This is an HTML version of an attachment to the Freedom of Information request 'Building Specification'.


           ASSET AND FACILITIES MANAGEMENT  
PROPERTY SERVICES 
 FIFE COUNCIL  
 
 
 
 
 
 

TRADE PACKAGE TP-02 
 [DOWNTAKINGS/ ALTERATIONS]    V1.0 
CA5150111_Phase 3 Depot Project - Glenrothes 
 
Release: 
V_1.0 
First drafted date: 
27/01/12 
Author: 
CL/ NW 
Checked: 
CL/NW 
Status: 
Preliminary 
Document Number: 
CA5150111_8.2.13_TP-02 
 
 
Document History 
 
Document Location - The source of this document is on Property Services network in location: 
N:\Client\Corporate\Glenrothes\10073300 - Bankhead Facility\5150111 - Adaptation & Fit Warehouse 
Space\Docs\08 Pre-Contract\8.2 Design team\8.2.1 CA\8.2.13 Specification Doc's 
 
Revision History 
 
Revision 
Previous 
Summary of Changes 
By 
Checked 
date 
revision 
date 

27/01/12 
1.0 
Preliminary Issue 
CL/NW 
CL/NW 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Distribution - This document has been distributed to: 
 
Name 
Title 
Date of Issue  Version 
JL  
Project Manager 
 
1.0 
BB, CW, PQ, JG  
Cost Team 
 
1.0 
PP, SK, JC, IS, RH 
Design Team 
 
1.0 
CA, PG 
Senior Manager/ Project Client Rep 
 
1.0 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CA5150111 - Bankhead Ph3  
TP-03_DOWNTAKINGS_v1.0.doc/ Specification 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Approvals - This document requires the following approvals (signed approval forms are filed in the 
Management section of the project file): 
 
 
Name 
Title  
Signature 
Date of Issue  Version 
TBC 
 
 
 
 
TBC 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   Asset and Facilities Management Services > Property Services 
 
Page 2 of 2