Minutes
Project SEMMMS A6 to Manchester Airport Relief Road
Job No
Date of Meeting 09/02/10
Meeting No
Page 1
of 5
Location of Meeting
Stockport Town Hall
Time of Meeting
14.30 hrs
Subject of Meeting
Manchester Airport – Options for Preliminary Design / Options Appraisal
Persons present including representation
Jim McMahon (JM)
SMBC
Martin Rigby (MR)
SMBC
David Taylor (DT)
SMBC
Nick Whelan (NW)
SMBC
David Bland (DB)
Manchester City Council (MCC)
John Twigg (JT)
Manchester Airport Group (MAG)
John Atkins (JA)
Manchester Airport Group (MAG)
Andy Brookfield (AB)
Aecom
Graham Martin (GM)
Scott Wilson (SW)
Apologies: John Bottomley
Manchester Airport Group
Circulation as above +
Sue Stevenson (SS)
SMBC
Naz Huda (NH)
SMBC
Nasar Malik (NM)
Atkins
Robin Kimber (RK)
Atkins
Tim Baker (TB)
Scott Wilson
Joseph Roberts (JR)
Scott Wilson
Date of Notes
18 February 2010
S:\Projects\SEMMMS Major Information\15.0 Meetings\15.10 Highways
Meetings\100209 SEMMMS Manchester Airport Mtg - Options for PRelim
Design_Appraisal.doc
Form No. Q102
24.05.00
Minutes
Project SEMMMS A6 to Manchester Airport Relief Road
Job No
Date of Meeting 09/02/10
Meeting No
Page 2
of 5
NOTES
DATE
ACTION
Purpose of Meeting
1.1
GM provided an overview of the status of the SEMMMS project
and reiterated that this meeting was to determine a number of
options that could be considered for inclusion within the Options
Appraisal exercise for the Preliminary design options at the Airport.
.
1.2
Through discussion with the relevant parties (SMBC / MCC / MAG
/ SEMMMS Design team / SW) any options not feasible as a result
of identified constraints could be discounted at this stage.
Manchester Airport Masterplanning
1.3
JT provided an overview of matters concerned with that north of
Ringway Road. The 3 main points of connection need to be
maintained for access; safety (emergency) routes and future
planning for the Airport, being:
• Terminal 1 point of connection;
• Terminal 2 point of connection; and
• Ringway Road
1.4
JA provided an overview of matters concerned with that on the
north side of the Airport, primarily associated with future
development re Airport City.
1.5
MAG with MCC has now secured land ownership from Jctn. 5 to
Shadowmoss Road, effectively.
1.6
MAG has consent for 1.2m sq.ft of B1 presently and is looking into
best-fit options for development parcels for the full 60 acre site.
1.7
HKR are working with MAG on the masterplanning and Aecom are
developing the traffic modelling. Internal layouts and linkages are
being developed and investigated.
1.8
MAG will require to incorporate improved linkages between the ALL to
north of site (towards Wythenshawe) and the main Airport hub to NOTE
the south. This linkage / Gateway must be accommodated within
the SEMMMS layout and is envisaged to be at least 10m wide –
preference to keep SEMMMS at grade and/or go down and under
the link / Gateway to retain opportunities to accommodate
pedestrians/cyclists and aesthetics.
1.9
JT commented that the Airport are not progressing any related
traffic modelling with any figures, relating to passenger throughput
or traffic volumes, that are inconsistent with DfT estimates.
Date of Notes
18 February 2010
S:\Projects\SEMMMS Major Information\15.0 Meetings\15.10 Highways
Meetings\100209 SEMMMS Manchester Airport Mtg - Options for PRelim
Design_Appraisal.doc
Form No. Q102
24.05.00
Minutes
Project SEMMMS A6 to Manchester Airport Relief Road
Job No
Date of Meeting 09/02/10
Meeting No
Page 3
of 5
NOTES
DATE
ACTION
1.10
JLL are reviewing quantums relating to development opportunities
on behalf of the Airport and scheduled to report to Airport by the
end of March 2010.
1.11
TIA’s are available for the development scenarios.
1.12
Atkins (RK) to check that the SEMMMS traffic model includes the 2
Atkins
no. existing consents in relation to the Airport development.
(RK)
1.13
The SEMMMS traffic modelling requires to check that the
committed development flows include the following:
• Davenport Green
• Manchester Business Park
• Burford
• Airport (1.2m sq.ft B1)
Atkins
Request a schedule from the SEMMMS traffic modelling team to
(RK)
confirm the committed developments included.
1.14
The profiling of the SEMMMS model to be monitored in liaison with
Atkins /
the Airport to ensure that the SEMMMS model replicates the
MAG
current airport development proposals. GM noted that meetings
had happened between the Airport/Aecom and Atkins/GMTU on
this matter and this would be continued through the modelling
development.
Metrolink
1.15
JMcM / MR provided overview of recent meeting with GMPTE re
Metrolink Phase 3B. With current programmes the Metrolink
element of the interface with SEMMMS would be delivered first.
1.16
Potential for joint bid between SEMMMS and GMPTE for funding
SMBC
to GMTF – currently nether SEMMMS or Metrolink Phase 3B
includes costs for grade-separated solution for interface.
1.17
SEMMMS team will continue to liaise with GMPTE on development
SMBC/
of options for interface between the two schemes – ensure that
SW
solution adheres to SEMMMS and Airport requirements.
1.18
The location of the station needs to be established with GMPTE at
earliest opportunity – key factor that multi-modal interchange is
developed with Airport proposals. At this stage it is noted that no
fixed alignment for tram lines – can be north r south of SEMMMS.
Date of Notes
18 February 2010
S:\Projects\SEMMMS Major Information\15.0 Meetings\15.10 Highways
Meetings\100209 SEMMMS Manchester Airport Mtg - Options for PRelim
Design_Appraisal.doc
Form No. Q102
24.05.00
Minutes
Project SEMMMS A6 to Manchester Airport Relief Road
Job No
Date of Meeting 09/02/10
Meeting No
Page 4
of 5
NOTES
DATE
ACTION
SEMMMS Scheme Options @ Airport
1.19
JMcM requested that Airport provide information with regard to
MAG
potential plot sizes so as to align / position the preliminary design
options and related infrastructure accordingly.
1.20
Discussion and consideration of merits and constraints of all
options tabled by NW. Conclusions were as noted below:
1.21
Option 1 – discounted
1.22
The fully at-grade solution could not accommodate the
development proposals of the Airport - impact on development plot
sizes and the key (non-motorised) N-S link.
1.23
Option 2 – discounted
1.24
Access to T1 and T3 not legible. Capacity issues in accessing T1
and T3 eastbound. Egress from east not accommodated. The key
(non-motorised) N-S link not accommodated.
1.25
Option 3A – to be taken forward / developed
SMBC
1.26
The SEMMMS throughflow to be underneath as part of this grade-
separated solution. The main roundabout to be developed as close
to existing ground level as practicable, with potential for existing
slip road to be retained.
1.27
Option 3B – to be taken forward / developed
SMBC
1.28
Comments as per Option 3B, with the grade-separated interchange
element to be considered in a position west of Option 3A.
1.29
Option 4 – discounted
1.30
The layout of this option brings everything off at T2 roundabout –
this is no acceptable and will most definitely overload the junction.
1.31
Option 5 – discounted
1.32
The layout and principles of this option could not accommodate the
development proposals of the Airport - impact on development plot
sizes and the key (non-motorised) N-S link.
1.33
Option 6 – discounted
1.34
Access to the T2 roundabout is not accommodated. Development
site accesses are not accommodated and there is inadequate local
access. There is also an impact on the key (non-motorised) N-S
link.
Date of Notes
18 February 2010
S:\Projects\SEMMMS Major Information\15.0 Meetings\15.10 Highways
Meetings\100209 SEMMMS Manchester Airport Mtg - Options for PRelim
Design_Appraisal.doc
Form No. Q102
24.05.00
Minutes
Project SEMMMS A6 to Manchester Airport Relief Road
Job No
Date of Meeting 09/02/10
Meeting No
Page 5
of 5
NOTES
DATE
ACTION
1.35
Option 7 – to be taken forward / developed
SMBC
1.36
This option is to be considered with consideration of the scale of
the junctions – investigate whether they can be reduced in scale to
accommodate the development proposals at the Airport.
1.37
Option 8 – to be taken forward / developed
SMBC
1.38
This option includes a signalised T-junction alongside a major
gyratory. This option needs to be able to accommodate the key
(non-motorised) N-S link.
Options Appraisal
1.39
SEMMMS Design team will progress the Options Appraisal for the Mar 10
SMBC
Airport options with the Styal Road preferred option(s) incorporated
into the overall assessment (particular to the COBA and junction
analysis/traffic modelling elements).
1.40
Input from MAG will be required to assist with Options Appraisal
SMBC/
with regard to Land Impact/Costs. MR will liaise with JA on this
MAG
particular matter.
1.41
The Options Appraisal is scheduled to present output at the March
2010, Project Board meeting. This is with an aim to have Design
Freeze 3 by the end of March 2010.
1.42
Comments were made to note that the vertical alignment of
NOTE
SEMMMS at the end of the runway should be as close to existing
ground level as practicable.
Date of Next Meeting - t.b.a. as required
Date of Notes
18 February 2010
S:\Projects\SEMMMS Major Information\15.0 Meetings\15.10 Highways
Meetings\100209 SEMMMS Manchester Airport Mtg - Options for PRelim
Design_Appraisal.doc
Form No. Q102
24.05.00