RENAMING THE DEPARTMENT – ACTION REQUIRED. 
 
ISSUE 
PRIORITY* 
ACTION 
Cost Estimate if 
known 
 
 
 
 
BRANDING 
 
 
Temporary logo is 

Commission the 
Could be built in to 
needed 
production of a 
the costing for re-
temporary logo from 
brand commission 
COI (possible D&AD 
from COI 
competition) 
Temporary logo 
1-2 
Electronic versions of 
n/a 
has been 
temporary logo 
developed 
circulated to relevant 
colleagues to use on 
intranet, internet, 
campaigns etc. 
Design and agree 

Commission potential 
£50k 
new permanent 
designs from COI 
logo and 
using existing 
Corporate Identity 
secondary colour 
and guidelines 
palette agree with 
MB and Ministers  
 
 
 
 
INTERNAL 
COMMS 
 
Inform all staff of 

Issue newsflash to 
 
departmental 
staff to inform them 
name change 
of our name change 
Defra logo is now 
1-2 
Removal of 
n/a 
out-of-date 
downloadable 
templates etc from 
intranet. Removal of 
Defra logo from 
Internal comms 
channels templates 
such as newsflash, 
Defra briefing etc. 
Usage of Defra 

Issue newsflash to all 
n/a 
logo 
staff on usage of 
Defra logo. 
New ministerial 

Commission potential 
£10k 
boards are 
suppliers from COI to 
required with new 
get the artwork 
branding for 
developed and the 
building receptions 
boards printed 
Internal comms 
2-3 
New branding 
At most £10k 
channels and 
applied to all internal 
collateral including 
comms channels to 

intranet. 
reflect new branding. 
Collateral such as 
pop-up banners and 
new Word, 
PowerPoint, letter 
templates etc are 
also produced and 
distributed to staff. 
New ministerial 
2-3 
New ministerial 
n/a 
boards are now 
boards mounted in 
available 
LNH and other 
appropriate building 
receptions across the 
estate 
The Department’s 

Commission strategy 
£10k+ 
strategy has 
refresh from COI and 
changed and new 
produce associated 
marketing 
collateral including 
collateral needs to 
interactive online 
be designed and 
version, postcards 
produced (?) 
and posters. 
New permanent 

Defra 
n/a 
logo is rolled out 
briefing/newsflash on 
across the 
new branding 
Department 
guidelines issued 
 
 
 
 
E-COMMS / CIOD 
 
New .gov.uk 

Register new .gov.uk 
 
domain name 
domain name 
through COI/IBM and 
arrange necessary 
DNS and/or web 
hosting configuration 
for interim website 
External and 
2-3 
Develop/apply new 
Cost uncertain – 
internal web 
branding (by IBM 
may be 
applications (eg 
and/or 3rd parties) 
considerable – 
whole farm 
reflects uncertain 
approach, noise 
state of both legacy 
mapping etc) 
and recent 
applications 
 
 
 
 
E-COMMS 
 
Social media 

Set up new YouTube, 
Zero 
channels 
Flickr, Google, 
Twitter accounts in 
new name 
Public web site -  

Apply temporary 
Minimal (eComms 
(i) front page and 
branding solution to 
staff time/ 
(ii) all other 
website front page 
overtime?) if interim 
core/standard 
and all other 
logo/solution 
pages 
standard pages, 
available 

and/or apply “banner” 
across all pages 
Intranet – new 

Remove Defra brand 
Minimal (just 
design home page 
from front pages and 
eComms staff time/ 
and other pages, 
other standard pages 
overtime?) 
old design 
and replace with new 
standard pages 
name/interim logo 
NDPB/agency and 
1-2 
Review impact of any 
Cost uncertain – 
Trans Govt Web 
name, remit, brand 
additionality likely to 
Rat impacts 
impacts on the Trans 
be small 
Gov Web Rat 
process 
Public web site -  

New branding 
Limited – branding 
non-core (3rd party 
applied by 3rd parties 
refresh will in many 
maintained/ 
cases be covered 
hosted) 
by existing contracts 
Websites – public 
2-3 
New branding 
Depends on design 
and intranet 
applied (public 
solution – up to say 
website and intranet, 
£20-50k plus 
as necessary) 
eComms staff time 
 
 
 
 
CIOD /IBM 
 
 
email 

Put a redirect onto all 
£50K 
incoming email in 
place to capture old 
and new email 
addresses. 
email 

Change all 
£200k 
Departmental email 
suffixes. 
Application 

Some applications 
Too difficult to 
changes 
produce legal 
estimate. 
documents 
(certificates) which 
will need to be 
identified and 
changed.  
Change all IT 
3 to 6 
Enterprise licensing 
£250k 
contracts to reflect 
months. 
agreements where 
name change 
Defra is the licensee 
and main IBM 
contract. (IBM should 
be zero cost). 
Review use of 
3 to 6 
Both defra.gov.uk 
 
defra and maff 
months+? 
and maff.gov.uk are 
names within IT 
extensively used 
systems 
within IT networks, 
systems and 
applications. Impact 
of updating would 
need to be scoped 
 
 
 
 

ESTATES 
 
 
Blank out internal 

Not Defra name-
 
ministerial 
change dependant 
signage, as 
requested 
Cover all existing 

Agree temporary 
 
public facing 
wording, commission 
signage on 
Service Provider to 
Whitehall buildings 
produce and 
with temporary, 
temporarily fit 
laminated signage 
signage. 
Cover all existing 

Agree temporary 
 
public facing 
 
wording, commission 
signage on all 
Service Provider to 
Defra and Defra 
produce and 
agency buildings 
temporarily fit 
with temporary, 
signage.  This could 
laminated signage 
be partly obscuring 
signage by replacing 
Defra logo only. 
Replace all 

Work with nationwide   
“service” signage 
service provider and 
within all Defra 
various reprographics 
agency buildings 
departments 
which contain 
(particularly London) 
Defra logo or joint 
in replacing standard 
logos 
service signage 
Replace internal 

Not Defra name-
 
ministerial 
change dependant 
signage, as 
requested 
Replace all Defra 

Work with nationwide   
signage on all 
service provider and 
Defra and Defra 
their signage 
agency buildings 
contractors in 
supplying and fitting 
new signage 
 
 
 
 
CCU / HELPLINE 
 
Helpline 

Notify Helpline of 
Minimal 
new Dept name 
(Vertex DataScience 
Ltd) and change all 
automated welcome 
messages switched 
to new name 
Change dept name 

IBM will be setting up 

in email helpline 
new email address 
address (ie to 
for whole dept 
helpline@newdept. 
(presumably) but this 
gsi.gov.uk) 
being public facing 

needs priority 
 
 
 
 
OTHER 
 
New brand 

Implementation in 
£100k plus? 
implementation 
phased programme 
according to 
presentational 
priorities,  stock 
levels, etc. 
 
 
 
 
 
 
 
 
 
*1 Day One, 2 Week One, 3 Month One