Dear Stockport Borough Council,

I understand the Minimum width(3mts) has not been obtained in the final design/construction of the Public Footpath at the rear of the Vale View School.

In my view, this will create a serious Health and Safety Issuse for the end users,hence, can you please provide me with a copy of the WAIVER from the SBC to the Contractor (BAM).
Such information WILL be in the As Built Health and Safety Files but unfortunatel , that document is not yet available?!

Yours faithfully,

alan m dransfield

FOI Officer, Stockport Metropolitan Borough Council

Dear Mr Dansfield,

Thank you for your request for information which has been given reference
4752. Please quote this on any correspondence regarding your request.

Stockport Council will respond to your request within 20 working days. If
there will be a charge for disbursements e.g. photocopying in order to
provide the information, we will inform you as soon as possible to see if
you wish to proceed; however such charges are usually waived if they
amount to less than £10.

Yours sincerely,

Corporate Information Service

show quoted sections

FOI Officer, Stockport Metropolitan Borough Council

2 Attachments

Dear Mr Dransfield,

 

I am writing in response to your request for information below (Ref 4752).

The response to your request has been prepared by the relevant Council
service and is as follows:

 

Please find attached the approval to the reduced width of footpath, along
with the drawing submitted.

 

If you are unhappy with the way we have handled your request you are
entitled to ask for an internal review. Any internal review will be
carried out by a senior member of staff who was not involved with your
original request. To ask for an internal review, contact
[1][email address] in the first instance.

 

If you are unhappy with the outcome of any internal review, you are
entitled to complain to the Information Commissioner. To do so, contact:

 

Information Commissioner’s Office

Wycliffe House

Water Lane

Wilmslow

Cheshire

SK9 5AF

 

[2]www.ico.gov.uk

 

01625 545 745

 

Yours sincerely,

 

Corporate Information Services

Stockport Metropolitan Borough Council

 

show quoted sections

Dear FOI Officer,

There is nothing in this document which clearly states the footpath width was reduced. Furthermore as this footpath was reduced by 50% I assume this was reflected by a 50% cost reduction of time and labour. Could you please confirm this design change order COST REDUCTION please

Yours sincerely,

alan m dransfield

FOI Officer, Stockport Metropolitan Borough Council

Dear Mr Dransfield,

 

A number of your requests repeat requests you have previously made as well
as those which have not yet received a response. You have made two
requests earlier this afternoon which both ask for the same document; and
in response to your email below, information about costs has already been
provided to you in response to reference FOI 4739, which was sent to you
this morning. On this basis, your request below has already been answered.

 

Yours sincerely,

 

Corporate Information Services

Stockport Metropolitan Borough Council

 

show quoted sections

alan m dransfield

Dear FOI Officer,
I have not received any cost breakdown for the reduced footpath. Can you please resend or refer me to which message includes such cost. You have not informed me if a "NEGATIVE CHANGE ORDER" WAS ISSUED

Yours sincerely,

alan m dransfield

FOI Officer, Stockport Metropolitan Borough Council

Dear Mr Dransfield,

 

As explained in our previous email, the response to your request about
costs was included in the response sent your request reference FOI 4739.
The response to this request can be found on the What Do They Know website
at the link below:

 

[1]http://www.whatdotheyknow.com/request/va...

 

The response to this specific point, taken from our previous response is:

 

‘The cost of the works are included in the tender figure submitted by the
main contractor BAM and not identified as a separate item.’

 