Stamped and Metered Quality of Service in 2007/2008
The table below sets out the proportion of 1st and 2nd Class Stamped and Metered items that are delivered on
Day B, C, D, E, F, G or later (G+) etc - with Day B being the day after posting, Day C being the second day after
posting, and so on.
Acc by Due Day
Day B
Day C
Day D
Day E
Day F
Day G
Day G+
of Delivery
1st Class
Period 01 07/08
92.7
6.3
0.7
0.1
0.0
0.0
0.1
0.4
Period 02 07/08
93.4
5.5
0.7
0.2
0.0
0.0
0.1
0.3
Period 03 07/08
93.3
5.5
0.7
0.2
0.1
0.0
0.1
0.3
Period 04 07/08
85.8
11.0
2.2
0.6
0.2
0.1
0.1
0.5
Period 05 07/08
64.7
23.2
8.4
2.6
0.6
0.2
0.3
0.7
Period 06 07/08
83.1
11.0
2.8
1.4
0.7
0.4
0.5
0.5
Period 07 07/08
90.7
7.4
1.1
0.3
0.1
0.1
0.2
0.4
Period 08 07/08
56.6
17.9
7.9
4.3
4.3
3.1
5.9
0.7
Period 09 07/08
87.6
9.6
1.6
0.5
0.2
0.1
0.4
0.4
Period 10 07/08
90.9
8.0
0.8
0.2
0.0
0.0
0.1
0.6
Period 11 07/08
92.7
6.1
0.8
0.2
0.1
0.0
0.1
0.3
Period 12 07/08
92.3
6.5
0.8
0.2
0.1
0.0
0.0
0.3
Acc by Due Day
Day B
Day C
Day D
Day E
Day F
Day G
Day G+
of Delivery
2nd Class
Period 01 07/08
29.2
63.9
5.6
0.7
0.2
0.1
0.4
0.4
Period 02 07/08
35.5
58.4
4.9
0.7
0.2
0.1
0.2
0.3
Period 03 07/08
34.1
60.2
4.6
0.7
0.2
0.0
0.2
0.3
Period 04 07/08
30.4
57.8
8.9
2.0
0.4
0.2
0.3
0.5
Period 05 07/08
26.1
47.5
18.3
5.9
1.3
0.3
0.6
0.9
Period 06 07/08
26.9
58.8
9.0
2.9
1.0
0.7
0.8
0.7
Period 07 07/08
30.9
60.8
6.5
1.2
0.3
0.1
0.2
0.3
Period 08 07/08
20.5
43.8
12.5
5.8
4.7
5.0
7.8
1.2
Period 09 07/08
27.9
62.7
6.7
1.3
0.5
0.2
0.5
0.4
Period 10 07/08
29.3
64.7
4.8
0.9
0.2
0.0
0.0
0.5
Period 11 07/08
30.0
63.5
5.3
0.9
0.2
0.0
0.1
0.3
Period 12 07/08
27.8
65.5
5.5
0.8
0.3
0.1
0.1
0.3
These figures represent the twelve periods from 19th March 2007 to 16th March 2008.
The final column shows the statistical accuracy limits at 95% confidence intervals.