London Borough of Barnet
Authorities Monitoring Report 2017/18
Barnet’s Local Plan
Draft Authorities Monitoring Report 2017/18
Barnet’s Local Plan
Page 0
link to page 3 link to page 3 link to page 5 link to page 6 link to page 10 link to page 11 link to page 12 link to page 13 link to page 17 link to page 21 link to page 24 link to page 28 link to page 31 link to page 33 link to page 35 link to page 36 link to page 37 link to page 39 link to page 42 link to page 43 link to page 44 link to page 49 link to page 50 link to page 53 link to page 60
London Borough of Barnet
Authorities Monitoring Report 2017/18
Contents
1
Authorities Monitoring Report 2017/18......................................................................... 2
2
Summary ..................................................................................................................... 2
3
Monitoring the Local Development Scheme ................................................................ 4
4
Monitoring the Community Infrastructure Levy (CIL) .................................................... 5
5
Monitoring the Duty to Cooperate ................................................................................ 9
6
Monitoring Neighbourhood Plans ............................................................................... 10
7
Barnet’s Place Shaping Strategy ............................................................................... 11
8
Barnet’s Housing Trajectory and 5 Year Supply ........................................................ 12
9
Policy CS2 Brent Cross Cricklewood ......................................................................... 16
10
Distribution of Growth ................................................................................................ 20
11
Housing Quality and Choice in Barnet ....................................................................... 23
12
Are we building the right homes for the next generation? .......................................... 27
13
Protecting and enhancing Barnet’s character ............................................................ 30
14
Promoting Barnet’s Town Centres ............................................................................. 32
15
Protecting Barnet’s Town Centres ............................................................................. 34
16
Open Spaces............................................................................................................. 35
17
Promoting a strong and prosperous Barnet - Employment space .............................. 36
18
Travel and Parking .................................................................................................... 38
19
Community Facilities and Health ............................................................................... 41
20
Improving Health and Wellbeing in Barnet ................................................................. 42
21
Environment .............................................................................................................. 43
Appendix A – Clarification of Town Centre Frontages (DM Policies) ..................................... 48
Appendix B – Mill Hill East Area Action Plan ......................................................................... 49
Appendix C – Colindale Area Action Plan ............................................................................. 52
Appendix D – Barnet Housing Trajectory Detail .................................................................... 59
Barnet’s Local Plan
Page 1
London Borough of Barnet
Authorities Monitoring Report 2017/18
1
Authorities Monitoring Report 2017/18
The Authorities Monitoring Report (AMR) monitors planning policies set out in Barnet’s
Local Plan. This AMR focuses mainly on the period from April 2017 to March 2018.
The production of an AMR is a requirement of the Planning and Compulsory Purchase
Act 2004. AMRs have been produced in Barnet since 2004.
The AMR examines policies from the Local Plan Core Strategy and Development
Management Policies documents as well as the Mill Hill and Colindale Area Action Plans
(AAPs). The AMR also sets out progress on the production of strategic planning
documents such as Supplementary Planning Documents (SPDs) and Development Plan
Documents (DPDs). The production of these documents has been signposted through
the Local Development Scheme (LDS) (the programme for the Local Plan).
The Council is currently reviewing the Local Plan and expects to adopt a new Local Plan
by 2021. The AMR forms part of the extensive evidence base required to support the
approach of the new Local Plan.
The AMR is also required under the Localism Act 2011 to set out details of receipts
generated by the Community Infrastructure Levy (CIL) as well as progress on
neighbourhood planning together with updates on the Duty to Cooperate.
As well as the AMR the Council also publishes the Annual Regeneration Report. The
Regeneration Report provides an update on how places are being transformed through
partnership developments on priority housing estates in Barnet. It also highlights how
the Council are investing in skills, training and employment opportunities and attracting
investment to secure sustainable communities and services.
2
Summary
Barnet has the largest population of any borough in London and this is expected to
increase. With a growing population, the Borough is becoming more diverse, getting
younger and more metropolitan in its makeup. A key role of the Local Plan is managing
growth, ensuring that the qualities that make Barnet an attractive place to live, such as
access to green space and good schools, are not lost. By monitoring and managing
change the Council will be able to continue to maintain sustainable, effective growth
throughout the Borough.
This AMR for 2017/18 is being used to analyse the performance of planning policies
from Barnet’s Local Plan. This AMR covers the period from 1st April 2017 to 31st March
2018.
The AMR is essential in identifying policies that are performing well, as well as those
which require a review or a different response. The AMR therefore plays a key role in
underpinning our emerging Local Plan.
Barnet’s Local Plan
Page 2
London Borough of Barnet
Authorities Monitoring Report 2017/18
2.2 Policy Highlights
Supplementary Planning Documents for Green Infrastructure and North
Finchley Town Centre were adopted in 2017/18.
Over
£11.2 million of Barnet CIL was collected in 2017/18 and
370
Liability Notices were issued. The three main allocations for CIL was for a
community centre, sports and physical activities, youth zone and early education and
childcare.
2.3 Performance at a Glance
Barnet had
2,360 housing completions over the 2017/18 financial year. This
represents the highest level of completions since Barnet published the first AMR
(2004/05).
11,745 new homes added to housing stock
between 2011/12 and 2017/18. Most of them are
flats
A total of
341 affordable homes
were completed in 2017/18.
90% Flats
Barnet’s Town Centres provided
409
10% Houses
additional new homes in 2017/18. Over half of new homes delivered in town
centres were in Finchley Church End and Whetstone.
In
Colindale, 765 new homes were completed. One in three new homes
completed in Barnet were delivered within Colindale.
Mill Hill East is creating a new high quality suburb in the
heart of Barnet. It is expected to deliver 2,240 new homes,
with
250 completed in 2017/18.
Barnet lost around
20,850m2 of office space in
2017/18.
Barnet’s Local Plan
Page 3
London Borough of Barnet
Authorities Monitoring Report 2017/18
3
Monitoring the Local Development Scheme
Barnet’s most recent Local Development Scheme (LDS) was published in June 2018.
For the purpose of the 2017/18 AMR, the previous LDS, published in September 2016,
will be used. The LDS sets out the intentions of the Council for the Local Plan, in
particular the Development Plan Documents (DPDs) and Supplementary Planning
Documents (SPDs) it intends to produce and the timetable for their production and
review.
Progress on strategic planning documents since April 2017 includes the following:
3.2 Development Plan Documents
The Council commenced evidence gathering on the Local Plan in March 2017.
3.3 Supplementary Planning Documents
3.3.1 The Council approved two documents for public consultation and adoption in 2017/18:
• SPD on North Finchley adopted in February 2018
• SPD on Green Infrastructure adopted in October 2017
Table 1 shows Barnet’s progress on DPDs and indicates how the Council will move
forward with other documents.
Table 1: Local Development Scheme Progress (DPDs)
Activity
LDS Milestones
Progress
Comments
Evidence Gathering – Summer 2016 –
Underway
Local Plan timetable
Spring 2017
revised to respond to
Preparation of Local Plan – Summer 2017
Underway
increased housing
Publication – Spring 2018
Not started
requirement
Local Plan
Submission – Autumn 2018
Not started
Examination in Public – Spring 2019
Not started
Local Plan
Adoption – Autumn 2019
Not started
Publication in 2021
Preferred Stage Consultation April 2013
Completed
July-Sept 2015
North London
Publication Consultation Spring 2017
Completed
Mar-Apr 2019
Waste Plan
Submission – Winter 2017/18
Completed
Summer 2019
(NLWP)
Examination – Spring 2018
Not started
Autumn 2019
Adoption – Autumn 2018
Not started
Summer 2020
Preliminary Draft Charging Schedule (PDCS)
‐
Community
Spring 2018.
Infrastructure
Draft Charging Schedule (DCS) – Autumn
Revised to align with
Not started
Levy and related 2018
Local Plan timetable
documents
CIL Examination – Spring 2019
CIL Adoption – Autumn 2019
Barnet’s Local Plan
Page 4
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 2 shows progress on production of Supplementary Planning Documents (SPDs).
These documents help to implement Local Plan policies.
Table 2: Local Development Scheme Progress (SPDs)
Activity
LDS Milestones
Progress
Comments
Pre-production - Spring 2016 – Winter 2017
Production / Consultation – Spring 2017
Affordable
On hold, pending Local
Assessment of Representations – Summer
Not Started
Housing
Plan Reg 18
2017
Adoption – Autumn 2017
Pre-production - Start preparation of the
evidence base – Jan 2012
Green
Production / Consultation – Dec 2015
Completed
Adopted October 2017
Infrastructure
Assessment of Representations – Feb 2016
Adoption – May 2016
The Council has engaged in a series of national and regional planning consultations
between April 2017 and March 2018, including:
• Response to Housing White Paper, May 2017
• Response to Mayor’s Draft Culture and the Night Time Economy SPG, June 2017
• Response to Planning for the Right Homes in the Right Places, Nov 2017
• Response to Draft London Plan, March 2018
4
Monitoring the Community Infrastructure Levy
(CIL)
Table 3: Barnet CIL receipts and expenditure 2017/18 Reg. 62 Report
Community Infrastructure Regulations 2010
Barnet CIL
(as amended)
Financial Year 2017/18
Requirements of regulation 62: Reporting
Total CIL receipts for year
£11,215,000
Total CIL expenditure for year
£8,349,000 (excluding administrative expenses)
Summary details of CIL expenditure during year
There have been 4 main areas where CIL has
including
been spent in 17/18, as set out below
The items of infrastructure to which CIL has been
Community Centre –
£1,658,000
applied
Tarling Road
Sports and Physical
£5,375,000
Activities
Early Education and
£1,156,000
Childcare place
sufficiency
Town Centre
£160,000
Total
£8,349,000
The amount of CIL expenditure on each item
As above
The amount of CIL applied to repay borrowed money
Not relevant as CIL cannot be used to repay
borrowed money
The amount of CIL applied to administrative expenses
2017-18: £513,780 (4.6%)
pursuant to regulation 61[2] and that amount as
expressed as a percentage of CIL
Barnet’s Local Plan
Page 5
London Borough of Barnet
Authorities Monitoring Report 2017/18
Summary details of the receipt and expenditure of CIL
See tables for each area committee below
to which regulations 59E[3] and 59F[4] have been
applied [i.e. the neighbourhood portion]
Total CIL receipts that 59E and F applied to
Neighbourhood CIL is capped at £150,000.00 per
committee area per year as agreed by Policy and
resources committee
The items to which the CIL receipts to which
See tables for each area committee below
regulations 59E and 59F have been applied
The amount of expenditure on each item
See tables for each area committee below
2017/18
Budget
Hendon Area Committee
Allocation
(CIL Actual Spend
Reserve) £s
Budget Allocation
£150,000
Parking – Glendor Gardens
(2,500)
-
Change Island Crossing at Junction of Broadfields
Avenue & Broadhurst Avenue to a safer Zebra
(3,000)
2,765
Crossing – Feasibility Study
Road safety around Barnfield Road/Montrose Avenue
near Annunciation School and Goldbeaters School – (2,500)
1,369
Review
Contribution to modernisation of the infant school
(7,500)
-
playground at St Mary’s & Joseph’s School
Increase security at Sheaveshill Allotments – supply (4,329)
-
and installation of gate and an access system
Contribution to modernisation of the school playground
(7,500)
-
at Dollis Junior School
Installation of street lighting in Brookside Walk
(25,000)
25,000
Bell Lane and Green Lane, including installing a zebra
(5,000)
3,778
crossing (20k LIP Funded)
Edgware K Controlled Parking Zone – CPZ – Manns (6,000)
4,309
Road & Garden City Statutory Consultation Outcome
Greyhound Hill, NW4 – Request for Pedestrian (7,500)
7,500
Facilities (£17,5 LIP Funded)
Langstone Way, NW7 – Request for Pedestrian (25,000)
11,790
Crossing
Feasibility study around Ellesmere Avenue and the
(5,000)
4,819
Fairway
Feasibility study Deconshire Road, NW7
(2,000)
4,900
Feasibility study for making Gaskarth Road a one way
(3,000)
3,312
Table Tennis table
(4,186)
4,186
Pedestrian Crossing in Glow Lane, NW7, Mill Hill – (5,000)
3,458
Feasibility study
Residents Parking Zone for Daws Lane, NW7, Mill Hill
–
(5,000)
-
Informal Consultation
High quality climbing frame for Dollis Infant School
(7,500)
7,320
Double yellow lines on Orchard Drive & Stone Grove
(2,000)
5,207
Junction
Total
89,713
2017/18
Budget
Chipping Barnet
Allocation
(CIL Actual Spend
Reserve) £s
Budget Allocation
£150,000
Barnet’s Local Plan
Page 6
London Borough of Barnet
Authorities Monitoring Report 2017/18
Barnet Lane – Speeding and Stop Line
(2,000)
3,292
Hadley Highstone – Speeding
(1,500)
5,771
Woodville Road/Potters Road – Implementation
(25,000)
4,464
Play Equipment – Brunswick Park
(20,000)
19,350
Hadley Green
& Hadley Highstone, EN5 – (12,000)
1,637
Pedestrian/road safety improvements
Great Bushey Drive and Oak Tree Drive N20 – (7,500)
7,054
Commuter Parking
Member waiting restriction request – Four Sites
(4,500)
7,831
Alleviate Problems of Commuter/All Day Parking on
(5,000)
872
The Meadway and Surrounding Roads in High Barnet
Steel Gate and Installation of Electronic Entry CCTV
(3,000)
-
Cameras
Two Wooden Benches in Longland Drive N20
(500)
-
Junction of Lyonsdown Road and Longmore Avenue
(17,000)
2,760
Barnet Lane in the vicinity of its junction with Totteridge
(12,000)
1,435
Lane
Speed survey – Rushdene Avenue
(2,000)
418
Improvement work to Bowling Green – East Valley (3,000)
3,000
Bowls Club
Yellow Lines – Longland Drive N20, Chandos Avenue,
St Johns Ave & Friern Barnet Road and East Crescent
at junction with Beaconsifeld Road – To now include (6,000)
8,221
Laurel Avenue and Parking on corner of Singleton
Scarp and Holden Road, Woodside Park
Installation of a bench outside Sainsburys on East
(1,700)
1,262
Barnet Road
Alston Road 20MPH Zone – Speed Survey
(1,000)
1,154
Vicinity of Barnet Hospital – monitoring parking in the
roads surrounding Barnet Hospital following the
(5,000)
112
introduction of the parking controls in the area
Junction between Oakleigh Road North and Russell
(5,000)
7,846
Road
Car Park in Barnet Lane
(25,000)
-
The Mayor of Barnet’s Golden Kilometre Marked (25,000)
6,354
Routes – 10 Parks
Request for council officers to look into introduction of
20mph limit along Cromer Road and Shaftesbury Road
(5,000)
7,853
EN5
Halos on Belisha Beacons – Totteridge Lane
(2,000)
4,335
High Street, Barnet – Pavement Build-outs
(15,000)
6,462
Total
101,485
2016/17
Budget
Finchley and Golders Green
Allocation
(CIL Actual Spend
Reserve) £s
Budget Allocation
£150,000
North Crescent, N3 – CPZ issues
(5,000)
5,000
Cost of tools for use by The Diggers – construction of (5,600)
-
compost bins
Westbury Road – design and carry out statutory (25,000)
8,990
consultation and implementation
Holders Hill Road – various, yellow lines and bays – (20,500)
6,604
remainder LIP Funded
Barnet’s Local Plan
Page 7
London Borough of Barnet
Authorities Monitoring Report 2017/18
Summers Lane – design and carry out statutory (24,200)
14,528
consultation and implementation
Alexandra Grove – design and carry out statutory
(13,500)
5,042
consultation and implementation – remainder LIP
The Hocrofts – 5 tonne weight restriction
(8,800)
2,637
Tillingbourne Gardens – design and carry out statutory (6,500)
3,852
consultation and implementation
Parking near Summerside School and Woodhouse
(25,000)
4,762
Open Space Enhancement
Village Road, N3 – feasibility study
(5,000)
1,635
Removing trees to support the work of the Residents
(7,065)
7,065
Association for the upkeep of Northway Rose Gardens
Friary Road Traffic Management Measures – 2 VAS
signs in Friary Road, Road Markings and monitoring to
(16,000)
9,013
take place as to the effectiveness of the implementation
Links View, Dollis Road, N3 – Road Safety
Improvements – design and carry out statutory (20,000)
10,739
consultation and, subject to the outcome of that
consultation, introduce the agreed Option
New Yew tree to repair the damaged hedge at Kinglsley
(3,000)
-
Way junction with Meadway in the Garden Suburb
Planting scheme in Gratton terrace
(9,000)
-
Speed survey and on-site investigation for Glenhurt (5,000)
2,864
Road, N12
Village Road, N3 – feasibility study – Road markings
and provision of two vehicle activated signs and
(25,000)
2,692
cobbled paving setts
Leslie Road/Leopold Road – Request for On-Way and (12,650)
2,470
20mph
Erskine Hill and North Square included in the controlled
(7,500)
47
parking zone – design and consultation
Two parts of East Finchley CPZ be split – design and (2,500)
223
consultation
Speed survey on Hampstead Way between Meadway
and Wellgarth Road & possibility of including controlled
(5,000)
2,769
crossing
Replace single yellow line outside Annabel Court,
(2,000)
736
Hodford Road NW11 with a double yellow line
Speed Control measures for Church Lane
(5,000)
1,903
Total
95,501
The total amount of
CIL receipts for the reported year retained at the end of £10,701,220 (CIL)
the reported year
The CIL receipts from previous years retained at the
£17,765,000 (CIL)
end of the reported year (excluding neighbourhood
(includes the 2017/18 receipts set out above)
portion)
Hendon - £60,287
Neighbourhood portion CIL receipts for reported year
Chipping Barnet - £48,515
retained at the end of the reported year
Finchley and Golders Green - £54,499
Hendon - £102,289
Chipping Barnet - £245,818
Neighbourhood portion CIL receipts for previous years
Finchley and Golders Green – £137,780
retained at the end of the reported year
(Excludes the 2017/18 neighbourhood portion
receipts set out above)
In relation to any infrastructure payments accepted
None
payments accepted by the charging authority
Items of infrastructure to which the infrastructure
N/A
payments relate
The amount of CIL to which each item of infrastructure
N/A
relates
Barnet’s Local Plan
Page 8
London Borough of Barnet
Authorities Monitoring Report 2017/18
5
Monitoring the Duty to Cooperate
Under the Localism Act (2011) the Council as a ‘local authority’ has a ‘duty to co-
operate'. The Act requires that councils and public bodies ‘engage constructively,
actively and on an ongoing basis’ with other local planning authorities on strategic
priorities to ensure that plans are in place to support the current and future projected
levels of development, in particular where there are issues of cross boundary impact.
We continue to work in collaboration with neighbouring authorities and other relevant
agencies to discuss common issues. Table 4 shows meetings between April 2017 and
March 2018.
Table 4: Duty to Co-operate and Barnet
Public body
Meeting dates
Venue
Brent/Barnet Duty to Cooperate meeting
27th March 2017
Brent
GLA Environment Strategy
13th April 2017
London Councils
Green Arc Meeting
10th July 2017
Theydon Bois
London SHLAA Methodology & London
24th November 2017
City Hall
SHMA
Planning Officers Society / British Property 19th April 2018
Birmingham
Federation Conference
Hertsmere Duty to Cooperate meeting
9th October 2018
Hertsmere
Planning Officers Society Conference
25th January 2019
Central London
Transport for London meeting
29th January 2019
Barnet House
Camden Duty to Cooperate meeting
31st January 2019
Camden
London Development Database meeting
26th February 2019
Barnet House
Enfield Duty to Cooperate meeting
21st March 2019
Enfield
GLA & LB Brent – Staples Corner meeting
28th March 2019
Brent
Environment Agency meeting
24th April 2019
Barnet
Barnet/Brent Duty to Cooperate meeting
2nd May 2019
Barnet
Barnet/Harrow Duty to Cooperate meeting
21st May 2019
Barnet
Affinity Water meeting
17th July 2019
Hatfield
Other Regional Meetings
Meeting dates
Venue
Association of London Borough Planning
Bi-monthly
London Councils
Officers (ALBPO) Meetings -
Development Plans Association of London Borough Planning
Bi-monthly
London Councils
Officers (ALBPO) Meetings –
Policy
Officers sub group Association of London Borough Planning
Quarterly
Camden
Officers (ALBPO) Meetings –
Neighbourhood Plans West London Alliance Policy Officers &
Quarterly
Ealing
Chief Planners
Transport for London
Quarterly
Barnet/London
Barnet’s Local Plan
Page 9
London Borough of Barnet
Authorities Monitoring Report 2017/18
6
Monitoring Neighbourhood Plans
The Council has designated two Neighbourhood Area Forums in Mill Hill and West
Finchley. We are supporting these Forums in producing their Neighbourhood Plans.
There have been no expressions of interest in new Neighbourhood Plan Areas since
April 2017.
Table 5: Meetings related to neighbourhood plans 1st April 2017 to 31st March
2018
Neighbourhood Plan (NP) body
Meeting dates
Venue
Mill Hill NP Public Meeting
21st September 2016
Hartley Hall, Mill Hill
West Finchley NP Meeting
14th June 2017
Barnet House
Mill Hill NP Meeting
10th August 2017
Barnet House
West Finchley NP Public Drop-In Session
20th November 2017
Gordon Hall
Barnet’s Local Plan
Page 10
London Borough of Barnet
Authorities Monitoring Report 2017/18
7
Barnet’s Place Shaping Strategy
Policy CS 1 – Barnet’s Place Shaping Strategy - protection, enhancement and consolidated growth / Three Strands Approach
Indicator
Indicator
Targets
Progress
Number
CS 1A
Net additional
Deliver 22,000 new homes between 2011/12 and 2021/22
On the basis of the housing trajectory in Table 2 (in Appendix D), it is
dwellings per annum
Deliver 28,000 new homes between 2011/12 and 2025/26
estimated that:
25,586 new homes will be delivered between 2011/12 and 2021/22
39,293 new homes will be delivered between 2011/12 and 2025/26
CS 1B
Housing quality –
To deliver an annual increase in the proportion of completed major
In 2017 Barnet introduced a bi-annual Delivering for Barnet
building for life
housing schemes assessed under Building for Life Standard and
Architecture award. The Developments that won in 2017 are as
meeting the ‘good’ standard
follows:
•
Residential Alteration: 40 Hale Lane
•
Non-residential Alteration: Sacks Morasha Jewish Primary
School
•
Residential new build (10+ units): Dollis Valley Way
•
Residential new build (<10 units): 1 Park Avenue
•
Non-residential new build: Belarussian Chapel
•
New or improved public open space: Colindale Garden Peel
Square
•
Heritage and Conservation: Avenue House Estate
•
Civic Project: Stonegrove Church and Community Centre
•
People’s Choice: Little Lamps Nursery
CS 1C
Amount of borough
Maintain area of land (with LB Barnet) designated Green Belt (2,466
No loss of Green Belt or Metropolitan Open Land
designated
Ha) and Metropolitan Open Land (690 Ha)
Metropolitan Open
Land/Green Belt
CS 1D
Coverage of Town
Adopt Town Centre Frameworks for Priority Town Centres by
North Finchley Town Centre Framework SPD was adopted in
Centres with Town
2015/16 (Chipping Barnet, Edgware, Finchley Church End and
February 2018. All listed town centres are covered by adopted town
Centre Frameworks
North Finchley)
centre frameworks
or their equivalent
Barnet’s Local Plan
Page 11
London Borough of Barnet
Authorities Monitoring Report 2017/18
8
Barnet’s Housing Trajectory and 5 Year
Supply
Barnet’s target as set out in the London Plan (March 2016) is to deliver 2,349 net
new homes per year.
Barnet’s Local Plan target reflects Barnet’s previous London Plan target of 2,255 net
new homes per year and aims to provide 28,000 additional homes by 2025/26.
Demonstrating a 5 year supply of deliverable housing sites is a requirement of the
National Planning Policy Framework. Based on current consents and projected
delivery of allocated sites, Barnet can demonstrate a deliverable supply of 6.1 years
of the London Plan target of 2,349. Based on the Local Plan aim to deliver 28,000
and net delivery to date Barnet can demonstrate a deliverable supply of 5.8 years.
8.2 Methodology
Identified supply is split into minor planning permissions, major planning permissions,
allocations and prior approvals. Allocations are sites identified for development in
planning policy documents including the Area Action Plan for Colindale, the Area
Action Plan for Mill Hill East, the Local Plan Core Strategy and Town Centre
Strategies/Frameworks as well as Planning Briefs. Allocations include the
Regeneration Areas1. The sites identified in Allocations underpin housing delivery in
the longer term.
Nearly half of Barnet’s consents are in the Regeneration Areas and can represent
very large schemes such as Brent Cross Cricklewood, Beaufort Park and Colindale
Gardens in Colindale. However nearly 10% of the units currently on the 15 year
housing trajectory are consents outside Regeneration Areas. These could be
considered to be windfall major development although Barnet does not include a long
term windfall projection for major development.
Prior approvals for conversion of certain non residential uses such as offices to
residential are considered as a separate category to consents.
8.3 Minors
Minors are represented by an analysis of ten years of past completions for
development between 1 and 9 units. The average delivery equates to a figure of 360
units per annum.
1 Regeneration Areas = Colindale, Mill Hill and Brent Cross Cricklewood
Barnet’s Local Plan
Page 12
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 1 - Yearly Minor Development Completions
20
20
20
20
20
20
20
20
20
20
08
09
10
11
12
13
14
15
16
17
/09
/10
/11
/12
/13
/14
/15
/16
/17
/18
421
426
329
389
262
295
221
309
346
360
Total
3,358
450
421
426
389
400
346
360
329
350
295
309
300
262
250
221
200
150
100
50
0
Table 6 - 5 Year Supply Calculations
AMR 2017/18 - London Plan Target - Sedgefield
A
Housing target for past plan period (2015/16 - 2017/18)
7047
Housing completions for past plan period (2015/16 -
B
2017/18)
6322
C
Shortfall (A-B)
725
D
Five year target (2018/19 - 2022/23) (2349x5)
11745
E
Five year requirement (shortfall + five year target) (C+D)
12470
F
Annual five year requirement (E/5)
2494
G Housing supply (2018/19 - 2022/23)
18141
H
Requirement gap (G-E)
5671
I
Housing land supply years (G/F)
7.3
AMR 2017/18 - Barnet Target - Sedgefield
A
Housing target for past plan period (2011/12 - 2017/18)
13067.0
Housing completions for past plan period (2011/12 -
B
2017/18)
11745.0
C
Shortfall (A-B)
1322.0
D
Five year target (2018/19 - 2022/23) (2349x5)
11745.0
E
Five year requirement (shortfall + five year target) (C+D)
13067.0
F
Annual five year requirement (E/5)
2613.4
G Housing supply (2018/19 - 2022/23)
18141.0
H Requirement gap (G-E)
5074.0
I
Housing land supply years (G/F)
6.9
Barnet’s Local Plan
Page 13
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 7: Total identified 5 year supply: Majors consents, allocations, prior approvals, non-
conventional supply consent and development pipe
Totals
2018-19
2019-20
2020-21
2021-22
2022-23
Consent
1,774
2,702
2,008
1,609
2,449
10,542
Allocation
0
77
70
1,883
2,654
4,684
Prior Approval
172
336
355
268
0
1,131
Non Conventional
10
94
0
0
0
104
Supply Consent
Total Majors
1,956
3,209
2,433
3,760
5,103
16,461
Total Minors
336
336
336
336
336
1680
Total Majors and Minors
2,292
3,545
2,769
4,096
5,439
18,141
Barnet’s Local Plan
Page 14
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 2: Barnet’s Housing Trajectory/ Completions and Manage/ Monitor
8000
6000
4000
2000
0
-2000
-4000
-6000
Past Completions
Projected Completions
London Plan Target
MONITOR - No. dwellings above or below cumulative target
MANAGE - Housing requirement taking account of past/projected completions
Barnet’s Local Plan
Page 15
London Borough of Barnet
Authorities Monitoring Report 2017/18
9
Policy CS2 Brent Cross Cricklewood
The Section 73 planning permission for the regeneration of Brent Cross Cricklewood was approved in July 2014 and allows for the comprehensive
redevelopment of the area to create a new mixed use town centre with an increase of over 55,000sqm of comparison retail floorspace; construction of 7,500
new homes including affordable homes; creation of a new commercial quarter with a forecast of over 20,000 new jobs underpinned by a new train station and
improved and accessible public transport offer and high quality new public realm. The Brent Cross regeneration is being delivered in three parts: Brent Cross
North; Brent Cross South; and Brent Cross Thameslink.
Brent Cross North
The area of the BXC development to the north of the A406 (North Circular) is to be delivered by Hammerson and Aberdeen Standard Investments (HASI) and
incorporates the retail led mixed use development around Brent Cross Shopping Centre as well as infrastructure improvements to the strategic highway
network. This part of the regeneration has detailed Reserved Matters approvals in place for 82,325sqm of retail floorspace in an extension to the existing
Brent Cross Shopping Centre as well as a hotel, cinema and leisure floorspace; a replacement bus station; and new riverside walkway. Compulsory Purchase
Order 1 was confirmed by the Secretary of State in December 2017 and a significant number of the planning conditions and highway approvals are in place to
enable the development to commence. HASI deferred their start on site for Brent Cross North due to the current retail and investment market climate.
However, they are still committed to the scheme and are continuing to review their position. Applications to re-phase infrastructure to allow Brent Cross South
to commence were made in April 2019.
Brent Cross South
The area to the South of the North Circular is being developed through a Joint Venture Partnership between Barnet Council and Argent Related. Brent Cross
South will deliver a mixed-use development of 6,700 new homes focused around the new town centre supported by new and improved schools, community
health and leisure facilities, improved parks and open spaces. Permission is also in place for up to 4 million sq.ft of office space to create a new office quarter
around the new Thameslink Train Station. Compulsory Purchase Order 2 was confirmed by the Secretary of State in July 2018 for the land needed to deliver
the first phases of Brent Cross South and Reserved Matters have been approved for three development plots and associated public realm in Phase 1B
(South) and Phase 1C. Construction on Plot 12 is programmed to start by February 2020.
Brent Cross Thameslink
Barnet Council is working with Network Rail to deliver a new train station ‘Brent Cross West’ on the Thameslink line, which will support the regeneration and
growth in the area as well as provide new and existing residents with direct access to Thameslink rail services.
The Brent Cross Thameslink project is being
forward funded through Government Grant which has now been confirmed to enable the new station to be delivered sooner alongside the early phases of the
regeneration. Planning permission was granted in 2018 for a Rail Freight Facility, Waste Transfer Station and Rail Sidings to replace existing facilities and
infrastructure and release land for the delivery of the new station and future plot development. Compulsory Purchase Order 3 was confirmed by the Secretary
of State in May 2018 for all the land needed to deliver the new station and associated rail infrastructure. Construction work on the replacement Rail Freight
Facility, Waste Transfer Station and Rail Sidings commenced in early 2019. The new station is expected to be open in 2022.
This AMR focuses on progress with the BXC indicators up to March 2019. The full list of Monitoring Indicators for Brent Cross – Cricklewood is set
out in Appendix B of the Core Strategy.
Note 1: A Section 73 Application was submitted in October 2013 to amend conditions attached to 2010 permission. This was approved by the Council in January 2014 subject to
Direction to Secretary of State and S106. Planning Consent for the Section 73 application was issued on 23 July 2014 following completion of the S106 legal agreement.
Barnet’s Local Plan
Page 16
London Borough of Barnet
Authorities Monitoring Report 2017/18
Indicator
Indicator
Targets
Progress
Number
a) Grant of BXC planning permission
a) Hybrid planning permission granted 28 October 2010. Section 73
b) Completion of Planning Performance Agreement (para
Planning Consent issued on 23 July 2014
22 of Initial Planning Agreement Schedule 2)
b) The Property Development Agreement between the Brent Cross
c) BXC Public Consultation Strategy approved (Condition
development partners and the London Borough of Barnet was signed
1.23). Planning & development forums established (if
on the 03/03/2015 which establishes obligations on both parties and
appropriate)
terms of engagement.
CS 2AA
2010 - 2012
d) Detailed topographical and geotechnical surveys
c) Approved 31/03/2015 (ref 14/07891/CON).
e) Existing Open Space site measurement approved
d) Relevant surveys carried out by the Development Partners.
(Condition 2.3)
e) Approved 03/07/15 (ref 14/07888/CON).
f)
Detailed transportation survey work undertaken to
f)
Condition 37.1 Phase Transport Report Scope & Matrix for Phase 1
underpin the pre-commencement transport approvals.
approved 10/02/2015 (ref 14/07507/CON). Condition 37.1a Phase
Transport Report Scope for Phase 1A approved 10/02/2015
(14/07506/CON).
Discharge of relevant pre-reserved matters conditions,
The relevant Pre-RMA Conditions related to Phase 1A (North) have been
including:
approved or secured resolution to grant in 2015.
a) A5 Corridor Study (Condition 2.7)
a) Approved 04/04/2016 (ref 14/07402/CON).
b) Construction Consolidation Centre Feasibility Report
b) Approved 04/02/2015 (ref 14/07508/CON).
(Condition 1.9)
c) Approved 09/09/2015 (ref 14/08112/CON).
CS 2 AB
2010 - 2012
c) Framework Servicing and Delivery Strategy (Condition
d) Condition 37.1 Phase Transport Report Scope & Matrix for Phase 1
1.21)
approved 10/02/2015 (ref 14/07507/CON). Condition 37.1a Phase
d) Phase 1 Transport Report (Condition 37)
Transport Report Scope for Phase 1A approved 10/02/2015
e) Walking and Cycling Study (Condition 1.20)
(14/07506/CON).
f)
Mobility Feasibility Study and Strategy (Condition 1.25)
e) Approved 10/09/2015 (ref 14/08105/CON).
g) RDF Feasibility Study (Condition 35.3)
f)
Approved 30/03/2015 (ref 14/07955/CON).
h) Vacuum Waste Collection System Feasibility
g) Approved 10/07/2015 (ref 14/07893/CON).
Study (Condition 1.24)
h) Approved 27/03/2015 (ref 14/07961/CON).
Detailed design of Site Engineering and Preparation Works
a) Condition 31.1 discharged on 28/01/2015 for Phase 1A (North) (ref
(Condition 1.8) including:
14/07509/CON) including draft Site Specific Remediation Strategies
for whole of Phase 1.
a) Identification of Remediation Zones and Sub-Zones
b) Detailed design work in order to fix the highways layouts has
for Phase 1 (Condition 31.1) Commence Site
commenced in consultation with the relevant Highways Authorities
including TfL and Highways England and a process of engagement
CS 2 AC
2010 - 2012
Specific Remediation Strategy for Remediation
Zones in Phase 1 (Condition 31.2)
is established. Reserved matters for Phase 1A (North) infrastructure
b) Detailed design work in relation to alignment of the
including roads and junction layouts approved September 2015
primary and secondary road network within the
(15/03312/RMA).
development as the basis for fixing the Highways
c) c) Work continued in 2015 in relation to the CPO to bring forward
Orders needed to enable the development to
the first phases of development and critical infrastructure. Orders for
proceed (Condition 13.1)
CPO1 and CPO2 were made on 20 April 2015. The formal statutory
c) Site assembly process progress:
Notices were served on those affected by the CPO on 30 April 2015.
Barnet’s Local Plan
Page 17
London Borough of Barnet
Authorities Monitoring Report 2017/18
-
negotiations with owners / occupiers
A Public Inquiry took place from the 17 May – 27 July 2016 led by an
-
site acquisition strategy
independent Planning Inspector. Site assembly is progressing and
-
Residential Relocation Strategy (Condition
the Council and its advisors are progressing private treaty
1.10) and
negotiations with those businesses and residents affected by the
-
Business Relocation Strategy (Condition 46.3)
CPO. For CPO1 acquisitions have now been completed. For CPO2
-
Compulsory Purchase Order (CPO) boundary
the Council has negotiated Heads of Terms with six residential
defined
owners and has reached agreement with thirteen commercial owners
d) Site referencing process for CPO commenced.
and has completed on McGovern and Brothers, DSG Ltd and Lewis
Properties and is continuing its negotiation on lease terms with a
number of business owners on the Claremont Industrial Estate.
The Residential Relocation Strategy (Condition 1.10) has been
submitted and approved in September 2015.
d) Site referencing process for CPO completed 2015.
Between 2013 and 2014:
a) The Chair of the Consultative Access Forum was appointed in July
2014 and the inaugural meeting of the Forum was held in September
a) Consultative Access Forum established
2014. CAF have advised on Reserved Matters proposals for Phase 1A
b) Inclusive Access Strategy and Wayfinding Strategy
North and Phase 1B North.
approved (Condition 1.26)
b) to h) These conditions have all been approved in 2015.
c) Clitterhouse Mobility Scheme approved (Condition 2.2)
CS 2 BA
2013 - 2014
d) Pedestrian and Cycle Strategy approved (Condition 2.8)
e) Estate Management Framework approved (Condition 7)
f) Employment Skills Action Plan approved (Condition 10)
g) Phase Car Parking Standards and Phase Car Parking
Standards approved for Phase 1 (Condition 11.2)
h) Scheme for Existing Landscape features in Phase 1 and
Phase 1 arboricultural method statement approved
(Condition 27)
a) Site Engineering and Preparation Works (Phase
(a) to (d) Pre-Application work linked to the submission of Reserved
1) approved (Condition 1.8) including approvals to:
Matter Applications for Phase 1A (North) was carried out throughout 2014
b) Identification of Remediation Zones and Sub-Zones for
and/or approved in 2015.
Phase 1 (Condition 31.1)
c) Commence preparation of the Site Specific Remediation Reserved Matter Applications for Phase 1A (North) comprising
Strategy for Remediation Zones in Phase 1 (Condition Infrastructure (roads, bridges and river diversion works) (15/03312/RMA),
28.7)
CS 2 BB
2013 - 2014
d) Detailed approvals (Condition 13.1) obtained for:
Clitterhouse Playing Fields and Claremont Open Space (15/00769/RMA),
-
primary and secondary roads in Phase 1;
Central Brent Riverside Park (15/03315/RMA)and the residential
-
Bridge Structure B1 (A406 Tempelhof Bridge);
development of Plots 53 and 54 (15/00720/RMA) were all submitted in
-
Brent Cross Pedestrian Underpass;
January 2015 and were all approved between June and September 2015.
-
Bus Station Temporary Enhancement Works;
-
Eastern River Brent Alteration and Diversion
Works;
-
River Brent Bridges (as relevant to the Eastern
River Brent Alteration and Diversion Works);
Barnet’s Local Plan
Page 18
London Borough of Barnet
Authorities Monitoring Report 2017/18
-
Clarefield Park Temporary Replacement Open
Space;
-
Clitterhouse Playing Fields (Part 1).
a) Other Phase 1A reserved matters approvals (Condition
a) Reserved Matter Applications were submitted in January 2015 and
1.2.1)
have been approved (see above).
b) Revised Indicative Construction Programme approved
b) & c) There has been some delay to the programme. The Primary
(Conditions 4.3, 4.4 and 5.3)
Development Delivery Programme and Detailed Delivery (Non PDP)
c) Primary Development Delivery Programme and Detailed
Programme are not anticipated to be submitted until the end of 2017. The
Delivery (Non PDP) Programme approved (Condition 5)
Development Partners are now seeking to carry out Early Utility Diversion
d) Highways Orders made and/or promoted
works in the first quarter of 2018 with a main start on site for Phase 1A
e) Construction Accesses approved in relation to the
(North) and Phase 1B (North) in Summer 2018.
CHP/CCHP and WHF (condition 8.4)
d) Discussions in respect of Highways Orders are taking place with the
f)
CPO made and submitted for confirmation.
appropriate Highways authorities. Section 278 Agreements have been
drafted and Technical Approval of plans was reached at the end of 2018.
e) The Council is leading on the delivery of the new Thameslink Railway
CS 2 BC
2013 - 2014
Station in partnership with Network Rail and public sector stakeholder
partners in order to support the south-side scheme and comprehensive
regeneration of the Brent Cross Cricklewood area. The delivery strategy
for the new station includes the delivery of a new Waste Transfer Station
which is being developed in consultation with the North London Waste
Authority. A drop-in planning application for the WTS was approved in
October 2017.
f) Compulsory Purchase Orders 1 and 2 were made on 20 April 2015.
The formal statutory Notices were served on those affected by the CPO
on 30 April 2015. A Public Inquiry was held between 17 May 2016 and 27
July 2016 led by an independent Planning Inspector appointed by the
Secretary of State. CPO1 and CPO2 were confirmed by the Secretary of
State on 7th December 2017.
CS2 BD
2015 - 2016
a) CPO Confirmed
a) The Public Inquiry for Compulsory Purchase Orders 1 and 2 took
b) All Phase 1 interests acquired
place between 17 May and 27 July 2016. CPO1 and CPO2 were
c) All requisite interests in Phase 1 site bound into the
confirmed by the Secretary of State on 7th December 2017.
Planning Obligations under the Initial Planning Agreement
b) & c) Site assembly is progressing and the Council and its advisors are
(Condition 6)
progressing private treaty negotiations with those businesses and
d) All Necessary Consents for Phase 1 Critical Infrastructure
residents affected by the CPO. For CPO1, the council has acquired or
(Pre-Phase) (including highways agreements and bonds)
agreed Heads of Terms on 14 properties. For CPO2, the council has
completed and in place (Condition 13.1)
acquired or agreed HoTs on 6 properties. Agreement with thirteen
e) Phase 1A commences 2016/17 and will be carried out in
commercial owners has also been reached and agreements have been
accordance with the Primary Development Delivery
completed on McGovern and Brothers, DSG Ltd and Lewis Properties. In
Programme
March 2019 all of the businesses in the Claremont Way Industrial Estate
f) Phase 1B reserved matters applications submitted and
were vacated in preparation for demolition.
approved (2016/17).
d) Detailed design work in order to fix the highways layouts and progress
the relevant Highways Orders has commenced in consultation with the
relevant Highways Authorities including TfL and Highways England. The
Barnet’s Local Plan
Page 19
London Borough of Barnet
Authorities Monitoring Report 2017/18
designs reached technical approval at the end of 2018. A draft section
278 Agreement has been prepared.
e) There has been some delay to the programme. In order to safeguard
the delivery of the scheme, a Section 96A ‘non-material amendment’
application was approved in November 2015 to amend the 2014 Planning
Permission to allow the implementation of Phase 1A (North) in the short
term by the carrying out of minor works (specifically the digging of a
trench to contain the piled foundations for one of the approved pedestrian
bridges). The trench was dug and a certificate of lawful development was
issued on 20th January 2017 (16/7507/191) confirming that the
development had been implemented.
f) Reserved matters for Phase 1B (North) were approved in October
2017 and Reserved Matters for Phase 1B South were approved in
February 2018 in accordance with the relevant deadline in the s73
Permission.
a) Phase 1B Commences and will be carried out in
a) Reserved Matters for Phase 1B North including the shopping centre
accordance with the Primary Development Delivery
extension were approved in October 2017 and pre-commencement
Programme.
conditions have been discharged. In June 2018 Hammerson and
b) Plot 1C Commences and will be carried out in accordance
Aberdeen Standard Investments (HASI) deferred their start on site for the
with the Primary Development Delivery Programme.
Shopping Centre extension due to the current retail and investment
market climate. However, they are still committed to the scheme and are
CS2 BE
2016 - 2018
continuing to review their position. Applications to re-phase infrastructure
to allow Brent Cross South to commence were made in April 2019.
Reserved Matters for Phase 1B South were approved in February 2018
in accordance with the relevant deadline in the s73 Permission.
Construction on Plot 12 is programmed to start by February 2020.
b) Reserved Matters for Phase 1C were approved in March and April
2019 in accordance with the relevant deadline in the s73 Permission.
10 Distribution of Growth
Policy CS3 – Distribution of growth in meeting housing aspirations
Indicator
Indicator
Targets
Progress
number
CS 3A
Net additional dwellings in BXC,
Delivery of housing units between 2011/12 and 2015/16,
See Figure 4 for Development Pipeline showing phased
Colindale, Granville Road, Mill Hill
2016/17 and 2020/21, 2021/22 and 2025/26 in
delivery of new housing
East, West Hendon, Dollis Valley,
accordance with Policy CS3.
Stonegrove and Spur Road and
North
London
Business
Park
(NLBP) as a proportion of the
annual total
Barnet’s Local Plan
Page 20
London Borough of Barnet
Authorities Monitoring Report 2017/18
CS 3B
Delivery of housing in accordance
Delivery of new housing:
Figure 3 sets out density of residential completions since
with Table 3.2 – Sustainable Within the range of 35 to 130 units per hectare dependant
2010/11
Residential Quality of the London
on PTAL (Suburban)
An analysis of units completed in 2017/18 reveals:
Plan
Within the range of 35 to 260 units per hectare dependant
on PTAL (Urban)
77 units of residential units at a Suburban density
Within the range of 35 to 405 units per hectare dependant
An example of which is:
on PTAL (Central)
Garden Suburb
F/01319/12 – Chandos Lawn Tennis Club, Chandos Way,
Wellgarth Road, NW11 7HP – development consisting of
45 residential units (development completed 01/01/2018)
PTAL rating 1 – 48 units/ha
332 units of residential units at an Urban density
An example of which is:
Hendon
15/04738/FUL - Ella & Ridley Jacobs House and Sam
Beckman Centre, 19-25, Church Road, 29 Babington
Road, NW4 4EB - development consisting of 32
residential units (development completed 18/01/2018).
PTAL rating 2 – 145 units/ha
2,108 units of residential units at a Central density
An example of which is:
Colindale
H/05856/13 – British Library Newspapers, 130 Colindale
Avenue, NW9 5HE - development consisting of 395 units
(development completed 01/10/2017).
PTAL rating 3 – 329 units/ha
Barnet’s Local Plan
Page 21
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 3: Density of Residential Completions 2010/11-2017/18 (units per ha)
150
122
112
re
101
cta 100
84
88
e
80
75
h
71
r ep 50
its
n
U
0
2010/11
2011/12
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
Figure 4: Barnet Housing Development Pipeline (including completions since 2011)
Housing Delivery from Other Sources
4080
5978
11217
Priority Housing Estates + Regeneration and Development Areas
4320
3533
6205
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2011/12 - 2015/16
2016/17-2020/21
2021/22-2025/26
Barnet’s Local Plan
Page 22
London Borough of Barnet
Authorities Monitoring Report 2017/18
11 Housing Quality and Choice in Barnet
Policy CS4 – Providing quality homes and housing choice in Barnet
Indicator
Indicator
Targets
Progress
Number
CS 4A
Affordable homes
Deliver 40% of housing identified in Town Centres, Other Major
Table 8a sets out where new affordable homes have been completed
delivered (Gross)
sites and the Regeneration and Development Areas as new
affordable homes by 2025/26
Table 8b and Figure 5 show completions on affordable housing and
delivery as a % of net conventional supply.
Contributions to affordable housing set out at DM 10 – see below.
CS 4B
Are we building the
Delivery of housing mix in line with the Sub Regional Strategic
We are continuing to ask whether we are building the right homes for
right homes for the
Housing Market Assessment (LBB COI) to include an increase in
the next generation. in order to answer the question, we assess the
next generation?
the proportion of: Social rented homes – 3 bedroom + (2011
housing completions, examining the source of supply; those being –
baseline 20% of social rented stock)
new build, conversions, change of use, extensions and the type and
Intermediate affordable homes – 4 bedroom + (2011 baseline 11%
size of the units.
of social rented stock)
Market housing – 4 bedrooms + (2011 baseline 9% of market stock)
See section 12 on are we building the right homes for the next
(baseline as % of tenure stock – Source – North London SHMA,
generation.
2011 )
Table 8a Affordable Housing Delivery 2017/18 since 2010/11
Affordable Housing Completions
Source
Units
Total Town Centre sites
45
Total other major sites
474
Brent Cross – Cricklewood
0
Mill Hill East AAP
365
Colindale AAP
1,343
Total Regeneration Development Areas, Town
2,227
Centre sites and Other Major sites
Table 8b: Affordable Housing Output as a proportion of Overall Conventional Housing Provision – 2014/15 to 2017/18
Total Net Conventional Affordable Completions
Affordable as % of total net conventional supply
2014/15
2015/16
2016/17
2017/18
Total
2014/15
2015/16
2016/17
2017/18
Total
344
205
460
341
1,350
25%
12%
21%
14%
18%
Barnet’s Local Plan
Page 23
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 5 - Net conventional affordable housing completions by tenure 2013/14 to 2017/18
500
450
400
350
its
n 300
ufor 250
e
b 200
m
u
N 150
100
50
0
2013/14
2014/15
2015/16
2016/17
2017/18
Social Rent
Affordable Rent
Intermediate
Policy DM 10 – Affordable Housing contributions
Indicator
Indicator
Targets
Progress
Number
DM 10A
Refer to Policy CS4
Refer to Policy CS4
Table 9 provides a breakdown of contributions received from
schemes in the period 2012/13 to 2017/18. Details of affordable
housing contributions are outlined in the 2017-18
Annual
Regeneration Report, demonstrating funding investment within the
borough. Overall, £12.28 million of Section 106 developer
contributions were made throughout the reporting period.
Table 10 provides a breakdown of receipts in 2017/18.
Table 9: Affordable housing contributions since 2012/13
2012-2013
2013-2014
2014-2015
2015-2016
2016-2017
2017-2018
Affordable
Housing
£1.17m
£0.16m
£0.87m
£0.82m
£0.27m
£8.99m
Contributions
Barnet’s Local Plan
Page 24
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 10: Affordable housing contributions receipts 2017/18
Planning Ref
Site
Amount Received
Receipt Date
Decision Date
H/03404/11
St Josephs College, Lawrence Street, London, NW7 4JX
£64,312.52
30/06/2017
29/03/2012
£64,684.12
30/06/2017
£66,715.57
30/06/2017
H/00459/13
Convent of St Mary At The Cross, Priory Field Drive,
£124,652.00
06/06/2017
02/07/2014
Edgware, Middx, HA8 9PU
£124,652.00
11/07/2017
H/02747/14
Hendon Football Club, Claremont Road, London, NW2
£1,769,251.00
05/05/2017
23/12/2014
1AE
F/04159/11
Leo Baeck House, 65-67 The Bishops Avenue, London,
£2,340,697.67
21/04/2017
29/03/2012
N2 0BG
H/05856/13
British Library Newspapers, 130 Colindale Avenue,
£4,432,689.00
30/11/2017
23/12/2014
London, NW9 5HE
Total
£8,987,653.88
Policy DM 02 – Development standards
Indicator
Indicator
Targets
Progress
Number
DM 02A
Total amount of new
Delivery of new play space in accordance with Infrastructure
There was an extension to the play area in Stonegrove Park which
play space delivered
Delivery Plan
totalled 153 sqm and an extension to Brunswick Park which totalled
86 sqm
DM 02B
Residential units
To justify exceptions for new units approved below minimum space
We have not allowed any exemptions for new builds. Flexibility may
approved below
standards
be provided in smaller units as a result of residential conversions.
minimum space
standards
Policy DM 03 – Accessibility and inclusive design
Indicator
Indicator
Targets
Progress
Number
DM 03A
Lifetime homes
All new homes meet ‘Lifetime Homes’ standard
From October 2015 building regulation M4 (2) – ‘accessible and
approved
adaptive dwellings’ replaced Lifetime Homes requirement 89% of
units in completed schemes (2017/18) are M4 (2) compliant
DM 03B
Wheelchair
10% of new homes to be wheelchair accessible or easily adaptable From October 2015 building regulation M4 (3) – ‘accessible and
Accessible homes
adaptive dwellings’ replaces wheelchair housing standards
approved
requirement
7.1% of units in schemes completed (2017/18) are M4 (3) compliant
Barnet’s Local Plan
Page 25
London Borough of Barnet
Authorities Monitoring Report 2017/18
Policy DM 07 – Protecting housing in Barnet
Indicator
Indicator
Targets
Progress
Number
DM 07A
Number of new
No net loss of housing except for where replaced by a new nursery,
No housing was lost in the 2017/18 financial year
community uses
doctors surgery or educational use
(including education)
replacing residential
uses
Policy DM 08 – Ensuring a variety of sizes of new homes to meet housing need
Indicator
Indicator
Targets
Progress
Number
DM 08A
Refer to Policy CS4
Refer to policy CS4
See section 12 on Are we building the right homes for the next
generation?
Policy DM 09 – Specialist Housing
Indicator
Indicator
Targets
Progress
Number
DM 09A
New housing for older
All new housing for older people delivered within walking distance
New work to be undertaken in terms of housing schemes for older
people
of local shops (500m)
people in support of the new Local Plan
Barnet’s Local Plan
Page 26
London Borough of Barnet
Authorities Monitoring Report 2017/18
12 Are we building the right homes for the next
generation?
12.1.1
From 2012 new build developments have accounted for 81% of new housing
completions. Conversions have accounted for 5%, change of use accounts for 12%
and extensions account for 2% of new housing completions.
12.1.2
While change of use accounts for 12% of new homes created in Barnet, there has
been a drastic increase in the number of units created this way. This is due to
changes in legislation involving developments which involve change of use.
12.1.3
The smallest homes are generated through extensions, changes of use and
conversions. This will increase with changes to the Use Class Order as planning
space standards cannot be applied to schemes which do not require planning
permission. An example of smaller units arising from relaxation of planning space
standards due to prior approval of an office block (Barnet House, 1255 High Road,
Whetstone (17/1313/PNO)) for conversion to 254 residential units. If this prior
approval was implemented then 96% of the units would not meet minimum
residential space standards as set out in the Sustainable Design and Construction
SPD. The smallest studio unit in Barnet House would be 16m2 if the office building
was converted in accordance with 17/1313/PNO.
Table 11: Residential completions 2011/12-2017/18 by housing type
Number of Bedrooms
Unit
1
2
3
4
5+
%
Type
Total
Number
100%
(34%)
(46%)
(15%)
(4%)
(1%)
of units
Barnet’s Local Plan
Page 27
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 6: Proportion of new units in flats by bedroom 2011/12-2017/18
Figure 7: Proportion of new units in houses by bedroom 2011/12-2017/18
Figure 8: Proportion of new flats and houses by bedroom 2011/12-2017/18
Barnet’s Local Plan
Page 28
London Borough of Barnet
Authorities Monitoring Report 2017/18
Policy CS5 – Protecting and enhancing Barnet’s character
Indicator
Indicator
Targets
Progress
Number
CS 5A
Net additional
Delivery of new housing units between 2016/17 and 2020/21,
Figure 4 shows the delivery of homes that are not within the
dwellings outside the
2021/22 and 2025/26 in incremental small housing schemes, town
boundaries of the Regeneration, Development or Priority Estate
growth areas and
centre sites and Other Major sites.
Areas.
regeneration estates
Policy CS4 – Providing quality homes and housing choice in Barnet
Indicator
Indicator
Targets
Progress
Number
CS 4C
Net additional gypsy,
Deliver by 2017
No new plots have been delivered
traveller pitches and
Up to 15 pitches for Gypsy and Travellers
travelling showpeople
Up to 2 plots for Travelling Showpeople
plots
Baseline in 2015/16 is zero
CS 4D
Progress update on
New homes completed on each priority estate by tenure and
See
Annual Regeneration Report, for a progress report update
regeneration of
dwelling mix
priority estates
Policy DM 01 – Protecting Barnet’s character and amenity
Indicator
Indicator
Targets
Progress
Number
DM 01A
Satisfaction with local
No decrease in satisfaction with local area as a place to live from
The Residents Perception Study for Autumn 2017 shows that 85% of
area as a place to live
baseline of 86% in the 2010/11 residents perception study
residents are satisfied with their local area.
Barnet’s Local Plan
Page 29
London Borough of Barnet
Authorities Monitoring Report 2017/18
13 Protecting and enhancing Barnet’s character
Policy CS 5 – Protecting and enhancing Barnet’s character
Indicator
Indicator
Targets
Progress
Number
CS 5B
Number of, and
New Tall Buildings completed in strategic locations identified in
Tall buildings approved in 2017/18:
location of Tall
Policy CS5
•
Peel Centre (Blocks H, J K and M) – 21 storeys -
Buildings approved/
16/7836/S73
completed
•
West Hendon (Phase 4) – 21 storeys - 17/0017/RMA
•
Colindale Gardens (Phases 2a-c) – 16 storeys -
17/2564/RMA
•
Brent Cross (Phase 1b) – 13 storeys - 17/6662/RMA
Tall buildings under construction in 2017/18:
•
112-132 Cricklewood Lane – 8 storeys - 16/0601/FUL
•
Beaufort Park (Blocks C7-C8a) – 11 storeys -
16/3652/NMA
•
National Institute for Medical Research – 9 storeys -
16/4545/FUL
Tall buildings completed in 2017/18:
•
Peel Centre (Blocks T and U) – 14 storeys - 16/1683/NMA
•
Northway House – 13 storeys - B/05378/14
•
1 King Street – 8 storeys - F/00266/13
•
Gateway House – 8 storeys - F/03933/13
•
British Library Newspapers - 11 storeys H/05856/13
Policy CS 5 – Protecting and Enhancing Barnet’s Character
Indicator
Indicator
Targets
Progress
Number
CS 5C
Number of buildings
No increase in number of heritage assets on the heritage assets at
There has been an decrease in the number of heritage assets on the
on the heritage
risk register (from baseline of 13 listed buildings, 1 scheduled
heritage assets risk register since 2010/11
assets at risk register
monument and 2 Conservation Areas in 2010/11)
The latest heritage assets risk register identifies:
8 Listed Buildings
1 Scheduled Monument
1 Conservation Area
Barnet’s Local Plan
Page 30
London Borough of Barnet
Authorities Monitoring Report 2017/18
There will be 1 building removed as a heritage asset at risk and
potentially 2 others that will be removed from the 2019/20 register.
Policy DM 05 – Tall Buildings
Indicator
Indicator
Targets
Progress
Number
DM 05A
Number of
Number of tall buildings refused:
Planning applications for tall buildings in Grahame Park
redevelopments of
•
In strategic locations identified in CS 5
(17/2840/OUT) and North London Business Park (15/07932/OUT)
existing tall buildings
were refused in 2017/18.
Policy DM 06 – Barnet’s Heritage and Conservation
Indicator
Indicator
Targets
Progress
Number
DM 06A
Number of
No Conservation Area Character Appraisal is more than 5 years old Conservation Area Character Appraisals. These are set out below.
conservation
The following are covered by a CACA of which
appraisals less than 5
•
2 are no more than 5 years old
years old
•
13 are more than 5 years old
In 2012/13 Finchley Garden Village approved
In 2013/14 Finchley College Farm CACA started
In 2015/16 Moss Hall Crescent approved
Appraisals no more than 5 years old
•
Cricklewood Railway Terraces 2016
•
Moss Hall Crescent 2015
Appraisals more than 5 years old:-
•
Finchley Garden Village 2013
•
Hendon - Church End 2012
•
Hendon - The Burroughs 2012
•
Finchley Church End 2011
•
Golders Green Town Centre 2011
•
Hampstead Garden Suburb 2010
•
Mill Hill 2008
•
Totteridge 2008
Barnet’s Local Plan
Page 31
London Borough of Barnet
Authorities Monitoring Report 2017/18
•
Monken Hadley 2007
•
Watling Estate 2007
•
Wood Street 2007
•
Glenhill Close 2001
•
Hampstead Garden Suburb, The Bishop's Avenue 1999
Policy DM 18 – Telecommunications
Indicator
Indicator
Targets
Progress
Number
DM 18A
Applications for
Number of telecoms appeals dismissed
Over the 2017/18 period, 6 prior notification applications were
telecommunications
received, of these 2 were approved, 2 were refused and 2 were
approved
refused and allowed at appeal.
Over the same period, 2 full planning applications were put forward,
2 of which was refused.
14 Promoting Barnet’s Town Centres
Policy CS6 – Promoting Barnet’s Town Centres
Indicator
Indicator
Targets
Progress
Number
CS 6A
Total amount of new
Deliver an additional 2,200m2 of convenience floorspace by
During 2017/18, planning permission was given for an additional
floorspace for Town
2021/26 focused on the following sub-areas –
2,114.2m2 of A1 floorspace in the following locations:
Centre Uses
East (North Finchley, Finchley Church End, East Finchley and
•
Whetstone)
Brent Street
West (Edgware, Mill Hill, and Burnt Oak)
•
Chipping Barnet
Deliver an additional 16,800m2 of comparison floorspace by
2021/26 focused on the following sub-areas – East, West and South
•
Cricklewood
West
•
East Finchley
East (North Finchley, Finchley Church End, East Finchley and
Whetstone)
•
Finchley Church End
West (Edgware, Mill Hill and Burnt Oak)
South West (Hendon and Brent Cross Cricklewood)
•
New Barnet
•
Whetstone
CS 6B
Net additional
Delivery of housing units between 2016/17 and 2020/21, 2021/22
Table 8a shows housing delivery in Barnet’s major and district town
dwellings in town
and 2025/26 in accordance with Table 3 – Barnet’s development
centres.
centres
pipeline.
Barnet’s Local Plan
Page 32
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 12: Barnet's Retail Development Pipeline 2017/18
Permission
Permission
A1 sqm
Proposal Address
Location
reference
Date
floorspace
178-180 Long Lane, London, N3 2RA
17/1361/FUL
13/04/2017
18
West Finchley
174 High Road, London, N2 9AS
17/1346/FUL
18/04/2017
-47
East Finchley (East Finchley)
Unit 2 Friern Bridge Retail Park, Pegasus Way, London, N11 3PW
17/2122/FUL
31/05/2017
482
Coppetts
25 East Barnet Road, Barnet, EN4 8RN
17/1922/FUL
09/06/2017
59
East Barnet (New Barnet)
Unit 2 Friern Bridge Retail Park, Pegasus Way, London, N11 3PW
17/2126/FUL
05/07/2017
1,394
Coppetts
41 - 42 Wilton Court, Wilton Road, London, N10 1LU
17/4490/PNR
05/09/2017
-60
Coppetts
157 - 161 Hale Lane, Edgware, HA8 9QW
17/4937/FUL
07/09/2017
99.5
Hale
140 - 148 Cricklewood Lane, London, NW2 2DT
17/4517/FUL
15/09/2017
277
Childs Hill
8 Station Road, Barnet, EN5 1QW
17/6035/PNR
01/11/2017
-46.5
Oakleigh (New Barnet)
130 - 132 Brent Street, London, NW4 2D
17/6280/FUL
21/11/2017
-133.3
Hendon (Brent Street)
136 High Road, London, N2 9ED
17/5389/FUL
05/12/2017
-128
East Finchley (East Finchley)
2A Alverstone Avenue, Barnet, EN4 8DS
17/6096/FUL
13/12/2017
21.9
East Barnet
37 Church Road, London, NW4 4EB
17/4534/FUL
20/12/2017
-60
Hendon (Brent Street)
85 High Street, Barnet, EN5 5UR
17/7207/FUL
28/12/2017
-155
High Barnet (Chipping Barnet)
Brent Cross Shopping Centre, Unit N11/12 Prince Charles Drive, London,
17/7088/FUL
03/01/2018
-270
West Hendon
NW4 3FP
194 - 196 Cricklewood Broadway, London
17/0233/FUL
10/01/2018
3,457
Childs Hill (Cricklewood)
269 Ballards Lane, London, N12 8NR
17/7546/PNO
23/01/2018
-148
West Finchley
30 Brookhill Road, Barnet, EN4 8SN
17/5331/FUL
26/02/2018
1,471
East Barnet
1338 - 1340 High Road, London, N20 9HJ
18/0492/FUL
28/02/2018
-731
Oakleigh (Whetstone)
78 Colindale Avenue, London, NW9 5ES
17/8050/FUL
01/03/2018
-59
Colindale
West Finchley (Finchley Church
117 Ballards Lane, London, N3 1XY
18/1027/PNR
29/03/2018
-101
End)
Total
5,340.6
Barnet’s Local Plan
Page 33
London Borough of Barnet
Authorities Monitoring Report 2017/18
15 Protecting Barnet’s Town Centres
Policy DM11 – Development principles for Barnet’s town centres
Indicator
Indicator
Targets
Progress
Number
DM 11A
Town centre trends
No reduction in % frontage where the proportion of A1 units in town
Town centre surveys are carried out biannually with the last being
centre primary frontages is above 75% (baseline year 2010 Survey) held in 2018. The study showed a 1.5% increase in average vacancy
across major and district town centres in Barnet.
Policy DM 12 – Maintaining our local centres and parades
Indicator
Indicator
Targets
Progress
Number
DM 12A
Local centre trends
No significant reduction in retail floorspace in local centres
A survey of Barnet’s local centres took place in autumn 2018. The
overall amount of retail floorspace in local centres is lower than
district centres with most centres achieving just under 45% of units in
A1 retail use.
More than half of local centres demonstrate a downward trend in the
number of A1 retail units whilst the others demonstrate an upward
trend in the number of A1 retail units – based on two surveys (2016
and 2018).
Around two thirds of local centres have seen a rise in vacancy rates.
Deansbrook Road, East Barnet and Market Place have seen a
reduction in vacancies, whilst Colney Hatch Lane has remained at
the same vacancy rate and New Southgate remains without any
vacancies. West Hendon remains the local centre with the highest
vacancy rate.
Barnet’s Local Plan
Page 34
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 9: Percentage Use Class changes for Barnet's 14 local town centres for 2016 and 2018
100%
90%
80%
70%
Other
60%
Vacant
50%
B1 office
40%
Sui generis
30%
A5 take aways
20%
A4 pubs/bars
A3 café/restaurants
10%
A2 service
0%
A1 retail
16 Open Spaces
Policy CS 7 – Enhancing and protecting Barnet’s open spaces
Indicator
Indicator
Targets
Progress
Number
CS 7A
Protection of Public
No net loss of public open space in Barnet’s parks from 2010/11 There has been no net loss of public open space over the 2017/18
open space
baseline of 488 ha
period.
Barnet’s Local Plan
Page 35
London Borough of Barnet
Authorities Monitoring Report 2017/18
CS 7B
% of borough with
Reduce areas of public open space deficiency in North and East
New documents that play a key role in enhancing Barnet’s open
public access to open
Finchley by delivering Green Infrastructure in those areas in
spaces:
space and nature
accordance with the IDP
•
Green Infrastructure SPD October 2017
reserves
•
Tree Policy October 2017
•
Barnet’s Playing Pitches Strategy March 2017
•
Parks and Open Spaces Strategy May 2016
The Infrastructure Delivery Plan (2011) is to be revised to support the
review of Barnet’s CIL Charging Schedule and the new Local Plan.
CS 7C
Additional on-site
By 2025/26 deliver 18.5 ha of new public open space in Brent Cross
Preparatory work has begun on delivering approved parks and open
open space in
Cricklewood, Colindale and Mill Hill East
spaces planned for Brent Cross.
regeneration and
development areas
The enhancing of parks in Colindale is to deliver significant support
to the Council’s regeneration initiatives within the surrounding area.
New investment in in parks and open spaces in Colindale and Burnt
Oak are to be completed by 2020. Work has commenced on
development proposals for improvements to Colindale and
Rushgrove parks.
Policy DM 15 – Green Belt and open spaces
Indicator
Indicator
Targets
Progress
Number
DM 15A
Delivery of Green
Financial contributions per annum to Green Infrastructure projects
In 2017/18 a total of £566,823 was secured through S106 for Green
Infrastructure
Infrastructure
17 Promoting a strong and prosperous Barnet - Employment space
Policy CS8 – Promoting a strong and prosperous Barnet
Indicator
Indicator
Targets
Progress
Number
CS 8A
Total amount of net
Deliver 1,500 new jobs in Mill Hill East and Colindale by
Progress on job delivery is set out in sections on implementing the area
additional floorspace – by
2021
action plans of Colindale and Mill Hill East in Appendix B and C.
type and location
[employment areas, town
Deliver 20,000 new jobs in Brent Cross-Cricklewood by
centres or other]
2026
Barnet’s Local Plan
Page 36
London Borough of Barnet
Authorities Monitoring Report 2017/18
CS 8B
Employment land
Deliver an additional 161,000m2 of business space by
Tables 13 and 14 show that Barnet has lost 992m2 of B8 Floorspace and
available – by type
2026 through new build or refurbishment to meet forecast
gained 1,202 m2 of B1 office space in 2017/18.
demand in regeneration and development areas and town
centres
CS 8C
Commercial rents per m2
No significant increase in commercial rents above inflation
The average Commercial Rents achieved in Barnet for 2017/18:
across borough
relative to London average
-
Retail:
£13 per sq ft - £55 per sq ft.
-
Office:
£15.79 per sq ft - £36.50 per sq ft.
-
Industrial:
£2.50 per sq ft - £13.50 per sq ft
CS 8D
16 to 18 year olds who
No increase of NEETs from baseline of 5% of 16 to18 year
Most recent figures for NEETs from the Department of Education
are not in education,
olds in 2010/11 relative to London average. London
In Barnet = 3.6%
training or employment
Baseline 5% in 2010/11
In London = 5.3%
(NEET)
Policy DM 14 – New and Existing Employment space
Indicator
Indicator
Targets
Progress
Number
DM 14A
Maintain current
No net loss in current floorspace in the Locally Significant Industrial
There has been no net loss in floorspace in the Locally Significant
floorspace in the
Sites, the Industrial Business Park and the Business Locations
Industrial Sites, the Industrial Business Parks or the Business
Locally Significant
Locations
Industrial Sites, the
Industrial Business
Park and the
Business Locations
DM 14B
Amount of new office
No new office space outside the town centres/ edge of centre
In 2017/18 there was no increase in office space outside town
space in town centres
centres, Barnet experienced a net loss of 5,567m2 of office space
outside town centres/edge of centre.
Table 13: Planning consents including net gain/ loss in B8 warehouse floorspace
Proposal Address
Ref
Date of Decision
Net B8 Floorspace (m2) Location
Golders Green Delivery Office, St Georges Road, NW11
17/5013/FUL
17/01/2018
-709 Garden Suburb
0LS
1A, Woodside Park Road, N12 8RT
17/7472/PNP
22/01/2018
-230 Woodhouse
Rear of 867, Finchley Road, NW11 8RR
17/7520/PNP
26/02/2018
-53 Childs Hill
TOTAL
-992
Barnet’s Local Plan
Page 37
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 14: Planning consents showing net gain/loss in B1 floor space
Proposal Address
Ref
Date of Decision
Net B1 Floorspace (m2)
Location
1 - 5 Halt Parade, The Hyde, London, NW9 5AH
17/0660/FUL
21/08/2017
40 Colindale
12 - 18 High Road, London, N2 9PJ
16/2351/FUL
08/01/2018
19 East Finchley
122 Granville Road, London, NW2 2LD
17/3943/FUL
12/09/2017
-377 Childs Hill
130 - 132 Brent Street, London, NW4 2DR
17/6280/FUL
21/11/2017
110 Hendon
140 - 148 Cricklewood Lane, London, NW2 2DT
17/4517/FUL
15/09/2017
-277 Childs Hill
159-163 Station Road, Edgware, HA8 7JS
17/4443/FUL
06/09/2017
83 Edgware
178-180 Long Lane, London, N3 2RA
17/1361/FUL
13/04/2017
-142 West Finchley
198 High Street, Barnet, EN5 5SZ
17/1197/FUL
24/04/2017
36 High Barnet
3 - 7 Henry Road, Barnet, EN4 8BL
17/3915/FUL
02/11/2017
88 East Barnet
307 Regents Park Road, London, N3 1DP
17/1052/FUL
09/06/2017
-118 Finchley Church End
4 Portsdown Mews, London, NW11 7HD
17/1838/FUL
17/05/2017
141 Golders Green
49 - 51 Manor Park Crescent, Edgware, HA8 7LY
16/4253/FUL
13/04/2017
147 Edgware
682 High Road, London, N12 9PT
17/7827/FUL
21/02/2018
41 Woodhouse
867 Finchley Road, London, NW11 8RR
17/6008/FUL
17/11/2017
102 Childs Hill
915 High Road, London, N12 8QJ
16/5639/FUL
16/06/2017
-2,029 Woodhouse
995A High Road, London, N12 8PW
17/2936/FUL
17/07/2017
-258 Woodhouse
Broomhills, Woodside Lane, London, N12 8UD
17/7157/FUL
10/01/2018
-229 Woodhouse
Car Wash And Garage, Moxon Street, Barnet, EN5 5TY
17/1422/FUL
14/08/2017
126 High Barnet
Golders Green Delivery Office, St Georges Road,
17/5013/FUL
17/01/2018
1,704 Garden Suburb
London, NW11 0LS
Homebase, Rookery Way, London, NW9 6SS
17/3146/FUL
26/06/2017
250 Colindale
Hyde House, The Hyde, London, NW9 6LH
17/5297/FUL
31/01/2018
-901 Colindale
Land At Bentley Way Rear Of 7A East Barnet Road,
17/4298/FUL
31/08/2017
45 High Barnet
Barnet, EN5 5FP
Paulston House, 1-3 Totteridge Lane, London, N20 0EX
17/2770/FUL
27/06/2017
197 Totteridge
Total
-1,202
18 Travel and Parking
Policy CS 9 – Providing safe, effective and efficient travel
Indicator
Indicator
Targets
Progress
Number
Development
Delivery of transport infrastructure in
accordance with
382 bus route extended to Millbrook Park in April 2015
and delivery of
Barnet’s IDP including
CS 9A
new bus routes
Rapid Transit Bus Service at Brent Cross Cricklewood
125 bus route extended to in May 2019
See Core Strategy Policy CS 2 for progress on Brent Cross Cricklewood
Barnet’s Local Plan
Page 38
London Borough of Barnet
Authorities Monitoring Report 2017/18
Delivery of step
Step Free Rail and tube stations at Brent Cross Cricklewood
7 tube stations in Barnet have step free access
free access
•
Street to train – Edgware, Finchley Central, Hendon Central, High Barnet
and Woodside Park
•
Street to platform – Golders Green and West Finchley
CS 9B
Funding for Step Free Access at Colindale Station and Mill Hill East Station is to
be secured from contributions from developments in the AAP areas (Section 106
and Barnet CIL) as well as funding from Transport for London (TfL) and other
sources.
See Core Strategy Policy CS 2 for progress on Brent Cross Cricklewood
Impact of School
Seek to reduce
single car use as mode of travel to school.
15.1% average reduction in single household pupil car use when comparing the
Travel Plans on
prior to travel plan implementation survey and the 2017/18 hands up survey.
CS 9C
mode of travel
See Figure 10
usually used
Mode share by
By 2026 increase mode share of cycling to 4.3% of all trips
Mode share remains at 1% (2017/87)
cycling
(Baseline of 1% of all trips in 2007/08-2009/10 )
(LTDS -
Barnet is formulating a Cycling Strategy as part of an overall Transport Strategy
proportion of trips
CS 9D
by London
residents where
trip origin is in
Barnet made by
cycling
Number of
To meet London Plan target of 1 in every 5 new parking
Consents such as Albert Road, 1-3 Station Road and British Newspaper Library
electric car
spaces providing an electrical charging point
have conditions requiring submission of a car parking management plan which
CS 9E
parking spaces
includes parking spaces that have electric vehicle charging points with overall
provision of 20 % active and 20% passive.
Barnet’s Local Plan
Page 39
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 10: Children travelling to school – average modal split – comparison of
baseline data and 2018 data – all schools
45
40
ge 35
ta
n 30
rceep 25
il
p
u 20
p
ge 15
rae 10
Av
5
0
Walk
Scoot
Buggy
Cycle
Rail
Tube
Public
School
Car
Car Share Park and
Bus
Bus
Stride
Baseline
2018 (all schools)
Figure 11: Children travelling to school – mode of travel usually used – car (target v
actual)
40
35
ils 30
p
u
p 25
f
o
20
ge at 15
ercen 10
P
5
0
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
proposed
Target
Actual
Barnet’s Local Plan
Page 40
London Borough of Barnet
Authorities Monitoring Report 2017/18
Policy DM 17 – Travel impact and parking standards
Indicator
Indicator
Targets
Progress
Number
DM 17A
Number of Travel
100% of significant trip generating applications to
There has been a total of 247 Travel Plans that have been provided as part of
Plans provided as
provide a Travel Plan
planning approvals/ conditions/ obligations
part of major
applications
DM 17B
No. of new CPZs
Increased coverage of CPZs in and around
Following public consultation in 2018 revisions and additions have been made
and extensions to
Regeneration and Development areas (baseline of 30
to CPZs in Colindale. These changes were implemented in June 2019
existing CPZs in
CPZs in 2011)
relation to
https://www.barnet.gov.uk/parking/parking-and-traffic-enforcement/controlled-
Regeneration &
parking-zones-cpz/implementation-colindale-and
Development Areas
19 Community Facilities and Health
Policy CS 10 – Enabling Inclusive and Integrated Community Facilities and Uses
Indicator
Indicator
Targets
Progress
Number
CS 10A
Delivery of the
Delivery of community facilities in accordance with Barnet’s IDP
The Infrastructure Delivery Plan (2011) is to be revised to support the
facilities identified in
review of Barnet’s Charging Schedule and the new Local Plan
the Infrastructure
Delivery Plan
CS 10B
New Schools
Number of new schools provided (as set out in accordance with
New or Expanded schools (2017/18) in Barnet:
Provided
Barnet’s IDP)
All Secondary Schools
St Mary’s and St John’s (300 Expansion 2017)
Saracens High (900 New 2018)
St James’ Catholic High (150 Expansion 2018)
Mill Hill (15 Expansion 2018)
Archer Academy (60 Expansion 2018)
Hendon School (40 Expansion 2018)
All Primary Schools
Childs Hill (105 Expansion 2017)
St Agnes RC (105 Expansion 2017)
Barnet’s Local Plan
Page 41
London Borough of Barnet
Authorities Monitoring Report 2017/18
Policy DM 13 – Community and education uses
Indicator
Indicator
Targets
Progress
Number
DM 13A
New primary schools
Increase in primary school places
As of 2017/18 Barnet has 4,494 primary school places. A decrease
provision
of 150 primary school places on 2016/17 total of 4,644 places.
Further detail on schools can be found in CS10B.
20 Improving Health and Wellbeing in Barnet
Policy CS 12 – Making Barnet a safer place
Indicator
Indicator
Targets
Progress
Number
CS 12A
Perceptions that
No decrease in perception that people in the area work together in
The Autumn 2017 Residents Perception Study found that 84% of
people in the area
their communities from baseline of 62% in the 2010/11 Residents
residents agree that people from different backgrounds get on well
work together in their
Perception Study
together
communities
(Residents
Perception Study)
CS 12B
Perceptions of anti-
No decrease in the number of people who feel safe during the day
The Autumn 2017 Residents Perception Study found that 68% of
social behaviour
from baseline of 95% in the 2010/11 Residents Participation Study. residents feel safe after dark
(Residents
Perception Study)
Policy CS 11 – Improving health and well-being in Barnet
Indicator
Indicator
Targets
Progress
Number
CS 11A
Mortality rates from all
Maintain mortality rates from all circulatory diseases below the
In 2017, the mortality rate from all circulatory diseases per 100,000
circulatory diseases
London average
of the population in Barnet was 216.54 compared to 229.81 for
London.
Barnet’s Local Plan
Page 42
London Borough of Barnet
Authorities Monitoring Report 2017/18
21 Environment
Policy CS 13 – Ensuring the efficient use of natural resources
Indicator
Indicator
Targets
Progress
Number
CS 13A
Per capita CO2
For Major Development meet the following targets for CO2
In 2013/14, within the development pipeline there were:
emissions in the
reduction in buildings:
• 431 homes that meet Code Level 3 (23%)
Borough
Residential buildings
• 1288 homes that meet Code Level 4 (68%)
Year Improvement on 2010 Building Regulations
In 2015, changes to the 2008 Climate Change Act meant local authorities could no
2010-2013 25% (code for sustainable homes level 4)
longer require code lever 3,4,5 or 6 as part of the conditions imposed on planning
2013-2016 40%
permissions. Energy requirements for dwellings will instead be set by the Building
2016-2031 Zero carbon
Regulations which will be changed to be the equivalent to code level 4.
Non domestic buildings
Year Improvement on 2010 Building Regulations
Non domestic buildings
2010-2013 25%
667 Watford Way – achieved a 30% reduction on 2010 Building Regulations
2013-2016 40%
through fabric improvements and energy efficient lighting and 100m2 PV panels
2016-2019 as per building regulations
Watling Park Primary School – achieves a 35% reduction on 2013 Building
2019-2031 Zero Carbon
Regulations through fabric improvements and energy efficient lighting and 90m2
PV panels
London Academy Primary – achieves a 40% reduction on 2010 Buildings
Regulations through fabric improvements and energy efficient lighting and 175m2
PV panels
Mill Brook Park School – achieves 34% reduction on 2010 Building Regulations
with fabric, lighting, 200m2 PV panels and future connection to CHP network.
CS 13B
NOx and primary No increase for the annual mean and the hourly mean of
Figures 12 and 13 show air quality information for two locations that has two
PM10 emissions
NOx and the annual mean and daily mean for PM10 above
automatic monitoring sites which monitors nitrous oxides (NO2) and particulates
(LBB Air Quality
2010/11 baseline.
(PM10). These are:
Management
•
Tally Ho Corner in North Finchley at the junction of High Road and Ballards
Area)
Lane
•
Chalgrove School located north of the North Circular Road in Finchley Church
End
For further details on air quality in Barnet see the Air Quality Action Plan – 2017 -
2022
https://www.barnet.gov.uk/sites/default/files/assets/citizenportal/documents/Enviro
nmentalHealth/ScientificServices/AirQualityActionPlan2017consultationdocument.
pdf
Barnet’s Local Plan
Page 43
London Borough of Barnet
Authorities Monitoring Report 2017/18
Figure 12 Monitoring for Nitrogen Dioxide – NO2: Comparison with Annual Mean Objective
80
s
n
70
tio
60
tra
n
50
ce 3) 40
con g/m 30
an
m
e
(
20
m
al
10
u
n
0
An
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Tally Ho Corner, N12
Chalgrove Primary School, Chalgrove Gardens
UK Quality Objective
Figure 13: Monitoring for PM10: Comparison with Annual Mean Objective
60
s
n
50
tio
tra
n
40
ce 3)
30
con g/m
an
(m 20
e
m
10
al
u
n
0
An
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Tally Ho Corner, N12
Chalgrove Primary School, Chalgrove Gardens
UK Quality Objective
Barnet’s Local Plan
Page 44
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 15: Monitoring for Nitrogen Dioxide – NO2: Comparison with Hourly Mean Objective
Number of Exceedances of hourly
Location
mean (200
g/m3)
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Tally Ho Corner
9
15
4
11
33
15
17
5
9
0
0
1
Chalgrove Primary School
1
8
0
0
0
0
0
0
0
0
0
1
Figures in bold show exceedances of the UK air quality objective (20 exceedances of 200 g/m3)
Table 16: Monitoring for PM10: Comparison with Daily Mean Objective
Number of Exceedances of daily mean objective (50
g/m3)
Location
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Tally Ho Corner
12
16
9
7
6
24
7
5
6
6
4
6
Chalgrove Primary School
13
11
4
4
1
14
0
0
0
3
3
4
UK Air Quality Objective is 35 exceedances of daily mean objective (the objective is being achieved)
Policy CS 14 – Dealing with our Waste
Indicator
Indicator
Targets
Progress
Number
CS 14A
Capacity of waste
Targets as set out in North London Waste Plan
Reg 19 consultation - March-April 2019
management facilities
Submission - Summer 2019
both new and existing
Hearing - Autumn 2019
(the North London
Inspector’s Report - Early 2020
Waste Plan will
Adoption - Summer 2020
identify indicators and
targets across all
seven boroughs
which will be reported
in each boroughs
AMR)
Barnet’s Local Plan
Page 45
London Borough of Barnet
Authorities Monitoring Report 2017/18
CS 14B
Residual household
Year on year reduction in kgs of residual household waste per
Residual household waste is waste from household sources which
waste
household from baseline of 717kg for 2010/11 (Corporate Plan – contains materials that have not been separated or sent for recycling,
CPI 4001)
composting or reuse.
The residual waste per household in kgs has fallen to 612.25 kg in
2017/18.
Figure 14 shows a steady decline in the amount of residual waste
produced in Barnet.
Figure 14: Residual waste per household in Barnet 2012/13 to 2017/18
750
(Kg)
ld 700
o
hesuoh 650
r ep
te 600
was
ld
o
he 550
s
u
o
H
500
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
Actual residual waste (Kg per household)
Barnet's target waste (Kg per household)
Policy DM 04 – Environmental considerations for development
Indicator
Indicator
Targets
Progress
Number
DM 04A
Units connected to
Delivery of Decentralised Energy Networks in Brent Cross – Delivery of Combined Heat and Power (CHP) proposed at Brent
decentralised energy
Cricklewood by 2021 and Colindale by 2016
Cross as Part of Phase 1 which was approved in October 2017.
network
Delivery of Colindale wide CHP and district heating system supported
by energy centres at Colindale Hospital and Colindale Gardens.
Colindale Hospital was completed in February 2017. Colindale
Barnet’s Local Plan
Page 46
London Borough of Barnet
Authorities Monitoring Report 2017/18
Gardens is currently under construction having started in Autumn
2017.
DM 04B
Planning permissions
No planning permissions granted contrary to EA advice
3 applications were granted contrary to EA advice.
granted contrary to
EA advice on either
flood defence or
water quality grounds
Policy DM 16 – Biodiversity
Indicator
Indicator
Targets
Progress
Number
DM 16A
Area of land in SINCs
No net loss of area designated as SINC
No Change
Policy CS 15 – Delivering the Core Strategy
Indicator
Indicator
Targets
Progress
Number
CS 15A
Delivery of identified
Delivery of projects in accordance with Barnet’s IDP
The Infrastructure Delivery Plan (2011) is to be revised to support
infrastructure projects
the review of Barnet’s CIL Charging Schedule and the new Local
in the Infrastructure
Plan
Delivery Plan
Barnet’s Local Plan
Page 47
London Borough of Barnet
Authorities Monitoring Report 2017/18
Appendix A – Clarification of Town Centre Frontages (DM Policies)
Clarifications for North Finchley and Temple Fortune town centres are set out below. Changes shown in bold for secondary frontage on High
Road, North Finchley and Temple Fortune Parade.
North Finchley
Temple Fortune
Frontage
Street Name
Building Numbers
Frontage
Street Name
Building Numbers
Halleswelle Parade,
1 to 17 (all)
Lodge Lane
2 to 4 (even)
Finchley Road
Primary
702 to 808 (even),
Frontage
High Road
Temple Fortune Parade
751 to 839 (odd)
11 to 40 (all)
Primary
362 to 382 (even)
Belmont Parade
1 to 8 (all)
Ballards Lane
Frontage
321 to 369 (odd)
1095 to 1117, 1175 to
Grand Arcade
1 to 19 (all)
1201 (odd),
Finchley Road
ADD 672 to 700
788 to 832 (even)
810 to 884 (even)
788a
Secondary
High Road
ADD 711 and 727 to
Clifton Gardens
58
Frontage
749
Finchley Road
746 to 786, 856 (even)
841 to 877 (odd)
1013 to 1093 (odd)
2 to 4 (even)
Ashbourne Parade,
1 to 14 (all)
Nether Street
1 to 7 (odd)
Secondary
Finchley Road
Woodhouse Road
1 to 11, 13 to 17 (odd),
Frontage
Monksville Parade,
1 to 16 (all)
Source: LB Barnet Planning Policy Team - Town Centre Surveys
Finchley Road
Bridge Lane
1 to 3 (odd)
ADD 1 to 3
Temple Fortune Parade
4 to 10 (all)
Barnet’s Local Plan
Page 48
London Borough of Barnet
Authorities Monitoring Report 2017/18
Appendix B – Mill Hill East Area Action Plan
Mill Hill East Area Action Plan
Monitoring Framework
Indicator
Indicator
Targets
Progress 2017/18
Number
MHE-
Housing trajectory
Delivery of 2,000 additional homes by 2016.
559 new homes completed by 2017/18
MF1
MHE-
Housing densities in Achieve varied housing densities across the site from 35dph to 145
Millbrook Park (ref: H/04017/09) mixed use development of 2,174 units approved in
MF2
Barnet
dph, relative to the character area in which the housing is located
September 2011 with net density across the site between 70-85 dph.
and the area’s predominantly suburban character.
Net overall density across the site should be around 85dph
MHE-
Affordable housing
Target provision of 50% affordable housing, including around 70%
Phase 1a and 2 do not contain any affordable housing elements.
MF3
completions
social housing and 30% intermediate provision.
Millbrook Park Phase 1 provides 12 affordable rented units.
Delivery of a minimum of 30% affordable housing provision required Phase 3 will provide 16 affordable rented units and 17 shared ownership units.
if upper target proves unviable.
Phase 3a will provide 10 affordable rent and 4 shared ownership.
Phase 4a will provide 14 shared ownership.
Phase 4b will provide 22 affordable rent and 7 shared ownership.
Phase 4c will provide 9 affordable rent and 3 shared ownership.
In the 2017/18 year 25 affordable units have been provided.
MHE –
Lifetime Homes
Delivery of 100% Lifetime Homes and 10% wheelchair accessible
All new homes in all phases meet 10% wheelchair and 100% lifetimes homes criteria.
MF4
homes.
MHE-
Employment land
Provide for approximately 1 ha of employment land over the AAP
3,470m2 of B1 employment space is being provided as part of the outline planning consent
MF5
supply by type
period.
MHE –
Amount of
Provision of approximately 1,000 m² of retail floorspace and 500 m² H/04017/09 – approved for change of use of former officers’ mess into residential and a GP
MF6
completed retail,
for a GP practice / health centre at the Local
surgery, subject to marketing. H/04541/14 demonstrated no market demand and proposed
service, office and
High Street over the plan period.
the proposed surgery space to be converted into residential.
indoor leisure
17/7662/RMA (Phase 9a) - approved 400m2 retail floorspace
development
Delivery of other employment uses to create 500 jobs through
Officers’ Mess re-use, school and community
H/04386/12 – approved for provision of community facilities and a 3FE primary school
facilities, High Street uses and homeworking over the plan period.
(Millbrook Park) opened September 2014.
15/03305/RMA – approved 2,935m2 B1 light industrial floorspace
15/06417/OUT – approved 700m2 B1 floorspace
Barnet’s Local Plan
Page 49
London Borough of Barnet
Authorities Monitoring Report 2017/18
MHE-
Proximity of
Provision of community facilities centrally.
See Millbrook Park School above
MF7
new housing to
local facilities
MHE-
Renewable
Provision of 0.5ha of land for sustainable infrastructure, such as
District energy centre forms part of the outline consent. Further to outline consent
MF8
energy capacity
Combined Heat and Power, recycling facilities or other related uses (15/06417/OUT) for 630m2 energy centre in Phase 6b which has been completed.
installed by type
by the end of the plan period.
Monitor energy efficiency and renewable energy production against
targets
MHE-
Amount of land
Provision of around 5.5ha of public open space including sports
New public square – Millbrook Plaza – opposite Mill Hill East station
MF9
developed for public pitches and natural areas over the plan period, including:
Provision of LEAPs as part of Ridgemount
open space
Up to four new local public parks:
Retention of woodland to the north of the Green Belt; and Sports
Officers Mess provides 0.68 ha of publicly accessible gardens. Opened in 2013/14.
pitches for primary school / community use.
Central Park opened 2016 and Panoramic Park complete but not open yet.
The primary school will provide 1.5 ha of open space in the form of all-weather pitches
(H/04386/12) (0.75ha) Nb all-weather pitches count for double floorspace so meets
standard. The 3G pitch and porous macadam surface to provide for football, basketball,
netball, mini football and tennis open September 2014.
MHE-
Sustainable
Minimum Level 4 of the Government’s Code for Sustainable Homes Planning conditions require 10% green roofs and 10% grey water recycling across the
MF10
development
for residential development.
Millbrook Park site, solar panels and district heating system including SUDs in line with
Level 6 of the Code for Sustainable Homes by 2016 unless
Guidance from the EA and Thames Water.
otherwise agreed with the Council.
3,000m3 SUDs flood attention located underneath the schools all weather pitches as part of
Commercial and community buildings to achieve BREEAM very
site wide SUDs. Schools also has a 500m3 swale as part of school site. SUDs approved by
good rating.
EA.
Incorporation of SUDS in line with guidance from the EA and
Thames Water.
Development being within a 5 minute walking distance of public
transport.
Review requirements of new legislation and update standards
accordingly.
MHE-
On-site movement
Delivery of the following on site by the end of the plan period:
East-west route completed 2013.
MF11
and transport
A new east-west street across the site linking Bittacy Hill and Frith
Enhance bus services - 382 service now operating from Millbrook Park
Lane, suitable as a bus route;
A local high street running south from the east-west street to Mill
Hill East Underground station, suitable for use as a bus route.
MHE-
Off-site movement
Provision for any necessary off-site highway improvements,
Junction improvements at Bittacy Hill/Frith Lane and Holders Hill Circus
MF12
and transport
including (but not limited to):
Frith Lane / Bittacy Hill
Holders Hill Circus
Barnet’s Local Plan
Page 50
London Borough of Barnet
Authorities Monitoring Report 2017/18
MHE –
Sustainable
By the end of the plan period:
The 382 bus route has been extended with the bus route now operating from Millbrook Park.
MF13
transport
Incorporation of a bus route between Bittacy Hill and Frith Lane will
Step free access at Mill Hill East programmed for 2019/20
be promoted.
Improvements to Mill Hill East Underground station, including DDA
compliant step free access and better interchange with buses
(subject to funding being made available).
Provision of direct and safe walking and cycling routes across the
development and cycle storage facilities.
Homes to be within five minutes walking distance of a public
transport stop.
By end of plan period, an increased use of public transport and a
reduction in car use in comparison with the borough average.
Provision of Travel Plans for development.
Barnet’s Local Plan
Page 51
London Borough of Barnet
Authorities Monitoring Report 2017/18
Appendix C – Colindale Area Action Plan
Colindale Area Action Plan
Monitoring Framework
Indicator
Indicator
Targets
Progress 17/18
Number
Improving
Package 1 in Phases 1 and 2 (2007-2012)
Junction improvement works on Bunns Lane to commence in 2019/20, pending service
connectivity in
Package 2 in Phase 2 (2012-2016)
diversions.
Colindale
Package 3 in Phase 3 (2017-2021)
Agree Colindale Station development works with Transport for London
3A
Walking and Cycling
Joined up network of attractive, direct and safe pedestrian routes
The transportation team have submitted a liveable neighbourhood bid to TFL for walking
broadly in accordance with Figure 3.5.
and cycling routes in Colindale. This was unsuccessful and there has been no
Joined up network of attractive, direct and safe cycle routes broadly
resubmission.
in accordance with Figure 3.6.
Heybourne Park has been delayed and will be resubmitted as part of a new planning
3B
Cycle parking at key destinations.
application – the original principles will apply.
Cycle storage in all new developments.
Progressive mode shift for cycling and walking.
Bus routes
New and improved bus routes and greater frequency of buses
Extension to the 125 bus route operational in 2019. Service runs between Colindale
broadly in accordance with Figure 3.7. Increased bus use in
Station and Winchmore Hill
3C
Colindale.
Public transport
New public transport interchange, incorporating facilities identified in
Colindale Station:
interchange
Policy 3.4, by end of Phase 2.
• Step Free Access at Colindale Station to be secured as part of a new station. Agree
Colindale Station development works with Transport for London
3D
• The Colindale Station SPD was adopted February 2019
• The new station will be completed by 2022
Parking
Maximum provision of 1 space per unit, minimum provision of 0.7
General Parking Provision: 0.7 spaces per unit approved in Colindale Hospital and Brent
space per unit.
Works and Grahame Park Phase 1B developments and Colindale Hospital Phase 2 sites.
Zenith House: provision for 218 parking spaces approved in 2011
Remaining Phases at Beaufort Park: Parking Ratio was lowered to 0.7. Agreement was
3E
reached to vary the ratio (if necessary) between existing parameters of 0.6 to 0.9 subject
to his being justified by future parking survey
Peel Centre: Parking ratio approved of 0.7 spaces per unit
British Library - Parking ratio approved of 0.7 spaces per unit
New CPZ implemented in June 2019 .
Barnet’s Local Plan
Page 52
London Borough of Barnet
Authorities Monitoring Report 2017/18
Travel Plans
Travel plans and Transport assessments submitted as part of
Potential for a Colindale transport strategy which will pull together transport needs of
planning applications.
development in Colindale, both old and new including review of all the Travel Plans
agreed to date to improve access, permeability and transport integration across the
3F
regeneration area.
Building for Life
Score of 16 or above for each development to provide high quality
All schemes designed using the Building for Life (BFL) criteria as a guide.
5A
Criteria
homes within a high quality sustainable environment
Lifetime Homes
Delivery of 100% Lifetime Homes and 10% wheelchair accessible
Colindale Hospital conditioned to meet Lifetime Homes. All units designed to meet these
homes
standards. 714 lifetime homes meet the criteria.
Brent Works will also meet Lifetime Homes standards.
5B
Grahame Park Phase 1B designed to Lifetime Homes standards. 260 lifetime homes, 45
wheelchair accessible home
All new developments being designed around Lifetime homes requirements eg Peel centre
stage 1 demonstrates 100% compliance with Lifetime homes and will deliver 13%
wheelchair housing.
Densities
Densities not to exceed 200 dw/ha in Edgware Road Corridor of
Edgware Road Corridor of Change
Change
Green Point (H/04595/10) – 86 units 228 dw/ha
Former National Grid/Kidstop Site (W00084AE/06) – 84 units 162 dw/ha
Densities not to exceed 150 dw/ha in Colindale Avenue Corridor of
Zenith House (H/04167/10) - 309 units 300 dw/ha
Change
Colindale Avenue Corridor of Change
Densities not to exceed 120-150 dw/ha in Aerodrome Road
Colindale Hospital (H/00342/09) – 714 units 200 dw/ha
Corridor of Change
British Library (H/05856/13) – 395 units 329 dw/ha
5C
Brent Works (H/02576/09) – 104 units 167 dw/ha
Densities not to exceed 100-120 dw/ha in Grahame Park Way
Peel Centre (H/04753/14) – 2900 units 182 dw/ha
Corridor of Change
Aerodrome Road Corridor of Change
Beaufort Park (W/00198/AA/04) – 2800 units 280 dw/ha
Grahame Park Way Corridor of Change
Grahame Park Estate (W/01731JS/04) – 2977 units 88dw/ha
Barnet College (H/03551/14) – 396 units 76 dw/ha
New public piazza
New hard-landscaped public piazzas both sides of Colindale
To accommodate increased passenger capacity and step-free access and s106
and transport
Avenue within Phase 2 (2012-2016) of development.
requirements a new Colindale station needs to be in place by 2022. Approval for a new
interchange
station as part of a wider station mixed use redevelopment was given in July 2019
5D
Aerodrome Park
Aerodrome Park – new exemplary designed local park of
To be delivered across development stages 1, 2 and 3 of Colindale Gardens scheme.
approximately 5ha with new recreation, leisure and youth facilities
Total area of 5.4039Ha of public open space arranged through a variety of public open
5E
on Peel Centre delivered in Phase 3 (2017-2021)
spaces from piazza to public square to linear park to the largest space, a local ‘Peel Park’
at 2Ha all arranged along a central avenue.
Barnet’s Local Plan
Page 53
London Borough of Barnet
Authorities Monitoring Report 2017/18
Improvements to
Improvements to Montrose Park in Phases 1 and 2 (2007-2011 and
Planning permission achieved in September 2017 for improvements to Montrose and
Montrose Park
2012-2016) including new youth and sports facilities and new and
silkstream parks. Currently working with the EA to develop flood attenuation schemes to
improved pedestrian and cycle links. Regular maintenance of
deal with local flooding and improved river corridor. Youth zone is being commissioned
Montrose Park.
separately with aim to open in 2018.
5F
Colindale Open Spaces Strategy published August 2013 to consider requirements for new
open space and related facilities connected with development of Grahame Park and the
Peel Centre. Details to be reflected in Infrastructure Delivery Plan.
Improved
This will be monitored through statutory consultations with the
Increased range of environments (including wetlands and meadows) with opportunities for
biodiversity and
Environment Agency associated with planning applications in the
biodiversity as part of newly landscaped Heybourne Park (formerly known as Grahame
access to Silk
AAP area.
Park Open Space) opened in June 2011. Heybourne park phase 2 stage 2 designs
Stream
approved. Working through to planning application in 2018
Colindale Hospital development includes green walls, gabion (soil retention) walls, brown
and green roofs as well as 209 new trees to replace 111 existing trees and native shrub
planting to encourage invertebrates.
5G
Silkstream and Montrose park are being treated as one project – see 5F above.
Peel park in the Peel centre scheme to include hedgerow planting and flower rich
grassland. Green streets also proposed with a shared surface with street tree planting,
seating and cycle parking. The landscape masterplan proposes to strengthen the Silk
Stream
corridor and provide a new mosaic of habitats and opportunities for wildlife movement,
including green/brown roofs, hedges, flowering lawns, new tree planting, swales, minimum
lighting design.
Children’s play
Delivery of 10 square metres of well designed play and recreation
Play areas incorporated into Colindale Hospital and Grahame Park developments.
space
space for every child.
Colindale Hospital development has provided three locally equipped areas of play within
three courtyards, totalling 180m2. A 400m2 local area of play will be located within south
west corner of development.
Peel Centre is required to provide 8495.8m2 of playspace and the scheme demonstrates
a provision of 10,586m2 with components spread across the site and located at ground
5H
level and in podium amenity space of blocks.
British Library scheme will provide 3,933 m2 of communal open space, which ensures
opportunities for doorstep play, and the scheme is less than 100m from existing playspace
in Colindale Park.
Barnet College site Grahame Park way to provide 1300m2 central green space with
240m2 conditioned to provide 0-4 year old playspace. Noted that scheme also provides
2,200m2 private amenity space for family housing.
Barnet’s Local Plan
Page 54
London Borough of Barnet
Authorities Monitoring Report 2017/18
Energy hierarchy
Meet criteria set out in the London Plan
Colindale Hospital includes a single Energy Centre in accordance with London Plan
requirements for renewable energy. The Energy Centre is located at end of Block A and
uses a Combined Heat and Power (CHP) facility to generate heat and electricity on site.
6A
This is to be distributed around the development through a community district heat and
power network operated by energy company EON.
Energy masterplan to be published in May 2014
CHP and district-
Energy Centres on the Peel Centre West and Colindale Hospital
Energy Centre at Colindale Hospital completed September 2011 and operational serving
heating
sites within Phase 2 (2012-2016)
1,067 homes and the 319 student units (527 bed), 55 room apart hotel and commercial
system
All development to be able to link in to and support Colindale-wide
units.
CHP and district-heating system
Tunnelling works completed September 2011 to connect Brent Works development to
Energy Centre.
British Newspaper library site plans to connect to and serve the Colindale Community
Energy System Centre approved, site due for completion 2018.
126 Colindale Avenue (former Colindale Business Centre) will connect to the Colindale
6B
Community Energy System
Barnet College Grahame Park Way site to install a site heat network connecting all the
apartment blocks but not the housing. This would be served from a single energy centre,
located in B1. A condition is imposed to require details of the energy network provision to
be submitted and approved. It is also considered necessary to impose a condition
requiring the infrastructure to be put in place to enable a future connection to the Colindale
District Heating Network.
Peel Centre scheme to be served by a single energy centre in block H which will have
capability for future connection to area wide networks in Colindale .
Code for
Residential development to achieve a minimum of Level 4 as set
Due to viability Code 3 attached to residential development at Colindale Hospital and Brent
Sustainable
out in the Code for Sustainable Homes, (subject to development
Works. Colindale Hospital phase 2 and 3 will achieve Code 4.
Homes
viability) and thereafter will keep pace with the government’s
timetable for development
All residential units in Grahame Park Phase 1B to meet Code 3 plus. Potential to meet
Commercial and community buildings required to achieve a
Code 4 once detailed design stage is reached.
BREEAM Excellent rating
British Newspaper Library and Barnet College sites will achieve Code Level 4.
6C
BREEAM rating for commercial units dependant on fit out. Therefore BREEAM Excellent
not achievable at planning stage for commercial units in Grahame Park Phase 1B due to
unknown tenants.
Barnet College building being designed to BREEAM excellent.
Peel Centre CSH no longer applies following government withdrawal after Housing
technical standards review.
Barnet’s Local Plan
Page 55
London Borough of Barnet
Authorities Monitoring Report 2017/18
Flood risk
Flood Risk Assessment (FRA) submitted with planning application
Environment Agency has approved FRAs for Brent Works, Colindale Hospital Phase 1, 2
and 3 and Grahame Park Phase 1B.
6D
Neither Peel Centre, British libraries or Barnet College Grahame Park Way were objected
to by the Environment Agency.
Surface water run
SUDS incorporated in all development. Planning conditions or S106
Conditions applied to Colindale Hospital and Brent Works in accordance with FRA.
off
agreement relating to maintenance of SUDS.
Colindale Hospital Phase 2 to attenuate run off to green field rates.
Heybourne Park includes SUDS as part of new landscaping.
Southern Square and Southern Park in Grahame Park Phase 1B designed to include
SUDS as part of landscaping.
Peel Centre - a Surface Water Drainage Strategy has been prepared to handle water
through attenuation measures proposed within the site boundary and will accommodate 1
in 100 year flood events. Discharge to the Silk Stream and Thames Water surface runoff
sewers will therefore be limited.
6E
British Library to incorporate SUDS - Permeable paving in private parking areas and non-
adopted highways, providing attenuation;
• Void system beneath the permeable paving in the podium deck areas to provide
attenuation and improve water quality, integrated with the irrigation system;
• Attenuation tanks below private road and parking areas to attenuate uncontaminated run-
off from roof areas and to provide attenuation from road areas.
Barnet College Grahame Park Way scheme will reduce surface water discharge rate from
the site to 18.8 litres per second for all events up to and including a 1 in 100 year plus
climate change event. This is an improvement on existing discharge. Scheme proposing
same solutions as British Library.
Waste management
Household waste and recycling facility (HWRF) on the land
HWRF no longer required by NLWA, light industrial units constructed on this site -
between the railway lines.
Propeller Way – see 7e below.
Waste and recycling storage facilities in all developments in
6F
accordance with the Council’s guidance (‘Information for
Conditions applied to Brent Works and Colindale Hospital, Peel Centre, Barnet College
Developers and Architects – provision of domestic and organic
Grahame Park Way and British Libraries with regard to waste and recycling facilities
waste collection services, and recycling facilities’)
Housing delivery
3185 units by 2011
Since adoption of the Area Action Plan in 2010, some 6,000 new homes have been
7a
7601 units by 2016
completed. .
9806 units by 2021
Affordable housing
Target of 50% affordable housing; 70% social housing, 30%
See Table 8A for affordable housing completions
intermediate (though with the potential of 60% social housing and
7b
40% intermediate).
Barnet’s Local Plan
Page 56
London Borough of Barnet
Authorities Monitoring Report 2017/18
Health facilities
Health facilities in Colindale Avenue Corridor of Change and
Options Appraisal study was completed in 2015 to understand impact that regeneration
Grahame Park Estate
and the resulting population growth will have on health services in the Colindale area. The
study supported two locations that were identified in the Colindale Area Action Plan for
future health centres: (1) Grahame Park; (2) Former Peel Centre site (also known as
7c
Central Colindale).
Central Colindale Health Centre expected to be available from 2023
Grahame Park Community Hub expected to be available from 2022
Plot 9 Health Centre expected to be available from 2020.
Retail facilities
Around 5,000 m2 excluding community facilities provided within
Demolition of Station House completed October 2011 to enable construction of new piazza
Colindale Avenue Corridor of Change in Phase 2 (2012-2016).
and construction of 374 bed aparthotel together with a 310 m2 bar-club / restaurant (Use
Class A3/A4), a gym (Use Class D2) and four commercial units on the ground floor
totalling 797m2 for uses within classes A1 or A3 of the Use Classes Order.
Aparthotel/student accommodation on site and almost complete as of September 2016
Planning permission granted for conversion of health centre within Colindale Hospital
development to provide commercial floorspace on ground floor (Use classes A2, A3, B1).
No retail included in Phase 2 Colindale Hospital.
7d
Grahame Park phase 1B includes supermarket with floorspace limited to 1,395 m2. Total
retail floorspace not to exceed 7,564 m2.
Beaufort Park blocks C1-2 to deliver 1,183m2 A1-A5, B1 and D1 floorspace.
Beaufort Park blocks C3 – C5 to deliver 798 m2 of A1-5/B1 floorspace.
British Library to provide 772m2 commercial space and 112 D1 space.
Peel Centre to provide up to 10,000 square metres of floorspace for a range of town centre
uses (Class A1-A4, D1 and D2) including 3,000m2 foodstore. In Stage 1 there will be 171
m2 of non resi (Class A1-A4, D1 and D2).
Job delivery
Provide for jobs broadly in accordance with Figure 7.6.
Propeller Way (Land Between Railways South Side Of Aerodrome Road) – completed and
occupied 996 m2 of B1 / B2 industrial accommodation across 8 individual units leased by
Network Rail. Units created 16 jobs.
7e
Merit House refurbishment of offices to be used by call centre with 600 existing jobs and
target to create 1,400 new local jobs
Primary schools
New/relocated primary school on Barnet College site within Phase
Council secured former Mill Hill Sports Club site to deliver 4, form entry primary school to
2 of the AAP (2011-2016)
meet demand in the area, planning permission granted summer 2012 and Orion Primary
New primary school on Peel Centre East site (if required) within
school opened Spring 2014.
Phase 3 of the AAP (2016-2021)
Former Orion School will be occupied by expanded Blessed Dominic Primary in Lanacre
7f
Avenue.
Ongoing discussions about primary school plot on Barnet College site.
Peel Centre consent included 3FE primary school in outline approved at July 2015
committee.
Barnet’s Local Plan
Page 57
London Borough of Barnet
Authorities Monitoring Report 2017/18
Barnet College
Barnet College relocated to Colindale Hospital Site within Phase 2
July 2014 consent amended previous consent to provide 5,536m2 college, 500m2 public
relocation
of the AAP (2012-2016)
library and 500m2 centre for independent living (all Use Class D1) on Plot A8 on Lanacre
Avenue. This amended the February 2012 reserved matters application. The Colindale
Hospital site was developed for residential owing to delays in the College’s disposal of
their Grahame Park Way site, which the College confirmed in 2013. Plot A8 is 350m from
Colindale tube so is also considered a sustainable location for the college to move to and
has recently opened in July 2016 with the relocation being complete in September 2016.
Middlesex
New student village for Middlesex University in Aerodrome Road
Middlesex University are exploring plans for developing their Platt Hall site for additional
University student
Corridor of Change within Phase 2 (2012-2016)
student accommodation
housing
Barnet’s Local Plan
Page 58
London Borough of Barnet
Authorities Monitoring Report 2017/18
Appendix D – Barnet Housing Trajectory Detail
Table 1: Barnet trajectory summary
2000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Past Com pletions
Majors
1240
250
610
1510
970
770
1010
1010
960
1070
810
1080
1147
786
1243
1426
1881
2000
Projected
Com pletions Majors
1956
3209
2433
3760
5103
3501
2591
2307
1215
1072
1225
1356
1669
1340
802
Past Com pletions
Minors
24
139
194
256
336
463
319
408
421
426
329
389
262
295
221
309
346
360
Projected
Com pletions
Minors
336
336
336
336
336
336
336
336
336
336
336
336
336
336
336
All Past
Com pletions
1264
389
804
1766
1306
1233
1329
1418
1381
1496
1139
1469
1409
1081
1464
1735
2227
2360
All Projected
Com pletions
2292
3545
2769
4096
5439
3837
2927
2643
1551
1408
1561
1692
2005
1676
1138
Total Com pletions
1264
389
804
1766
1306
1233
1329
1418
1381
1496
1139
1469
1409
1081
1464
1735
2227
2360
2292
3545
2769
4096
5439
3837
2927
2643
1551
1408
1561
1692
2005
1676
1138
Barnet’s Local Plan
Page 59
London Borough of Barnet
Authorities Monitoring Report 2017/18
Table 2: Barnet trajectory 2016 (sorted by ward)
Year
Strategic
2032
Eastin
Northin
Added to
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Status
Site Address
Ward
Source
Source Reference
Spatial
-
g
g
Trajector
-19
-20
-21
-22
-23
-24
-25
-26
-27
-28
-29
-30
-31
-32
Distribution
2033
y
Watling Avenue carpark &
TOWN
NO PLANNING
Burnt Oak
ALLOCATION
Call for sites / udp site
Market
CENTRE
129
100
104 Brunswick Park Road
Brunswick
52834
11
COMPLETED
193504
CONSENT
15/06397/FUL
GENERAL
2015/16
London N11 1EZ
Park
1
UNDER
Sir Thomas Lipton Memorial
30
Brunswick
52902
CONSTRUCTIO
Hospital, 151 Chase Side, N14
194545
CONSENT
16/7101/FUL
GENERAL
2017/18
Park
6
N
5HE
200
200
200
200
200
Awaiting
decision from
2015 /16
Brunswick
52803
Core Strategy and
Secretary of
North London Business Park
193517
ALLOCATION
GENERAL
planning
Park
0
Planning Brief
State on
brief
planning appeal
APP/N5090/W/15/31320
PRIORITY
-21
58
74
52465
CONSENT
Granville Road
Childs Hill
186914
CONSENT
49
HOUSING
-
6
F/04474/14
ESTATE
UNDER
122
112-132 Cricklewood Lane,
52423
CONSTRUCTIO
Childs Hill
186043
CONSENT
16/0601/FUL
GENERAL
2016/17
NW2 2DP
5
N
UNDER
13
The Castle 452 Finchley Road,
52508
CONSTRUCTIO
Childs Hill
186445
CONSENT
16/1974/FUL
GENERAL
2016/17
NW11 8DG
4
N
130 - 134 Granville Road,
52472
11
COMPLETED
Childs Hill
186822
CONSENT
17/2084/FUL
GENERAL
2017/18
NW2 2LD
0
52395
PRIOR
14
CONSENT
220 The Vale, NW11 8SR
Childs Hill
186425
17/2690/PNO
GENERAL
2017/18
9
APPROVAL
First & Second Floor, Britannia
18
52382
PRIOR
TOWN
CONSENT
Business Centre, Cricklewood
Childs Hill
185795
17/0121/PNO
2013/14
0
APPROVAL
CENTRE
Lane, NW2 1DZ
UNDER
35
Church Walk House, Church
52495
CONSTRUCTIO
Childs Hill
186257
CONSENT
15/05969/FUL
GENERAL
2017/18
Walk, NW2 2TJ
9
N
106-108 Hodford Road NW11
52509
TOWN
15
COMPLETED
Childs Hill
187385
CONSENT
16/1376/FUL
2017/18
8EG
3
CENTRE
Tower Service Station 617
28
CONSENT
52506
Finchley Road London NW3
Childs Hill
186019
CONSENT
16/5296/FUL
GENERAL
2017/18
SUBJECT S106
4
7BS
CONSENT
194 - 196 Cricklewood
52376
TOWN
96
Childs Hill
185820
CONSENT
17/0233/FUL
2017/18
SUBJECT S106
Broadway, NW2 3EB
1
CENTRE
46
NON
UNDER
114 - 120 West Heath Road,
52536
CONVENTION
CONSTRUCTIO
Childs Hill
186799
16/5993/FUL
GENERAL
2017/18
NW3 7TX
8
AL SUPPLY
N
CONSENT
APP/N5090/W/16/31586
40
41
Imperial House, the Hyde,
52059
REGENERATIO
CONSENT
Colindale
189944
CONSENT
45
2014/15
NW9 5AL
1
N AREA
15/04442/FUL
Mcdonalds Site, 157 Colindeep
52097
REGENERATIO
175
ALLOCATION
Colindale
189463
ALLOCATION
Colindale AAP
2010
Lane
9
N AREA
Burger King / Eyeland Site
52072
REGENERATIO
162
ALLOCATION
Colindale
189756
ALLOCATION
Colindale AAP
2010
NW9 5EB
5
N AREA
Peel centre Development
52180
Colindale AAP
REGENERATIO
199
300
250
340
300
270
290
CONSENT
Colindale
189735
CONSENT
2010
Stage 2 and 3
6
H/04753/14
N AREA
UNDER
310
351
Peel Centre Development
52180
Colindale AAP
REGENERATIO
CONSTRUCTIO
Colindale
189735
CONSENT
2010
Stage 1
6
H/04753/14
N AREA
N
35
Colindale AAP
126 Colindale Avenue (former
52122
H/05833/14
REGENERATIO
CONSENT
Colindale business centre),
Colindale
189787
CONSENT
2010
5
17/6829/PNO
N AREA
NW9 5HD
18/2026/PNO
Barnet’s Local Plan
Page 60
London Borough of Barnet
Authorities Monitoring Report 2017/18
52282
REGENERATIO
90
100
ALLOCATION
Middlesex University Halls
Colindale
189360
ALLOCATION
Colindale AAP
2010
3
N AREA
Merit House, Edgware Road,
52071
REGENERATIO
85
95
ALLOCATION
Colindale
189804
ALLOCATION
Colindale AAP
2010
NW9 5AB
2
N AREA
UNDER
102
96
101
Trinity Square' Barnet College,
52182
Colindale AAP
REGENERATIO
CONSTRUCTIO
Colindale
190886
CONSENT
2010
Grahame Park Way
5
H/03551/14
N AREA
N
Colindale Hospital - Former
42
NHSBT expansion site with
52109
Colindale AAP
REGENERATIO
COMPLETED
Colindale
190013
CONSENT
2010
Birch, Willow Courts & Elysian
5
H/04541/11 H/00093/13
N AREA
House
PRIORITY
500
500
500
500
Grahame Park Phase 1 (Plots
HOUSING
10, 11 and 12) Phase 2 (Plots
52162
Grahame Park SPD
NO PLANNING
Colindale
190185
ALLOCATION
ESTATE
-
13, 14, 15 and 16) and Phase
6
W01731JS/04
REGENERATIO
3 (Plots 17, 18, 19, 20 and 21)
N AREA
UNDER
Beaufort Park REMAINING
H/00146/12
187
177
52386
REGENERATIO
CONSTRUCTIO
Phases (Blocks C7 C8 C9 and
Colindale
194391
CONSENT
H/04184/14
-
0
N AREA
N
C10)
16/3652/NMA
Beaufort Park REMAINING
52205
REGENERATIO
189
190
CONSENT
Colindale
189847
CONSENT
H/02713/09
-
Phases (Blocks D1-D7)
7
N AREA
UNDER
191
182
Beaufort Park REMAINING
52205
REGENERATIO
CONSTRUCTIO
Colindale
189847
CONSENT
H/04672/14
-
Phases (Blocks F1, F2, F8, F9)
7
N AREA
N
UNDER
THE RUSHGROVES'
193
193
52160
CONSTRUCTIO
Homebase, Rookery Way,
Colindale
188746
CONSENT
H/05828/14
GENERAL
2015/16
4
N
London, NW9 6SS
Kwik Fit - The Hyde (adj
52077
REGENERATIO
30
30
ALLOCATION
Colindale
189672
ALLOCATION
Colindale AAP
-
Kidstop)
7
N AREA
Hyde House, Rushgrove
52148
PRIOR
40
CONSENT
Colindale
188800
H/05915/14
GENERAL
2014/15
Avenue, London, NW9 6LH
6
APPROVAL
Land Behind Sheaveshill
52109
34
CONSENT
Colindale
189311
CONSENT
16/6222/FUL
GENERAL
2017/18
Court, The Hyde, NW9 6SJ
4
Colindale Telephone
200
200
105
CONSENT
52163
17/5534/PNO
Exchange The Hyde, NW9
Colindale
188697
CONSENT
GENERAL
2018/19
SUBJECT S106
3
18/0352/FUL
6LB
150
153
Colindale Station Colindale
52130
19/0859/OUT
CONSENT
Colindale
189957
CONSENT
GENERAL
2019/20
Avenue NW9 5HR
8
Colindale Station SPD
Douglas Bader Park Estate,
52147
200
200
200
NO PLANNING
Colindale
191093
ALLOCATION
Regeneration Report
GENERAL
-
Clayton Field, NW9 5SE
4
Land Adjacent To 114
12
Coppetts Road And To The
Rear Of 102-114 Coppetts
52800
CONSENT
Road, And Land Between
Coppetts
190932
CONSENT
15/06412/FUL
GENERAL
-
2
Coppetts Wood Primary
School And Allotment Gardens
London N10 1JS
55
55
45-69 East Barnet Rd, EN4
East
52663
New Barnet Town
NO PLANNING
196141
ALLOCATION
GENERAL
-
8RN
Barnet
1
Centre Strategy
Land Adjacent To 106 -128
12
East
52755
CONSENT
Mount Pleasant And 27-37
196466
CONSENT
16/3262/FUL
GENERAL
2017/18
Barnet
3
Langford Road, EN4 9HG
East
52664
PRIOR
16
COMPLETED
30 Lancaster Road, EN4 8AP
195766
17/1122/PNO
GENERAL
2017/18
Barnet
9
APPROVAL
Woodgate House and Studio
East
52776
PRIOR
12
CONSENT
196716
18/3675/PNO
GENERAL
-
Games Road EN5 9HN
Barnet
8
APPROVAL
25
Fayer's Building Yard &
East
52675
New Barnet Town
NO PLANNING
196086
ALLOCATION
GENERAL
-
Church EN4 9NR
Barnet
8
Centre Strategy
100
100
East
52660
New Barnet Town
TOWN
NO PLANNING
Sainsbury's, East Barnet Road
196098
ALLOCATION
2013/14
Barnet
3
Centre Strategy
CENTRE
CONSENT
Gateway - The Former East
East
52651
91
196217
CONSENT
16/7601/FUL
GENERAL
2017/18
SUBJECT S106
Barnet Gas Works
Barnet
2
Barnet’s Local Plan
Page 61
London Borough of Barnet
Authorities Monitoring Report 2017/18
UNDER
150
153
Victoria Quarter - The Former
East
52647
CONSTRUCTIO
196498
CONSENT
B/04834/14
GENERAL
2013/14
East Barnet Gas Works
Barnet
7
N
16
NON
East
52638
CONVENTION
COMPLETED
41 Wilmot Close, N2 8HP
190384
F/02952/13
GENERAL
-
Finchley
7
AL SUPPLY
CONSENT
UNDER
21
East
52731
TOWN
CONSTRUCTIO
12 - 18 High Road, N2 9PJ
189211
CONSENT
16/2351/FUL
2017/18
Finchley
9
CENTRE
N
Land At Broadfields Primary
50
62
51958
CONSENT
School Roseberry Drive,
Edgware
193723
CONSENT
15/03137/FUL
GENERAL
2016/17
4
Edgware, HA8 8JP
Premier Place, 102-124
60
62
51939
TOWN
CONSENT
Station Road And Car Park To
Edgware
191764
CONSENT
16/0112/FUL
2016/17
1
CENTRE
Rear, HA8 7BJ
Berkeley House, 18 - 24 High
51941
PRIOR
TOWN
44
COMPLETED
Edgware
191439
16/6157/PNO
2017/18
Street, HA8 7RP
3
APPROVAL
CENTRE
463
463
463
463
463
Edgware Underground & Bus
51949
Edgware Town Centre
TOWN
NO PLANNING
Edgware
191921
ALLOCATION
-
Stations, HA8 7AW
8
Strategy
CENTRE
476
476
476
476
476
51931
Edgware Town Centre
TOWN
NO PLANNING
Edgware Forumside
Edgware
191619
ALLOCATION
2013/14
1
Strategy
CENTRE
Land at the Rectory, Rectory
51941
51
CONSENT
Edgware
192111
CONSENT
18/2839/FUL
GENERAL
2019/20
Lane, HA8 7LG
6
51903
20
CONSENT
186 High Street, HA8 7EX
Edgware
191950
CONSENT
18/4685/FUL
GENERAL
2019/20
5
Finchley
65
65
298 - 304 Regents Park Road,
52504
PRIOR
TOWN
CONSENT
Church
190442
17/0047/PNO
2017/18
N3 2SZ
7
APPROVAL
CENTRE
End
Dove House, Gadd House And
Finchley
88
52512
PRIOR
TOWN
CONSENT
Cooper House, Arcadia
Church
190496
16/3417/PNO
2017/18
1
APPROVAL
CENTRE
Avenue, N3 2JU
End
Finchley
12
52514
PRIOR
CONSENT
2A Lichfield Grove N3 2JP
Church
190564
18/4463/PNO
GENERAL
-
6
APPROVAL
End
Finchley
43
44
Land West of Beechwood
52523
CONSENT
Church
189495
CONSENT
18/6355/FUL
GENERAL
2018/19
Avenue N3 3BA
1
End
48
NON
UNDER
Hammerson House 50A The
Garden
52676
CONVENTION
CONSTRUCTIO
Bishops Avenue London N2
188120
16/0852/FUL
GENERAL
2016/17
Suburb
3
AL SUPPLY
N
0BE
CONSENT
Arden Court, 53, The Bishops
Garden
52688
38
CONSENT
188079
CONSENT
F/04857/14
GENERAL
2017/18
Avenue, N2 0AZ
Suburb
7
Harrison Varma House, 98
Garden
52737
PRIOR
10
CONSENT
189007
16/7819/PNO
GENERAL
2017/18
Great North Road, N2 0NL
Suburb
1
APPROVAL
94-96 Great North Road N2
Garden
52739
PRIOR
16
CONSENT
188994
17/2738/PNO
GENERAL
-
0NL
Suburb
2
APPROVAL
290-294 Golders Green Road,
Golders
52417
60
CONSENT
188326
CONSENT
16/3806/FUL
GENERAL
-
NW11 9PY
Green
7
Parcelforce, Geron way /
Golders
52323
REGENERATIO
230
COMPLETED
186616
CONSENT
F/01932/11
-
Edgware rd, NW2
Green
1
N AREA
Golders
52345
REGENERATIO
292
352
525
439
758
392
650
796
964
699
802
CONSENT
Brent Cross Cricklewood
186817
CONSENT
C/17559/08
-
Green
0
N AREA
Brent Cross Cricklewood -
Golders
52345
REGENERATIO
52
186817
CONSENT
17/2963/RMA
2017/18
Phase 1B North
Green
0
N AREA
Brent Cross Cricklewood - land
Golders
52345
REGENERATIO
47
CONSENT
186817
CONSENT
15/00720/RMA
2015/16
off Brent Terrace
Green
0
N AREA
Yamor House 285 Golders
Golders
52402
16
CONSENT
188367
CONSENT
16/5062/FUL
GENERAL
2016/17
Green Road NW11 9JE
Green
1
Barnet’s Local Plan
Page 62
London Borough of Barnet
Authorities Monitoring Report 2017/18
10
NON
279 Golders Green Road
Golders
52408
CONVENTION
COMPLETED
188338
16/5589/FUL
GENERAL
2016/17
London NW11 9JJ
Green
5
AL SUPPLY
CONSENT
1-5 Princes Parade, Golders
29
CONSENT
Golders
52415
Green Road and 1-3 Heather
188253
CONSENT
18/2492/FUL
GENERAL
2018/19
SUBJECT S106
Green
9
Gardens NW11 9HS
Land Adjacent Northway And
60
60
Fairway Primary School The
52078
CONSENT
Hale
193503
CONSENT
15/03138/FUL
GENERAL
2016/17
Fairway Mill Hill London NW7
3
3HS
Spectrum House, Hillview
52386
17/6496/FUL
33
CONSENT
Hendon
189167
CONSENT
GENERAL
2014/15
Gardens, London, NW4 2JQ
9
17/2261/FUL
-16
Ella And Ridley Jacob House
NON
And Sam Beckman Centre 19 -
52303
CONVENTION
TOWN
COMPLETED
Hendon
189358
15/04738/FUL
2016/17
25 Church Road And 29
2
AL SUPPLY
CENTRE
Babington Road
CONSENT
NORTH WEST FOUR' Former
18
Tenby Mansions Site And 186
52332
TOWN
COMPLETED
Hendon
189310
CONSENT
17/0641/FUL
2017/18
- 192 Brent Street, London,
7
CENTRE
NW4 1BE
Upper and Lower Fosters
52333
NO PLANNING
Hendon
188981
ARG
Regeneration Strategy
GENERAL
2018/19
Estate
5
77
70
70
Westhorpe Gardens and Mills
52350
CONSENT
Hendon
189659
CONSENT
18/7495/FUL
GENERAL
2019/20
Grove NW4 2TU
4
79
70
Elmbank Barnet Road Barnet
High
52331
64
COMPLETED
196251
CONSENT
15/03343/FUL
GENERAL
2015/16
EN5 3HD
Barnet
0
Land At 1-7 Moxon Street And
12
At 44 Tapster Street Including
Land To The Rear Of 1-11
High
52456
CONSENT
196557
CONSENT
15/06410/FUL
GENERAL
2016/17
Moxon Street And Opposite
Barnet
7
The Old Printworks Barnet
EN5 5TY
Brake Shear House 164 High
High
52455
TOWN
40
CONSENT
196742
CONSENT
16/2466/FUL
2016/17
Street Barnet EN5 5XP
Barnet
3
CENTRE
High
52458
TOWN
10
CONSENT
74 - 78 High Street, EN5 5SN
196492
CONSENT
17/1241/FUL
2017/18
Barnet
7
CENTRE
100
93
High
52441
Chipping Barnet town
TOWN
NO PLANNING
Army Reserve Depot
196874
ALLOCATION
2013/14
Barnet
6
centre strategy
CENTRE
Moxon Street Garage, EN5
High
52458
10
CONSENT
196521
CONSENT
18/1337/FUL
GENERAL
2019/20
5TY
Barnet
2
Mill Hill East (Millbrook Park)
52420
REGENERATIO
100
100
100
55
CONSENT
Mill Hill
191779
CONSENT
Mill Hill AAP
-
Phase 9
2
N AREA
Mill Hill East (Millbrook Park)
52420
REGENERATIO
30
80
CONSENT
Mill Hill
191779
CONSENT
Mill Hill AAP
-
Phase 10
2
N AREA
Mill Hill East (Millbrook Park)
52412
REGENERATIO
6
COMPLETED
Mill Hill
191882
CONSENT
Mill Hill AAP H/03860/13
-
Phase 3
0
N AREA
Mill Hill East (Millbrook Park)
52412
Mill Hill AAP
REGENERATIO
65
COMPLETED
Mill Hill
191882
CONSENT
-
Phase 4a
0
15/01546/RMA
N AREA
UNDER
40
60
88
Mill Hill East (Millbrook Park)
52455
Mill Hill AAP
REGENERATIO
CONSTRUCTIO
Mill Hill
191793
CONSENT
-
Phase 4b
5
16/3111/RMA
N AREA
N
Mill Hill East (Millbrook Park)
52410
REGENERATIO
60
74
10
CONSENT
Mill Hill
192085
CONSENT
Mill Hill AAP H/03904/12
-
Phase 5
8
N AREA
60
100
100
50
Mill Hill East (Millbrook Park)
52410
Mill Hill AAP H/03904/12
REGENERATIO
CONSENT
Mill Hill
192085
CONSENT
-
Phase 6
8
18/6352/RMA
N AREA
Mill Hill East (Millbrook Park)
52384
Mill Hill AAP
REGENERATIO
30
36
CONSENT
Mill Hill
191997
CONSENT
-
Phase 6b
7
15/06417/OUT
N AREA
Mill Hill East (Millbrook Park)
52410
REGENERATIO
20
50
50
46
CONSENT
Mill Hill
192085
CONSENT
Mill Hill AAP H/03904/12
-
Phase 7
8
N AREA
Mill Hill East (Millbrook Park)
52410
REGENERATIO
30
50
50
34
CONSENT
Mill Hill
192085
CONSENT
Mill Hill AAP H/03904/12
-
Phase 8
8
N AREA
Barnet’s Local Plan
Page 63
London Borough of Barnet
Authorities Monitoring Report 2017/18
Mill Hill East (Millbrook Park) -
10
52410
REGENERATIO
COMPLETED
Phase 1 - Countryside
Mill Hill
192085
CONSENT
Mill Hill AAP H/04080/12
-
8
N AREA
Annington
UNDER
50
39
Mill Hill East (Millbrook Park)
52412
Mill Hill AAP
REGENERATIO
CONSTRUCTIO
Mill Hill
191882
CONSENT
-
Phase 4c
0
15/06898/RMA
N AREA
N
UNDER
231
231
National Institute of Medical
52334
CONSTRUCTIO
Mill Hill
192500
CONSENT
16/4545/FUL
GENERAL
2016/17
Research
3
N
52426
23
CONSENT
141-143 Dollis Road NW7 1JX
Mill Hill
191109
CONSENT
17/3796/FUL
GENERAL
2018/19
0
Marshall Hall, Marshall Estate,
52228
10
CONSENT
Mill Hill
192526
CONSENT
17/6118/FUL
GENERAL
-
Hammers Lane, NW7 4DQ
7
11-19 Ballards Lane and 6
52525
PRIOR
24
CONSENT
Mill Hill
190821
17/6047/PNO
GENERAL
-
Albert Place N3 1QB
2
APPROVAL
52186
444
400
CONSENT
Pentavia Retail Park NW7 2ET
Mill Hill
191263
CONSENT
17/8102/FUL
GENERAL
-
4
94
16/0517/PNO (70)
Kingmaker House, 15 Station
52632
PRIOR
TOWN
CONSENT
Oakleigh
196084
17/7210/PNO (119)
2013/14
Road, Barnet, Herts, EN5 1NZ
7
APPROVAL
CENTRE
18/5067/PNO (94)
UNDER
22
Car Wash 1420 - 1428 High
52636
TOWN
CONSTRUCTIO
Oakleigh
194386
CONSENT
B/01561/13
2014/15
Road, London, N20 9BH
9
CENTRE
N
Oakwell Grange' (Haringey
50
Gospel Trust) Land at
52641
COMPLETED
Wellgrove School, High
Oakleigh
194505
CONSENT
B/03068/11
GENERAL
-
6
Road/Chandos Avenue,
London, N20 9EQ
Brook Point 1412-1420 High
67
UNDER
Road, Turnberry House & Euro
52636
PRIOR
17/0184/PNO
TOWN
CONSTRUCTIO
Oakleigh
194386
2014/15
House 1394-1410 High Road,
9
APPROVAL
18/0468/PNO
CENTRE
N
London, N20 9BH
Springdene Nursing Home, 55,
52688
27
CONSENT
Oakleigh
194438
CONSENT
17/1652/FUL
GENERAL
2018/19
Oakleigh Park Road, N20 9NH
0
Barnet House, 1255 High
52640
PRIOR
TOWN
254
CONSENT
Totteridge
193867
17/1313/PNO
2017/18
Road, N20 0EJ
5
APPROVAL
CENTRE
UNDER
124
Totteridge Place' 1201 High
52639
CONSTRUCTIO
Totteridge
193746
CONSENT
14/07670/FUL
GENERAL
2015/16
Road, London, N20 0PD
8
N
UNDER
144
144
Land between Sweets Way
52793
CONSTRUCTIO
Totteridge
193459
CONSENT
B/04309/14
GENERAL
2014/15
and Oakleigh Road North, N20
8
N
UNDER
56
1060A to 1072 High Road,
52643
CONSTRUCTIO
Totteridge
193276
CONSENT
B/06116/13
GENERAL
2015/16
Whetstone, London N20 0QP
3
N
UNDER
34
Brookdene Holden Road
52556
CONSTRUCTIO
Totteridge
192507
CONSENT
17/1255/FUL
GENERAL
2016/17
London N12 7DR
1
N
St Barnabas Church, 42
30
52564
CONSENT
Holden Road, Woodside Park
Totteridge
192491
CONSENT
16/5632/FUL
GENERAL
-
0
N12 7DN
Edelman House 1238 High
52647
PRIOR
26
CONSENT
Totteridge
193868
17/6853/PNO
GENERAL
-
Road N20 0LH
4
APPROVAL
70-84 and Land R/O Oakleigh
52663
50
57
CONSENT
Totteridge
193955
CONSENT
19/1950/FUL
GENERAL
2019/20
Road North, N20 9EZ
7
PRIORITY
117
52502
CONSENT
Dollis Valley - Phase 3
Underhill
195489
CONSENT
17/5168/RMA
HOUSING
-
5
ESTATE
PRIORITY
125
52502
CONSENT
Dollis Valley - Phase 4
Underhill
195489
CONSENT
B/00354/13
HOUSING
-
5
ESTATE
PRIORITY
123
52502
CONSENT
Dollis Valley - Phase 5
Underhill
195489
CONSENT
B/00354/13
HOUSING
-
5
ESTATE
PRIORITY
101
52493
CONSENT
Dollis Valley - Phase 2
Underhill
195677
CONSENT
B/02349/14
HOUSING
-
6
ESTATE
Barnet’s Local Plan
Page 64
London Borough of Barnet
Authorities Monitoring Report 2017/18
Land Adjacent To Whitings Hill
33
52331
CONSENT
Primary School Whitings Road
Underhill
195621
CONSENT
15/03139/FUL
GENERAL
2016/17
2
Barnet EN5 2QY
309-319 Ballard's Lane North
West
52626
TOWN
65
65
NO PLANNING
192020
ALLOCATION
North Finchley SPD
2018/19
Finchley N12 8LY
Finchley
0
CENTRE
811 High Rd North Finchley &
West
52625
TOWN
66
66
NO PLANNING
192388
ALLOCATION
North Finchley SPD
2018/19
Lodge Lane carpark N12 8JT
Finchley
4
CENTRE
UNDER
401 - 405 Nether Street,
34
West
52519
TOWN
CONSTRUCTIO
London N3 1QG (Adastra
190819
CONSENT
15/05632/FUL
-
Finchley
9
CENTRE
N
House)
Central House and 1-9
West
52522
PRIOR
TOWN
48
CONSENT
190795
16/3722/PNO
2013/14
Ballards Lane
Finchley
7
APPROVAL
CENTRE
200
200
200
178
West
52540
Finchley Church End
TOWN
NO PLANNING
Finchley Central Station
190617
ALLOCATION
2013/14
Finchley
4
town centre strategy
CENTRE
72
707 High Road, London, N12
West
52636
PRIOR
17/6746/PNO (63)
TOWN
COMPLETED
191957
2013/14
0BT
Finchley
9
APPROVAL
18/0782/FUL (9)
CENTRE
Tally Ho Triangle, High Rd,
140
141
West
52634
TOWN
NO PLANNING
Ballards Lane & Kingsway,
192018
ALLOCATION
North Finchley SPD
2018/19
Finchley
1
CENTRE
North Finchley N12 0GA/0BP
West
52547
10
CONSENT
105A Ballards Lane N3 1XY
191064
CONSENT
17/5180/FUL
GENERAL
-
Finchley
6
Rowlandson House, 289-293
West
52618
PRIOR
47
CONSENT
191913
17/7863/PNO
GENERAL
-
Ballards Lane, N12 8NP
Finchley
8
APPROVAL
Finchley House, High Rd &
100
102
West
52638
TOWN
NO PLANNING
Kingsway North Finchley N12
191955
ALLOCATION
North Finchley SPD
2018/19
Finchley
9
CENTRE
0BT
85
85
Tesco, 21-29 Ballards Lane N3
West
52529
Finchley Church End
TOWN
NO PLANNING
190937
ALLOCATION
2013/14
1XP
Finchley
2
town centre strategy
CENTRE
UNDER
250
0
0
0
439
0
0
202
0
515
West
52186
PRIORITY
CONSTRUCTIO
West Hendon Estate
187924
CONSENT
H/01054/13
-
Hendon
5
ESTATE
N
UNDER
43
117-125 West Hendon
West
52216
CONSTRUCTIO
187787
CONSENT
15/00750/FUL
GENERAL
2015/16
Broadway, London NW9 7BP
Hendon
2
N
Tiles Direct 60-68 West
West
52238
48
CONSENT
187613
CONSENT
16/0972/FUL
GENERAL
2016/17
Hendon Broadway, NW9 7AE
Hendon
9
CONSENT
West
52238
53
60 West Hendon Broadway
187613
CONSENT
17/6434/FUL
GENERAL
2018/19
SUBJECT S106
Hendon
9
220-222 Hendon Way NW4
West
52303
10
COMPLETED
188378
CONSENT
17/5671/FUL
GENERAL
-
3NE
Hendon
2
West
52152
18
CONSENT
63-65 The Hyde, NW9 6LE
188629
CONSENT
17/1317/FUL
GENERAL
-
Hendon
9
1,3,4 and 5 The Exchange,
89
West
52354
PRIOR
CONSENT
Brent Cross Gardens, NW4
188002
17/2355/PNO
GENERAL
-
Hendon
0
APPROVAL
3RJ
Philex House 110-124 West
West
52181
48
NO PLANNING
188233
ALLOCATION
Call for sites
Hendon Broadway NW9 7DW
Hendon
1
744-776 High Rd North
Woodhous
52636
TOWN
NO PLANNING
192287
ALLOCATION
North Finchley SPD
2018/19
Finchley N12 9QG/9QS
e
4
CENTRE
100
75
Woodhous
52641
TOWN
21
COMPLETED
706 High Road, N12 9QL
192095
CONSENT
15/06414/FUL
2016/17
e
6
CENTRE
Woodhous
52630
PRIOR
TOWN
CONSENT
869 High Road, N12 8QA
192627
17/0786/PNO
2017/18
e
1
APPROVAL
CENTRE
10
East Wing, 672-708 High Rd
Woodhous
52642
TOWN
NO PLANNING
192045
ALLOCATION
North Finchley SPD
2018/19
North Finchley N12 9PT/9QL
e
1
CENTRE
60
65
Woodhous
52634
CONSENT
912-920 High Road N12 9RW
192871
CONSENT
17/7366/FUL
GENERAL
-
e
4
24
Total
1956
3209
2433
3760
5103
3501
2591
2307
1215
1072
1225
1356
1669
1340
802
Barnet’s Local Plan