Notes 
A303 Stonehenge Improvement 
 
 

Title: 
  Stakeholder Strategy Board meeting 6 December 2016 Notes 
The Moonraker Hotel, 
Date: 
  06 December 2016  Time:  11:30 – 
13:30 
Location:  Trowbridge, Wiltshire 
BA14 9BL 
Fleur de Rhé-Philipe  - Wiltshire 
Parvis Khansari - Wiltshire Council 
Council 
Alistair Cunningham - Wiltshire 
Karen Jones – Wiltshire Council 
Council 
Attendees:    Derek Parody – Highways England 
Phil McMahon – Historic England 
Geoff Dodsworth – AAJV 
Kate Davies – English Heritage 
Chris Jones - AAJV 
Jenny Davies – English Heritage 
Cassandra Genn – National Trust 
Jon Griffiths - Department for 
Sarah Walker - Highways England 
Apologies: 
  Transport 
Andrew Alcorn – HE 
James Lough - AAJV 
Chris Taylor - HE 
Chair: 
  Derek Parody 
Circulation: 
  Those present plus absentees 
Meeting 
objective(s):    Meeting of the A303 Stonehenge Improvement Project’s Stakeholder 
Strategy Board. 
 
 
DISCUSSION POINTS 
Action 
No.  Item 
(What, by whom, 
by when) 
1.    Introductions  
 
JD & CJ introduced as new faces to the Board, standing in for Kate 
Davies and James Lough respectively 
2.    Safety moment 
 
Discussion about awareness of condition of tyres for safe winter 
driving & stopping distances 
3.  
Notes from October meeting 
 
Notes accepted as accurate.  Outstanding actions: 
 
a. Summary of report on PWC paper to be circulated to SSB at 
DP instead to 
December meeting. 
arrange for 
PWC to present 
at future SSB  
 
b. Al  other actions picked up as part of planning arrangements for 
 
public consultation and feeding into working groups. 

Project Update - key issues: 
 
 
a. DP presented outcome of option identification being tunnel 
 
option through WHS (with north or south bypass of Winterbourne 
Stoke) vs. long route to the south of WHS. 
 
b. The proposal for public consultation is just to consult on the 
tunnel option and to invite views on whether the Winterbourne 
Stoke bypass should pass north or south of the vil age. Approval 
was being awaited from DfT/Secretary of State for the public 
 
Page 1 of  3 



 
 
 
 
 

Notes 
A303 Stonehenge Improvement 
 
 

consultation proposal and for the timing of the consultation launch, 
planned for 9 Jan. (The SoS had visited the site on 1 Dec and was 
supportive.) 
 
c. The Design Panel had been given a presentation on the 
proposals and had been complimentary and supportive in 
response. 
 
d. The Board endorsed the approach HE were planning to take for 
consultation. 
 
e. Proposed developments in the Boscombe Down/Solstice Park 
area were raised for awareness of contextual planning issues 
needing to be taken into consideration in relation to Amesbury. 
 
f. Concerns were raised about the location of the west tunnel portal 
and its proximity to the Normanton Down Barrow Group. 
 
g. There was discussion about the byways within the WHS, with HE 
clarifying that the DCO process for the project would just assume 
the current byway status, leaving any proposals for change sought 
by others to Wilts Council. 

Public Consultation proposed in early 2017 
 
 
a. CJ presented on the intentions with regard to the 8-week public 
 
consultation planned to start on 9 Jan 201, the means of informing 
the general public & stakeholders, the venues for holding public 
 
exhibitions and the arrangements for securing responses. 
 
 
 
b. There was discussion about how the Historic England/EH/NT 
 
Communications Board planned for 13 Dec could be used to plan 
for bringing CEOs together during consultation with a view to 
 
coming out with a supportive message. HE had been invited to the   
meeting, and the invite would be extended to include Wilts. 
 
 
 
c. HE are planning to publish the Technical Appraisal Report in 
KJ to request 
support of the consultation. Other background material would also 
material Wilts 
be made available for Wilts officers to view. 
officers would 
 
like to view. 
d. A presentation about the consultation arrangements to Wilts 
council ors is planned for 19 Dec to make them aware of the 
pending consultation in the new year. 
  
6.  
Working Groups & Forums 
 
 

AOB 
 
 
a. PK queried the status of the traffic modelling being undertaken 
 
on the project, and DP confirmed that the modelling was being 
updated to remove any current anomalies to ensure future 
robustness.  
 
b. Constituency MP, John Glen, is keen to see the A303 problems 
 
being addressed and is keen to lend support as necessary. 
 
 
 
Page 2 of  3 



 
 
 
 
 

Notes 
A303 Stonehenge Improvement 
 
 

NEXT MEETING 
 
Wiltshire Council 
Date: 
14 February 2017  Time   15:00 to 
Offices, Monkton 
17:00 
Location:  Park, Chippenham, 
Wiltshire SN15 1ER 
 
 
Page 3 of  3