University of Glasgow 
 
 
Internal Audit Update 
2008/09 Annual Report 
4th November 2009 
 
This report and the work connected therewith are subject to the Terms and Conditions of the contract between 
University of Glasgow  and Deloitte LLP.  The report is produced solely for the use  of University of Glasgow.  
Its contents should not be quoted or referred to in whole or in part without our prior written consent, except as 
required  by  law.    Deloitte  LLP  will  accept  no  responsibility  to  any  third  party,  as  the  report  has  not  been 
prepared, and is not intended for any other purpose.  

Contents 
Page  
Introduction and Executive Summary  
 

Priority One Recommendations 
 
 

Annual Internal Audit Report 
 
 

Overall Activity Summary 
 
 
 

Project by Project Summary  
 
 

2008/09 Plan Completion 
 
 
 

Internal Audit Plan 2009/10   
 
 
10 
Statement  of Responsibility  
                    
11 
 
 


Introduction and Executive Summary   
As Internal Auditors, our role is to provide the Audit Committee, University Court and management with independent assurance as to the 
adequacy and effectiveness of the systems of internal control we review and to report weaknesses identified together with 
recommendations for improvement.  We fulfil this role by performing appropriate audit work as agreed with the Audit Committee. Overall 
messages for the Audit Committee for the year ended 31 July 2009 are as follows:  
  • Our Internal Audit reports this year have identified 102 recommendations.  This represents a reduction of 21% from 2007/08 when 
we raised 129 recommendations.  8 recommendations are rated Priority One, compared to 14 Priority One recommendations in the 
previous year.  A summary of the Priority One recommendations is included on page 2.  Overall our impression is that the control 
environment  within  the  University  continues  to  improve.    While  the  overall  number  of  recommendations  has  not  reduced 
significantly, we believe this is more due to the Internal Audit coverage being expanded into areas not previously reviewed.  

Five out of eight Priority One recommendations relate to business and financial management within the Small Animal Hospital, the 
Weipers Centre for Equine Welfare and Hospitality Services.  These are areas where pricing and financial structures and strategies 
were found to be insufficient and did not demonstrate value for money, but are not considered pervasive across the organisation. 

We  have  noted  improvements  in  the    core  financial  processes  reviewed,  specifically  through  our  work  in  Purchase  to  Pay  which  
identified  wholesale  changes  to  the  controls  over  accounts  payable  through  the  introduction  of  the  Purchase  to  Pay  module  on 
Agresso.    Our  additional  work  around  the  financial  processes  of  insurance  management  and  pension  schemes  identified  no 
significant control weaknesses. 

The  structure  and  management  of  Information  Technology  continues  to  be  an  area  of  relative  weakness  and  our  work  on  IT 
 
Resource Management has prompted further internal reviews of the approach to key elements of IT Services, including email, data 
 
storage  and  helpdesk  facilities.    Our  follow  up  work  has  noted  some  progress  in  the  implementation  of  outstanding 
 
recommendations, however the decentralised structure  means this process is highly consultative and often time consuming. 

Over the year we have continued to support the development of risk management throughout the University.  We have worked with 
representatives from the Faculties to further develop the template and processes for risk management, including  clear identification 
of remediation actions.  We also met with the Senior Management Group on 28th October to further encourage the embedding of 
best practice risk management. 

The results of our follow up on previous audit recommendations show that overall 43% of recommendations have now been fully 
implemented, 39% have been partially implemented and 18% have not yet been implemented.  A number of the outstanding issues 
relate to the upgrading of systems within Finance and IT areas, which it is recognised will take longer to implement. 

Since the last Audit Committee meeting we have finalised our reports IT Network Security and Data Handling (see pages 6-8).  The 
Data Handling report included one Priority One recommendation which has been discussed and agreed with management.    

Three reviews from the 2008/09 plan are not yet fully complete. These are Research Grants and Contracts, Estates Maintenance 
and Court Governance .  Further details can be found on page 9. 


Priority One Recommendations   
The eight Priority One recommendations raised during 2008/09 are summarised as follows.  All of these issues have been agreed with management 
and  action  plans  put  in  place  to  address  the  recommendations.    The  Court  Office  and  Finance  Office  regularly  report  to  the  Audit  Committee  on 
progress against outstanding recommendations, and Internal Audit will independently follow up on all outstanding recommendations during 2009/10.   
There is a gap in the level of pricing guidance and challenge provided across the University for commercial activities, outwith the 
established R&E project approval process.  
Our review of a sample of commercial contracts identified two in particular (Small Animal Hospital and Weipers Centre for Equine 
Welfare) where the pricing structure is not robust and the process for calculating prices (based on staff time and cost of consumables) 
Commercial 
is open to significant error or omission.  
Pricing 
For the SAH / Weipers Centre for Equine Welfare, over 100 items had a lower mark up rate than required as per policy.  It is 
acknowledged that there is a requirement for different mark-up rates for different products. However, from this analysis, we noted that 
there is no consistency in the method of determining and applying these mark-up rate bandings for all product groups and no process 
to review and confirm the mark up of individual items.  
The  P&DR  process  is  not  formally  connected  to  decisions  on  pay  and  promotion,  although  we  recognise  that  discussions  and 
Staff 
negotiations  have  commenced  around  the  strengthening  of  links  between  performance  and  pay  for  some  staff,  in  particular 
Performance 
professorial  staff.    University  policies  on  pay  awards  for  each  group  of  staff  should  be  reviewed  to  clearly  define  the  links  with 
and 
performance  as  measured  through  the  P&DR  process.    These  should  include  links  to  performance  for  any  enhanced  pay  and  for 
Development 
promotion or regrading decisions 
 
The current structure of IT support services has Faculty teams reporting to Faculty management with no link or reporting line to the 
 
IT Resource 
Director  of  IT  Services.    This  has  resulted  in  inconsistent  practices  and  inefficient  resource  allocation.    In  addition,  there  are  two 
 
Management 
Faculties where the IT teams are devolved to Department level (three Departmental teams at each Faculty), and one further Faculty 
with additional IT staff located outwith the central Faculty team.  These structures should be revised with a view to combining these.  
There has been no stock management system in place for the last two years which has led to issues such as a lack of stock counts, 
no  recording  of  waste  and  a  lack  of  guidance  around  ordering  procedures  such  as  minimum/maximum  reorder  levels.    New  stock 
Hospitality 
control software has now been purchased and this requires to be installed. 
Services 
There is no overall strategic plan in place to guide the Service in the next 3-5 years.  In particular there is no financial strategy in place 
which  defines  the  approach  to  target  markets,  pricing  and  costs,  including  the  underlying  assumptions,  and  is  supported  by  market 
research and benchmarking analysis. 
There  are  a  number  of  policies  that  include  aspects  of  data  handling  but  no  single,  central  data  handling  policy.    There  is  a  lack  of 
compliance  monitoring  to  ensure  staff  are  treating  data  in  a  controlled  manner.    There  is  consequently  a  lack  of  understanding  or 
Data Handling 
assurance  over  data  handling,  for  example  what  information  is  stored  locally;  whether  data  transmissions  between  systems  and  to 
third parties are secure; and the extent of action taken on non-compliance with policies.  


Annual Internal Audit Report 
Report to the Audit Committee 
 
As Internal Auditors we are required to provide the Audit Committee with an Annual Internal Audit Report.  The University Court 
and  its  management  are  responsible  for  ensuring  that  a  system  of  control,  financial  and  otherwise,  is  established  and 

maintained.  This is in order to carry on the operations of the University in an orderly and efficient manner, to ensure adherence 
to management policies, to safeguard the assets, and to secure, as far as possible, the completeness and accuracy of records.  
Our  responsibility  as  internal  auditors  is  to  evaluate  significant  systems  and  associated  internal  controls  and  to  report  to  the 
Audit Committee on the adequacy of such controls and systems.  We cannot examine the whole system of controls, financial or 
otherwise,  nor  is  Internal  Audit  a  substitute  for  management’s  responsibility  to  maintain  adequate  systems  of  internal  control 
over financial and operational systems. 
   
In considering our assessment of the framework of controls we have taken the following into consideration: 
 
• results of audits undertaken during the year; 
• follow up action taken in respect of previous year’s audit work; 
• our perception of the extent of risk and control awareness amongst the staff and management of University of Glasgow. 
 
On the basis of work undertaken for the year ended 31 July 2009 we consider that University of Glasgow generally has an 
adequate framework of control over the systems we examined as summarised on page 4 (subject to implementation of the 
recommendations in particular those rated Priority One). In providing such an assessment we would draw to your attention our 
summary findings as presented in our individual reports issued throughout the year and particularly the Priority One 
recommendations.   
 

We take responsibility for this report, which has been prepared on the basis of the limitations set out on page 12. 


 Overall Activity Summary 
The following table provides a summary of the work we have undertaken in respect of the plan for 2008/09. 
Project Title 
Status / Timing 
Budget (days) 
Days to date 
  
Recommendations 
2008/09 
Priority 1 
Priority 2 
Priority 3 
  
Review of Purchase to Pay (brought forward from 07/08) 
Complete 
15 
15 



Review of Commercial Pricing 
Complete 
25 
27 
  



Review of Pension Scheme Administration 
Complete 
10 
10 
  



Review of Corporate Communications 
Complete 
10 
12 



Review of Staff Performance and Development  
Complete 
15 
17 



Review of Sports and Recreation Services 
Complete 
15 
15 



Review of Student Services Relocation 
Complete 
20 
20 



Review of Insurance Management Arrangements 
Complete 
10 
10 
  



Review of IT Resource Management 
Complete 
20 
23 



Review of Programme Approval Procedures 
Complete 
15 
16 



Review of Hospitality Services 
Complete 
20 
20 



Review of E-Learning 
Complete 
15 
16 
  



Review of Faculty Corporate Planning 
Complete 
15 
17 



PAYE Compliance Risk Assessment 
Complete 
10 
10 



Review of IT Network Security 
Complete 
15 
15 
  



Review of Data Handling 
Complete 
15 
15 



Review of Estates Maintenance 
Draft report issued 
10 

Review of Research Grants and Contracts 
Fieldwork complete 
35 
37 
Review of Court Governance 
Fieldwork in progress 
10 

8% 
Risk Management – Faculty Action Planning 
Complete 
15 
15 
  
Whistleblowing Investigation 
Complete 
11 
11 
  
31% 
1
Review of Student Lifecycle Workshops 
Complete 
15 
15 
  
2
Audit Committee Effectiveness and TOR Review 
Complete 


3
Risk Management – Risk Workshop 
Complete 


  
61% 
Follow Up 
Complete 
20 
20 
2008/09 Plan Development 
Complete 
10 
11 
  
Contract Management Time 
Complete 
25 
31 
  
Audit Committee 
Complete 
15 
17 
  
  
  
426 
442 

62 
32 



Project by Project Summary 
A summary of the projects which have been undertaken since the last meeting is outlined on the following pages. Where applicable, the ‘temperature 
gauge’ is intended to provide Audit Committee members with a relative feel for the impact and overall importance of the findings of each project. 
  



Project by Project Summary 
Review of Data Handling 

Recent information security breaches by a number of publicly funded bodies have resulted in the Scottish Government actively seeking to improve data 
handling practices. Its main objective is to ensure that good data protection practices are implemented to prevent data leakages that could result in 
significant reputational damage and financial loss.   
 
Data handling is the process of ensuring that manual and electronic data is stored, archived or disposed in a safe and secure manner during and after its 
use. This includes the development of policies and procedures to manage data and should consider the different types of data, various types of media and 
storage, responsibilities and privileges, and mechanisms for archive, retention and disposal.   The purpose of this review was to conduct a high level 
assessment of the data handling methodology in place to evaluate the design of the controls and processes implemented. 
 
Our overall conclusion was that significant work is required to reach a satisfactory level of control over data handling on a University-wide basis.  A 
summary of our main recommendations and conclusions is as follows: 
 

There are a number of policies that include aspects of data handling but no single, central data handling policy.  There is a lack of compliance 
monitoring to ensure staff are treating data in a controlled manner.  There is consequently a lack of  understanding or assurance over data 
handling, for example what information is stored locally and whether data transmissions between systems and to third parties are secure, and 
what action is taken on non-compliance with policies.  This issue is graded Priority One due to the significant risks associated with loss of 
confidential data. 

Data handling specific training course are available and are included as part of the induction session for new staff joining the University. 
However, it has been estimated that only 20% of staff attend this session.  There is currently no mandatory training session with regard to 
data handling and the associated risks.  

A formal data handling policy should be created which considers all aspects of data handling across the University and its external partners 
and is based on an initial risk assessment. This policy should formally define data handling boundaries and require different levels of rigour 
and security in the management of data depending on its sensitivity and risk classification. Clear policies and guidance material should be 
documented in relation to encryption within the University. 

Responsibility for data handling within the University of Glasgow should be clearly assigned to an appropriate member of University 
management.  
These issues and recommendations have been discussed with management and we await full management responses demonstrating  the actions to be 
undertaken along with timescales for completion. 
 
Priority 
CW 
PI 
Total 
 
 




CW = Control Weakness 




PI = Process Improvement 







Project by Project Summary 
Follow Up of 2007/08 Network Security Review 

 The purpose of this review was to conduct a full follow up review of the 2007/08 Network Security review which assessed the University’s controls over 
network security infrastructure, systems and hardware. The following areas were selected for review: 
 

General Network Security – including the logical security provisions in place to protect the University’s IT systems, the administration of 
information security and the monitoring of the security of the University’s key systems. 

Security Policy and Procedures Review – the applicable network security policies and guidelines for systems. 

Network Software and Hardware – including the provisions in place to handle current and future threats to the continued availability of the 
University’s key network and system resources. This also included current hardware and software versions and patching levels. 

Monitoring and Management  – the use of monitoring and management tools and resultant security metrics in relation to network usage, abuse, 
availability, behavioural analysis and security threats. 
 
The departments within the University have varying levels of autonomy with respect to information technology.  In 2007/08, we made 11 
recommendations and the status of implementation of the outstanding audit recommendations by grade is shown in the following table: 
 
 
Fully 
Partially 
Not 
Priority 
Total 
 
Implemented 
Implemented 
Implemented 
 
One 




 
 
Two 




 
Three 




 
 
TOTAL 
2 (18%) 
8 (73%) 
1 (9%) 
11 (100%) 
 
 
The Priority One recommendation relating to inappropriate administrator accounts has now been fully implemented.  Supervisor access to the root 
account was previously accessible through a number of routes but this has now been restricted by IP address so only authorised individuals can make 
fundamental changes to the environment. 
 
The recommendations which remain outstanding (all Priority Two) relate to: 

the implementation of appropriate password standards across all systems, although we note some progress within the Central ITS department; 

user administration policies and procedures, where user access reviews are not performed on a regular basis; 

regular review of audit logs and the results of security scans; 

the implementation of appropriate security policies; 

the implementation of fit for purpose change control processes; 

The introduction of robust anti virus processes throughout the University; 

performing regular risk assessments; and  

enhancing physical access controls to server rooms. 
 
These results represent adequate progress by the central IT Services team, however further improvements to the IT Security controls are hindered by 
the decentralised nature of IT support services throughout the Faculties. 


 

Project by Project Summary 
Follow Up on Prior Recommendations 
 While the Audit Committee receive regular updates on the progress of outstanding recommendations from management throughout the year, Internal 
Audit continue to independently review this through an annual assessment of the implementation status by discussion with management, review of 
documentation and further sample testing where appropriate.   
 
We concluded that out of 190 outstanding recommendations, 82 (43%) have been fully implemented.  74 (39%) have been partially implemented and 34 
(18%) have not been progressed.     
 
 
Priority 
Implemented 
Partially Implemented 
Not Implemented 
Total 
 


18 

31 
  

52 
47 
22 
121 
 

21 


38 
 
Total 
82 (43%) 
74 (39%) 
34 (18%) 
190 (100%) 
 
The four Priority One recommendations not implemented relate to: 

Quality and Completeness of Data in the Student Records System, dependent on the  progression of the Student Lifecycle project; 

The development of Business Recovery Plans for Faculties and Departments; 

The implementation of a programme of Business Continuity Testing; 

The roll out of a suitable accounting package for the University Trust, to replace the spreadsheets currently in use. 
 
The following table shows the outstanding recommendations per year and demonstrates a year on year reduction in the total number.  Eight 
recommendations from 2005/06 and 31 from 2006/07 remain outstanding, although it should be noted that some of these refer to significant system 
developments and restructuring within the University. 
 
 
Year 
Implemented 
Partially Implemented 
Not Implemented 
Total 
 
2005/06 



17 
 
2006/07 
13 
20 
11 
44 
 
2007/08 
60 
49 
20 
129 
 
Total 
82 (43%) 
74 (39%) 
34 (18%) 
190 (100%) 
 
Specific reviews where good progress has been made (over 80% of recommendations implemented) include Library Procurement, Heritage Asset 
Management, Strategic Performance Management, TRAC and Tendering. 
 
Reviews with poor performance (less than 20% of recommendations implemented) include International Student Recruitment, Space Management and 
Business Continuity Management.  These outstanding recommendations will continue to be monitored by management throughout the year and followed 
up by Internal Audit independently. 
10 


2008/09 Plan Completion 
The 2008/09 plan was reviewed mid-year and two additional reviews added to replace others where the work was requested to be deferred.  These are 
summarised as follows: 
 
 
Review of Research Grants and Contracts 
 
The RAE results for 2008 rated the majority of research at University of Glasgow as being world leading or internationally excellent. In 2007/08, the 
 
University was successfully awarded 1,084 research grants totalling £103.89m.  To fulfil its strategic ambition within research, it is important that 
 
the University has robust procedures in place outlining how research grants applications are to be submitted, how research grant awards are to be 
 
approved, and how the conditions of these research grants will be adhered to.  
 
 
Our approach to the review of Grants and Contracts included discussions with academic staff and administrators as well as staff from the Grants 
 
team, Contracts team and Research and Other Services team within Finance.  We also carried out testing of grants and contracts files to ensure 
 
that relevant processes, policies and procedures were being adhered to, and assessed the overall design of the current process. 
 
 
Our fieldwork is complete for this review and we are currently in the process of discussing findings and recommendations with management.  This 
 
report is expected to be finalised by the next meeting of the Audit Committee. 
 
 
 
Review of Court Governance 
 
The fieldwork for our review of Court effectiveness and governance is underway.  We have completed a desktop exercise to review the adequacy 
 
and completeness of key documentation and plan to meet with a sample of Court members over the next month to discuss Court effectiveness to 
 
enable  us  to  gain  a  qualitative  self  assessment  for  the  review.    The  output  for  this  review  will  be  similar  to  the  Audit  Committee  assessment 
 
prepared earlier this year. 
 
 
Additionally,  a  review  of  Estates  Maintenance  was  included  on  the  plan  for  2008/09.    The  completion  of  fieldwork  has  been  delayed  due  to  the 
progression of HR modernisation within the Estates & Buildings Service.  A draft report is now with management for comments. 
 
 
 
 
 
11 


Process Area Assessment 
Internal Audit Plan 2009/10 
Our strategy for Internal Audit in 2009/10 was presented to the last meeting of the Audit Committee.  Since then we have adapted the plan slightly to 
account for input of the Audit Committee members including the addition of a review of Endowments and a review of Estates Acquisition and Disposal.  In 
order to accommodate the review of Estates Acquisition and Disposal, we have removed the planned review of Estates Refurbishment Projects.  
The revised summary project plan for 2009/10 is shown below: 
 
Area 

DAYS 
PROJECT 
DAYS 
Strategic Planning 
5% 
18 
Review of International Marketing Strategy 
18 
Review of NSS Results and Action Planning 
15 
Core  
Review of Student Recruitment and Retention 
15 
17% 
66 
Operations 
Review of Commercialisation 
18 
Review of International Partnerships and Collaborations 
18 
Review of Staff Recruitment and Appointment 
12 
Review of Estates Acquisitions and Disposals 
15 
Support  
Review of Contract Risk Management 
15 
20% 
82 
Processes 
Review of IT User Administration 
15 
Review of Carbon Reduction Management 
10 
Review of Value for Money Indicators 
15 
Review of Fraud Management 
18 
Financial 
Review of Voluntary Severance Schemes and Payments 
12 
Management 
18% 
70 
Review of Sales Order Processing 
15 
Processes 
Review of Endowment Funds 
10 
Review of Capital Asset Management 
15 
Risk Management Workshop and Training 
15 
Risk and  
Review of Health and Safety Governance 
15 
Regulatory 
17% 
70 
Review of TRAC 
15 
Compliance 
Review of Clinical Trials Management 
10 
Review of EC Funding 
15 
Business Change 
4% 
15 
Review of Student Lifecycle Project 
15 
Contract Management 
25 
Internal Audit 
Audit Committee 
18 
19% 
79 
Management 
Contingency 
18 
Follow Up 
18 
100 
400 
400 
10 

Statement of Responsibility 
We take responsibility for this report which is prepared on the basis of the limitations set out below. 
The matters raised in this report are only those which came to our attention during the course of our internal audit work and are not necessarily a comprehensive 
statement of all the weaknesses that exist or all improvements that might be made.  Recommendations for improvements should be assessed by you for their full impact 
before they are implemented.  The performance of internal audit work is not and should not be taken as a substitute for management’s responsibilities for the application 
of sound management practices.  We emphasise that the responsibility for a sound system of internal controls and the prevention and detection of fraud and other 
irregularities rests with management and work performed by internal audit should not be relied upon to identify all strengths and weaknesses in internal controls, nor 
relied upon to identify all circumstances of fraud or irregularity.  Auditors, in conducting their work, are required to have regards to the possibility of fraud or irregularities.  
Even sound systems of internal control can only provide reasonable and not absolute assurance and may not be proof against collusive fraud.  Internal audit procedures 
are designed to focus on areas as identified by management as being of greatest risk and significance and as such we rely on management to provide us full access to 
their accounting records and transactions for the purposes of our audit work and to ensure the authenticity of these documents.  Effective and timely implementation of 
our recommendations by management is important for the maintenance of a reliable internal control system.  
 
Deloitte LLP 
Glasgow 
October 2009 
 
In this document references to Deloitte are references to Deloitte LLP. 
 
Deloitte LLP is a limited liability partnership registered in England and Wales with registered number OC303675 and its registered office at 2 New Street Square, London 
EC4A 3BZ, United Kingdom.  
 
Deloitte LLP is the United Kingdom member firm of Deloitte Touche Tohmatsu (‘DTT’), a Swiss Verein whose member firms are separate and independent legal entities.  
Neither DTT nor any of its member firms has any liability for each other’s acts or omissions.  Services are provided by member firms or their subsidiaries and not by 
DTT. 
 
©2009 Deloitte LLP.  All rights reserved.  