Extra costs

Marrk Keir made this Rhyddid Gwybodaeth request to High Speed Two (HS2) Limited

Automatic anti-spam measures are in place for this older request. Please let us know if a further response is expected or if you are having trouble responding.

Gwrthodwyd y cais gan High Speed Two (HS2) Limited.

Dear High Speed Two (HS2) Limited,

Works to construct the Chiltern Tunnel North Portal are going ahead to plans not shown in the HS2 Act of Parliament. Please could you tell me the extra costs incurred by extra work/installation/clearance/demolition there.

Yours faithfully,

Marrk Keir

FOI Request, High Speed Two (HS2) Limited

Dear Marrk Keir, 

 

Thank you for your email to HS2 Ltd. 

 

We are considering your request under the Environmental Information
Regulations 2004 and aim to reply as soon as possible and no later than
25/01/2022. 

 

Your reference number for the request is  FOI-21-4495.

 

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

dangos adrannau a ddyfynnir

FOI Request, High Speed Two (HS2) Limited

2 Atodiad

Dear Marrk Keir, 

 

Thank you for your email to HS2 Ltd. 

 

Please find attached correspondence which I trust will prove
self-explanatory.

 

Your reference number for the request is  FOI-21-4495.

 

Yours sincerely,

 

J Palmer | Briefings, Correspondence and FOI Adviser | HS2 Ltd      

Tel: 08081 434 434 (Freephone number)| [1][HS2 request email] |
[2]Facebook | [3]Twitter | [4]LinkedIn

High Speed Two (HS2) Limited , The Podium, 1 Eversholt Street, London, NW1
2DN | [5]www.gov.uk/hs2

 

dangos adrannau a ddyfynnir