14 September 2016 
 
Dear Mr Tidswell-Pretorius 
 
Site: 
Brockham Oil Field, Feltons Farm, Brockham 
Proposal:  Additional drilling operations at Brockham Oil Field 
 
Thank you for your letter dated 8 August 2016 but received here at in the County Planning 
Department on 17 August 2016. I apologise for the delay in responding to your letter. I did send 
an email to you on 24 August 2016 confirming I would respond by this week.  
 
From reading your letter I understand that Angus Energy Limited wish to undertake additional 
drilling operations at the site which would include the partial abandonment of the existing 
wel bore and then to “side track” and dril  a new well under the provisions of the planning 
consent you cite, ref: MO08/0894. You wish to know what information the County Planning 
Authority would require of Angus Energy Limited to commence this work.  
 
Firstly I would like to request clarification of which borehole you are seeking the partial 
abandonment of and to then ‘side track’ from i.e. is this Brockham 1(BRX-1) or Brockham 2. For 
the purposes of this letter, I am assuming it is Brockham 1.  
 
Having looked back through the files for Brockham Oil Field, I am afraid to say the planning 
permission you refer to, MO08/0894, does not grant planning permission for the drilling of an oil 
wel . In fact, MO08/0894 is for the “Construction of a concrete hardstanding of some 1841 
square metres” (dated September 2008) which was at the request of the Environment Agency 
to ensure any potential spillages at the site were captured and did not percolate into the 
groundwater.  
 
I believe the correct planning permission for the drilling of a well is MO07/0161 which was for 
“Installation and operation of a dril ing rig on an existing wellsite for: Workover programme of 
existing well, and B) the drilling of a new well, for a temporary period until 31 December 2008” 
granted in June 2007. This application sought permission to install a drilling rig to carry out a 
workover programme on the existing Brockham 1 (BRX-1) well and then secondly to drill a new 
well (BRX-3) to enable the continued production of oil from the site. The drilling of BRX-3 was to 
allow the full exploitation of the reservoir within the permitted production timescale of 2036 
(MO06/1294).  
 
It should be noted that planning permission MO07/0161 was subject to 15 conditions of which 
condition 4 ‘Duration’ is the most important with regards to your request. Condition 4 says the 
following: 

 
The development hereby permitted shall cease on or before 31 December 2008 [Officer 
underlining], by which date all buildings, plant, machinery (both fixed and otherwise) and 
any engineering works connected therewith, on or related to the application site 
(including any hard surface constructed for any purpose), shall be removed from the 
application site and the site shall be returned to its former condition, as permitted under 
MO06/1294 for the continued production of oil. Notwithstanding the requirements of this 
scheme, any plant or equipment required to make the site safe to a specification agreed 
with the Department of Trade and Industry in accordance with the Petroleum 
(Production) Land areas Regulations 1994 or any subsequent Regulations may remain 
in position.” 

 
According to file records, the permission was commenced on 9 July 2007 (letter dated 9 July 
2007 from Midmar Energy Limited to Surrey County Council).  
 
As such, I believe that the relevant permission you are seeking to carry out further work under 
is MO07/0161 which was a time limited permission which duly expired on 31 December 2008. 
Consequently Brockham Oil Field should be operating in accordance with planning permission 
ref: MO06/1294 which is the use of an existing wellsite for the production and export of crude 
oil. Therefore, I do not consider that Angus Energy Limited have planning permission to 
undertake additional drilling operations at the site under planning permission MO07/0161 nor 
MO06/1294. Should Angus Energy Limited wish to carry out a ‘side track’ a fresh new planning 
application seeking planning permission will be required.  
 
If you wish to progress an application I would strongly encourage you to undertake pre-
application discussions. The County Planning Authority charges for some of this work and the 
arrangements are set out on our website: http://www.surreycc.gov.uk/environment-housing-
and-planning/planning/planning-applications-register/the-planning-process/making-a-planning-
application/pre-application-discussions-for-planning-applications 
 
 
Should you have any further queries please do not hesitate to contact me.  
 
Yours sincerely 
 
 
 
 
Mrs S Murphy 
Principal Planning Officer 