved search facilities at the 
Gloucestershire Archives, Clarence Row, Alvin Street, Gloucester.  The works to date has been done 
by a Contractor whose employment under a JCT DB2016 contract was terminated in accordance 
with the terms and conditions of that contract. 
Works will include surveying and assessing the extent of work already completed and hence 
identifying the outstanding work required to complete the project in accordance with the designs of 
the original design team.  A draft Schedule of Works forms part of these Employer’s Requirements – 
the Contractor may use this and add or modify items therein as he deems appropriate. 
The Contractor will be responsible for doing the works necessary to complete the project on a design 
and build basis under a JCT DB2016 form of contract using the original design team of Quattro 
Design Architects (architectural); NDC (mechanical and electrical services); and Davidson Walsh 
(structural engineering).  The Contractor will assume the design responsibility for the completion 
works only and will take no design responsibility for works already done by the original Contractor 
whose employment was terminated under the original contract.  Design responsibility for the 
original work will be assumed by the design team under a separate arrangement with the Employer. 
 
Parties: 
 
Employer: 
 
Gloucestershire County Council 
Shire Hall 
Westgate Street 
Gloucester GL1 2TG 
 
Employer’s Agent: 
 
Adams Fletcher & Partners 
The Wheelhouse 
Bond’s Mill 
Stonehouse GL10 3RF 
 

Architect and Principal Designer: 
 
Quattro Design Architects 
Matthews Warehouse 
High Orchard Street 
Gloucester GL2 5QY 
 
M&E Services Engineer: 
 
National Design Consultancy 
Unit A2 Vantage Park 
Old Gloucester Road 
Bradley Stoke 
Bristol BS16 1GW 
 
Structural Engineer: 
 
Davidson Walsh 
37 Prestbury Road 
Cheltenham 
GL52 2PT