Core Services Lump Sum Schedule
2.1
Contractors are required to provide an Annual Lump Sum price for each of
the Core Services, Cyclic and Reactive Activities selected in the
Employer
Service Information. Details of Cyclic and Reactive Activities for each Service
are set out in Volume 2.
2.1
Contractors shall break down each Core Service Lump Sum price into the
following constituent elements: staff; labour; plant; materials; equipment; sub-
contract; fee; local overhead; risk allowance. Contractors shall also indicate
any estimates of quantity (eg number of emergency call-outs) on which they
have based their Lump Sum price. The breakdown of the total Lump Sum
prices by elements and estimate of quantity is to assist the
Employer in
determining the viability of any bid received and to enable the
Employer to
better understand the costs associated with the Service requested and shall
not be deemed to be an acceptance of the contractors assumptions. Any
changes to the prices will only be made in accordance with the Contract
Conditions of Contract.
2.3
Unless stated otherwise, one twelfth of the Annual Lump Sum will be paid to
the
Contractor each month for provision of the activity, unless the contractor
has not carried out the service to the Employers Satisfaction, in which case
the Service Manager will make an Assessment of the value of service
undertaken and payment will be made on this basis.
2.4
Core Service Lump Sum for Reactive Activities only covers individual works
or services requiring a response within 7 calendar days or less and where the
estimated cost after the application of any adjustments to the schedule of
rates does not exceed £1,000 (£1400 for TfL) (but see 2.7 below)
2.5
Reimbursement for “Inspection of Highway Structures”, "Site Inspections" and
“Design Services” is only available through the Schedule of Rates.
2.6
Only provision of the Winter Service will be reimbursed through a Core
Service Lump Sum; treatments will be reimbursed through the SoR.
2.7
Lump Sum for 3rd Party Damage covers individual works whose permanent
repair is estimated to cost up to £10,000, but other conditions apply (see
Volume 2 Section 2.24)
2.8
For TfL Core Services Lumps sums, two Prices are required:
Option 1 Including Mobilisation Costs - The Contractor should build in, his
mobilisation costs into the annual Core Service Lump Sums in proportion to
the services that require the expenditure
Page 3
Option 2 Excluding Mobilisation Costs - The Contractor may claim, up to the
amount stated in the Mobilisation Lump Sum Schedule as a separate amount
to be paid as indicated. He then shows reduced Core Service Annual Lump
Sums on sheet TfL Excluding Mobilisation Lump Sums in proportion to that
service required expenditure.