Follow this request
There is 1 person following this request
Act on what you've learnt
Similar requests
East Greenwich Library renovation and redecoration works
To Greenwich Borough Council by Darryl Chamberlain 28 May 2010
Hyder Consulting
To Greenwich Borough Council by Darryl Chamberlain 26 July 2010
Eltham Regeneratio Agency
To Greenwich Borough Council by Darryl Chamberlain 3 August 2011
Eltham Regeneration Agency - DLR report
To Greenwich Borough Council by Darryl Chamberlain 31 January 2011
Greenwich Foot Tunnel closures
To Greenwich Borough Council by Darryl Chamberlain 24 November 2010
Greenwich Foot Tunnel refurbishment
To Greenwich Borough Council by Darryl Chamberlain 31 January 2011
St Alfege Park works and "friends" groups
To Greenwich Borough Council by Darryl Chamberlain 27 September 2011
Olympic Games - Local Societies Consultative Group
To Greenwich Borough Council by Darryl Chamberlain 31 January 2011
Great Harry site hoardings
To Greenwich Borough Council by Darryl Chamberlain 29 August 2011
Olympics PR contracts
To Greenwich Borough Council by Darryl Chamberlain 28 September 2010
Greenwich and Woolwich foot tunnels
Darryl Chamberlain made this Freedom of Information request to Greenwich Borough Council
The request was successful.
From: Darryl Chamberlain
28 October 2011
Dear Greenwich Borough Council,
In the council meeting of 26 October, Councillor Denise Hyland said
the discovery of "hidden structures" had held up works at the
Greenwich and Woolwich Foot Tunnels. She was answering a
supplementary question from Antony Austin on the foot tunnel
repairs.
Would you please detail which hidden structures have been
discovered at the foot tunnels?
Yours faithfully,
Darryl Chamberlain
From: foi
Greenwich Borough Council
28 October 2011
Dear Mr Chamberlain
Your Request has been logged as RFI/03683. You may expect a response
within the prescribed 20 working days, i.e. by 25th November 2011
FOI Coordinator, on behalf of Greenwich Council
4th floor, Riverside House, Woolwich High Street, London SE18 6BU
Tel: 020 8921 5084
show quoted sections
From: Alan Soskin
Greenwich Borough Council
28 November 2011
Dear Mr Chamberlain
I write with reference to your Request, shown below. Our response is as
follows.
The comment related to the stairs in both locations and in all four shafts
these have corrosion of the load bearing faces and ends of the cast iron
treads and corrosion hidden behind the stair stringers that could not be
detected until the stringers were removed. In addition many of the
individual treads have been found to be completely fractured and these
have been replaced with specially cast replacements. This
hairline-fracture damage was not detectable until the holding bolts on the
stair soffits had been removed.
Removal of chequer-plate flooring to the machine rooms has revealed
structural repairs required to the structural members before the
re-installation of the lifts and motors, and at high level on the
Greenwich cupolas, fractured and broken cast iron elements have been
removed and re-cast or repaired ready for replacement. Again, these
problems were not apparent to the pre-contract survey and inspection
either because the structures and components were inaccessible or they
only revealed themselves as components were accessed for conservation .
Alan Soskin
Corporate Information Manager, Greenwich Council
Corporate Client & Customer Services
3rd floor, The Woolwich Centre, 35 Wellington Street, London SE18 6HQ
Tel: 020 8921 5084
show quoted sections