This is an HTML version of an attachment to the Freedom of Information request 'Copies of papers and minutes since 2006'.

0x01 graphic

Strategic Aims

  1. To effectively strengthen existing partnership base whilst focusing on under-represented groups.

  2. To ensure that work supports WNC's core remit, by actively promoting the work of the WNC and its activities to raise its profile and to communicate its views to others.

  3. To develop and actively engage wide-ranging, diverse, and representative stakeholders.

Our Vision

  • A world where all women can express their needs and priorities and where Government listens and acts so that the needs of all women are at the heart of Government policy.

  • A world in which every human being is respected and is able to achieve their potential, living free from harm and discrimination.

Our Mission

  • Support, advise and encourage the women's sector to enable all women's voices to be heard effectively;

  • Act as a conduit for all those voices, in order to both advise and to hold Government to account;

  • Promote women's equality;

  • Ensure the views and experiences of as many women as possible are represented to Government to promote women's equality and change;

  • Ensure that where possible, women's opinions are communicated to Government so that they can be taken into account when laws are made and policies decided;

  • As far as possible, seek the views of and empower, socially excluded and marginalised women; and

  • Disseminate messages from Government across the women's equality sector.

Unique Selling Point

The WNC is the only independent advisory body established to provide a bridge between women's organisations and the UK Government. It provides a route for women's organisations to communicate effectively to Government, but also provides an easier way for Government to disseminate messages to and consult with women's organisations.

Stakeholders

  • Individual women;

  • Individual partners;

  • Partner organisations;

  • Individual women's organisations;

  • Ministers for Women;

  • Other organisations that represent women

  • Organisations with a core commitment to women's equality; and

  • GEO and OGD officials

WORK STRAND

OBJECTIVES

ACTIVITY

LEAD OFFICIAL

RESOURCES

SUCCESS

INDICATORS

PROGRESS

Violence Against Women

Violence Against Women Work Group

  1. Quarterly and ad hoc meetings to bring together experts from across the field to present a cohesive and consistent voice on VAW to Government

Four meetings per year

Sub groups to feed back to main group on sector specific issues.

Eleri Butler

Cost:

£3696

Staff Resources

Maintaining and improving communications and understanding between the VAW sector and Government

VAW meetings for 2 April, 16 July, 1 October plus one further, take place.

  1. Following consultation with group members, respond to Government consultations

Eleri Butler

Cost:

None allocated

Staff Resources

Increased consultation but Government with VAW sector

Consistency of lobbying voice from sector to Government

  1. Regular liaison between WNC and Government officials.

GEO to attend all VAW meetings to receive feedback and give update on Government work

Regular attendance by Government officials other than GEO to give updates and

Eleri Butler

Cost:

None allocated

Staff Resources

Improved relationships between VAW sector and GEO and increased communication

Forced Marriage Unit Official, and expert on MARACs attends April 2008 meeting.

VAW Chair continues ongoing correspondence OGDs, including planned letters to Home Office and Minster for Women

Sexual Violence Policy Monitoring Sub Group

  1. To monitor and evaluate Government policy and other action around sexual violence.

Monitor the implementation of the Sexual Offences Act 2003; to monitor how sexual violence is addressed through government policy delivery mechanisms; to monitor the Home Office Violent Crime Action Plan

Eleri Butler

Cost:

None allocated

Staff Resources

Good understanding of current acts laws, the way they affect service provision and funding and be engaged and consult with government on proposed amendments and changes.

Group monitors HO Violent Crime Action Plan throughout 2008/9 as part of SVPM work plan

  1. To provide a cohesive voice to Government on issues concerning sexual violence.

WNC will invite Government officials to speak at the group and gain feedback from the group. The WNC will facilitate interim meetings and email contact and

Eleri Butler

Cost:

None allocated

Staff Resources

The group takes all possible opportunities resource permitting, to engage and consult with government on issues concerning sexual violence. The group provides a cohesive voice in all its documents, outlining concerns and strategies

  1. To engage Government officials in the work of the sub group

The WNC will invite Government officials to the group; arrange meetings between relevant partners and Government and provide briefings where necessary using information from sub group partners.

Eleri Butler

Cost:

None allocated

Staff Resources

The group meets Government officials either through attendance at the SVPM sub group or through official attendance at the VAW group.

The group contributes information and expertise to WNC briefings.

Group continues to meet with Government officials concerning the crisis in the Rape Crisis

Group launches Q&A on prostitution in April 2008.

GLA talks to SV Group about Trafficking and 2012 Olympics (April meeting).

  1. To promote and raise awareness around sexual violence in schools and education

The group will attend relevant events to raise awareness of the problems with sexual violence; the group will engage with organisations promoting awareness and education

Eleri Butler

Cost:

None allocated

Staff Resources

The group engages other organisations not part of the sub group in awareness raising, for example the EHRC, the EDF and other equalities organisations as well as statutory bodies.

Domestic Violence Policy Monitoring Sub Group

  1. To monitor and evaluate Government policy and other action around domestic violence.

To group will monitor the Home Office Violent Crime Action Plan, monitor and engage on sources of funding and provision for domestic violence and monitor, campaign and engage on issues concerning BME women facing domestic violence as well as those with no recourse to public funds

Eleri Butler

Cost:

None allocated

Staff Resources

No recourse, is a standing agenda item at meetings.

The group regularly discusses the Home Office Violent Crime Action Plan at meetings.

  1. Engage Government Departments on issues concerning DV

The Group will meet with Government officials to ensure two-way communication and to keep central Government abreast of activities. The group will write and meet with Government officials external to the meeting. The group will provide information for briefings to ministers and other Government officials

Eleri Butler

Cost:

None allocated

Staff Resources

The group takes all possible opportunities, resource permitting to engage and consult with government on issues concerning domestic violence.

  1. Ensure a cohesive voice on issues concerning domestic violence

Eleri Butler

Cost:

None allocated

Staff Resources

The group provides a cohesive voice in all its documents, outlining concerns and strategies through above consultations and by discussing and circulating responses and correspondence.

Official from National Policing Improvement Agency talks to SV Group about sexual offence monitoring (April meeting).

  1. Campaign for and monitor public awareness of domestic violence through education system and media

Eleri Butler

Cost:

None allocated

Staff Resources

No recourse to public funds as standing agenda item at meetings.

Migration and Asylum Working Group

Maintain and improve relations with Government providing a cohesive voice on migration and asylum issues to Government

Develop strategic workplan for coming year, looking at trafficking for forced labour as a priority issue, gender impact assessment of PBS as it is rolled out

Follow up on MfW priorities in relation to refugee and asylum-seeking women and women with insecure immigration status

Shelly Dowrich

Cost:

£3,320

Staff Resources

Workplan developed, and appropriate priorities included.

Specific work on MfW priorities in relation to refugee and asylum-seeking women and women with insecure immigration status, actioned.

Maintain and improve relations with BIA officials

Cost:

None allocated

Staff Resources

BIA to use M&A group as sounding board and take every opportunity to consult

Outreach and Communications Strategy

1) To continue to identify under-represented groups and to ensure ongoing accuracy of partner database

Regularly update database to identify and gaps; maintain partner's categories; and cross-reference with WORGS document.

Mutanser Ashraf

Cost:

None allocated

Staff Resources

Partnership database is frequently updated; gaps in partnership base clearly identified; and `Women's Organisations in the

United Kingdom' directory maintained and available on website.

2) To maintain and build relationships with under-represented groups.

Maintain partners contacts to nurture and build trust; improve communications; maintain website and newsletter; keep partners

Updated on WNC's partnership principles and other important documents.

Mutanser Ashraf

Cost:

None allocated

Staff Resources

Positive feedback from partners and stakeholders on new website and Newsletter received; and similar for any specific feedback consultations that may be run.

3) To work with information gained above to target under-represented regions (e.g. North East, South West) and sectors of the community (e.g. younger women, women with disabilities, minority women and transgender women) to encourage them to become partners.

Holding events for identified groups in targeted regions;

monitor and evaluate info on new partners; aim to hold 2 targeted events in England.

Mutanser Ashraf

Cost:

At least £4,800 for 2 events - then £2,400 for each further event

Staff Resources

Under-represented groups identified and events run to engage and support them; 2 events are organised and take place in England - Update: One event being planned with Equality South West in Taunton on 30 April 2008.

4) To ensure outreach activities are conducted in Wales, Scotland and N. Ireland and Partners in each, feel their concerns are being heard and shared.

Will hold one event in each devolved Nation every year; will monitor involvement of partners from devolved nations; consider producing Newsletter for each Nation; to arrange annual meetings with Women/Equality Ministers in devolved Nations; and ensure fairer representation on Working Groups.

Mutanser Ashraf

Cost:

£11,100

Staff Resources

One event held in each of the Nations during the year; meetings held with Women/ Equality Ministers in Nations; noticeable improved representation on working groups, by partners in devolved regions.

5) To engage Commissioners in partnership activities throughout the year.

Support Commissioners to organise events on their areas/expertise;

Commissioners to agree 10 new Partners;

Commissioners to work with cross-party political representatives; and keep Directorate up to date.

Mutanser Ashraf

Cost:

£4,800 for 2 events (repeat of 3) above)

Staff Resources

Greater diversity and number of women attending events; increase in number of WNC partners, especially from

under-represented groups;

Commissioners recruit 10 new partners; evidence of events arranged or meetings attended, involving mix of Parliamentarians; Commissioners regularly update Directorate.

1) Raise profile and promoting the work of the WNC by providing partners and others, with accessible and useful information on areas of interest, such as Government Consultations etc., to obtain views and contributions, to feed into government policy.

Complete development of new website; fine-tune revamped Newsletter, ensuring produced regularly; attend more partners' events; ensure links between WNC and partners' websites; attend EDF meetings; maintain

WNC publications and make available in different languages and braiile; Commissioners use Parliamentary links; respond to articles in press; provide internship opportunities.

Mutanser Ashraf

Cost:

£5,000

Staff Resources

New website successfully launched; improvements to Newsletter; strong links with a wider range of partners; increased visits to website; increased knowledge across equality sector; more information provided to Directorate by Commissioners, on activity; documents produced to demand.

2) To develop and maintain a new, modern, interactive website, to be fully functional by Spring 2008.

Continue creating new Website; ensure content is relevant and useful;

partners' section developed; obtain feedback from partners and others.

Mutanser Ashraf

Cost:

Non allocated

Staff Resources

Website is launched;

checks made on content and appearance; partners' feedback sought and any action taken; six-month report on success and reaction so far.

3) To continue to manage Ministerial meetings of the 6 O Group of women's organisations.

Regular meeting dates agreed; Chair briefed in advance of meetings; consideration given on expand group to include under-represented groups.

Mutanser Ashraf

Cost:

£500

Staff Resources

Meeting dates agreed and meetings take place; briefing with Chair takes place; pre-Ministerial meeting arranged with 6 O members; agree approach to involving more diverse representatives - Update: proposals on creating a similar group of BME representatives is being worked on.

4) To work to develop a new, modern `logo' for the WNC.

Views obtained from Commissioners and Directorate;

design companies approached for ideas; resource implication considered.

Mutanser Ashraf

Cost:

Non-allocated

Staff Resources

Plan drafted on approach for producing a new WNC design; views sought and received and resource implications examined; and new WNC logo design produced and published.

5) To consider how the WNC may most effectively have a soft re-launch.

Views sought from the Board on approach; and plan and timeline produced for re-launch.

Mutanser Ashraf

Cost:

£2,000

Staff Resources

Board and GEO consulted; agree a set of announcements to make; re-launch takes place; greater awareness of and contact with, WNC throughout the year.

6) To represent views of WNC Partners to government.

Partners' views forwarded GEO officials; particular `hot topics' fed back to GEO; possible online consultations carried out on specific issues;

e-list of Parliamentarians produced; to

`piggyback' more events or partners and key stakeholders.

Mutanser Ashraf

Cost:

£7,000

Potentially considerableStaff Resources

Feedback from partners passed to GEO, including `hot topics'; specific consultations carried out;

Parliamentary e-list created; increased attendance at partners' and others' events.

7) All Partners Conference to be held every other year with defined objectives and diverse representation. Outcome of Conference to be clear, i.e. Report to be fed into Government Equalities Office and Ministers for Women.

Consideration to holding Partners' Conference this year or next and outside London;

and plan produced.

Mutanser Ashraf

Cost:

£25,000

Considerablestaff Resources

Decision taken on when and where Partners' Conference takes place; bids for funding made to contacts; detailed project plan produced; successful Partners' Conference takes place.

8) A standard set material for delegate packs to be prepared for use at WNC events

Documents identified and printed for inclusion in packs; folders and other stationary, available.

Mutanser Ashraf

Cost:

£5,000

Staff Resources

Documents prepared; sufficient stationary is available; packs produced and are available for use..

1) To nurture long term relationships with Partners.

Aim to attend partners' main events; analyse and use

information from partnership application forms; facilitate exchange of advice and information between partners;

Continue co-ordinating meetings of 6 O Group with Ministers.

Mutanser Ashraf

Cost:

£2,500

Staff Resources

Greater attendance at partners' main events; stronger engagement with partners; better information sharing and communications between partners.

2) Provide appropriate information for stakeholders and promote links and awareness of the diversity of partners.

Ensure partners include a link to WNC website from their own website;

WORGS maintained and on website and hard copies available.

Mutanser Ashraf

Cost:

£1,500

Staff Resources

Email all partners to request website links are made; carry out spot-check on leading partners' websites to check WNC link included; WORGS Directory maintained and available on website and in hard copy.

International Strategy

1. Bring together the views of women from around the UK on international human rights issues, and to contribute to government policy

To disseminate e-updates for the European and International Network; to update website regularly; to work to the Commission leading on international; To develop and follow a work plan for engagement and Commonwealth

Shelly Dowrich

Cost:

None allocated

Staff Resources

Regular e-updates are disseminated; website is up-to-date; WNC engaged with issues at EU and Commonwealth level; e-network continues to share information electronically.

2. Build capacity to actively engage with regional and international instruments

CEDAW - To finalise CEDAW Shadow report and submit by 14 April 2008; WNC will attend CEDAW examination in July 2008; and CEDAW report to be disseminated to partners

Shelly Dowrich

Cost:

£6,000

Staff Resources

CEDAW report is finalised and submitted to UN by April 2008 deadline; WNC attends CEDAW examination and partners are aware and engaged with CEDAW process.

CSW - WNC to provide link between the UK Government delegation and UK NGOs at CSW 53; to facilitate a pre-CSW meeting; to submit a statement and hold side event on the relevant theme; to host post-CSW event; to produce ECOSOC report.

Shelly Dowrich

Cost:

£6,200

Staff Resources

WNC holds pre- and post meetings; attends CSW 53, submits written statement and holds side event; partners are engaged with the CSW process with increased access for those not previously engaged in process. ECOSOC report produced and forwarded to UN by May 08 deadline.

1325 Attending quarterly meetings of the APG, funding permitting, developing a database of UK organisations/ individuals working on 1325, to explore feasibility of repeating the IWIP (Iraqi Women's Internship Programme)

Shelly Dowrich

Cost:

None allocated

(IWIP to be decided)

Staff Resources

Increased WNC involvement in 1325 activity; attends all APPG meetings; good contacts made with NGOs working on 1325; and clarity and decision on possibility of a repeat of the IWIP.

BPfA Beijing platform for Action Actively engaging in relevant BpfA activities including on-line consultations as and when required

Shelly Dowrich and Commissioner lead

Cost:

None allocated

Staff Resources

3. Build effective sustainable relationships with relevant government players

Facilitate regular meetings between Ministers, officials and e-Network members on HR issues; and WNC represented at relevant APPGs' and other appropriate events.

Shelly Dowrich

Cost:

None allocated

Staff Resources

Contact facilitated between key NGOs and Government; meetings of APPGs attended.

4. Achieve and support diverse and representative network group to ensure that a broad spectrum of views on women's international human rights issues are incorporated into our work and are conveyed to government.

To network with partners with an international remit; to attend relevant events; to support NGO events; facilitate the capacity-building of existing NGOs and facilitate meetings between NGOs and Government officials.

Shelly Dowrich

Cost:

None allocated

Staff Resources

Maintained and increased contact with other organisations working in international arena; their events are supported; communication between key stakeholders, facilitated.

5. To provide women nationally and internationally currently undertaking studies, working in and have a keen interest in women's equality, the opportunity to intern at the WNC for an agreed period

To liaise with relevant internship organisations, so interns have interesting and varied experiences; encouraging participants to gain greater understanding of WNC, partners and our work; providing opportunities for shadowing and mentoring; and evaluate participant's experiences.

Shelly Dowrich

Cost:

None allocated

Staff Resources

WNC hosts one to two interns over the year; following own internship programme; facilitates useful learning and experiences; and action taken on evaluation outcomes.

Board of Commissioners

1) Service the proper functioning of the Board ensuring it is appropriate, accurate and effective.

Four meetings of the Board are planned and to take place on agreed dates; agenda and papers agreed by Director and Chair; minutes and actions from meetings recorded and followed up; Commissioners' work days for payment, agreed in advance and payment processed.

Leon Bond

Cost:

£41,960

Staff Resources

Commissioners meetings take place in June 08, October 08, December 08 and March 09; new Commissioners are inducted to WNC and all necessary information is provided; accurate management and administration of payment of work days.

2) Commissioners lead WNC work, and work in conjunction with Directorate.

Commissioners liaise regularly with Directorate; suggest possible future pieces of work; and work closely with Directorate.

Commissioners lead partner events; lead relevant debates in Parliament; take a lead role on outreach work; and update Directorate on their activity.

Honours

1) To propose a list of suitable women for consideration for honours, twice per year.

Identify individuals for recommendation; produce supporting text on each; monitor which is successful and which not.

Shelly Dowrich

Cost:

None allocated

Staff Resources

List of women nominated by twice-yearly deadlines; some nominations identified as successful.

Governance/

Sponsor Relations

Governance

Business Plan for 2008-09 agreed with GEO and Ministers; budget for 2008-09 set with delegation letter; regular update meetings between WNC and GEO to take place; activity to produce Annual Report for 2007-08; preparations for 2009-10 Business plan underway.

Susan Green.

Cost:

None allocated

Staff Resources

2008-09 Business Plan completed and agreed; WNC budget agreed and delegation letter received; 2007-08 Annual Report completed by end of June 08; regular update meetings take place; activity on 2009-10 Business Plan begins.

Light Touch

Review -

To progress

remaining activity

on the

recommendations

from the LT Review.

Continue to monitor progress on actions; update MoU and other connected documents; provide updates to Director and Board; ensure realistic timeline in place for remaining activity.

Sue Green and Daniel Barrow

Cost:

None allocated

Staff Resources

Action on each recommendation progressed to completion where possible; Project Chart of activity maintained; progress monitored and Director and Board provided with regular updates.

Personnel/Staffing

1) Staff are encouraged to identify their training and development needs and appropriate, available opportunities are agreed.

Training and development opportunities for staff identified; LM agrees appropriateness; and Director authorises expenditure.

Sue Green

Cost:

£10,000

Staff Resources

Staff identify suitable training and development opportunities and are able to participate

2) Arrangements are developed for Directorate Awayday.

Needs of the Directorate team are identified; developmental team Awayday is planned; and Awayday takes place.

Sue Green and Daniel Barrow

Cost:

£4,000

Staff Resources

Team needs are considered and identified; and annual Awayday takes place.

3) Staff Structure of Directorate evaluated and appropriate staffing levels identified.

Staffing levels decided on; staff informed as soon as possible; plan for recruitment agreed; temporary staff informed as soon as possible, on impact on them.

Sue Green and Daniel Barrow

Cost:

Non-allocated

Staff Resources

Appropriate staffing levels identified; activity takes place to better match workloads and staffing levels; all staff informed of changes as soon as possible.

Possible additional work areas

1. Women in Public Life - Updating this to include step by step simple guide? How to be a Governor/councillor etc.

2. Work on the BME women's sector

3. International;

Work on Commonwealth Heads of Government meeting and further work on Europe

4. M & A;

Use the Listening to Muslim Women model and updated financial proposal to include increased costs plus all costs

5. IWIP in Afghanistan and Palestine

6. PR strategy and work - (recommendation in LTR)

7. Women in disability - work with Equality 2025? Similar work to MtG?


8. Work on White/Green papers? Equalities review?

9. Consultation project on widowhood in the UK

Total cost of Business Plan for 2008-09 is £135,880 (No permanent or temporary staffing costs are included)

WNC/08/1/07

BUSINESS PLAN 2008-09

Page 2 of 24