Series 1600 - Piling and Embedded Retaining Walls
Rate £ : p
ITEM NO. DESCRIPTION
UNIT
A
B
< 10
10 +
Piling Plant
16.0005
Establishment of piling plant for bored cast-in-place piles
Item
16.0010
Moving piling plant for bored cast-in-place piles
nr
Cast-in-Place Piles
16.0015
Vertical 300mm diameter bored cast-in-place piles not exceeding 5m in 
m
length
16.0020
Vertical 450mm diameter bored cast-in-place piles not exceeding 5m in 
m
length
16.0025
Vertical 600mm diameter bored cast-in-place piles not exceeding 5m in 
m
length
16.003
Temporary steel casing to 300mm diameter vertical bored piles
m
16.0035
Temporary steel casing to 450mm diameter vertical bored piles
m
16.0040
Temporary steel casing to 600mm diameter vertical bored piles
m
16.0045
Excavation in Hard Material for any piling works

Reinforcement for Cast-in-Place Piles
16.0050
High yield steel bar reinforcement, nominal size 16mm and under, not 
 t 
exceeding 12m in length
16.0055
High yield steel bar reinforcement, nominal size 20mm and over, not 
 t 
exceeding 12m in length
16.0060
Mild steel helical reinforcement, nominal size 16mm and under, not 
 t 
exceeding 12m in length
Proof Loading of Piles
16.0065
Establishment of proof loading equipment for bored cast-in-place piles
 Item 
16.0070
Proof loading of vertical bored cast-in-place piles with maintained load
nr
16.0075
Proof loading of vertical bored cast-in-place piles with constant rate load
nr
16.0080
Proof loading of vertical bored cast-in-place piles with dynamic load
nr
SoR1600
Page 161