Dear High Speed Two (HS2) Limited,

You have constructed a temporary haul road across the Colne Valley, across lakes and rivers. It is an impressive piece of engineering. Could you tell me please how much it has cost so far and how much you expect it to cost by the time it has been removed?

Yours faithfully,

Marrk Keir

FOI Request, High Speed Two (HS2) Limited

Dear Marrk Keir 

 

Thank you for your email to HS2 Ltd. 

 

We are considering your request under the Environmental Information
Regulations 2004 and aim to reply as soon as possible and no later than
30/05/2022. 

 

Your reference number for the request is  FOI-22-4635.

 

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

dangos adrannau a ddyfynnir

FOI Request, High Speed Two (HS2) Limited

2 Atodiad

Dear Marrk Keir, 

 

Thank you for your email to HS2 Ltd. 

 

Please find attached our response. 

 

Your reference number for the request is  FOI-22-4635.

 

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

dangos adrannau a ddyfynnir