University of Glasgow
Internal Audit Update
2008/09 Annual Report
4th November 2009
This report and the work connected therewith are subject to the Terms and Conditions of the contract between
University of Glasgow and Deloitte LLP. The report is produced solely for the use of University of Glasgow.
Its contents should not be quoted or referred to in whole or in part without our prior written consent, except as
required by law. Deloitte LLP will accept no responsibility to any third party, as the report has not been
prepared, and is not intended for any other purpose.
Contents
Page
Introduction and Executive Summary
1
Priority One Recommendations
2
Annual Internal Audit Report
3
Overall Activity Summary
4
Project by Project Summary
5
2008/09 Plan Completion
9
Internal Audit Plan 2009/10
10
Statement of Responsibility
11
2
Introduction and Executive Summary
As Internal Auditors, our role is to provide the Audit Committee, University Court and management with independent assurance as to the
adequacy and effectiveness of the systems of internal control we review and to report weaknesses identified together with
recommendations for improvement. We fulfil this role by performing appropriate audit work as agreed with the Audit Committee. Overall
messages for the Audit Committee for the year ended 31 July 2009 are as follows:
• Our Internal Audit reports this year have identified 102 recommendations. This represents a reduction of 21% from 2007/08 when
we raised 129 recommendations. 8 recommendations are rated Priority One, compared to 14 Priority One recommendations in the
previous year. A summary of the Priority One recommendations is included on page 2. Overall our impression is that the control
environment within the University continues to improve. While the overall number of recommendations has not reduced
significantly, we believe this is more due to the Internal Audit coverage being expanded into areas not previously reviewed.
•
Five out of eight Priority One recommendations relate to business and financial management within the Small Animal Hospital, the
Weipers Centre for Equine Welfare and Hospitality Services. These are areas where pricing and financial structures and strategies
were found to be insufficient and did not demonstrate value for money, but are not considered pervasive across the organisation.
•
We have noted improvements in the core financial processes reviewed, specifically through our work in Purchase to Pay which
identified wholesale changes to the controls over accounts payable through the introduction of the Purchase to Pay module on
Agresso. Our additional work around the financial processes of insurance management and pension schemes identified no
significant control weaknesses.
•
The structure and management of Information Technology continues to be an area of relative weakness and our work on IT
Resource Management has prompted further internal reviews of the approach to key elements of IT Services, including email, data
storage and helpdesk facilities. Our follow up work has noted some progress in the implementation of outstanding
recommendations, however the decentralised structure means this process is highly consultative and often time consuming.
•
Over the year we have continued to support the development of risk management throughout the University. We have worked with
representatives from the Faculties to further develop the template and processes for risk management, including clear identification
of remediation actions. We also met with the Senior Management Group on 28th October to further encourage the embedding of
best practice risk management.
•
The results of our follow up on previous audit recommendations show that overall 43% of recommendations have now been fully
implemented, 39% have been partially implemented and 18% have not yet been implemented. A number of the outstanding issues
relate to the upgrading of systems within Finance and IT areas, which it is recognised will take longer to implement.
•
Since the last Audit Committee meeting we have finalised our reports IT Network Security and Data Handling (see pages 6-8). The
Data Handling report included one Priority One recommendation which has been discussed and agreed with management.
•
Three reviews from the 2008/09 plan are not yet fully complete. These are Research Grants and Contracts, Estates Maintenance
and Court Governance . Further details can be found on page 9.
1
Priority One Recommendations
The eight Priority One recommendations raised during 2008/09 are summarised as follows. All of these issues have been agreed with management
and action plans put in place to address the recommendations. The Court Office and Finance Office regularly report to the Audit Committee on
progress against outstanding recommendations, and Internal Audit will independently follow up on all outstanding recommendations during 2009/10.
There is a gap in the level of pricing guidance and challenge provided across the University for commercial activities, outwith the
established R&E project approval process.
Our review of a sample of commercial contracts identified two in particular (Small Animal Hospital and Weipers Centre for Equine
Welfare) where the pricing structure is not robust and the process for calculating prices (based on staff time and cost of consumables)
Commercial
is open to significant error or omission.
Pricing
For the SAH / Weipers Centre for Equine Welfare, over 100 items had a lower mark up rate than required as per policy. It is
acknowledged that there is a requirement for different mark-up rates for different products. However, from this analysis, we noted that
there is no consistency in the method of determining and applying these mark-up rate bandings for all product groups and no process
to review and confirm the mark up of individual items.
The P&DR process is not formally connected to decisions on pay and promotion, although we recognise that discussions and
Staff
negotiations have commenced around the strengthening of links between performance and pay for some staff, in particular
Performance
professorial staff. University policies on pay awards for each group of staff should be reviewed to clearly define the links with
and
performance as measured through the P&DR process. These should include links to performance for any enhanced pay and for
Development
promotion or regrading decisions
The current structure of IT support services has Faculty teams reporting to Faculty management with no link or reporting line to the
IT Resource
Director of IT Services. This has resulted in inconsistent practices and inefficient resource allocation. In addition, there are two
Management
Faculties where the IT teams are devolved to Department level (three Departmental teams at each Faculty), and one further Faculty
with additional IT staff located outwith the central Faculty team. These structures should be revised with a view to combining these.
There has been no stock management system in place for the last two years which has led to issues such as a lack of stock counts,
no recording of waste and a lack of guidance around ordering procedures such as minimum/maximum reorder levels. New stock
Hospitality
control software has now been purchased and this requires to be installed.
Services
There is no overall strategic plan in place to guide the Service in the next 3-5 years. In particular there is no financial strategy in place
which defines the approach to target markets, pricing and costs, including the underlying assumptions, and is supported by market
research and benchmarking analysis.
There are a number of policies that include aspects of data handling but no single, central data handling policy. There is a lack of
compliance monitoring to ensure staff are treating data in a controlled manner. There is consequently a lack of understanding or
Data Handling
assurance over data handling, for example what information is stored locally; whether data transmissions between systems and to
third parties are secure; and the extent of action taken on non-compliance with policies.
2
Annual Internal Audit Report
Report to the Audit Committee
As Internal Auditors we are required to provide the Audit Committee with an Annual Internal Audit Report. The University Court
and its management are responsible for ensuring that a system of control, financial and otherwise, is established and
x
maintained. This is in order to carry on the operations of the University in an orderly and efficient manner, to ensure adherence
to management policies, to safeguard the assets, and to secure, as far as possible, the completeness and accuracy of records.
Our responsibility as internal auditors is to evaluate significant systems and associated internal controls and to report to the
Audit Committee on the adequacy of such controls and systems. We cannot examine the whole system of controls, financial or
otherwise, nor is Internal Audit a substitute for management’s responsibility to maintain adequate systems of internal control
over financial and operational systems.
In considering our assessment of the framework of controls we have taken the following into consideration:
• results of audits undertaken during the year;
• follow up action taken in respect of previous year’s audit work;
• our perception of the extent of risk and control awareness amongst the staff and management of University of Glasgow.
On the basis of work undertaken for the year ended 31 July 2009 we consider that University of Glasgow generally has an
adequate framework of control over the systems we examined as summarised on page 4 (subject to implementation of the
recommendations in particular those rated Priority One). In providing such an assessment we would draw to your attention our
summary findings as presented in our individual reports issued throughout the year and particularly the Priority One
recommendations.
X
We take responsibility for this report, which has been prepared on the basis of the limitations set out on page 12.
3
Overall Activity Summary
The following table provides a summary of the work we have undertaken in respect of the plan for 2008/09.
Project Title
Status / Timing
Budget (days)
Days to date
Recommendations
2008/09
Priority 1
Priority 2
Priority 3
Review of Purchase to Pay (brought forward from 07/08)
Complete
15
15
-
5
1
Review of Commercial Pricing
Complete
25
27
3
6
1
Review of Pension Scheme Administration
Complete
10
10
-
-
-
Review of Corporate Communications
Complete
10
12
-
6
-
Review of Staff Performance and Development
Complete
15
17
1
3
1
Review of Sports and Recreation Services
Complete
15
15
-
3
3
Review of Student Services Relocation
Complete
20
20
-
5
2
Review of Insurance Management Arrangements
Complete
10
10
-
3
3
Review of IT Resource Management
Complete
20
23
1
3
2
Review of Programme Approval Procedures
Complete
15
16
-
4
2
Review of Hospitality Services
Complete
20
20
2
2
1
Review of E-Learning
Complete
15
16
-
2
4
Review of Faculty Corporate Planning
Complete
15
17
-
9
3
PAYE Compliance Risk Assessment
Complete
10
10
-
6
8
Review of IT Network Security
Complete
15
15
-
-
-
Review of Data Handling
Complete
15
15
1
5
1
Review of Estates Maintenance
Draft report issued
10
6
Review of Research Grants and Contracts
Fieldwork complete
35
37
Review of Court Governance
Fieldwork in progress
10
6
8%
Risk Management – Faculty Action Planning
Complete
15
15
Whistleblowing Investigation
Complete
11
11
31%
1
Review of Student Lifecycle Workshops
Complete
15
15
2
Audit Committee Effectiveness and TOR Review
Complete
7
7
3
Risk Management – Risk Workshop
Complete
8
8
61%
Follow Up
Complete
20
20
2008/09 Plan Development
Complete
10
11
Contract Management Time
Complete
25
31
Audit Committee
Complete
15
17
426
442
8
62
32
4
Project by Project Summary
A summary of the projects which have been undertaken since the last meeting is outlined on the following pages. Where applicable, the ‘temperature
gauge’ is intended to provide Audit Committee members with a relative feel for the impact and overall importance of the findings of each project.
7
5
Project by Project Summary
Review of Data Handling
X
Recent information security breaches by a number of publicly funded bodies have resulted in the Scottish Government actively seeking to improve data
handling practices. Its main objective is to ensure that good data protection practices are implemented to prevent data leakages that could result in
significant reputational damage and financial loss.
Data handling is the process of ensuring that manual and electronic data is stored, archived or disposed in a safe and secure manner during and after its
use. This includes the development of policies and procedures to manage data and should consider the different types of data, various types of media and
storage, responsibilities and privileges, and mechanisms for archive, retention and disposal. The purpose of this review was to conduct a high level
assessment of the data handling methodology in place to evaluate the design of the controls and processes implemented.
Our overall conclusion was that significant work is required to reach a satisfactory level of control over data handling on a University-wide basis. A
summary of our main recommendations and conclusions is as follows:
•
There are a number of policies that include aspects of data handling but no single, central data handling policy. There is a lack of compliance
monitoring to ensure staff are treating data in a controlled manner. There is consequently a lack of understanding or assurance over data
handling, for example what information is stored locally and whether data transmissions between systems and to third parties are secure, and
what action is taken on non-compliance with policies. This issue is graded Priority One due to the significant risks associated with loss of
confidential data.
•
Data handling specific training course are available and are included as part of the induction session for new staff joining the University.
However, it has been estimated that only 20% of staff attend this session. There is currently no mandatory training session with regard to
data handling and the associated risks.
•
A formal data handling policy should be created which considers all aspects of data handling across the University and its external partners
and is based on an initial risk assessment. This policy should formally define data handling boundaries and require different levels of rigour
and security in the management of data depending on its sensitivity and risk classification. Clear policies and guidance material should be
documented in relation to encryption within the University.
•
Responsibility for data handling within the University of Glasgow should be clearly assigned to an appropriate member of University
management.
These issues and recommendations have been discussed with management and we await full management responses demonstrating the actions to be
undertaken along with timescales for completion.
Priority
CW
PI
Total
1
1
0
1
CW = Control Weakness
2
4
1
5
PI = Process Improvement
3
1
0
1
8
6
Project by Project Summary
Follow Up of 2007/08 Network Security Review
X
The purpose of this review was to conduct a full follow up review of the 2007/08 Network Security review which assessed the University’s controls over
network security infrastructure, systems and hardware. The following areas were selected for review:
•
General Network Security – including the logical security provisions in place to protect the University’s IT systems, the administration of
information security and the monitoring of the security of the University’s key systems.
•
Security Policy and Procedures Review – the applicable network security policies and guidelines for systems.
•
Network Software and Hardware – including the provisions in place to handle current and future threats to the continued availability of the
University’s key network and system resources. This also included current hardware and software versions and patching levels.
•
Monitoring and Management – the use of monitoring and management tools and resultant security metrics in relation to network usage, abuse,
availability, behavioural analysis and security threats.
The departments within the University have varying levels of autonomy with respect to information technology. In 2007/08, we made 11
recommendations and the status of implementation of the outstanding audit recommendations by grade is shown in the following table:
Fully
Partially
Not
Priority
Total
Implemented
Implemented
Implemented
One
1
0
0
1
Two
0
7
1
8
Three
1
1
0
2
TOTAL
2 (18%)
8 (73%)
1 (9%)
11 (100%)
The Priority One recommendation relating to inappropriate administrator accounts has now been fully implemented. Supervisor access to the root
account was previously accessible through a number of routes but this has now been restricted by IP address so only authorised individuals can make
fundamental changes to the environment.
The recommendations which remain outstanding (all Priority Two) relate to:
•
the implementation of appropriate password standards across all systems, although we note some progress within the Central ITS department;
•
user administration policies and procedures, where user access reviews are not performed on a regular basis;
•
regular review of audit logs and the results of security scans;
•
the implementation of appropriate security policies;
•
the implementation of fit for purpose change control processes;
•
The introduction of robust anti virus processes throughout the University;
•
performing regular risk assessments; and
•
enhancing physical access controls to server rooms.
These results represent adequate progress by the central IT Services team, however further improvements to the IT Security controls are hindered by
the decentralised nature of IT support services throughout the Faculties.
9
7
Project by Project Summary
Follow Up on Prior Recommendations
While the Audit Committee receive regular updates on the progress of outstanding recommendations from management throughout the year, Internal
Audit continue to independently review this through an annual assessment of the implementation status by discussion with management, review of
documentation and further sample testing where appropriate.
We concluded that out of 190 outstanding recommendations, 82 (43%) have been fully implemented. 74 (39%) have been partially implemented and 34
(18%) have not been progressed.
Priority
Implemented
Partially Implemented
Not Implemented
Total
1
9
18
4
31
2
52
47
22
121
3
21
9
8
38
Total
82 (43%)
74 (39%)
34 (18%)
190 (100%)
The four Priority One recommendations not implemented relate to:
•
Quality and Completeness of Data in the Student Records System, dependent on the progression of the Student Lifecycle project;
•
The development of Business Recovery Plans for Faculties and Departments;
•
The implementation of a programme of Business Continuity Testing;
•
The roll out of a suitable accounting package for the University Trust, to replace the spreadsheets currently in use.
The following table shows the outstanding recommendations per year and demonstrates a year on year reduction in the total number. Eight
recommendations from 2005/06 and 31 from 2006/07 remain outstanding, although it should be noted that some of these refer to significant system
developments and restructuring within the University.
Year
Implemented
Partially Implemented
Not Implemented
Total
2005/06
9
5
3
17
2006/07
13
20
11
44
2007/08
60
49
20
129
Total
82 (43%)
74 (39%)
34 (18%)
190 (100%)
Specific reviews where good progress has been made (over 80% of recommendations implemented) include Library Procurement, Heritage Asset
Management, Strategic Performance Management, TRAC and Tendering.
Reviews with poor performance (less than 20% of recommendations implemented) include International Student Recruitment, Space Management and
Business Continuity Management. These outstanding recommendations will continue to be monitored by management throughout the year and followed
up by Internal Audit independently.
10
8
2008/09 Plan Completion
The 2008/09 plan was reviewed mid-year and two additional reviews added to replace others where the work was requested to be deferred. These are
summarised as follows:
Review of Research Grants and Contracts
The RAE results for 2008 rated the majority of research at University of Glasgow as being world leading or internationally excellent. In 2007/08, the
University was successfully awarded 1,084 research grants totalling £103.89m. To fulfil its strategic ambition within research, it is important that
the University has robust procedures in place outlining how research grants applications are to be submitted, how research grant awards are to be
approved, and how the conditions of these research grants will be adhered to.
Our approach to the review of Grants and Contracts included discussions with academic staff and administrators as well as staff from the Grants
team, Contracts team and Research and Other Services team within Finance. We also carried out testing of grants and contracts files to ensure
that relevant processes, policies and procedures were being adhered to, and assessed the overall design of the current process.
Our fieldwork is complete for this review and we are currently in the process of discussing findings and recommendations with management. This
report is expected to be finalised by the next meeting of the Audit Committee.
Review of Court Governance
The fieldwork for our review of Court effectiveness and governance is underway. We have completed a desktop exercise to review the adequacy
and completeness of key documentation and plan to meet with a sample of Court members over the next month to discuss Court effectiveness to
enable us to gain a qualitative self assessment for the review. The output for this review will be similar to the Audit Committee assessment
prepared earlier this year.
Additionally, a review of Estates Maintenance was included on the plan for 2008/09. The completion of fieldwork has been delayed due to the
progression of HR modernisation within the Estates & Buildings Service. A draft report is now with management for comments.
11
9
Process Area Assessment
Internal Audit Plan 2009/10
Our strategy for Internal Audit in 2009/10 was presented to the last meeting of the Audit Committee. Since then we have adapted the plan slightly to
account for input of the Audit Committee members including the addition of a review of Endowments and a review of Estates Acquisition and Disposal. In
order to accommodate the review of Estates Acquisition and Disposal, we have removed the planned review of Estates Refurbishment Projects.
The revised summary project plan for 2009/10 is shown below:
Area
%
DAYS
PROJECT
DAYS
Strategic Planning
5%
18
Review of International Marketing Strategy
18
Review of NSS Results and Action Planning
15
Core
Review of Student Recruitment and Retention
15
17%
66
Operations
Review of Commercialisation
18
Review of International Partnerships and Collaborations
18
Review of Staff Recruitment and Appointment
12
Review of Estates Acquisitions and Disposals
15
Support
Review of Contract Risk Management
15
20%
82
Processes
Review of IT User Administration
15
Review of Carbon Reduction Management
10
Review of Value for Money Indicators
15
Review of Fraud Management
18
Financial
Review of Voluntary Severance Schemes and Payments
12
Management
18%
70
Review of Sales Order Processing
15
Processes
Review of Endowment Funds
10
Review of Capital Asset Management
15
Risk Management Workshop and Training
15
Risk and
Review of Health and Safety Governance
15
Regulatory
17%
70
Review of TRAC
15
Compliance
Review of Clinical Trials Management
10
Review of EC Funding
15
Business Change
4%
15
Review of Student Lifecycle Project
15
Contract Management
25
Internal Audit
Audit Committee
18
19%
79
Management
Contingency
18
Follow Up
18
100
400
400
10
Statement of Responsibility
We take responsibility for this report which is prepared on the basis of the limitations set out below.
The matters raised in this report are only those which came to our attention during the course of our internal audit work and are not necessarily a comprehensive
statement of all the weaknesses that exist or all improvements that might be made. Recommendations for improvements should be assessed by you for their full impact
before they are implemented. The performance of internal audit work is not and should not be taken as a substitute for management’s responsibilities for the application
of sound management practices. We emphasise that the responsibility for a sound system of internal controls and the prevention and detection of fraud and other
irregularities rests with management and work performed by internal audit should not be relied upon to identify all strengths and weaknesses in internal controls, nor
relied upon to identify all circumstances of fraud or irregularity. Auditors, in conducting their work, are required to have regards to the possibility of fraud or irregularities.
Even sound systems of internal control can only provide reasonable and not absolute assurance and may not be proof against collusive fraud. Internal audit procedures
are designed to focus on areas as identified by management as being of greatest risk and significance and as such we rely on management to provide us full access to
their accounting records and transactions for the purposes of our audit work and to ensure the authenticity of these documents. Effective and timely implementation of
our recommendations by management is important for the maintenance of a reliable internal control system.
Deloitte LLP
Glasgow
October 2009
In this document references to Deloitte are references to Deloitte LLP.
Deloitte LLP is a limited liability partnership registered in England and Wales with registered number OC303675 and its registered office at 2 New Street Square, London
EC4A 3BZ, United Kingdom.
Deloitte LLP is the United Kingdom member firm of Deloitte Touche Tohmatsu (‘DTT’), a Swiss Verein whose member firms are separate and independent legal entities.
Neither DTT nor any of its member firms has any liability for each other’s acts or omissions. Services are provided by member firms or their subsidiaries and not by
DTT.
©2009 Deloitte LLP. All rights reserved.