Extracts on the Historic Rail Estate (HRE) taken from CEO Reports for financial year 2019-
20 
 
NB: There were no specific HRE papers tabled at any of the board meetings held between April 2019 
and March 2020. 
 
Extract from the CEO Report: 24 October 2019 
Operations 
Works being carried out by the Historic Rail Team at Queensbury Tunnel were abandoned in late 
September when the adjoining landowner deliberately diverted water into the tunnel. Our 
inspection had to be cut short because the water was advancing so quickly that it was unsafe for our 
employees. The tower scaffold that facilitated access had to be left behind, and is now lost to the 
water.” 
 
Extract from the CEO Report: 26 September 2019 
Safety 
A 3-arch former railway structure carrying a well trafficked minor road in Essex was reported to the 
Historic Rail Estate (HRE) engineer by the examiner on 2 September as showing additional signs of 
movement. Concerned about the immediate threat to public safety, immediate liaison with the 
highways team at Essex County Council resulted in the road being closed and options for 
interventions are currently being evaluated.”