This is an HTML version of an attachment to the Freedom of Information request 'Bus Route Specifications'.

 
SECTION 2: PART A 
 
SERVICE SPECIFICATION FOR ROUTE Nos. 149 & N149 
 
 
 CONTENTS 
Page 
 
  1. 
Tenders Required 

  2. 
Proposed Changes 
2   
  3. 
Terminals 
3   
  4. 
Days of Operation 
3   
  5. 
Vehicle Type 

  6. 
Frequencies 
5   
  7. 
Minimum Performance Standards 
13   
  8. 
Running Times 
14   
  9. 
Layovers 
14   
10. Timing 
Constraints 
15  
11. Control 
Strategy 
15 
12. Operational 
Considerations 
16  
13. Stopping 
Arrangements 
16  
14. 
Timing Points and Mileages 
17 
15. Vehicle 
Livery 
17 
16. 
Stands and Blinds 
18 
 
 
 
Appendices 
 
  A. 
Sample Running Times for Route Nos. 149 & N149 
19   
  B. 
Route Record 
25   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
_______________________________________________________________________ 
This document should be read in conjunction with the Corporation’s Guide for 
Tenderers (Part A: Explanatory Notes - Service Requirements).  Where appropriate, 
reference is made to the relevant section.
 

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
1. TENDERS 
REQUIRED 
 
This document describes the service for which the Corporation requires Tenders and 
Tenderers must submit a fully compliant bid. In addition, Tenderers may wish to draw 
upon their local knowledge to submit alternative bids which offer improved value for 
money in meeting passenger needs. These might incorporate, for example, different 
timings, frequencies, route structures and / or vehicles. The Corporation will welcome 
such bids and give them careful consideration.  
 
For more information, please refer to Section 2.1 of Part A of the Guide for Tenderers. 
 
2. PROPOSED 
CHANGES 
 
At this time, no changes are proposed to the existing service for introduction prior to the 
commencement of the new Route Agreement for Route Nos. 149 & N149.  
 
Tenderers should note that the following alterations (subject to consultation) are 
proposed as part of this Service Specification for introduction with the new Route 
Agreement: 
 
Two frequency options are specified: 
 
Option 1: 
•  Saturday shopping period frequencies are reduced from every 6 minutes to every 8 
minutes.  
 
Option 2: 
•  Mondays to Fridays interpeak frequencies are increased from every 8 minutes to 
every 6 minutes.  
 
Options 1 & 2: 
•  Mondays to Fridays AM & PM peak frequencies are increased from every 6 minutes 
to every 5 minutes.  
•  Two peak flow journeys are specified during the Mondays to Fridays AM peak in 
both directions and during the Mondays to Fridays PM peak ex London Bridge Bus 
Station, Bay F. Thus, there will be a frequency of every 4-5 minutes (14 buses per 
hour) during the busiest hour.  
•  Departures on Route No. N149 are re-timed ex London Bridge Bus Station, Bay F to 
improve interworking between Route Nos. 149 & N149.  
•  Double deck, dual door, 87 capacity vehicles are specified, subject to a satisfactory 
route test.  
•  The designation Route No. N149 is used for contractual purposes only.  This service 
will be marketed as Route No. 149. This includes all publicity, including destination 
blind displays. 
•  Tenderers must identify the cost of the Nightly element of this service 
separately. 
•  Any significant effects on tender submissions and proposals will be negotiated with 
shortlisted Tenderers during the evaluation and with the successful Tenderer post 
award as appropriate.  
 
2

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
3. TERMINALS 
 
Route Nos. 149 & N149 will operate between Edmonton Green Bus Station and London 
Bridge Bus Station, Bay F.  
 
Full details of the route to be followed, the permitted terminal workings and the available 
stands are shown at Appendix B. Tenderers should particularly note the information 
relating to the shared usage of stands, the taking of meal reliefs and the use of ferry 
vehicles. 
 
4. 
DAYS OF OPERATION 
 
One timetable must be offered for Route Nos. 149 & N149 which will operate as follows: 
 
DAY OF OPERATION 
OPTION 1 
OPTION 2 
Mondays to Fridays 
Section 6.1 
Section 6.1 
Saturdays & Good Friday 
Section 6.2 
Section 6.2 
Sundays 
Section 6.3 
Section 6.3 
Christmas Day  
No service 
No service 
Boxing Day 
Section 6.4 
Section 6.4 
Other Public Holidays 
Sunday service 
Sunday service 
Nightly 
Section 6.5 
Section 6.5 
New Year’s Eve night/New Year’s Day morning* Nightly 
service Nightly 
service 
Christmas Eve night/Christmas Day morning 
No service 
No service 
Christmas Day night/Boxing Day morning 
No service 
No service 
 
* The New Year’s Eve service level should be regarded as a minimum and any 
frequency increases and/or diversions will be discussed with the successful Tenderer 
on an annual basis. 
 
 
3

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
5. VEHICLE 
TYPE 
 
Please refer to Section 2.5 of Part A of the Guide for Tenderers. 
 
Route No. 149 & N149 is currently approved for vehicles which are a maximum of 18 
metres long and 2.55 metres wide. A formal route test will be required for vehicles which 
exceed these dimensions. This will be arranged with the successful Tenderer.  
 
The service requirement set out in Section 6 assumes that dual door, double deck 
buses with a minimum capacity of 87 of which approximately 60 should be seated, will 
be used on this route. Luggage space should also be provided. 
 
Tenderers must submit proposals based on new vehicles. These must be of a low floor 
design and be accessible to wheelchairs by means of a powered ramp.  
 
Bids for both conventional diesel powered vehicles and diesel-electric hybrid 
vehicles should be submitted and separate prices for both types are required. 
 
Bids based on a mix of hybrid and conventional vehicles would be welcomed, 
subject to a minimum of 10 hybrid powered vehicles being offered for this 
route (full hybrid operation should be offered for routes with a vehicle 
requirement of less than 10). 
 
Tenderers should refer to the vehicle design (including accessibility) features contained 
in Schedule II to Annex B of the Framework Agreement and Section 2 Part B of the 
Master ITT (Version 2 issued June 2005). 
 
 
Tenderers may also submit bids based on using existing vehicles. Tenderers are 
asked to specify what refurbishment would be carried out on existing buses and the 
expected timescale of those works. See Master ITT (Version 2 issued June 2005). 
 
 
 
 
4

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6. FREQUENCIES 
 
The level of service (e.g. every 15 minutes) required by the Corporation is described in 
terms of the interval between departures. Whilst a completely regular service at the 
specified frequency should be possible at most times, occasionally a bus may be 
timetabled to depart up to five minutes earlier or later than the regular time. 
 
Tenderers should note that when the specified frequency changes (e.g. between the 
peak and midday periods), the scheduled interval between buses should never be 
greater than that provided by the lower of the two frequencies AT ANY POINT ON 
THE ROUTE. 
 
Tenderers should note that unless otherwise stated all journeys should operate 
between the terminal points defined in each direction. 
 
 
5

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.1 
Mondays to Fridays (Option 1) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0355 - 0500   
Every 10 minutes 
0501 - 0530   
Every   8 minutes 
0531 - 0605   
Every   6 minutes 
0606 - 0705   
Every   5 minutes 
0706 - 0805   
Every   4-5 minutes (14 buses per hour) 
0806 - 0845   
Every   5 minutes 
0846 - 0915   
Every   6 minutes 
0916 - 1335   
Every   8 minutes 
1336 - 1505   
Every   7 minutes 
1506 - 1805   
Every   5 minutes 
1806 - 1835   
Every   6 minutes 
1836 - 2005   
Every   7 minutes 
2006 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0400. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 5 
minutes apart at Dalston Junction between 0705 and 0905, no more than 7 
minutes apart between 1500 and 1550 and no more than 5 minutes apart 
between 1551 and 1630.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
0450 - 0555   
Every 10 minutes 
0556 - 0640   
Every   8 minutes 
0641 - 0700   
Every   6 minutes 
0701 - 0800   
Every   5 minutes 
0801 - 0900   
Every   4-5 minutes (14 buses per hour) 
0901 - 0930   
Every   5 minutes 
0931 - 1010   
Every   6 minutes 
1011 - 1440   
Every   8 minutes 
1441 - 1545   
Every   7 minutes 
1546 - 1710   
Every   5 minutes 
1711 - 1810   
Every   4-5 minutes (14 buses per hour) 
1811 - 1840   
Every   5 minutes 
1841 - 1940   
Every   6 minutes 
1941 - 2105   
Every   7 minutes 
2106 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0455. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 6 
minutes apart at Seven Sisters Station between 0715 and 0735, no more than 5 
minutes apart between 0736 and 0955, no more than 8 minutes apart between 
1445 and 1530, no more than 7 minutes apart between 1531 and 1635 and no 
more than 5 minutes apart between 1800 and 1900.  
 
6

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.1 
Mondays to Fridays (Option 2) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0355 - 0500   
Every 10 minutes 
0501 - 0530   
Every   8 minutes 
0531 - 0605   
Every   6 minutes 
0606 - 0705   
Every   5 minutes 
0706 - 0805   
Every   4-5 minutes (14 buses per hour) 
0806 - 0845   
Every   5 minutes 
0846 - 1505   
Every   6 minutes 
1506 - 1805   
Every   5 minutes 
1806 - 1835   
Every   6 minutes 
1836 - 2005   
Every   7 minutes 
2006 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0400. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 5 
minutes apart at Dalston Junction between 0705 and 0905, no more than 6 
minutes apart between 1500 and 1550 and no more than 5 minutes apart 
between 1551 and 1630.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
0450 - 0555   
Every 10 minutes 
0556 - 0640   
Every   8 minutes 
0641 - 0700   
Every   6 minutes 
0701 - 0800   
Every   5 minutes 
0801 - 0900   
Every   4-5 minutes (14 buses per hour) 
0901 - 0930   
Every   5 minutes 
0931 - 1545   
Every   6 minutes 
1546 - 1710   
Every   5 minutes 
1711 - 1810   
Every   4-5 minutes (14 buses per hour) 
1811 - 1840   
Every   5 minutes 
1841 - 1940   
Every   6 minutes 
1941 - 2105   
Every   7 minutes 
2106 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0455. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 6 
minutes apart at Seven Sisters Station between 0715 and 0735, no more than 5 
minutes apart between 0736 and 0955, no more than 6 minutes apart between 
1445 and 1635 and no more than 5 minutes apart between 1800 and 1900. 
 
7

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.2 
Saturdays & Good Friday (Option 1) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0355 - 0535   
Every 12 minutes 
 
 
0536 - 0655   
Every 10 minutes 
0656 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0400. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Dalston Junction between 0805 and 1105.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
0450 - 0655   
Every 12 minutes 
0656 - 0755   
Every 10 minutes 
0756 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0455. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Seven Sisters Station between 0900 and 1100.  
 
8

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.2 
Saturdays & Good Friday (Option 2) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0355 - 0535   
Every 12 minutes 
 
 
0536 - 0655   
Every 10 minutes 
0656 - 0730   
Every   8 minutes 
0731 - 1805   
Every   6 minutes 
1806 - 1920   
Every   7 minutes 
1921 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0400. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 6 
minutes apart at Dalston Junction between 0805 and 1105.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
0450 - 0655   
Every 12 minutes 
0656 - 0755   
Every 10 minutes 
0756 - 0825   
Every   8 minutes 
0826 - 1900   
Every   6 minutes 
1901 - 2015   
Every   7 minutes 
2016 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0455. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 6 
minutes apart at Seven Sisters Station between 0900 and 1100.  
 
 
9

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.3 
Sundays (Options 1 & 2) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0355 - 0520   
Every 20 minutes 
 
 
0521 - 0620   
Every 15 minutes 
 
 
0621 - 0655   
Every 12 minutes 
 
 
0656 - 0725   
Every 10 minutes 
0726 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0400. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Dalston Junction between 0930 and 1130.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
 
 
0450 - 0615   
Every 20 minutes 
 
 
0616 - 0645   
Every 15 minutes 
 
 
0646 - 0820   
Every 12 minutes 
 
 
0821 - 0900   
Every 10 minutes 
0901 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0455. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Seven Sisters Station between 0930 and 1130.  
 
 
10

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.4 
Boxing Day (Options 1 & 2) 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
0800 - 2350   
Every   8 minutes 
 
First departure from Edmonton Green Bus Station no later than 0805. 
Last departure from Edmonton Green Bus Station no earlier than 2345. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Dalston Junction between 0930 and 1130.  
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
 
 
0820 - 0900   
Every 10 minutes 
0901 - 0050   
Every   8 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0825. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0045. 
 
Tenderers should ensure that buses are scheduled to be no more than 8 
minutes apart at Seven Sisters Station between 0930 and 1130.  
 
 
 
11

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
6.6 Nightly 
 
1. 
Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
0005 - 0345   
Every 30 minutes 
 
First departure from Edmonton Green Bus Station no later than 0010. 
Last departure from Edmonton Green Bus Station no earlier than 0340. 
 
2. 
London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
0100 - 0440   
Every 30 minutes 
 
First departure from London Bridge Bus Station, Bay F no later than 0105. 
Last departure from London Bridge Bus Station, Bay F no earlier than 0435. 
 
 
Tenderers must identify the cost of the Nightly element of this service separately. 
 
 
12

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
7. 
MINIMUM PERFORMANCE STANDARDS 
 
Please refer to Section 2.7 of Part A of the Guide for Tenderers. 
 
Tenderers should note that the objective of the Operator of Route Nos. 149 & N149 
shall be to operate all scheduled mileage and adhere fully  to the published 
timetable. The Operator must use its best endeavours to achieve this. 
 
The  minimum standards of acceptable performance for Route No. 149 (Options 1 
& 2)
 shall be: 
 
Average Excess Wait Time: 
 
No more than 1.20 minutes 
Minimum Operated Mileage: 
 
No less than   98.00% 
 
The minimum standards of acceptable performance for Route No. N149 shall be: 
 
 
Departing on Time   
 
 
No less than 85.00% 
 
Minimum Operated Mileage 
 
No less than 99.00% 
 
or as notified by the Corporation from time to time. The Operator will be required to 
achieve or better the standards. 
 
QSI Thresholds  
 
The QSI threshold is the standard of performance to be achieved by the operator in 
order to qualify for an automatic contract extension (in accordance with Schedule IX of 
the Framework Agreement). 
 
Average Excess Wait Time Threshold (Options 1 & 2) = 1.05minutes 
 
It is unlikely that the minimum number of QSI surveys for Threshold measurement will 
be conducted on Route No. N149 at present. However, this may change at a later date 
when a Threshold figure may be published. 
 
Summary of proposed QSI coverage: Route Nos. 149 & N149 (Options 1 & 2) 
 
Note: While London Buses undertakes to carry out QSI surveys at the times and 
locations specified below, it may prove impossible to rearrange a survey cancelled or 
nullified at short notice. 
 
Survey locations 
 
 
Towards London Bridge Station, 
Towards Edmonton Green Bus Station 
 Bay 

Edmonton 
Green 
   London 
Bridge 
Tottenham High Road  
 
 
Shoreditch 
Stoke Newington    
 
 
Tottenham High Road 
Liverpool Street 
 
 
Total scheduled manual QSI surveys per quarter = 112. 
 
 
13

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
8. RUNNING 
TIMES 
 
Extracts from the public timetable with sample running times for Route Nos. 149 & 
N149 are attached at Appendix A. This gives an indication of the time required to travel 
the route. Attention is drawn to the variations in running times at different times of the 
day. Please refer to Section 2.8 of Part A of the Guide for Tenderers for further 
information. 
 
Tenderers should carefully check the existing running times to ensure that they are 
appropriate in present traffic conditions. Tenderers should particularly check the existing 
running times for the Mondays to Fridays PM peak and the Saturday afternoon 
shopping period.  
 
It is expected that any changes to these running times can be accommodated within 
existing cycle times.  
 
When reviewing existing, and devising new, running times Tenderers should refer to: 
 
•  the minimum performance standards for Route Nos. 149 & N149 in Section 7 
above; 
•  the historical performance data provided in Section 1 Part B of the introduction to 
this ITT. 
 
Tenderers may consider if school summer holiday schedules, incorporating running 
time reductions, are desirable for this route. In this event, schedules and costs must be 
submitted separately. 
 
9. LAYOVERS 
 
Under normal circumstances, layover time on stands and at bus stations should be 
restricted to that required to provide a reliable service. Longer layovers for any other 
purpose may only be taken with the permission of the Corporation. 
 
14

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
10. TIMING 
CONSTRAINTS 
 
Route No. 149 should interwork with Route No. N149 to form a seamless 24 hour 
service. 
 
Tenderers submitting bids should bear this requirement in mind when compiling 
schedules. This requirement will be negotiated with the successful Tenderer for this 
route to ensure that optimal interworking/separation is delivered within its schedules. 
 
11. CONTROL 
STRATEGY 
 
Route Nos. 149 & N149 can suffer from the effects of traffic congestion, making 
some form of route control essential in order to achieve or better the minimum 
performance standards for this route. 
 
Tenderers should submit proposals on the control strategy they intend to adopt and 
the type of control they would intend to use by completing the form provided in 
Section 3: Part 7 of this ITT. The cost of this control should be included within the 
main Tender price. 
 
Tenderers should also indicate how they intend to facilitate driver changeovers and 
meal reliefs for this route.  
 
Further information is provided in Section 2.11 of Part A of the Guide for Tenderers. 
 
15

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
12. OPERATIONAL 
CONSIDERATIONS 
 
Tenderers should note the following operating considerations affecting Route No. 149 & 
N149: 
 
•  Route No. 149 suffers from major disruption in the Edmonton and Tottenham areas 
during home matches of Tottenham Hotspur football club. 
•  Route Nos. 149 & N149 can suffer from unpredictable traffic delays in the Dalston, 
Shoreditch and City of London areas particularly during Mondays to Fridays peak 
periods. 
 
Tenderers should also note the following factors/events which may have an impact on 
Route Nos. 149 & N149 in the foreseeable future: 
 
•  Proposals exist for large scale office development in the Bishopsgate area. 
•  The ongoing Thames Water main replacement works programme in central 
London will continue to affect these and other bus routes. 
•  The East London Line Extension may affect demand on Route Nos. 149 & N149. 
Therefore, adjustments may be required during the lifetime of the forthcoming 
contract. By June 2010, the northern extension of the East London line to Dalston 
is expected to be complete, with new step free stations at Dalston, Haggerston, 
Hoxton and Shoreditch. By February 2011, the extension of the East London line 
from Dalston Junction to Highbury & Islington is expected to be complete.  
•  East London Line construction works at Dalston Lane may cause delays to the 
service. A proposal exists for a bus station at Dalston Junction which will be built 
over the East London Line Extension Station.  
•  The construction of the new East London line station in Shoreditch High Street may 
cause delays to the service.  
•  As part of the Thameslink upgrade works, a new viaduct is to be built at Railway 
Approach, London Bridge. Works have commenced with completion of the project 
scheduled for 2012. The successful Tenderer will be advised of any road network 
changes when more information becomes available. 
•  There are tentative proposals to redevelop London Bridge Bus Station. The 
successful Tenderer will be updated when more information becomes available. 
 
The above factors have been included to assist Tenderers and represents the 
information currently available to the Corporation. Tenderers should make their own 
enquiries about events which may impact upon the route and should form their own 
views about their likely effect upon it. 
 
13. STOPPING 
ARRANGEMENTS 
 
Buses operating on Route Nos. 149 & N149 must serve all stops on the line of route 
designated for the route.  
 
16

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
14. 
TIMING POINTS & MILEAGES 
 
 
Timing Points 
The required timing points (and codes) are shown in Caesar. 
 
Mileages for Route Nos. 149 & N149 
 
Edmonton Green Bus Station to London Bridge Station, Bay F   
9.0 miles 
London Bridge Station, Bay F to Edmonton Green Bus Station   
8.7 miles 
 
Tenderers should note that: 
•  these measurements are believed to be accurate to within 0.5 miles, but no warranty 
or representation as to accuracy is given; 
•  out of service stand workings have not been measured and are not included within 
the above measurements; 
•  if alternative or additional measurements are used by the Tenderer, these must be 
stated in the tender submission; 
•  point to point measurements pertaining to recognised curtailment points or alternative 
terminals will be agreed with the successful Tenderer once the contract has been 
awarded. 
 
15. VEHICLE 
LIVERY 
 
All vehicles to be used on Route Nos. 149 & N149 from the commencement of the new 
Route Agreement must be in a livery that is exclusively Corporation red. The paint 
should be matched accurately to the colour as defined by the following manufacturer’s 
specifications: 
 
 
 
ICI London Bus Red P498 FPF 3 
 
Other manufacturers should also be able to produce this specification from the ICI 
colour chart. 
 
This requirement does not include the lower panels which may be in a different 
colour but which shall not exceed 50cm in height, or the rooftop which should be 
painted white so as to reduce temperatures inside the vehicle during the summer 
months. 
 
The positioning and size of Operators’ logos are to be agreed between the Operator 
and the Corporation and, where possible, these should be above the front doors on 
the nearside of the vehicles and above the drivers’ offside cab windows. 
 
All livery proposals must be submitted to the Contracts Tendering Manager for 
approval. 
 
 
17

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
16. 
STANDS AND BLINDS 
 
Tenderers should note that under normal circumstances, the specific restrictions 
relating to each stand will apply to the whole stand at all times. Any variation to such 
standing arrangements must be agreed by the Corporation. In addition, Tenderers 
should note the following general requirements: 
 
1) 
Drivers MUST switch off engines during layover periods at bus stations or on 
stands. 
2) 
No meal reliefs may be taken on any stand (on or off line of route) without the 
permission of the Corporation. 
3) 
No crew ferry vehicles may enter any stand (on or off line of route) without the 
permission of the Corporation. 
4) 
Destination blind displays to be used are shown under each stand description. 
Tenderers may suggest, within their bids, alternative blind displays. 
5) 
The intermediate (also known as via) blind display to be used on the nearside of 
the vehicle is shown in the box below: 
 
149 via Stoke Newington 
 
 
For further information, please refer to Annex C of the Framework Agreement: General 
Conditions relating to the use of London Buses’ Bus Stations and Stands. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
LBSL/SG/Route Nos. 149 & N149. 
07/08/2009. Tranche 319. 
 
18

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
APPENDIX A: SAMPLE RUNNING TIMES FOR ROUTE No. 149 
(based on current schedule) 
 
MONDAYS TO FRIDAYS 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F  
 
 
 
 
 
 
 
 
 
 Typical 
 
Longest 
Typical 
Longest 
Typical 
early 
morning
interpeak 
afternoon
late 
morning 
peak 
peak 
evening
Edmonton Green Bus Station 
0402 0800  1205  1657 2305 
Upper Edmonton Angel Corner, Fore 
Street 

0405 0804  1210  1702 2308 
Tottenham Swan 
0413 0820  1228  1720 2316 
Seven Sisters Station 
0414 
0822 
1230 
1722 
2317 
Stamford Hill Broadway 
0418 0829  1236  1728 2321 
Stoke Newington Rectory Road/Brooke 
Road 

0422 0835  1242  1734 2325 
Dalston 
Junction 
0427 0844  1251  1743 2331 
Shoreditch Church 
0432 0854  1300  1752 2340 
Liverpool Street Bishopsgate 
0436 0902  1306  1758 2346 
London Bridge Bus Station Bay F 
0444 0915  1317  1808 2352 
 
42 
75 
72 
71 
47 
minutes 
minutes 
minutes 
minutes 
minutes
 
2. London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
 Typical 
 
Longest 
Typical 
Longest 
Typical 
early 
morning
interpeak 
afternoon
late 
morning 
peak 
 
peak 
evening
London Bridge Bus Station Bay F 
0455 0757  1202  1700 2303 
Liverpool Street Bishopsgate 
0503 0810  1213  1710 2311 
Shoreditch Church 
0507 0817  1220  1717 2317 
Dalston 
Junction 
0513 0825  1230  1727 2327 
Stoke Newington Police Station 
0517 0830  1237  1734 2331 
Stamford Hill Broadway 
0521 0836  1244  1742 2335 
Seven Sisters Station 
0524 
0841 
1249 
1750 
2338 
Tottenham Swan 
0526 0843  1251  1752 2340 
Upper Edmonton Angel Corner, Fore 
Street 

0535 0854  1307  1812 2349 
Edmonton Green Bus Station 
0540 0900  1313  1818 2354 
 
45 
63 
71 
78 
51 
minutes 
minutes 
minutes 
minutes 
minutes
 
 
19

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
SATURDAYS 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
 
 
 
 
 
 Typical 
 
Typical 
Typical 
Typical 
early 
late AM 
PM 
late  
morning  shopping  shopping  evening
period 
period 
Edmonton Green Bus Station 
0402 1055 1503 
2300 
Upper Edmonton Angel Corner, Fore Street 
0405 1100 1508 
2303 
Tottenham Swan 
0413 1118 1526 
2311 
Seven Sisters Station 
0414 
1120 
1528 
2312 
Stamford Hill Broadway 
0418 1125 1533 
2316 
Stoke Newington Rectory Road/Brooke Road 
0422 1132 1540 
2320 
Dalston Junction 
0428 
1139 
1547 
2326 
Shoreditch Church 
0434 1148 1556 
2338 
Liverpool Street Bishopsgate  
0438 1152 1600 
2346 
London Bridge Bus Station Bay F 
0444 1200 1608 
2352 
 
42 
65 
65 
52 
minutes 
minutes 
minutes 
minutes
 
2. London Bridge Bus Station, Bay F to Edmonton Green Bus Station 
 
 Typical 
 
Typical 
Typical 
Typical 
early 
late AM 
PM 
late  
morning  shopping  shopping  evening
period 
period 
London Bridge Bus Station Bay F 
0455 1057 1505 
2303 
Liverpool Street Bishopsgate  
0503 1105 1513 
2311 
Shoreditch Church 
0507 1111 1519 
2319 
Dalston Junction 
0513 
1120 
1528 
2331 
Stoke Newington Police Station 
0517 1127 1535 
2335 
Stamford Hill Broadway 
0521 1135 1543 
2339 
Seven Sisters Station 
0524 
1141 
1549 
2342 
Tottenham Swan 0526 
1143 
1551 
2344 
Upper Edmonton Angel Corner, Fore Street 
0535 1159 1609 
2353 
Edmonton Green Bus Station 
0540 1206 1617 
2358 
 
45 
69 
72 
55 
minutes 
minutes 
minutes 
minutes
 
 
 
20

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
SUNDAYS 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 
 
 
 
 
 
 
 Typical 
 
Typical 
Typical 
Typical 
early 
late AM 
PM 
late  
morning 
shopping  shopping  evening
period 
period 
Edmonton Green Bus Station 
0402 1054 1505 2300 
Upper Edmonton Angel Corner, Fore Street 
0405 1058 1510 2303 
Tottenham Swan 
0413 1114 1527 2311 
Seven Sisters Station 
0414 
1116 
1529 
2312 
Stamford Hill Broadway 
0418 1122 1535 2316 
Stoke Newington Rectory Road/Brooke Road 
0422 1129 1542 2320 
Dalston Junction 
0428 
1136 
1550 
2326 
Shoreditch Church 
0434 1145 1600 2334 
Liverpool Street Bishopsgate  
0438 1150 1606 2338 
London Bridge Bus Station Bay F 
0444 1158 1614 2344 
 
42 
64 
69 
44 
minutes 
minutes 
minutes 
minutes
 
2. London Bridge Station to Edmonton Green Bus Station 
 
 Typical 
 
Typical 
Typical 
Typical 
early 
late AM 
PM 
late  
morning  shopping  shopping 
evening
period 
period 
London Bridge Station 
0455 1053 1501 2303 
Liverpool Street Station 
0503 1101 1509 2311 
Shoreditch Church 
0507 1107 1516 2315 
Dalston Junction 
0513 
1116 
1527 
2323 
Stoke Newington Police Station 
0517 1123 1535 2327 
Stamford Hill Broadway 
0521 1131 1543 2331 
Seven Sisters Station 
0524 
1137 
1549 
2334 
Tottenham Swan 0526 
1139 
1551 
2336 
Upper Edmonton Angel Corner, Fore Street 
0535 1152 1607 2345 
Edmonton Green Bus Station 
0540 1157 1612 2350 
 
45 
64 
71 
47 
minutes 
minutes 
minutes 
minutes
 
 
The above tables have been included to assist Tenderers. They represent the information 
currently available to the Corporation. Tenderers should form their own views about what is 
appropriate in terms of running times. (See Section 8.) 
 
21

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
APPENDIX B: SAMPLE RUNNING TIMES FOR ROUTE No. N149 
(based on current schedule) 
 
MONDAY NIGHTS/TUESDAY MORNINGS TO THURSDAY NIGHTS/FRIDAY MORNINGS
 

 
 
 
 
 
 
 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F  
 
 
 Typical 
Typical 
late 
early 
night 
morning 
Edmonton Green Bus Station 
0012 0312 
Upper Edmonton Angel Corner, Fore Street 
0015 0315 
Tottenham Swan 
0023 0323 
Seven Sisters Station 
0024 
0324 
Stamford Hill Broadway 
0028 0328 
Stoke Newington Rectory Road/Brooke Road 
0032 0332 
Dalston Junction 
0038 
0338 
Shoreditch Church 
0047 0345 
Liverpool Street Bishopsgate  
0053 0349 
London Bridge Bus Station Bay F  
0059 0355 
 
47 
43 
minutes 
minutes 
 
2. London Bridge Bus Station, Bay F to Edmonton Green Bus Station  
 
 Typical 
Typical 
late 
early 
night 
morning 
London Bridge Bus Station Bay F  
0110 0310 
Liverpool Street Station 
0118 0318 
Shoreditch Church 
0124 0322 
Dalston Junction 
0134 
0330 
Stoke Newington Police Station 
0138 0334 
Stamford Hill Broadway 
0142 0338 
Seven Sisters Station 
0145 
0341 
Tottenham Swan 0147 
0343 
Upper Edmonton Angel Corner, Fore Street 
0156 0352 
Edmonton Green Bus Station 
0201 0357 
 
51 
47 
minutes 
minutes 
 
 
22

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
FRIDAY NIGHTS/SATURDAY MORNINGS TO SATURDAY NIGHTS/SUNDAY 
MORNINGS   

 
 
 
 
 
 
 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F  
 
 
 Typical 
Typical 
late 
early 
night 
morning 
Edmonton Green Bus Station 
0012 0312 
Upper Edmonton Angel Corner, Fore Street 
0015 0315 
Tottenham Swan 
0023 0323 
Seven Sisters Station 
0024 
0324 
Stamford Hill Broadway 
0028 0328 
Stoke Newington Rectory Road/Brooke Road 
0032 0332 
Dalston Junction 
0038 
0338 
Shoreditch Church 
0050 0346 
Liverpool Street Bishopsgate  
0058 0352 
London Bridge Bus Station Bay F 
0104 0358 
 
52 
46 
minutes 
minutes 
 
 
 
 
 
 
 
 
2. London Bridge Bus Station, Bay F to Edmonton Green Bus Station  
 
 Typical 
Typical 
late 
early 
night 
morning 
London Bridge Bus Station Bay F 
0110 0310 
Liverpool Street Bishopsgate 0118 
0318 
Shoreditch Church 
0126 0325 
Dalston Junction 
0138 
0336 
Stoke Newington Police Station 
0142 0340 
Stamford Hill Broadway 
0146 0344 
Seven Sisters Station 
0149 
0347 
Tottenham Swan 0151 
0349 
Upper Edmonton Angel Corner, Fore Street 
0200 0358 
Edmonton Green Bus Station 
0205 0403 
 
55 
53 
minutes 
minutes 
 
 
 
 
23

Service Specification for Route Nos. 149 & N149 - 07/08/2009 
 
SUNDAY NIGHTS/MONDAY MORNINGS 
 
 
 
 
 
 
 
 
 
1. Edmonton Green Bus Station to London Bridge Bus Station, Bay F 
 
 
 Typical 
Typical 
late night
early 
morning 
Edmonton Green Bus Station 
0012 0312 
Upper Edmonton Angel Corner, Fore Street 
0015 0315 
Tottenham Swan 
0023 0323 
Seven Sisters Station 
0024 
0324 
Stamford Hill Broadway 
0028 0328 
Stoke Newington Rectory Road/Brooke Avenue 
0032 0332 
Dalston Junction 
0038 
0338 
Shoreditch Church 
0046 0345 
Liverpool Street Bishopsgate  
0050 0349 
London Bridge Bus Station Bay F 
0056 0355 
 
44 
43 
minutes 
minutes 
 
 
 
 
 
 
 
 
2. London Bridge Bus Station, Bay F to Edmonton Green Bus Station  
 
 Typical 
Typical 
late night
early 
morning 
London Bridge Bus Station Bay F 
0110 0310 
Liverpool Street Bishopsgate  
0118 0318 
Shoreditch Church 
0122 0322 
Dalston Junction 
0130 
0330 
Stoke Newington Police Station 
0134 0334 
Stamford Hill Broadway 
0138 0338 
Seven Sisters Station 
0141 
0341 
Tottenham Swan 0143 
0343 
Upper Edmonton Angel Corner, Fore Street 
0152 0352 
Edmonton Green Bus Station 
0157 0357 
 
47 
47 
minutes 
minutes 
 
 
 
 
 
The above tables have been included to assist Tenderers. They represent the information 
currently available to the Corporation. Tenderers should form their own views about what is 
appropriate in terms of running times. (See Section 8.) 
 
24

Printed On: 03 August 2009 10:54:20    
LONDON BUSES - ROUTE DESCRIPTION
ROUTE 149: Edmonton Green Station - London Bridge Station
(24 hour service)
Date of Structural Change:   23 October 2010.
Date of Service Change:   23 October 2010.
Reason for Issue:   New Tender.
STREETS TRAVERSED
Towards London Bridge Station: The Green, The Broadway, Fore Street, Tottenham
High Road, Stamford Hill, Northwold Road, Rectory Road, Manse Road, Evering Road,
Stoke Newington Road, Kingsland High Street, Kingsland Road, Shoreditch High Street,
Norton Folgate, Bishopsgate, Gracechurch Street, King William Street, London Bridge,
Borough High Street, Railway Approach, London Bridge Bus Station, Bay F.
Towards Edmonton Green Station: Bay F, London Bridge Street, Borough High Street,
London Bridge, King William Street, Gracechurch Street, Bishopsgate, Norton Folgate,
Shoreditch High Street, Kingsland Road, Kingsland High Street, Stoke Newington Road,
Stoke Newington High Street, Stamford Hill, Tottenham High Road, Fore Street, The
Broadway, The Green, Edmonton Green Bus Station.
STANDING AND TURNING POINTS
EDMONTON GREEN BUS STATION, SOUTH SIDE
Private stand for up to 7 buses in marked bays on south side of Edmonton Green Bus
Station on south side of Hertford Road. Overflow stand for 2 buses in separate marked
bays prior to and west of main stand area.
Buses proceed from Edmonton Green Bus Station direct to stand, departing via Edmonton
Green Bus Station and Hertford Road to The Green.  Set down in Edmonton Green Bus
Station, at Stop A and pick up in The Green, at Stop G.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   No more than 3 buses on Route 149 should be
scheduled to stand at any one time.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Edmonton Green.

TOTTENHAM, SNELLS PARK (from LONDON BRIDGE STATION)
Public stand on west side of Tottenham High Road at the junction with Langhedge Lane.   
The stand is marked out for one articulated bus and one non-articulated bus.
Buses proceed from Tottenham High Road via Fore Street and Langhedge Lane to stand,
departing via Langhedge Lane to Tottenham High Road.  Set down in Tottenham High
Road, at Stop C and pick up in Tottenham High Road, at Stop D.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   No more than 1 bus on Route 149 should be scheduled
to stand at any one time.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Snells Park, Sainsburys.
BRUCE GROVE (from LONDON BRIDGE STATION)
Buses proceed from Tottenham High Road via Bruce Grove and Lordship Lane departing
to Tottenham High Road.  Set down in Tottenham High Road, at Stop J and pick up in
Tottenham High Road, at Stop G.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:     Turning Point Only - Buses must not stand
DISPLAY:  
Bruce Grove.
TOTTENHAM, TOWN HALL APPROACH ROAD
Public stand for 2 buses on east side of Town Hall Approach Road commencing 26 metres
north of lamp standard No. TA7A and extending 24 metres north.
From Edmonton Green Station.
Buses proceed from Tottenham High Road via Monument Way, The Hale, Broad Lane,
Tottenham High Road, Philip Lane and Town Hall Approach Road to stand, departing via
Town Hall Approach Road to Tottenham High Road.  Set down in Monument Way, at Stop
R and pick up in Tottenham High Road, at Stop M.
From London Bridge Station.
Buses proceed from Tottenham High Road via Philip Lane and Town Hall Approach Road
to stand, departing via Town Hall Approach Road to Tottenham High Road.  Set down in
Tottenham High Road, at Stop M and pick up in Tottenham High Road, at Stop G.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Tottenham, Town Hall.

SEVEN SISTERS STATION
From Edmonton Green Station.
Buses proceed from Tottenham High Road via Monument Way, The Hale and Broad Lane
departing to Tottenham High Road.  Set down in Tottenham High Road and pick up in
Tottenham High Road, at Stop E.
From London Bridge Station.
Buses proceed from Tottenham High Road via Monument Way, The Hale and Broad Lane
departing to Tottenham High Road.  Set down in Tottenham High Road, at Stop M and pick
up in Tottenham High Road, at Stop Q.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:     Turning Point Only - Buses must not stand
DISPLAY:  
Seven Sisters.
OTHER INFORMATION:  
This turning point is only used when the contraflow bus
lane is closed.
STAMFORD HILL, ROOKWOOD ROAD, EAST SIDE
Public stand for 3 buses in two sections (16.5 and 24.5 metres) on east side of Rookwood
Road outside Stamford Hill Bus Garage commencing level with lamp standard No. 3 and
extending overall 77.5 metres north.
From Edmonton Green Station.
Buses proceed from Stamford Hill via Egerton Road and Rookwood Road to stand,
departing via Rookwood Road and Clapton Common to Stamford Hill.  Set down in
Stamford Hill, at Stop SK and pick up in Stamford Hill, at Stop SE.
From London Bridge Station.
Buses proceed from Stamford Hill via Egerton Road and Rookwood Road to stand,
departing via Rookwood Road and Clapton Common to Stamford Hill.  Set down in
Stamford Hill, at Stop SD and pick up in Stamford Hill, at Stop SL.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Stamford Hill.

STOKE NEWINGTON COMMON, SOUTH SIDE
Public stand in Stoke Newington Common in 2 parts.    
1 - On south side, commencing  behind the 33m bus stop cage and extending 53m east.
2 - Overflow stand on north side (offside), commencing at lamp standard No 4 and
extending 45 metres east.
From Edmonton Green Station.
Buses proceed from Northwold Road via Stoke Newington Common to stand, departing via
Stoke Newington Common, Rectory Road, Manse Road and Evering Road to Stoke
Newington High Street.  Set down in Northwold Road, at Stop D and pick up in Stoke
Newington High Street, at Stop R.
From London Bridge Station.
Buses proceed from Stoke Newington High Street via Northwold Road and Stoke
Newington Common to stand, departing via Stoke Newington Common to Rectory Road.   
Set down in Stoke Newington High Street, at Stop X and pick up in Rectory Road, at Stop
L.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Stoke Newington.
STOKE NEWINGTON, EVERING ROAD
Public stand in Evering Road, commencing 7 metres east of lamp standard No 6 opposite
flats 17-23 and extending 50 metres east.
From Edmonton Green Station.
Buses proceed from Manse Road via Evering Road to stand, departing via Evering Road to
Stoke Newington High Street.  Set down in Manse Road, at Stop N and pick up in Stoke
Newington High Street, at Stop R.
From London Bridge Station.
Buses proceed from Stoke Newington High Street via Northwold Road, Rectory Road,
Manse Road and Evering Road to stand, departing via Evering Road to Stoke Newington
Road.  Set down in Stoke Newington High Street, at Stop X and pick up in Stoke
Newington Road, at Stop Q.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Stoke Newington.

DALSTON, HERTFORD ROAD (from LONDON BRIDGE STATION)
Public stand for two buses in Hertford Road, commencing 10 metres south of a point
opposite the south flank wall of Nos 87/95 and extending 25 metres north.
Buses proceed from Kingsland Road via Enfield Road and Hertford Road to stand,
departing via Hertford Road and Downham Road to Kingsland Road.  Set down in
Kingsland Road, at Stop KE and pick up in Kingsland Road, at Stop KE.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Dalston, Downham Road.
SHOREDITCH CHURCH, HIGH STREET
Public stand on east side of Shoreditch High Street, commencing 14 metres north of a
point opposite centre of Batemans Row and extending 33 metres north.
From Edmonton Green Station.
Buses proceed from Kingsland Road via Shoreditch High Street to stand, departing via
Shoreditch High Street, Great Eastern Street and Old Street to Kingsland Road.  Set down
in Kingsland Road, at Stop T and pick up in Kingsland Road, at Stop V.
From London Bridge Station.
Buses proceed from Shoreditch High Street via Great Eastern Street, Old Street and
Shoreditch High Street to stand, departing to Shoreditch High Street.  Set down in
Shoreditch High Street, at Stop F and pick up in Shoreditch High Street, at Stop N.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   Unscheduled curtailments only.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
Shoreditch.
LONDON BRIDGE BUS STATION, STAND F
Private stand for up to 7 buses in Bay F on London Bridge Station Forecourt.
Buses proceed from Bay F direct to stand, departing to Bay F.  Set down in Bay F, at Stop
F and pick up in Bay F, at Stop F.
AVAILABILITY:  
At any time.
OPERATING RESTRICTIONS:   No more than 3 buses on Route 149 should be
scheduled to stand at any one time.
MEAL RELIEFS:  
No meal relief vehicles to stand at any time.
FERRY VEHICLES:  
No ferry vehicles to park on stand at any time.
DISPLAY:  
London Bridge.

PART B - PERFORMANCE STATISTICS
Route 149
Mileage Operated
Mileage Oper
100.0
99.0
98.0
97.0
96.0
rcentage
95.0
e
P

94.0
93.0
92.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
2008/2009
2008/
Mi
M n Stand
n St
ard
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
97.66
98.20
97.08
95.79
95.81
95.28
97.65
96.96
94.19
97.73
96.94
96.60
93.39
Min Standard 98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
De
D ductible Mileage
2.0
1.5
1.0
rcentage
e
P

0.5
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
0.49
0.40
0.43
0.93
0.59
0.82
0.76
0.64
0.64
0.73
0.91
1.07
1.26
Non D
N
e
on D ductible Mi

leage
6.0
5.0
4.0
3.0
rcentage
2.0
e
P

1.0
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
1.85
1.40
2.49
3.28
3.60
3.90
1.59
2.40
5.17
1.54
2.15
2.33
5.35
Note :
Mileage is based on 4 weeks data

PART B - PERFORMANCE STATISTICS
Route N149
Mileage Operated
Mileage Oper
100.0
99.0
98.0
97.0
96.0
rcentage
95.0
e
P

94.0
93.0
92.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
2008/2009
2008/
Mi
M n Stand
n St
ard
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
94.74
97.98
97.44
97.18
97.00
98.41
96.65
98.86
93.32
96.72
97.99
97.47
97.07
Min Standard 98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
98.00
De
D ductible Mileage
2.0
1.5
1.0
rcentage
e
P

0.5
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
1.63
1.16
1.25
0.15
0.74
0.24
0.45
0.46
0.69
0.17
0.27
0.00
0.61
Non D
N
e
on D ductible Mi

leage
6.0
5.0
4.0
3.0
rcentage
2.0
e
P

1.0
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
3.63
0.86
1.31
2.67
2.26
1.35
2.90
0.68
5.99
3.11
1.74
2.53
2.32
Note :
Mileage is based on 4 weeks data

PART B - PERFORMANCE STATISTICS
Route 149
Av
A erag
v
e Excess 
erag
Wait
e Excess 
in
Wait g
in  T
g ime 
3.0
2.5
2.0
s
1.5
Minute
1.0
0.5
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Perio
2008/2009
Min Standard
andar
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
0.85
0.86
0.91
1.03
1.11
1.34
1.39
1.39
1.05
1.03
0.97
1.04
1.33
Min Standard
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70
Long Gaps Occuring In 
u
Servic
rv e
5.0
4.0
3.0
e
g
ta

2.0
Percen
1.0
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
2008/2009
Benchmark
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
1.80
1.70
2.10
2.60
3.00
4.20
4.50
4.40
2.50
2.50
2.20
2.50
3.90
Benchmark
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
4.60
Note :
Reliability is based on 12 weeks rolling data

PART B - PERFORMANCE STATISTICS
Route N149
Departing On Time
100.0
90.0
e
g
ta

80.0
Percen
70.0
60.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
Perio
2008/2009
Min Standard
andar
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
Min Standard
Departing Early
5.0
4.0
e
g

3.0
ta
2.0
Percen
1.0
0.0
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
Period
2008/2009
Benchmark
Period
4/08
5
6
7
8
9
10
11
12
13
1/09
2
3
2008/2009
Benchmark
Note :
Reliability is based on 12 weeks rolling data
No data