Mae hwn yn fersiwn HTML o atodiad i'r cais Rhyddid Gwybodaeth 'Asbestos survey report for Pimlico station'.



Station 
Pimlico
Original Management Survey 
R370097
Date of Original Management 
Survey Report
27th March 2013
ACM photographs referenced below 
Re-inspection Reference:
V053-4RS-200422
are available from the Hazardous 
Materials Team - 
xxxxxxxxxxxxxxxxxx@xxx.xxx.xx
Next Planned Re-inspection 
Periodical re-inspection according to 
HM Managment Plan
Sample
ACM Photograph 
Risk 
Room Description
Room #
Asbestos?
Type
Material Type
Material Use
Quantity/ 
Management Option
Previous 
Last inspection
Comments
Amount
Reference / Comment Assessment
inspections
15th March 2020
UMC
2/151
Yes
Chrysotile
Woven cable insulation Cable sleeve
50m
photo DSC04937
Low
Reinspect
22nd April 2020
26th January 2017
Contact HM if planned work impacts this ACM
15th March 2015
8th October 2013
UMC
2/151
Yes
Chrysotile
Woven cable insulation Cable sleeve
50m
photo DSC04936
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
27th March 2013
UMC
2/151
Yes
Chrysotile
Woven cable insulation Cable sleeve
50m
photo DSC04938
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
UMC
2/151
Yes
Chrysotile
Woven cable insulation Cable sleeve
30m
photo DSC04935
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
UMC
2/151
Yes
Presumed Chrysotile
Tencore and electrical 
box
To wall 1
2 No.
photo DSC04934
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Most have now been 
Switch Room E2
2/662
Yes
Chrysotile
Marley type floor tiles
To floor
<1m2
removed photo 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
DSC04929
Switch Room E5
2/664
Yes
Presumed Chrysotile
Possible ACMs within 
switchgear
To wall
5 No.
photo DSC04930, 
photo DSC04931
Medium
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
CER
2/731
Yes
Presumed Chrysotile
Possible ACMs within 
switchgear
Switchgear
2 No.
photo DSC04969
Medium
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Damage to floor - 
SCR
2/746
Yes
Chrysotile
Marley floor tiles
To floor
8m2
entrance photo 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
DSC04970
Pump Room
2/771
Yes
Presumed Chrysotile
Possible ACMs within 
switchgear
Switchgear
1 No.
photo DSC04933
Medium
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Pump Room
2/771
Yes
Chrysotile
Woven cable insulation Cable sleeve
1.5m
photo DSC04934
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Vent Plant
2/776
Yes
Chrysotile
Woven cable insulation Cable sleeve
0.5m2
photo DSC04932
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Circulation Area
3/081
Yes
Amosite
Asbestos boarding
Firebreak within 
ceiling void
5m2
photo DSC04954, 
photo DSC04955
Medium
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
photo DSC04954, 
Circulation Area
3/081
Yes
Chrysotile
Cellactite sheeting
Within ceiling void
photo DSC04955 - not 
180m2
visible above fixed 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
ceiling
Too high to safely 

Above vitreous 
access during 
Circulation Area
3/081
Yes
Chrysotile & Amosite
Boarding material
enamel panel, right 
reinspection  photo 
Medium
Reinspect
15th March 2018
Contact HM if planned work impacts this ACM
hand side
DSC04954, photo 
DSC04955 - not visible 
Too high to safely 
Above vitreous 
access during 
Circulation Area
3/081
Yes
Chrysotile & Amosite
Fire break boarding
enamel panel, right 
5m2
reinspection photo 
Medium
Reinspect
15th March 2018
Contact HM if planned work impacts this ACM
hand side
DSC04954, photo 
DSC04955 - not visible 
Within incline 
LMC
3/161
Yes
Strongly Presumed 
adjacent to escalator 
Chrysotile
Woven cable insulation no 3, to j hanger no 1 - 1 No
photo DSC04940
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
at high level
LMC
3/161
Yes
Strongly Presumed 
Chrysotile
Woven cable insulation Throughout
Throughout photo DSC04941
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
LMC Access
3/161
Yes
Chrysotile
Cellactite sheeting
Lining tunnel rings
10m2
photo DSC04942
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Printed 22/10/2020
2 of 4

  
  
  
  
  
Station 
Pimlico
Original Management Survey 
R370097
Date of Original Management 
Survey Report
27th March 2013
ACM photographs referenced below 
Re-inspection Reference:
V053-4RS-200422
are available from the Hazardous 
Materials Team - 
xxxxxxxxxxxxxxxxxx@xxx.xxx.xx
Next Planned Re-inspection 
Periodical re-inspection according to 
HM Managment Plan
Sample
ACM Photograph 
Risk 
Room Description
Room #
Asbestos?
Type
Material Type
Material Use
Quantity/ 
Management Option
Previous 
Last inspection
Comments
Amount
Reference / Comment Assessment
inspections
  
LMC
3/161
Yes
Chrysotile & Crocidolite
Cement
Cable sleeve
1 No
photo DSC04943
Low
Reinspect
22nd April 2020
   Contact HM if planned work impacts this ACM
  
LMC
3/161
Yes
Chrysotile
Cement
Cable sleeve
1 No
photo DSC04944
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
  
LMC
3/161
Yes
Chrysotile
Woven cable insulation Cable sleeve
30m
photo DSC04945
Low
Reinspect
22nd April 2020
  
Contact HM if planned work impacts this ACM
LMC
3/161
Yes
Chrysotile
Woven cable insulation Cable sleeve
2 No.
photo DSC04947
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
LMC
3/161
Yes
Chrysotile
Asbestos gasket
Within pipe flanges
2 no.
photo DSC04948
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
photo DSC04956 - not 
Passage
3/201
Yes
Chrysotile
Cellactite sheeting
Within ceiling void
Through out visible above false 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
ceiling
Within ceiling void. 
Ceiling now fixed, 
photo DSC04957 - not 
Passage
3/202
Yes
Chrysotile
Cellactite sheeting
however material 
Through out visible above false 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
ceiling
present.
Within ceiling void. 
Ceiling now fixed, 
photo DSC04958 not 
Passage
3/203
Yes
Chrysotile
Cellactite sheeting
however material 
Through out visible above false 
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
ceiling
present.
Within ceiling void. 
Ceiling now fixed, 
Passage
3/204
Yes
Strongly Presumed 
Suspect Cellactite 
Chrysotile
sheeting
however material 
Through out photo DSC04972, 
presumed to be still 
photo DSC04976
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
present.
Within ceiling void. 
Ceiling now fixed, 
Passage
3/205
Yes
Strongly Presumed 
Suspect Cellactite 
Chrysotile
sheeting
however material 
Through out photo DSC04973
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
present.
Within ceiling void. 
Ceiling now fixed, 
Passage
3/206
Yes
Chrysotile
Cellactite sheeting
however material 
Through out photo DSC04959
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
present.
Within ceiling void. 
Ceiling now fixed, 
Passage
3/207
Yes
Chrysotile
Cellactite sheeting
however material 
Through out photo DSC04960
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
present.
Within ceiling void. 
Ceiling now fixed, 
Passage
3/208
Yes
Chrysotile
Cellactite sheeting
however material 
Through out photo DSC04961
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
present.
Within ceiling void. 
Ceiling now fixed, 
Lobby
3/236
Yes
Chrysotile
Cellactite sheeting
however material 
Through out photo DSC04962
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
presumed to be still 
present.
Within ceiling void. 
Station Supervisors 
Above fixed ceiling 
Office
3/281
Yes
Strongly Presumed 
Chrysotile
Cellactite sheeting
but presumed to be 
photo DSC04963
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
present.
photo DSC04572 not 
CER
3/406
Yes
Chrysotile
Cellactite sheeting
Ceiling lining
16m2
visible above false 
Low
Reinspect
15th March 2018
Contact HM if planned work impacts this ACM
ceiling
Vent to LMC
3/411
Yes
Chrysotile
Cellactite sheeting
Lining tunnel rings
12m2
photo DSC04953
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Printed 22/10/2020
3 of 4

  
  
  
  
  
Station 
Pimlico
Original Management Survey 
R370097
Date of Original Management 
Survey Report
27th March 2013
ACM photographs referenced below 
Re-inspection Reference:
V053-4RS-200422
are available from the Hazardous 
Materials Team - 
xxxxxxxxxxxxxxxxxx@xxx.xxx.xx
Next Planned Re-inspection 
Periodical re-inspection according to 
HM Managment Plan
Sample
ACM Photograph 
Risk 
Room Description
Room #
Asbestos?
Type
Material Type
Material Use
Quantity/ 
Management Option
Previous 
Last inspection
Comments
Amount
Reference / Comment Assessment
inspections
  
Ceiling lining. Now 
photo DSC04573 not 
Store
3/412
Yes
Chrysotile
Cellactite sheeting
above fixed ceiling. 
visible above false 
Low
Reinspect
15th March 2018
   Contact HM if planned work impacts this ACM
Presume still present.
ceiling
  
Switch Room E1 & 
E4
3/661
Yes
Chrysotile
Red floor tiles
To floor
2m2, some 
photo DSC04964
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
removed
  
Within ceiling void. 
  
Switch Room E1 & 
Above fixed ceiling 
E4
3/661
Yes
Chrysotile
Cellactite sheeting
but presumed to be 
photo DSC04965
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
present.
No access due to 
Switch Room
3/661
Yes
Strongly Presumed 
electrical equipment 
Chrysotile
1 x 15mm dia cable
1m
blocking doors. photo 
Low
Reinspect
15th March 2018
Contact HM if planned work impacts this ACM
DSC04966
Relay Room
3/711
Yes
Strongly Presumed 
Chrysotile
White cable insulation
In cable run
~25 No.
photo DSC04975
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Relay Room
3/712
Yes
Chrysotile
Woven cable insulation Cable sleeve
10 No.
photo DSC04974
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Relay Room
3/713
Yes
Chrysotile
Woven cable insulation Cable sleeve
5 No.
photo DSC04977
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Relay Room
3/713
Yes
Strongly Presumed 
Chrysotile
Woven cable insulation In cable runs
8 No.
photo DSC04978
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Relay Room
3/714
Yes
Chrysotile
Woven cable insulation Cable sleeve
7 No.
photo DSC04971
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
CER
3/731
Yes
Chrysotile
Woven cable insulation Cable sleeve
1Lm
photo DSC04968
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Pump / Switch
3/771
Yes
Chrysotile
Marley floor tiles
To floor
5m2
photo DSC04967
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Cable shaft heavily 
congested with both 
asbestos and plastic 
Cable Shaft
3/786
Yes
Strongly Presumed 
Chrysotile
Woven cable insulation cables entering 
throughout
photo DSC04949
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
through concrete 
ceiling and duct to 
wall
Cable Shaft
3/786
Yes
Chrysotile
Cement
Cable sleeve
1 No.
photo DSC04950
Low
Reinspect
22nd April 2020
Contact HM if planned work impacts this ACM
Cable Shaft
3/787
Yes
Chrysotile
Woven cable insulation Throughout cable 
shaft
Throughout photo DSC04951
Low
Reinspect
22nd April 2020
Yearly inspection and record damage
Risk Assessment 
Risk
Value
Action
Manage ACM and carry out planned remedial action to reduce the risk score, typical y within 6 
High
18 or Higher months or less, to below risk score 18 in accordance with the asbestos management policy
Manage as high risk but remedial action can be deferred until maintenance regimes change or 
Medium
12 to 17 or 
higher
demolition or major refurbishment is planned.
Manage and consider removal if the item falls within fal s within a demolition,  major 
Low
11 or less
refurbishment or maintenance regimes change and works are likely to disturb the material
SEE SURVEY BELOW FOR FURTHER INFORMATION
Printed 22/10/2020
4 of 4