Internal Audit Service 
 
Annual Report 
2010/11  
 
 
 

 
 

 
 
 

          
 
 
 
 

Internal Audit Service 
Annual Report 2010/11  
 
 

 
      TABLE OF CONTENTS  
 
 
 
 
INTRODUCTION 


 
IAS: TERMS OF REFERENCE & STRUCTURE 


 
OVERVIEW OF THE YEAR 2010/11 


 
 
Operational Developments 

Governance 

Risk Management 

Internal Control Systems 

Value for Money 

Other Work 

 
AUDIT RESULTS 


 
QUALITY ASSURANCE, COST & PERFORMANCE MEASURES 


 
PUBLIC INTEREST DISCLOSURE POLICY 


 
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 


 
INTERNAL AUDIT OPINION 


 
 
 
 
APPENDICES 

 
  
A: 
Analysis of Audit Reviews 
 
B: 

Assurance Plan 2010/11 Delivery 
 
 
 
 


Internal Audit Service 
Annual Report 2010/11  
 
 
INTRODUCTION 
 
1. 
This Annual Report for the year to 31 July 2011 has two key objectives: 
 
  To provide Court and the Principal, through the Audit Committee, with an independent opinion 
on the adequacy and effectiveness of the University’s arrangements for Governance, Risk 
Management, Control, and Value for Money. 
 
  To provide Court and the Principal, through the Audit Committee, with a summary  of the 
activities and resources of the Internal Audit Service (IAS) during 2010/11. 
 
IAS: TERMS OF REFERENCE & STRUCTURE 
 
2. 
The fundamental role of the IAS is in independently reviewing the arrangements in place which: 
   
  Identify, assess and manage risks to support the achievement of organisational objectives. 
 
  Confirm the soundness, adequacy and application of the internal control systems. 
 
  Assess the effectiveness and efficiency of operations and ensure that value for money is 
achieved. 
 
  Ensure compliance with laws, regulations, contracts, established policies, procedures and good 
practice. 
 
  Safeguard assets from fraud, irregularity or corruption. 
 
  Provide assurance on the integrity and reliability of financial and other information provided to 
management and stakeholders, including that used in decision making. 
 
3.  The IAS has no executive role, and has no  responsibility for the development, implementation or 
operation of systems. The Head of Internal Audit, subject to any guidance from the Audit Committee, is 
responsible for the management and development of the IAS. For administration purposes, the Head of 
Internal Audit reports to the Chief Operating Officer.  IAS reports directly to the Audit Committee.  The 
Head of  Internal Audit also has direct access to the Convener of Court, the Convener of the  Audit 
Committee, the Treasurer and the Principal.  
 
4.  The IAS had a full complement of three staff throughout most of 2010/11.  Bill Convery joined the IAS on 
secondment from Audit Scotland on 1 September 2010 as Acting Head of Internal Audit.  As of 1 April 
2011, Bill was appointed Head of Internal Audit.  The other members of staff are Senior Auditor:  John 
Basketter; CPFA, and Internal Auditor: Margaret Gray. 
 
OVERVIEW OF THE YEAR 2010/11 
 
Operational Developments 
 
5.  Given the staff changes at Head of IAS level it was considered opportune to carry out a cost 
effectiveness review of the in–house service provision model in comparison with alternative service 
delivery options. These included outsourcing to the private sector, buying-in resources under a locally 
managed service contract and consortia arrangements .The review concluded that the current in-house 
service delivery model provided the most cost effective option by a considerable margin. Other benefits 
from this model include flexibility, quality and staff commitment. 
 
6.  This review was followed by an assessment of the audit approach, including the planning, delivery and 
reporting of audit work.  The overall conclusion was that the IAS were providing a strong professional 
service with good feedback from Audit Committee, management and clients, and excellent results from 
the Peer Review process. Some opportunities were identified for a re-focusing of audit planning and the 
development of alternative approaches,  which will provide further assurances on the University’s 
governance arrangements and internal control systems. 


Internal Audit Service 
Annual Report 2010/11  
 
 
 
7.  Key recommendations from the assessment exercise include the development of an accountability and 
assurance approach, based on the self-assessment questionnaire previously developed by IAS. This is 
intended to make management’s existing responsibilities more explicit. The exercise also suggested a 
focus on faculty audits as a means of gaining assurance across the University on governance and 
control systems. These approaches have now been incorporated in the 3 Year Strategic Plan, which 
was agreed by Audit Committee in June 2011. 
 
Governance 
 
UK Bribery Act 2010 
 
8.  The UK Bribery Act came into force on 1 July 2011. The Act encompasses four offences in relation to 
bribery: 
 
  Making or offering a bribe. 
 
  Requesting, receiving or accepting a bribe. 
 
  Bribing a foreign public official. 
 
  Failing to prevent bribery 
 
 
9.  Organisations may be liable  for all of the above offences. Individuals  may be liable for the first three 
offences. Organisations can establish a statutory defence against claims of bribery under the Act, by 
having in place adequate procedures that are designed to prevent associated persons from engaging in 
bribery. Associated persons are those who perform services on behalf of an organisation, such as 
employees and agents. 
 
10.  A short-life working group was established   to consider the implications of the Act and identify risks. The 
group reported to the Executive Team in June, highlighting the arrangements in place to provide an 
adequate procedures defence and any gaps.  Policies on Fraud Prevention, Public Interest Disclosure 
Act and Declaration of Interests have been reviewed and revised in light of the Act. A communications 
and staff engagement strategy is being developed to ensure widespread awareness of the requirements 
of the Act. 
 
Governance Review 
 
11.  A high level governance review  was undertaken during the year, led by the Chief Operating Officer. 
Emerging issues were presented and discussed at the Audit  Committee  Workshop in February 2011. 
The outcome from the review will be reported to Court in September. 
 
Policy Updating 
 
12.  In response to an Audit Committee request, a schedule for updating all relevant University level policies 
was developed. An exercise was undertaken to consolidate the University’s policies, and associated 
procedures and guidelines. A process to routinely record information such as date of introduction, most 
recent update and next scheduled review is now in place. The IAS continues to confirm compliance with 
key policies and procedures at all audit visits. 
 
Risk management 
 
13.  Following consultation and feedback from users the Risk Management process developed in 2010 was 
refined and revised by the Risk Group, of which the Head of Internal Audit is a member. Changes to the 
existing policy were presented and discussed at Audit Committees during the year;  and a finalised 
version was launched in August 2011. The key objective of the revised policy is to simplify the process 
as much as possible for users to help embed risk management as a routine part of departmental 
governance procedures. The use of SharePoint  allows for readily accessible management information 
on the updating of risk registers and the changing profile of risks across the University. 


Internal Audit Service 
Annual Report 2010/11  
 
 
Internal Control Systems 
 
14.  IAS has continued to review  the application, design and appropriateness of the control systems and 
processes that manage the strategic and operational risks to the University.  Specific control areas 
within the assurance plan included financial systems, operational systems and IT systems. 
 
15.  In 2010,  the Audit Committee agreed that the IAS required external specialist support to provide 
assurance on aspects of the University’s IT systems. In 2011, an IT Consultant was engaged to provide 
this support. The Consultant has industry wide experience and has been providing consultancy services 
at another major Scottish University for over five years.  The consultant was tasked with gaining an 
understanding of the University’s IT structures and processes and to provide a risk based work plan to 
audit IT Security issues. An initial report was provided to the August 2011 Audit Committee. 
 
16.  IAS has been actively engaged in assessing the adequacy of the controls in two major projects: e-
Procurement and HR/Payroll. IAS has participated at both working Group and Steering Group level to 
ensure that robust procedural controls have been considered and put in place during the project 
development lifecycle. 
 
Follow-Up Activity 
 
17.  In 2010/11 a total of 82 recommendations were made compared to 27 in the previous year. Of these, 65 
have been fully implemented and 13 partly implemented. In discussions with departments 4 of the 
original recommendations were found to be no longer required because of changed circumstances. Of 
the 5 outstanding recommendations brought forward from 2009/10, 1 was implemented and the 4 others 
found to be no longer appropriate. 
 
18.  Progress on the completion of the partially implemented recommendations will be closely monitored in 
2011/12. 
 
Value for Money 
 
19.  The University is required to have a strategy for systematically reviewing management’s arrangements 
for securing value for money in order to comply with the SFC’s Financial Memorandum. The University 
has a wide variety  of mechanisms which help to ensure consideration of value for money, including 
Faculty Policy and Resource Committees; Departmental Committees; Financial Regulations; Purchasing 
Procedures; and Procurement Guidelines. The University’s Value for Money Strategy was approved by 
Court in May 2010 and demonstrates the University’s commitment to maximising benefits from its use of 
resources. This applies to the use of resources  across all of the University’s activities, no matter the 
source of funds.    
 
20.  Accurate, timely performance information is a key enabler in ensuring that resources are used in the 
most economic, efficient and effective way. High level quality management information is also essential 
for good management at all levels across the University.   
 
21.  To address the gap between the management information currently available and the management 
information people require to do their job more effectively a Corporate Management Information Project 
has been established. The project aims to deliver a Business Intelligence based suite of integrated Data 
Marts. Each Data Mart would be a management reporting solution meeting a particular business need 
from a core data warehouse. IAS will be represented on one of the emerging working groups planned to 
identify key Data Marts, and will monitor project progress generally.  
 
22.  The University also contributes to the Scottish Government’s efficient government  initiative  and is 
required to submit a return to the Funding Council each year giving information on prior year savings 
and current year targets. This showed savings of £1.8m in 2008/09, £4.5m in 2009/10 and anticipated 
savings of £6.0m in 2010/11. IAS reviewed the underlying data sources and assumptions supporting the 
figures in the return and concluded that the information provided was reasonable. 


Internal Audit Service 
Annual Report 2010/11  
 
 

 
23.  The biggest single expenditure line in the University’s accounts relates to staff costs.  Investment in staff   
development  and accountability arrangements  can have a major impact on staff performance. To help 
maximise the value from this significant use of resources the University rolled out the Accountability and 
Development Review process in January 2011. The process provides an opportunity for all staff to 
receive feedback on performance and understand better how their individual contribution fits into the 
University’s strategic priorities. The aim is to improve performance and quality outcomes as the process 
matures over time.  
 
24.  Ensuring that the University receives best value from its use of resources is a key objective in all audit 
reviews. There were clear value for money issues identified in a number of audit reports, including the 
Review of Expenses and Closure of the Hotel School. 
 
25.  IAS has been liaising with a number of value for money initiatives across the University, including 
Estates on the recycling of furniture and equipment and with IT on hardware procurement.  Outcomes 
will be reported in due course.  
 
Other Work  
 
Transparency Review/Full Economic Costing 
 
26.  During  2010/11, IAS has continued to review the steps taken by the University to ensure compliance 
with the requirements of the Transparent Approach to Costing (TRAC). Regular meetings were held with 
the fEC Accounting  Manager  to keep up to date with developments and modifications to the TRAC 
process and consider how these would impact on the audit process. 
 
27.  The  previous Quality Assurance and Validation process was  replaced  in 2009/10  by a Statement of 
Requirements. This is a comprehensive statement of the minimum requirements  for TRAC and covers 
all key areas, including: 
 
  The control environment. 
 
  Annual TRAC. 
 
  Charge out rates for research. 
 
  Charging costs to research projects. 
 
  TRAC (T). 
 
  TRAC EC - FP7. 
 
28.  The Funding Council required that all Universities submit a full self-assessment of compliance with the 
Statement of Requirements by 31 January 2011, and every three years thereafter. The Statement, along 
with the Annual TRAC Return 2009/10, was submitted by the Accounting Manager on 28 January 2011. 
 
29.  An overall audit approach and detailed work programme were developed taking into account the revised 
process and changes to TRAC guidance. Audit testing of the arrangements for the compilation of  the 
2009/10 TRAC and TRAC (T) Returns proved satisfactory.  
 
30.  Members of IAS also attend the Scottish University Help Group which consists of TRAC practitioners 
and representatives from the various Funding bodies along with other interested parties including 
Auditors.  These meetings provide a useful forum to understand the sector wide issues with regards the 
implementation of the TRAC requirements and enables the progress at Strathclyde University to be 
informally benchmarked by IAS against peer Institutions.   
 
 
 
 


Internal Audit Service 
Annual Report 2010/11  
 
 
EU Grant Certification 
 
31.  IAS  again was involved in the audit and certification process for  EU 6th  Framework grant claims. 
Elements of this work can be challenging and complex, however delivering this work in-house is highly 
cost effective for the University as compared to employing private firms. 
 
32.  During the course of  20010/11, a total of 7  claims (17  claims in 2009/10) amounting to £0.9m  were 
reviewed by IAS and an appropriate audit certificate, in accordance with EU guidelines was provided.  
 
33.  This year there was also an EU 7th Framework certification audit, valued at £0.45m. 
 
Ad Hoc Activity 
 
34.  During  2010/11, IAS has also undertaken a variety of other work which has contributed to our annual 
assurance opinion.   This includes review of the Court Members Register of Interests and use of the 
University Seal. 
 
AUDIT RESULTS 
 
35.  In line with the Annual Assurance Plan, as flexed with Audit Committee approval, a wide range of audit 
activity was undertaken over the year. Appendix A illustrates the broad mix of areas which were subject 
to review during the year, with details of overall outcomes and the audit opinions given. Further details of 
delivery against plan are provided at Appendix B. 
 
36.  A total of 82 recommendations were made in the year, each resulting in agreed management action to 
address the issue. A number of common themes were identified from audit findings, including:  
 
  Non compliance with Expenses Guidelines where expenditure was funded from special funds or 
other non-publicly funded income streams. 
 
  Processes for maintaining robust asset management registers had developed in a piecemeal 
manner over a number of years and revised clear, consistent guidance was required. 
 
  The integrity of the internal control environment is at  higher risk when there are  relocations, 
closures and major staffing changes. 
 
  The requirement to complete  a single source justification form and obtain quotations in 
accordance with the University’s tendering procedures. 
 
QUALITY ASSURANCE, COST & PERFORMANCE MEASURES 
 
Quality Assurance Toolkit 
 
37.  The assessment of IAS quality using the Committee of Higher Education Internal Auditors toolkit 
resulted in the following scores: 
 
Criteria 
IAS 
IAS 
2011 (% score) 
2010 (% score) 
Due Professional Care 
98 
93 
Strategy 
96 
92 
Methodology 
96 
95 
People 
96 
91 
Independence 
99 
97 
Quality Assurance 
90 
90 
Overall Average 
96 
93 
 


Internal Audit Service 
Annual Report 2010/11  
 
 
 
38.  These gradings have been agreed and validated by the Heads of Internal Audit of the two other 
participating institutions and a formal opinion has been issued by the two respective Heads of Audit on 
the IAS self assessment to Audit Committee.  Comparison of the Strathclyde scores against the average 
of the Peer review group are detailed below:  
 
Criteria 
IAS 
Average Peer Review 
2011 (% score) 
Group (% score) 
Due Professional Care 
98 
92 
Strategy 
96 
91 
Methodology 
96 
90 
People 
96 
86 
Independence 
99 
94 
Quality Assurance 
90 
85 
Overall Average 
96 
89 
 
39.  CHEIA’s Development Officer will collate provider scores submitted electronically by end August 2011 
and these will be presented anonymously for publication at CHEIA’s annual conference in September 
2011. The scores will be classified according to the level of participation (e.g. self-assessment, peer 
review, evidence based peer review). 
  
Audit Survey 
 
40.  The British Universities Finance Directors Group Annual Audit Survey relating to 2009/10 was issued in 
April 2011. The results of the survey are used by a number of Institutions to help benchmark both their 
internal and external audit provision. There were 92 (56%) responses this year, down from 117 (70%) in 
2009/10. As in previous years, the results come with a significant health warning as returns are taken at 
face value. Examples of potential inconsistencies in data interpretation include VAT, direct/indirect costs, 
and staff on-costs. 
 
41.  This years results are outlined below: 
 
Type of Provision 
2010/11 Average 
Average nos. of 
Cost per Day 
 
Annual Costs (£) 
days 
(£) 
Accounting Firm 
77,034 
137 
561 
In House 
163,179 
640 
255 
HE Consortium 
100,795 
206 
490 
Other Consortium 
60,850 
200 
304 
IAS 
170,000 
600 
283 
 
42.  The IAS costs are above average for in house providers;  however,  salary costs will be reduced next 
year as the excess secondment costs for the Acting Head of Audit ceased as at 1 April 2011. The 
figures are useful as indicative comparative cost differentials for alternative service delivery options. 
Acknowledging the caveat on data integrity, the IAS results are satisfactory. 
 
Balanced Scorecard 
 
43.  Information on performance for 2010/11  has been mapped  onto the refreshed performance 
measurement balanced scorecard and supporting metrics for IAS.   
 
Client Satisfaction Survey Results  
 
44.  The Client Satisfaction Survey forms part of IAS’s ongoing quality assurance process.  The number of 
returned survey forms remains low (3 in 2010/11) and consideration will be given as to how to increase 
this for next year. The collated results of the Client Satisfaction Surveys returned to date are detailed in 
the following table: 
 
 
 


Internal Audit Service 
Annual Report 2010/11  
 
 
 
 
Highly 
Satisfactory 
Unsatisfactory 
Satisfactory 
 
 
(%) 
(%) 
(%) 
1.  GENERAL 
 
 
 
 
How would you rate the overall 
75 
25 
 
usefulness of the audit?  
 
Explanation of audit objectives 
75 
25 
 
 
Professionalism of Auditor carrying 
100 

 
out the work 
2.  QUALITY OF AUDIT REPORT 
 
 
 
 
Overall clarity & presentation 
75 
25 
 
 
Relevance of findings and 
75 
25 
 
recommendations reported 
3.  TIMING 
 
 
 
 
Duration of audit process 
75 

25 
4.  COMMUNICATION 
 
 
 
 
Helpfulness of Auditor 
100 

 
 
Sufficient consultation during audit 
75 
25 
 
process 
 
Consultation on findings & 
75 
25 
 
recommendations 
 
PUBLIC INTEREST DISCLOSURE POLICY  
 
45.  During  2010/11, IAS was  involved in one review arising from this procedure.  The issue arose from an 
anonymous letter to senior management alleging that some members of staff had misappropriated 
University  property. A full investigation was undertaken, concluding that there was no evidence of any 
wrongdoing.  
 
FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 
 
46.  During  2010/11,  three  requests were received  for information held by IAS under the Freedom of 
Information Act. The requests were not made directly to the IAS but came via the University’s Freedom 
of Information Officer.  One of these requests was a follow-up to a previous request made to the 
University.  All such requests are cleared with the Information Officer and the Chief Operating Officer 
before any information is provided.  
 
INTERNAL AUDIT OPINION  
 
Basis of Opinion 
 
47.  IAS staff are required to conduct audit activity in accordance with the professional and ethical auditing 
standards set out in the following: 
 
  Code of Ethics and International Standards of the Institute of Internal Auditors. 
 
  Guidance associated with the Combined Code. 
 
  Committee of University Chairmen Guide for members of HE Governing Bodies. 
 
  Handbook for members of Audit Committees in Higher Education Institutions. 
 
  Government Internal Audit Standards and various ‘Good Practice Guides’ (HM Treasury). 
 
  Institute of Internal Auditors Position Statement on Risk Based Internal Auditing. 
 
  Codes and professional standards (Chartered Institute of Public Finance and Accountancy). 
 


Internal Audit Service 
Annual Report 2010/11  
 
 
 
48.  Given the breadth and complexity of the systems operated by the University, it is unlikely that any 
annual operational assurance plan would manage to cover all systems for managing risk in sufficient 
depth  –  this is certainly the case at the University of Strathclyde. Consequently, our assessment 
considers, not just the work performed in each year, but the work undertaken in prior years.  In addition, 
the IAS Annual Assurance Plan reviews the corporate risks of the University against assurance 
coverage. 
 
49.  The IAS is required to provide the University Court and Principal via the Audit Committee with an overall 
opinion stating whether the University has an adequate and effective framework of governance, risk 
management and control, and has in place adequate and effective processes with regards to economy, 
efficiency and effectiveness.  In giving this assessment, IAS can only provide reasonable,  not absolute 
assurance that there are no major weaknesses in the University’s governance, risk management, control 
and value for money arrangements. It should also be noted that the primary responsibility of the 
provision of adequate control and the detection of fraud lies with University Management. In assessing 
the level of assurance to be given, we have taken into account: 
 
  All assurance work undertaken during 2010/11 and work undertaken in previous years over the 
period of the strategic assurance plan and in the period up to finalisation of this report. 
 
  All follow up action taken in respect of audits from previous periods. 
 
  The effects of any significant changes in the University’s control environment. 
 
  The results of consultancy/ad hoc work undertaken during 2010/11. 
 
50.  No factors have been identified that have impacted on the actual or perceived objectivity and 
independence of the IAS for the year. This is kept under review throughout the year and any changes 
are immediately reported to Audit Committee. 
 
51.  The IAS is satisfied that the work undertaken to date allows a reasonable conclusion to be drawn as to 
the adequacy and effectiveness of the University’s governance, risk management, control and value for 
money processes.  
 
Opinion 
 
52.  In our opinion, the University of Strathclyde has adequate and effective arrangements for: 
 
  Risk Management. 
 
  Control. 
 
  Governance. 
 
  Value for Money. 
 
Looking Forward 
 
53.  Next year is a challenging one for IAS as the audit approach focuses more on faculty audits and the pilot 
Accountability & Assurance questionnaires are rolled out. Increasingly important will be the ability to be 
flexible and adaptable as the fast pace of change continues, driven by both internal and external factors. 
10 

Internal Audit Service 
Annual Report 2010/11  
 
 
 
54.  It is planned that the programme of regular meetings between the Convener of the Audit Committee and 
Head of Internal Audit will continue  in 2011/12. These have provided the opportunity for effective and 
productive discussions on emerging risks and audit findings.  
 
 
Bill Convery 
 Head of Internal Audit Service 
25 August 2011 
 
 

11 

Internal Audit Service 
Annual Report 2010/11 
Analysis of Audit Reviews 
Appendix A 
 
 
Report 
Area of Review 
Audit Opinion 
Key Assurance Category /          
Reference 
Summary of Identified Weakness Areas 
Governance 
Risk 
Controls 
VFM 
(Policy & 
Procedure) 

AC Meeting 
University Corporate 
N/A 
√ 
 
√ 
 
2 2010/11 
Governance Review 

254 
Research Contracts 
Satisfactory 
√ 
 
√ 
 

AC Meeting 
Overview of Asset 
Requires 
√ 
√ 
√ 
 
4 2010/11 
Management Procedures 
Improvement 

253 
Review of Software Asset 
Satisfactory 
√ 
 
√ 
 
Management 

252 
Architecture 
Requires 
√ 
√ 
√ 
√ 
Improvement 

250 
Civil Engineering 
Satisfactory 
√ 
√ 
√ 
 

251 
Economics 
Satisfactory 
√ 
√ 
√ 
√ 

249 
Institute of Photonics 
Satisfactory 
√ 
√ 
√ 
√ 

257 
SIPBS Post Implementation 
Satisfactory 
√ 
 
√ 
 
Review 
10 
258 
USSA Executive Expenses 
Satisfactory 
√ 
 
√ 
√ 
11 
AC Meetings 
Ad Hoc Exercises 
N/A 
√ 
√ 
√ 
 
2010/11 
Activity 
Reports 
12 
AC Meetings 
EDF 2 Monitoring 
Satisfactory 
√ 
 
√ 
 
2010/11 
Activity 
Reports 
13 
AC Meetings 
HR/Payroll System 
Satisfactory 
 
 
√ 
 
2010/11 
Implementation Update 
Activity 
Reports 
14 
AC Meetings 
E-Procurement System 
Satisfactory 
 
 
√ 
 
2010/11 
Implementation Update 
Activity 
Reports 
15 
AC Meetings 
Risk Management Process 
Satisfactory 
 
√ 
 
 
2010/11 
Activity 
Reports 
16 
AC April 
Annual TRAC Return 2009/10 
Satisfactory 
√ 
 
√ 
 
2011 
Meeting 
17 
AC April 
Annual TRAC T Return 
Satisfactory 
√ 
 
√ 
 
2011 
2009/10 
Meeting 
18 
AC April 
Annual Follow Up Report 
Satisfactory 
√ 
 
√ 
√ 
2011 
Meeting 
19 
EU Grant 
EU Grant Certification – 7 
Satisfactory 
 
 
√ 
 
Certificates 
Certificates issued. 
20 
AC Meetings 
Accountability & Assurance 
N/A 
√ 
√ 
√ 
√ 
2010/11 
Checklist 
21 
AC Meetings 
Jordanhill Campus Closure 
N/A 
√ 
√ 
√ 
√ 
2010/11 
22 
Ongoing 
Technology & Innovation 
N/A 
√ 
√ 
 
 
Centre 
23 
Ongoing 
Research Excellence 
N/A 
√ 
√ 
 
 
Framework 
24 
AC Meeting 
IS Security Review 
N/A 
 
√ 
√ 
 
1 2011/12 
25 
AC Meeting 
University Governance – 
Satisfactory 
√ 
 
 
 
1 2010/11 
Seal, Conflicts of Interest, etc. 
 
 

12 

Internal Audit Service 
Annual Report 2010/11 
Assurance Plan 2010/11 Delivery 
Appendix B 
 
Area of Review 
Audit 
Reported to Audit 
Comments 
Status 
Committee 
 
Corporate Governance 
 
Technology & Innovation Centre 
Ongoing 
When appropriate via  
Continued monitoring in 2011/12. 
Activity Report 
Decision Making Structures 
Postponed 

Included in Audit Universe. 
Internal & External 
Postponed 

Included in Audit Universe. 
Communications 
Student Recruitment 
Postponed 

Included in Audit Universe. 
Research Excellence Framework 
Ongoing 
When appropriate via  
Continued monitoring in 2011/12. 
Activity Report 
Performance Management 
Ongoing 
When appropriate via  
Continued monitoring in 2011/12. 
Activity Report 
Collaborative Agreements 
Postponed 

Included in Audit Universe. 
University Corporate Governance 
Complete 
Meeting 4 and AC Workshop 
 
Review (NE) 
 
Risk Management 
 
Risk Management System Review  
Complete 
Meeting 1: 2011/12 
 
Revisions to Risk Management 
Complete 
Meeting 3: 2010/11 
 
Framework (NE) 
 
Controls – Financial Systems 
 
HR/Payroll System 
Ongoing 
When appropriate via  
Continued monitoring in 2011/12. 
Activity Report 
Research Contracts Section 
Complete 
Meeting 5: 2010/11 
 
Resource Allocation Model 
Postponed 

Included in Audit Universe. 
Transparency Review/fEC 
Complete 
Meeting 4: 2010/11 
 
Overview of Asset Management 
Complete 
Meeting 4: 2010/11  
 
Procedures (NE) 
 
Controls – IT Systems/Processes 
 
Review of Software Asset 
Complete 
Meeting 1: 2011/12 
 
Management 
Management of IT Audit Review 
Complete 
Meeting 1: 2011/12 
 
(Outsourced) 
IS Security Review (Outsourced) 
Complete 
Meeting 1: 2011/12 
 
Review of IT General Controls 
Ongoing 
When appropriate via Activity 
Continued monitoring in 2011/12. 
(Outsourced) 
Report 
 
Controls – Operation Systems/Processes 
 
Advanced Forming Research 
Ongoing 
Meeting 2: 2011/12 
 
Centre 
Architecture 
Complete 
Meeting 2: 2010/11 
 
Civil Engineering 
Complete 
Meeting 2: 2010/11 
 
Economics 
Complete 
Meeting 3: 2010/11 
 
SBS Faculty 
Postponed 

Included in Audit Universe. 
Institute of Photonics 
Complete 
Meeting 1: 2010/11 
 
USSA Executive Expenses 
Complete 
Meeting 5: 2010/11 
 
Data Interrogation 
Ongoing 

Continued monitoring in 2011/12. 
Internal Control Questionnaire 
Ongoing 

Continued work in 2011/12. 
Review of Catering Service 
Ongoing 
Meeting 2: 2011/12 
 
Jordanhill Campus Closure (NE) 
Ongoing 
When appropriate via Activity 
Continued monitoring in 2011/12. 
Report 
Advisory Work  
Ongoing 
When appropriate via Activity 
Continued monitoring in 2011/12. 
Report 
NE: New Exercise identified during 2010/11 
 
13 

Internal Audit Service 
Annual Report 2010/11 
Assurance Plan 2010/11 Delivery 
Appendix B 
 
Area of Review 
Audit 
Reported to Audit 
Comments 
Status 
Committee 
 
Controls – Operation Systems/Processes (Contd) 
 
Points Based System of 
Ongoing 
Meeting 2: 2011/12 
 
Immigration (NE) 
 
Capital Project Review 
 
EDF 2 Project Monitoring 
Ongoing 
When appropriate via Activity 
Continued monitoring in 2011/12. 
 
Report 
SIPBS Post Implementation 
Complete 
Meeting 1: 2011/12 
 
Review 
 
Value for Money 
 
VFM Strategy Implementation 
Ongoing 
When appropriate via Activity 
Continued monitoring in 2011/12. 
Review 
Report 
 
Other Audit Work 
 
EU Grant Certification Work 
Complete 
When appropriate via Activity 
Continued work in 2011/12. 
Report 
Follow Up Audit Reviews 
Complete 
Meeting 4: 2010/11 
Included in 2011/12 Audit Plan. 
Governance 
Complete 
Meeting 1: 2010/11 
 
NE: New Exercise identified during 2010 
 
 
 
14 

Document Outline