Operational Maintenance
Marlow Development Proposal
Operational Maintenance
SEPEL will remote monitor every aspect of turbines performance and operating
parameters, ensuring continuity of operation and avoidance of excessive wear or
failure. The turbines PLC made by ABB or equivalent, will have the ability to
monitor all important parameters, such as gearbox oil temperature, turbine RPM,
head and tail water levels, generator temperature, frequency, voltage etc.
If any parameters are exceeded the PLC programming will both alert SEPEL’s
operation centre and take action to remedy the fault or shut the turbine/turbines
down.
Additionally, SEPEL will have the ability to fully remote control the turbines along
with video observation abilities and have full read access to all the PLC sensor
inputs.
Meter reading
Internet Connection
Oil Changes
Sensor Calibration (yr 1)
Sensor Calibration (yr 2)
Sensor Calibration (ongoing)
G59 Safety Testing
General Electrical Systems Check
General Inspection / Grate cleaning
EA Lease
Management Costs
Administration Costs
Misc Costs (for unknowns)
Generator Replacement
Gearbox - Bearing and Seals Replacement
Screw - Bearing and Seal Replacement
Cost of Sales (£00/MW-h or £3000 max per billing period) (e-power
pricing)
Insurance - loss/damage/business interruption
Operational Maintenance
Al of the information and concepts contained in this document are property of Southeast Power Engineering
Ltd. and are strictly confidential. The information contained in this document may not be used for any purpose
without the written consent of Southeast Power Engineering.
+44 (0)782 564 2306 – 9/27/2009www.sepengineering.com
Hydropower-Anaerobic Digestion-Pyrolysis-Gasification
Document Outline