HS2 Limited 
 
 
Eland House  
 
Bressenden Place  
 
London  
 
SW1E 5DU 
Dr Paul Thornton 
Tel: 020 7944 4908 
Via email:   xxxxxxxxxxxxxxxxxxxxxx@xxxxxxxxxxxxxx.xxx 
 
 
 
25 May 2012 
 
REQUEST FOR INFORMATION 
 
Reference: FOI11-393R 
 
Dear Dr Thornton  
 
I am writing regarding your request for a review of the response sent to you on 
25 April 2012.   
 
Your information request was handled by Sebastian Jew. I was appointed to 
carry out an independent review of the response as a senior executive not 
involved in the original decision. 
 
You had requested that we disclose all information held relating to the 
consideration of a deep bored tunnel development at that location and estimates 
of the amount of spoil that will need to be relocated in the course of constructing 
the line over the same section of track as it is currently proposed. 
 
After reviewing the case, my findings are that we do not hold the information 
requested; both for the consideration of the deep bored tunnel development and 
the estimates of the soil that would be needed to be relocated.    
 
The route announced by the Secretary of State is based on concept design and 
detailed work as you requested was not undertaken.   
 
If you are not satisfied with this response you have the right to contact the 
Information Commissioner. Please see annex A for full details of our complaint 
procedures.  
 
 
 
Ian Jordan 
Director  
 
 

High Speed Two (HS2) Limited, registered in England. Registration Number 06791686. Registered office Eland House, 
Bressenden Place, London, SW1E 5DU, UK 
 


 
 
Annex A 
Your right to complain to HS2 Ltd and the Information Commissioner 
 
You have the right to complain to HS2 Ltd within two calendar months of the date 
of this letter about the way in which your request for information was handled 
and/or about the decision not to disclose all or part of the information requested. 
 
Your complaint will be acknowledged and you will be advised of a target date by 
which to expect a response. Initially your complaint will be re-considered by the 
official who dealt with your request for information. If, after careful consideration, 
that official decides that his/her decision was correct, your complaint will 
automatically be referred to a senior independent official who will conduct a further 
review. You will be advised of the outcome of your complaint and if a decision is 
taken to disclose information originally withheld this will be done as soon as 
possible.  
 
If you are not content with the outcome of the internal review, you have the right to 
apply directly to the Information Commissioner for a decision. The Information 
Commissioner can be contacted at: 
  
Information Commissioner’s Office 
Wycliffe House  
Water Lane 
Wilmslow 
Cheshire 
SK9 5AF 
 
High Speed Two (HS2) Limited, registered in England. Registration Number 06791686. Registered office Eland House, 
Bressenden Place, London, SW1E 5DU, UK