Annual Performance Report  
for  
Lincolnshire Energy from Waste 
Facility 
 
Permit No: EPR/FP3739FS 
 
Year – 2014 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Report produced by 
 
FCC Environment 
 
Report Issued: 
 
26th January 2015 
 

link to page 5 link to page 6 link to page 7 link to page 9 link to page 10 link to page 11 Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Contents 
Contents ......................................................................................................................... 2 
Figures ........................................................................................................................ 2 
Introduction .................................................................................................................... 3 
Summary of plant operation ........................................................................................... 5 
Annual Waste Throughputs ....................................................................................... 5 
Total Plant Operational Hours ................................................................................... 5 
Residue production .................................................................................................... 6 
Energy Production ..................................................................................................... 7 
Summary of plant emissions .......................................................................................... 8 
Pollutants Measured ................................................................................................... 8 
Control of emissions .................................................................................................. 8 
Periodic Monitoring ................................................................................................. 10 
Emissions to Air ................................................................................................... 10 
Summary of plant compliance ..................................................................................... 11 
Compliance with emissions to air ............................................................................ 11 
Compliance with Ash Limits ................................................................................... 12 
Formal Enforcement Notices ................................................................................... 12 
Summary of plant improvements ................................................................................. 12 
Improvement Conditions ......................................................................................... 12 
Summary of information made available ..................................................................... 14 
Appendix 1 ................................................................................................................... 15 
 
Figures 
Figure 1: Breakdown by category for waste input ......................................................... 5 
Figure 2: Plant availability ............................................................................................. 6 
Figure 3: Quantity of residue produced as a % of waste burnt ...................................... 7 
Figure 4: Continuous emissions monitoring .................................................................. 9 
Figure 5: Periodic emission monitoring ....................................................................... 10 
Figure 6: Continuous emissions monitoring compliance post handover ..................... 11 
 
 
 
Page 2 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Introduction 
This report is required to be produced under the requirements of the Industrial 
Emission  Directive  on  access  to  information  and  public  participation,  which 
requires  the  operator  to  produce  an  annual  report  to  the  Regulator  on  the 
functioning  and  monitoring  of  the  plant  and  to  make  this  available  to  the 
public. 
 
The  Lincolnshire  Energy  from Waste facility  is  located  on  a  5 hectare  site  in 
Lincolnshire about 1.5km Northwest of Lincoln City. 
 
Within  2km  of  the  EFW  facility  there  is  one  site  of  special  scientific  interest 
(SSSI)  –  Swanholme  lakes  –  and  several  local  nature  reserves  and  wildlife 
sites. 
 
The  EFW  facility  has  a  total  capacity  of  approximately  49.7  MW  (thermal 
input)  and  is  capable  of  generating  up  to  13.1  MWe  of  electrical  power,  the 
majority of which is exported to the National Grid. Provision has been made to 
supply  additional  heat  in  the  form  of  up  to  10  MWth  when  a  commercial 
scheme becomes available to take the heat. 
 
The  facility  consists  of  one  incinerator  line  with  a  total  annual  capacity  of 
154,000 tonnes per year (19.24tph) of waste materials with a design average 
lower calorific value (LCV) of approximately 9.3 MJ/Kg. 
 
Waste  material  burned  at  the  facility  is  residual  municipal  solid  waste  (i.e. 
waste  that  has  had  recyclable  and  re-usable  materials  source  segregated) 
and  commercial  and  industrial  (C&I)  waste  derived  from  residential, 
commercial and industrial sources. All waste material for processing received 
at the facility is non-hazardous.  
 
Waste  material  arrives  by  road  and  is  weighed  before  proceeding  into  the 
tipping  hall  where  it  is  tipped  into  the  waste  bunker  of  sufficient  capacity  to 
hold several days waste inputs. 
 
Moving grate technology is used for burning the waste material. The furnace 
design  ensures  that  a  temperature  of  at  least  850°C  for  a  period  of  at  least 
two  seconds  is  achieved  in  the  combustion  chamber.  To  ensure  that  the 
temperature  does  not  fall  below  850°C  auxiliary  burners  firing  fuel  oil  are 
automatically triggered by online process monitoring equipment. 
 
Hot  gases  from  the  furnace  pass  into  a  boiler.  Steam  raised  in  the  boiler  is 
passed  to  a  turbine  to  generate  electricity.  Combustion  gases  are  cleaned 
before  they  are  released  to  atmosphere.  There  are  four  components  to  the 
gas cleaning abatement technique; 
 
-  Selective  Non-Catalytic  Reduction  (SNCR)  involving  the 
injection of ammonia into the combustion chamber above the 
flame providing for the abatement of nitrogen oxides. 
-  Dry  hydrated  lime  re-agent  injected  to  neutralise  acid  gas 
compounds. 
Page 3 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
-  Activated  carbon  injected  to  absorb  heavy  metals,  dioxins 
and furans. 
-  Bag filtration to remove fine particulates. The residues of the 
bag filters are collected and directed to a residues  silo. Part 
of the residues are recycled to the reagent injection points o 
ensure maximum usage of the lime content. 
 
Cleaned  flue  gases  exiting  the  abatement  system  of  the  incinerator  line  are 
discharged through the  75m tall stack. Gases are continuously monitored for 
particulate matter, oxides of nitrogen, sulphur dioxide, carbon monoxide, total 
organic carbon, hydrogen chloride and ammonia. Monitoring for heavy metals, 
dioxins, nitrous oxide and hydrogen fluoride is carried out periodically. 
 
Under  normal  circumstances  there  are  no  liquid  effluent  emissions  from  the 
incinerator.  Water  arising  from  boiler  blowdown  and  water  treatment 
backwash  is  recycled  to  the  Incinerator  Bottom  Ash  (IBA)  quench.  Water 
surplus  to  the  requirements  of  quenching  is  discharged  to  the  sewerage 
system.   
 
All  plant  areas  are  surfaced  to  the  appropriate  standards  for  the  activities 
within  those  areas.  All  liquid  tanks  and  drums  whose  emissions  to  water  or 
land could cause pollution, are contained in adequate bunding constructed in 
line  with  industry  best  practice  standards  and  sized  to  contain  110%  of  the 
contents  of  the  largest  tank  or  25%  of  the  total  tonnage  within  the  bund; 
whichever  is  the  larger.  Materials  used  for  surfacing  of  process  areas  and 
bunds are resistant to the materials they may come into contact with. 
 
There are no direct discharges to groundwater from the facility.  
 
Odour problems are not expected from the facility. Any potential odours from 
storage of the waste materials are extracted from above the waste bunker and 
used as combustion air within the furnace,  thereby destroying any potentially 
odorous compounds.  
 
The  solid  residues  produced  by  the  EFW  facility  are  Incinerator  Bottom  Ash 
(IBA) and Air Pollution Control (APC) residues.  APC residues are hazardous 
and sent for treatment before landfill disposal. IBA is sent for separation and 
recycling  of  the  metal  content;  with  the  remaining  ash  being  used  as  a 
substitute aggregate. 
 
During  the  early  stages  of  2014  the  EFW  facility  was  completing  its 
commissioning  period.  A  commissioning  plan  was  agreed  prior  to 
commencement  of  commissioning  which  allowed  for  excursions  from  the 
emission limits set within the permit to allow the plant to be commissioned and 
optimised. During the commissioning process start up large volumes of gas oil 
were  also  required;  however  the  data from  this  period has  gone  into  making 
up  this  report  which  may  distort  some  performance  data  and  not  be 
completely representative of how the facility will operate over its life time;  
 
Commissioning  was  completed  during  2014  with  the  plant  handover  to  FCC 
Environment on the 14th March 2014. 
Page 4 of 17 
Issue 1, dated 22 Jan 15 


Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Summary of plant operation 
Annual Waste Throughputs 
The  facility  burnt  approximately  143,444  tonnes  of  waste  in  the  reporting 
period. The vast majority of this waste was municipal waste from Lincolnshire.  
A breakdown of the waste inputs is shown in Figure 1.  
 
Figure 1: Breakdown by category for waste input 
 
0.56% 
MSW 
C&I 
99.44% 
 
 
 
Total Plant Operational Hours 
The facility operated with interruptions throughout the early parts of 2014 due 
to  continued  commissioning  activities;  with  a  further  period  of  planned 
maintenance downtime later in the year to replace the ID fan.  
 
 
 
 
Page 5 of 17 
Issue 1, dated 22 Jan 15 


Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
 
 
 
Figure 2: Plant availability 
 
Available 
Not available 
 
 
Over the entire year the facility operated for 7,586 hours giving an availability 
figure  of  86.6%.  Following  hand  over  of  the  facility  from  the  commissioning 
team  to  FCC  Environment  in  March  2014;  an  availability  of  89.9%  was 
achieved throughout the rest of the year. 
 
Residue production 
 
The plant produces two types of residue;  
  Bottom  Ash  –  an  inert  material  (including  large  volumes  of  metal 
content)  left  over  from  the  combustion  process.  This  was  sent  for 
further reprocessing to remove metals and for the ash to be used as a 
substitute aggregate. 
  Air  Pollution  Control  Residue  –  A  mixture  of  lime  and  other  particles 
that  have  been  captured  by  the  Flue  Gas  Treatment  Facility.    This 
material  gets  sent  to  a  treatment  facility  where  it  is  mixed  with  other 
waste before final disposal in a suitable landfill site 
 
The quantities of residues produced as a percentage of the waste inputs are 
shown in Figure 3 
 
Page 6 of 17 
Issue 1, dated 22 Jan 15 


Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Figure 3: Quantity of residue produced as a % of waste burnt 
25% 
24% 
23% 
22% 
21% 
20% 
19% 
18% 
17% 
16% 
15% 
14% 
13% 
12% 
11% 
10% 
9% 
8% 
7% 
6% 
5% 
4% 
3% 
2% 
1% 
0% 
IBA 
APCR 
 
 
Energy Production 
 
For the 2014 reporting period electrical export from Lincolnshire EfW totalled 
70665.72 MWh 
Page 7 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Summary of plant emissions 
 
The monitoring requirements  are set  out  in  Schedule  3  of the Environmental 
Permit. 
 
The  plant  is  required  to  carry  out  both  continuous  monitoring  as  well  as 
periodic  testing;  however  the  periodic  monitoring  will  begin  once  the 
commissioning period has ceased. 
Pollutants Measured 
 
Pollutants Measured 
Continuously 
Periodically 
Particulates 
 
 
Oxides of Nitrogen 
 
 
Sulphur dioxide 
 
 
Carbon Monoxide 
 
 
Ammonia 
 
 
Total Organic carbon 
 
 
Hydrogen Chloride 
 
 
Mercury 
 
 
Cadmium & Thallium 
 
 
Group III Metals 
 
 
PCDD & PCDF 
 
 
Hydrogen Fluoride 
 
 
Nitrous Oxide 
 
 
PAHs 
 
 
PCBs 
 
 
Control of emissions 
The control of the emissions is explained in the introduction section although 
for ease of reference the control measures have been summarised below: 
  The acidic gases (Sulphur Dioxide, Hydrogen Chloride and Hydrogen 
Fluoride) are controlled by the addition of lime to the flue gases. 
  Carbon  Monoxide  and  the  Total  Organic  Carbons  are  controlled 
through  the  combustion  controls  which  affect  the  amount  of  air  in  the 
combustion chamber 
  Oxides  of  Nitrogen  are  controlled  by  adding  sufficient  amounts  of 
ammonium hydroxide solution. The use of computer controls allows the 
system  to  react  to  the  changing  parameters  within  the  boiler  exactly 
controlling the levels of NOx and minimising the formation of ammonia. 
  The particulates or dust are captured by the bag filters which are highly 
effective  capturing  around  99.9%  of  the  particles  generated  from  the 
process. 
 
 
 
 
Page 8 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Figure  4  shows  the  single  maximum daily  and half hourly  value  recorded for 
each  continuously  monitored  substance  in  the  reporting  period  (not  the 
average  value). Carbon monoxide is measure over 10 minute periods with a 
95%  compliance  requirement  against  150mg/m³  and  thus  short  term  results 
are not displayed in figure 4.  
 
During  2014  while  the  plant  was  still  undergoing  the  commissioning  and 
optimisation  of  the  process  there  were  a  number  of  results  in  excess  of  the 
permit  emission  limit  value.  These  were  primarily  for  Carbon  Monoxide  and 
Total  Organic  Carbon  as  the  combustion  process  was  being  optimised.  An 
‘emissions during commissioning’ plan had been devised as a pre-operational 
condition  prior  to  start  up  and  approved  by  the  Environment  Agency 
recognising  the need for  some  leeway  in  order  to optimise  the  plant  for  long 
term operation. 
 
Further  information  on  emission  exceedences  following  the  handover  are 
covered in figure 6 and more detailed graphs showing the plants performance 
on a month by month basis for each substance can be found in Appendix 1. 
 
Figure 4: Continuous emissions monitoring  
 
Maximum value (expressed as a percentage of the limit) 
300% 
250% 
200% 
150% 
100% 
50% 
0% 
Particulates 
TOC 
HCL 
CO 
SO2 
Nox 
max half hour 
51% 
249% 
163% 
0% 
45% 
204% 
max daily 
6% 
20% 
97% 
256% 
90% 
91% 
 
 
 
 
Page 9 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Periodic Monitoring 
Emissions to Air 
Within  the  permit  there  is  an  obligation  to  carry  out  periodic  tests  on  the 
substances  emitted  from  the  stack  and  quality  assurance  of  the  installed 
Continuous  Emissions  Monitoring  System.  A  UKAS  certified  company  is 
required to carry out these tests and submit a report to FCC Environment. The 
results from the tests are included in the reports submitted to the Environment 
Agency and held on the public register.  
 
 
Figure 5: Periodic emission monitoring  
 
100.0% 
90.0% 
80.0% 
70.0% 
60.0% 
50.0% 
40.0% 
30.0% 
20.0% 
10.0% 
0.0% 
compounds of Cd & 
HF 
Mercury 
Metals 
Dioxin 
Th 
Max value 
1.5% 
2.0% 
4.0% 
11.6% 
5.2% 
Average 
1.2% 
2.0% 
1.7% 
7.1% 
3.1% 
 
 
Following  the  handover  of  the  facility  to  FCC  Environment;  3  quarterly 
emissions  monitoring  visits  have  taken  place  testing  for  substances  that  are 
not  continuously  monitored.  Figure  5  above  shows  the  maximum  recorded 
value and the average value for each substance as a percentage of the permit 
emissions limit value. 
 
As  can  be  seen  from  figure  5;  full  compliance  has  been  achieved  with 
periodically  monitored  substances,  with  all  values  significantly  below  the 
emission limit value. 
 
 
 
Page 10 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
 
Summary of plant compliance 
Compliance with emissions to air 
 
Figure 6: Continuous emissions monitoring compliance post handover 
 
100% 
Continuos Emission Monitoring Compliance 
90% 
80% 
70% 
60% 
50% 
40% 
30% 
20% 
10% 
0% 
Particulates 
TOC 
HCl 
CO 
SO2 
NOx 
abnormal operations 
0% 
0.00% 
0.00% 
0.00% 
0.00% 
0.01% 
Non compliant 
0% 
0.05% 
0.01% 
0.01% 
0.00% 
0.00% 
compliant 
100.00% 
99.95% 
99.99% 
99.99% 
100.00% 
99.99% 
 
 
Figure  6  shows  compliance  with  continuous  emissions  limit  values  post 
handover of the facility. A total of 10 non conformances with permit emission 
limits  occurred  during  the  period.  7  of  these  were  half  hourly  average  value 
exceedences for of Total Organic Carbon; mainly caused by a plant trip. The 
root cause of these trips were as a consequence of vibration on the induced 
draft fan which  led to the suppliers of the plant  designing and constructing a 
new  fan  which  was  installed  in  October  2014.  Since  the  replacement  of  the 
fan the facility has achieved full permit compliance. 
 
In addition to the TOC exceedences there was 1 half hour where a HCL value 
was in excess of the permit limit value and due to combustion control issues 
an  exceedence  occurred  for  Carbon  Monoxide  where  both  the  short  term 
value and as a consequence that days emission limit were recorded as being 
above the emission limit value. 
 
On  1  occasion  the  plant  recorded  a  single  half  hour  period  of  abnormal 
operation.  This  is  a  period  where  the  permit  allows  for  secondary  emission 
limit  values  to  be  applied  for  a  short  period  should  there  be  a  technically 
unavoidable stoppage of the abatement or measuring system. In this instance 
a fault on an Oxygen analyser used to correct other measured values led to a 
high NOx value.  
 
Page 11 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Compliance with Ash Limits 
 
Full permit compliance for ash results have been achieved since the handover 
of  the  plant  from  the  commissioning  phase.  2  samples  per  month  have  also 
been  taken  and  analysed  for  waste  classification  purpose;  with  results 
currently  demonstrating  that  the  IBA  is  considered  to  be  a  non  hazardous 
waste. 
Formal Enforcement Notices 
No enforcement notices were received during 2014. 
Summary of plant improvements 
Improvement Conditions 
Within  the Environmental Permit 6 improvement  conditions are set  out along 
with timetables for completion. To date the following improvement conditions 
have been completed 
 
  Improvement condition 1 - testing to determine size distribution of the 
particulate matter in the exhaust gases. 
  Improvement condition 2 - Post commissioning report 
  Improvement condition 3 – Checks to verify residency time 
  Improvement condition 5 (A) Initial calibration report on the Continuous 
Emissions Monitoring system 
  Improvement  condition  6  Progress  on  implementation  of  an 
environmental management system. 
 
2  improvement  conditions  remain  open;  these  require  a  full  years  worth  of 
operating  data  before  the  submission  can  be  completed  and  these  are 
expected to be submitted early in 2015. 
Page 12 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
 
 
Page 13 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility  Annual Report 2014 
Environmental Permit FP3739FS 
Summary of information made available 
General  information  about  FCC  Environment  and  the  Lincolnshire  Energy 
from Waste  Facility  can  be  found  at  http://www.fccenvironment.co.uk/lincoln-
efw.html 
 alternatively written enquiries can be sent to the following address: 
 
Lincolnshire Energy from Waste Facility 
Paving way; off Whisby Road 
 
 
North Hykeham 
Lincoln 
LN6 3QW 
 
 
Information held on the public register can be found at: 
 
Environment Agency 
Waterside House 
Waterside North 
Lincoln 
LN2 5HA 
 
03708506506 
 
 
Members of the public are advised to phone to arrange a viewing.  This is to 
allow the sites time to make the information requested more accessible.  This 
information can be viewed during normal working hours e.g. 09:00 to 17:00. 
 
  The Lincolnshire Energy from Waste facility has a liaison group which 
involving  a  range  of  representatives  from  the  local  community  and 
other interested parties 
 
The  liaison  group  meets  to  discuss  the  performance  of  the  installation  and 
future  activities.  If  you  are  interested  in  the  activities  of  the  liaison  group 
please contact: 
 
Sally Hood 
Visitor Centre Manager 
Lincolnshire Energy from Waste Facility 
Paving way; Off Whisby Road 
Lincoln 
LN6 3QW 
 
Email: xxxxx.xxxx@xxxxxxxxxxxxxx.xx.xx 
Page 14 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility 
Annual Report 2014 
Environmental Permit FP3739FS 
Appendix 1 
 
 Particulates 
100% 
90% 
80% 
70% 
 
60% 
V
L
 E

50% 
 of
40% 
%
30% 
20% 
10% 
0% 
Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 
Max half hour 
Max daily 
 
 
 
TOC 
300% 
250% 
200% 
 
V
L
 E 
150% 
 of
%

100% 
50% 
0% 
Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 
Max half hour 
Max daily 
 
Page 15 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility 
Annual Report 2014 
Environmental Permit FP3739FS 
 
Hydrogen Chloride 
180% 
160% 
140% 
120% 
 
100% 
LV

of 

80% 
%
60% 
40% 
20% 
0% 
Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13  Nov-13 Dec-13 
Max half hour 
Max daily 
 
 
 
 Carbon Monoxide 
1.4 
1.2 

 
0.8 
LV

of 

0.6 
%
0.4 
0.2 

Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 
Max half hour 
Max daily 
 
 
 
Page 16 of 17 
Issue 1, dated 22 Jan 15 

Lincolnshire EfW Facility 
Annual Report 2014 
Environmental Permit FP3739FS 
 Sulphur Dioxide 
100% 
90% 
80% 
70% 
 
60% 
LV

50% 
of 
%

40% 
30% 
20% 
10% 
0% 
Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 
Max half hour 
Max daily 
 
 
 Oxides of Nitrogen 
250% 
200% 
 
150% 
LV

of 
%

100% 
50% 
0% 
Jan-13 Feb-13 Mar-13  Apr-13 May-13 Jun-13  Jul-13  Aug-13 Sep-13 Oct-13  Nov-13 Dec-13 
Max half hour 
Max daily 
 
Page 17 of 17 
Issue 1, dated 22 Jan 15