This is an HTML version of an attachment to the Freedom of Information request 'Water Liaison Minutes'.



1MC05 MWCC
C1 - Chiltern Tunnels & Colne Valley Viaduct
Meeting:
Colne Valley Viaduct and Shaft construction – design options and
potential risks to Affinity Water supplies
No:
1MC05-ALJ-EV-MRC-C001-600001
Date:
19 December 2017/10:00-12:30
Location:
1 Triton Square, London
Attendees: HS2 – Reg. 13
Align – Reg. 13
Affinity Water (AW) – Reg. 13
Apologies: Reg. 13
Outcomes and Actions
1
Introduction
Programme discussed w/b 11 December – one minor issue. Purpose of
today to discuss in more detail construction methods and risks to Affinity
Water supplies.
2
Piling method
Reg. 12(4)(d)
Reg. 13
Align (
)
Reg. 12(4)(d)



1MC05 MWCC
C1 - Chiltern Tunnels & Colne Valley Viaduct
Reg. 12(4)(d)
Align
3
Vent shafts
Reg. 12(4)(d)
Align



1MC05 MWCC
C1 - Chiltern Tunnels & Colne Valley Viaduct
4
Cross passages
Reg. 12(4)(d)
5
Turbidity treatment
Reg. 12(4)(d)
6
Further meeting to discuss tunnel and cross passages in more detail.
HS2
Footnote
Reg. 12(4)(d)