This is an HTML version of an attachment to the Freedom of Information request 'Catholic Church junction cycle safety scheme: costs and level of safety improvement'.


 
Response to Request for Information 
 
Reference: 
FOI_3395_RES 
Date:   
 
21 November 2013 
Type of request 
Environment Information Request  
 
 
Catholic Church Junction Cycle Safety Scheme 
 
What is the cost of the scheme at the Catholic Church junction and what are the sources of 
funding and how are they broken down?   
 
 
The estimated cost is £900,000. Current spend shown on general ledger is £653,583. 
Further invoices are awaited. Expected out turn cost is £900,000. Fundings comes from: 
£450,000 Dft Cycle Safety Fund and £450,000 Traffic Signals maintenance budget as listed in 
CCC Transport Delivery Plan. 
 
What are the cycling-specific improvements made at the junction?  
 
 
- Four advanced stop boxes surfaced in red asphalt with screeded white cycle symbols. 
- Central reserve removed on Hills Road approach to provide new cycle lane in red asphalt with 
screeded white cycle symbols. 
- New traffic signal including ‘cycle green’ and associated sensors and equipment. 
- Change in island shape/geometry to improve cycle safety which should minimize conflicts with 
left turning vehicles. 
- More space created at frontage of church helps cyclists who are wheeling cycles or waiting 
with cycles. 
- 4 trixi mirrors due to be erected soon. 
 
What is the approximate, standard cost that the County would expect to budget for a scheme consisting of 
the fitting, to a junction of this size, of one cycle filter light, four advance stop lanes, and removal of a 
central island in order to make space for a red-surfaced tarmac cycle lane on one approach? 
Standard costs are difficult to calculate as all junctions are different. The extent to which 
statutory undertakers plant is affected varies and the traffic management requirements are 
always different. 
 
The three largest elements of the scheme that could not be deemed as cycle related are: 
Carriageway surfacing 
 
 
approx. £140,000 
Footway surfacing including York stone  approx. £90,000 
Traffic signals 
 
 
 
approx £75,000 
 
Where possible, provide documentation outlining the level of reduction of collisions involving cyclists 
that is projected to occur as a result of the changes to the junction. 
No such documentation exists. The measures implemented should reduce accidents but there is no 
specific target figure. 
 
www.cambridgeshire.gov.uk 

6) Where possible, please provide a copy of any safety audit(s) undertaken  
See attached Stage 2 Safety Audit. As this was a change to an existing junction there was no 
Stage 1 Safety Audit but instead there was a conversation with a representative of the Road 
Safety team to discuss the early proposals. A Stage 3 Safety Audit will be completed once all 
works are complete on site. 
 
Where possible, please provide a copy of the application made for the cycle-specific funding 
which contributed funds to this work, and a copy of the documentation awarding this funding to 
the Council. 
See attached application form, letter from Sustrans and memorandum of understanding. 
 
 