Background
-
16/03/2017
-
B147 - Grenville. Ground floor entrance lobby
0930
1000
1
PO4
JM1
16.0
16.0
16.0
480
200
2.5
0.001
<0.01
B147 - Grenville. 1st floor landing
0931
1001
16.0
16.0
16.0
480
200
1.5
0.001
<0.01
2
ENV23
JM2
PCM2
36
10
22.5
27
36
1002
4
n/a
4
48
n/a
100
HN15 ACU
Background air monitoring carried out to determine ambient airborne fibre concentration prior to the start of work. Results satisfactory.
1
2



Homes and Communities Agency
J117186 FC8
HMS Daedalus, Broom Way, Lee-on-Solent, PO13 9YA
-
Background
-
16/03/2017
-
B147 - Grenville. Ground floor. Toilet area
1030
1130
3
PO4
JM1
8.0
8.0
8.0
480
200
2
0.001
<0.01
B147 - Grenville. 1st floor. Toilet area
1035
1135
8.0
8.0
8.0
480
200
3
0.001
<0.01
4
ENV23
JM2
B147 - Grenville. Ground floor. Toilet area
1200
1300
8.0
8.0
8.0
480
200
1.5
0.001
<0.01
5
PO4
JM3
B147 - Grenville. 1st floor. Toilet area
1205
1305
8.0
8.0
8.0
480
200
1.5
0.001
<0.01
6
ENV23
JM4
B147 - Grenville. Ground floor. Toilet area
1345
1445
8.0
8.0
8.0
480
200
2
0.001
<0.01
7
PO4
JM1
B147 - Grenville - Ground floor - Entrance lobby
1346
1446
8.0
8.0
8.0
480
200
1.5
0.001
<0.01
8
ENV23
JM2
PCM2
36
10
22.5
27
36
1002
4
n/a
4
48
n/a
100
HN15 ACU
Background air monitoring carried out to determine ambient airborne fibre concentration during enclosure de-sheeting of level 1 toilet areas following removal of asbestos insulation board ceiling tiles,
and enclosure construction works within the ground floor toilet area where asbestos insulation board ceiling tiles are planned to be removed under controlled conditions.
FC8 - During bagging up of enclosure construction waste and transit to skip. Results satisfactory.