SEMMMS A6 to Manchester Airport Relief Road – Consultation Schedule 
 
3rd February 2010 
No. 
Organisation  
Key Contact 
Date 
Summary of Comments 
Contacted 
Stockport Metropolitan 
25th September  No formal reply received – SMBC to be consulted formally on issue of the 

 
Borough Council (SMBC) 
2009 
Scoping Report. 
25th September  No formal reply received – Mouchel have attempted direct contact via 

Cheshire East Council 
 
2009 
email on 07.12.09. 
Received correspondence via email between 14th and 17th December 
2009 – MCC Planning Department have the previous Stage 3 
Environmental Assessment Report (2003). DL has queried what the site 
Dave Lawless – Senior 
25th September 

Manchester City Council 
area of the Manchester section of the road is ("site-edged red" plan) 
Planner, DC South 
2009 
indicating the size of the planning application's site. The Head of 
Planning is keen to know the planning fees. Mouchel did not have this 
information at the time. 
Full response received by email on 29.10.09 with letter of advice 
Michael Holding - Planning 
25th September  attached detailing method of assessment and appropriate guidance. 

Natural England 
& Conservation Adviser 
2009 
There are no statutory sites for nature conservation within the area of 
Cheshire & Manchester 
search. 
Full response received by post on 02.11.09 containing advice for the 
Sylvia Whittingham - 
25th September 

Environment Agency 
assessment for drainage, flooding, environmental management & 
Planning Liaison Officer 
2009 
ecology. 
Interim response received by email on 27.10.09 - Advises to contact local 
Judith Nelson - Regional 
25th September 

English Heritage 
archaeology groups for data. EH will comment on scheme post ES 
Planner 
2009 
submission. 
North West Regional 
Sam Turner - Principal 
25th September  Response gained via telephone on 03.12.09 – 4NW confirmed receipt of 

Assembly (4NW) 
Planning Officer 
2009 
letter, but have no comments to make at present. 
Interim response received via telephone on 03.12.09. The only comment 
North West Regional 
Claire Jones / Ian Wray – 
25th September  at present is that the scheme is important strategically to increase growth 

Development Agency 
Transport Planning 
2009 
of Manchester Airport – SEMMMS is mentioned in the Regional 
Economic Strategy (Page 40). 
Paul Byrne - Head of 
Brief telephone conversation with Planning department on 03.12.09 
Government Offices 
Planning 
25th September 

revealed that they have no comments to make at present. Contact in the 
North West 
Elaine Howard - Natural 
2009 
Natural Environment department currently on leave. 
Environment 
25th September  No formal reply received – No telephone number or email address 
10 
Ringway Parish Council 
Mr P Johnson - Clerk  
2009 
available online. 
The Council discussed the scheme during their monthly meeting on 
09.11.09. A full response was received on 12.11.09 regarding the 
Poynton-with-Worth 
25th September 
11 
Brian Hogan – Clerk   
potential for the scheme to reduce congestion & improve air quality in 
Parish Council 
2009 
certain areas. They also provided suggestions for complementary 
measures. 

SEMMMS A6 to Manchester Airport Relief Road – Consultation Schedule 
 
3rd February 2010 
No. 
Organisation  
Key Contact 
Date 
Summary of Comments 
Contacted 
Chris Driver /  
Data request – email correspondence received regarding local sites on 
25th September 
12 
Cheshire Wildlife Trust 
Trianna Angele (Data 
13.10.09, data available for a fee. Maps and citations for Sites of 
2009 
Officer) 
Biological Interest (SBIs) received on 05.11.09. 
Wildlife Trust for Lancs, 
25th September  Response received via telephone on 29.09.09 – the scheme does not fall 
13 
 
Manc & Mersey 
2009 
in their area. 
Data request – email correspondence received on 28/09/09. Mouchel 
Tom Hunt - Enquiries 
25th September 
14 
rECOrd 
provided a GIS shapefile for the scheme for the data search to be 
Officer 
2009 
undertaken. Local species records received on 14.10.09. 
Lancs & Cheshire 
25th September  No formal reply received – Mouchel have attempted contact via 
15 
Paul Hill 
Entomology Society 
2009 
telephone on 03.12.09. 
Email received 28.09.09 to confirm that the group does not hold any 
Chester & District 
25th September 
16 
David King 
information on the SEMMMS study area – this group covers Chester not 
Ornithological Society 
2009 
Cheshire. 
North West Fungus 
Dr. Irene Ridge- 
25th September  No formal reply received – Mouchel have attempted contact via 
17 
Group 
Chairperson 
2009 
telephone on 03.12.09. 
David Kitching (Cheshire) / 
Dragonfly Association 
29th September  No postal address or telephone number is available for this group – the 
18 
Graham Jones 
for Cheshire & GM 
2009 
data is available through rECOrd (see number 14).  
(Manchester) 
Cheshire & Wirral 
25th September  No formal reply received – Mouchel have attempted contact via email on 
19 
Amphibian and Reptile 
Julian Whitehurst 
2009 
03.12.09. 
Group 
Wirral & Cheshire 

25th September  No formal reply received – Mouchel have attempted contact via 
20 
Guy Lingford 
Badger Group 
2009 
telephone on 03.12.09. 
25th September  No formal reply received – Mouchel have attempted contact via 
21 
Cheshire Mammal Group 
Tony Parker 
2009 
telephone on 03.12.09. 
Mammal Review 
25th September  Formal response received by email 06/10/09 containing useful local 
22 
Derek Yalden 
(Manchester University) 
2009 
information. 
Mike Freeman - Leader 
25th September  No formal reply received – Mouchel have attempted contact via 
23 
Cheshire Bat Group 
 
2009 
telephone on 03.12.09. 
The Pondlife Project 
25th September  No telephone number or email addresses have been made available for 
24 
(Liverpool John Moores 
 
2009 
this scheme. 
University) 
Cheshire & Wirral 

25th September  No formal reply received – Mouchel have attempted contact via email on 
25 
Ted Lock 
Ornithological Society 
2009 
03.12.09 (no telephone number has been made available). 
Manchester Museum 
Ron McGregor / Nigel 
25th September  No formal reply received – Mouchel have attempted direct contact via 
26 
(Manchester University) 
Thompson 
2009 
email on 03.12.09. 
Greater Manchester 
Norman Redhead - County 
GMAU issued with previous reports. Formal response received on 
25th September 
27 
Archaeological Unit 
Archaeologist & Director of 
18.11.09. GMAU happy with mitigation measures outlined in the 2007 
2009 
(GMAU) 
GMAU 
report, they have no further information to share providing the design 

SEMMMS A6 to Manchester Airport Relief Road – Consultation Schedule 
 
3rd February 2010 
No. 
Organisation  
Key Contact 
Date 
Summary of Comments 
Contacted 
does not alter. Mouchel have informed GMAU of slight alterations to the 
design. 
Greater Manchester 
25th September  No formal reply received – Mouchel have attempted contact via email on 
28 
 
Geological Unit 
2009 
03.12.09 (telephone number provided no longer works). 
Kathryn Riddington - 
25th September  Formal response received by email on 14.10.09 confirming that there are 
29 
Cheshire RIGS Group 
Keeper of Natural History 
2009 
no RIGS in the Cheshire area covered by the scheme. 
Greater Manchester 
25th September  No formal reply received – Mouchel have attempted direct contact via 
30 
 
RIGS Group 
2009 
email on 03.12.09 (No telephone number has been made available). 
Mouchel re-contacted Mr Bradshaw on 03.12.09 via telephone. He 
explained that they went into some depth in previous assessments when 
Mr Roy Bradshaw – 
25th September  the route had been confirmed. There is a need to consider in depth 
31 
Cycle Stockport 
Chairman (also part of 
2009 
designs and how cycleways link into the highway. He is concerned that 
CTC) 
the highway design will just consider cyclepaths as leisure routes and not 
adequately consider cyclists as road users. 
Peak & Northern 
25th September  No formal reply received – Mouchel have attempted direct contact via 
32 
 
Footpaths Society 
2009 
telephone on 02.09.09 (left message) and 16.09.09 (no answer). 
Formal responses have been received from representatives of the 
Greater Manchester and Cheshire areas. On 12.10.09 JC provided 
Janet Cuff  - Countryside 
useful information on the local area in relation to walkers and landscape 
Officer (GM) 
25th September 
33 
Ramblers Association 
and how the scheme would be detrimental to the existing environment. 
Neil Collie - Footpaths 
2009 
On 10.10.09 NC requested that we continue liaising with them, especially 
Secretary (Cheshire) 
regarding over-bridge designs. Mouchel have explained that specific 
pedestrian crossings are still undergoing design review. 
Bridleways Association 
25th September  No formal reply received – unable to chase up as there is no telephone 
34 
 
(Manchester) 
2009 
number or email address provided on the website. 
25th September  No formal reply received – Mouchel have attempted direct contact via 
35 
Disability Stockport 
 
2009 
telephone on 17.09.09 but the call went to voicemail. 
Manchester Friends of 
25th September  No formal reply received – Mouchel have attempted direct contact via 
36 
 
the Earth 
2009 
email on 07.12.09. 
Stockport Primary Care 
10th October 
No formal reply received – Mouchel have attempted direct contact via 
37 
 
Trust 
2009 
email on 07.12.09. 
Greater Manchester 
Mr John Hannen - 
25th September  The interests and members of this group over lap with No. 39 below – 
38 
Transport Resource Unit 
Development Officer 
2009 
please see response from Lillian Burns. 
NW Transport Activists 
25th September  A full response was received on 28.10.09. The group would like to be 
39 
Lillian Burns - Volunteer 
Round Table 
2009 
informed throughout the design and environmental assessment process. 
Formal letter of response received on 16.10.09. Previous information 
25th September  provided in 2004 is still largely relevant. Letter outlines some issues with 
40 
Manchester Airport 
Jon Bottomley 
2009 
regard to landscape and ecology, esp. bird hazards and proximity of the 
road to a runway. MIA is a key stakeholder and they wish to be kept 

SEMMMS A6 to Manchester Airport Relief Road – Consultation Schedule 
 
3rd February 2010 
No. 
Organisation  
Key Contact 
Date 
Summary of Comments 
Contacted 
informed regularly. 
Colin Robinson - 
Interim response received on 26.10.09. A One has enquired about the 
Highways Agency (A 
25th September 
41 
Programme Development 
level of response required for the consultation. They are HA agents and 
One) 
2009 
Officer (A One) 
may make additional comments / advise the HA on their response. 
25th September  No formal reply received – Mouchel have attempted direct contact via 
42 
DEFRA 
 
2009 
email on 07.12.09. 
Mr Roy Bradshaw – 
CTC National Cyclists 
25th September 
43 
Chairman (also part of 
See response for number 31. 
Organisation 
2009 
Cycle Stockport) 
Karen Lewty - 
No formal reply received – Mouchel attempted direct contact with Karen 
British Horse Society 
25th September 
44 
Development Officer for the 
via email on 07.12.09. Karen has been re-issued with a copy of the letter 
(BHS) 
2009 
Northwest 
and will chase up the response. 
25th September  A full response was received on 28.10.09. The group would like to be 
45 
CPRE 
Lillian Burns 
2009 
informed throughout the design and environmental assessment process. 
Interim response received on 07.12.09 – advise that we contact the BTO 
& local bird clubs to obtain up-to-date bird data, as the RSPB do not hold 
any bird data themselves. Areas around Manchester support important 
Tim Youngs – 
25th September 
46 
RSPB 
arable & wetland bird assemblages & so any loss of hedgerows, trees & 
Conservation Officer NW 
2009 
other semi-natural habitat maybe an issue. They will comment on the full 
application in summer 2010 and will look in more detail at potential 
impacts on birds at that stage 
Full response received by post on 30.11.09 - Two NT properties are 
Alan Hubbard - Land Use 
25th September  located in the vicinity of the scheme (>1km) and the Styal Conservation 
47 
The National Trust 
Planning Adviser 
2009 
Area is within 0.9km. Some key issues are outlined to take into account 
during the assessment. 
No formal reply received – Mouchel attempted direct contact with Ruth 
The Open Spaces 
Ruth Walker - Office 
25th September 
48 
via email on 07.12.09. Ruth has said that they may not have commented 
Society 
Manager 
2009 
as it is not something they would get involved with. 
National Farmers Union 
25th September  No formal reply received – Mouchel have attempted direct contact via 
49 
 
(NFU) 
2009 
email on 07.12.09. 
Formal response received on16.10.09. A number of CLA members will 
Country Land and 
25th September 
50 
Helen Lancaster 
be affected by the proposals so it is important that the group are kept in 
Business Association 
2009 
touch throughout the project. 
25th September  No formal reply received – Mouchel have attempted direct contact via 
51 
The Woodland Trust 
 
2009 
email on 07.12.09. 
British Geological 
25th September  No formal reply received – Mouchel have attempted direct contact via 
52 
 
Society (BGS) 
2009 
email on 07.12.09. 
Peter Foster - Regional 
25th September  Formal response received on 02.11.09. The scheme will be a significant 
53 
SUSTRANS 
Director for NW 
2009 
physical barrier to local journeys by bicycle or on foot on a north-south 

SEMMMS A6 to Manchester Airport Relief Road – Consultation Schedule 
 
3rd February 2010 
No. 
Organisation  
Key Contact 
Date 
Summary of Comments 
Contacted 
axis. The response suggests a number of points to address in the ES. 
Tameside Metropolitan 
25th September 
54 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
Borough Council  
2009 
25th September 
55 
Bollington Town Council 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
2009 
25th September 
56 
Adlington Parish Council  Mrs Helen Richards - Clerk 
Formal response received on 23.10.09 with no comments. 
2009 
25th September 
57 
Disley Parish Council 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
2009 
25th September 
58 
Offerton Parish Council 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
2009 
25th September 
59 
Prestbury Parish Council   
Consultee not in Phase 1 area – no requirement to chase up response. 
2009 
Pott Shrigley Parish 
25th September 
60 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
Council 
2009 
Tameside Area Health 
25th September 
61 
 
Consultee not in Phase 1 area – no requirement to chase up response. 
Authority 
2009 
John White – Chairman / 
Responses received in October contain local footpath information, 
Cheshire and Warrington  Genni Butler – Acting 
29th September  requesting for the provision of under and overbridges to reduce 
62 
Local Access Forum 
Countryside Access 
2009 
severance of communities, and requesting that CLAF be retained as a 
Development Officer 
consultee on the scheme.  
Response received by email on 02.11.09 with a number of concerns 
Greater Manchester 
28th October 
regarding the ecological assessment for the scheme. GMEU can also 
63 
Teresa Hughes 
Ecology Unit (GMEU) 
2009 
provide data records for local sites & species and have provided a list of 
information which is available for purchase.