This is an HTML version of an attachment to the Freedom of Information request 'Request details of SEPEL hydroelectric potential of Thames report'.


Operational Maintenance  
Marlow Development Proposal 
Operational Maintenance 
SEPEL will remote monitor every aspect of turbines performance and operating 
parameters, ensuring continuity of operation and avoidance of excessive wear or 
failure. The turbines PLC made by ABB or equivalent, will have the ability to 
monitor all important parameters, such as gearbox oil temperature, turbine RPM, 
head and tail water levels, generator temperature, frequency, voltage etc. 
If any parameters are exceeded the PLC programming will both alert SEPEL’s 
operation centre and take action to remedy the fault or shut the turbine/turbines 
down. 
Additionally, SEPEL will have the ability to fully remote control the turbines along 
with video observation abilities and have full read access to all the PLC sensor 
inputs. 
Meter reading 
Internet Connection 
 
 
Oil Changes 
 
 
Sensor Calibration (yr 1) 
 
 
Sensor Calibration (yr 2) 
 
 
Sensor Calibration (ongoing) 
 
 
G59 Safety Testing 
 
 
General Electrical Systems Check 
 
 
General Inspection / Grate cleaning 
 
 
EA Lease 
 
 
Management Costs 
 
 
Administration Costs 
 
 
Misc Costs (for unknowns) 
 
 
Generator Replacement 
 
 
Gearbox - Bearing and Seals Replacement 
 
 
Screw - Bearing and Seal Replacement 
 
 
Cost of Sales (£00/MW-h or £3000 max per billing period) (e-power 
 
 
pricing) 
Insurance - loss/damage/business interruption 
 
 
 
 
Operational Maintenance 
Al  of the information and concepts contained in this document are property of Southeast Power Engineering 
Ltd. and are strictly confidential. The information contained in this document may not be used for any purpose 
without the written consent of Southeast Power Engineering.   
+44 (0)782 564 2306 – 9/27/2009www.sepengineering.com 
Hydropower-Anaerobic Digestion-Pyrolysis-Gasification  

Document Outline